HomeMy WebLinkAboutPermit Building 1997-07-14COMM ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
225 FntJ-r Street, Springfield, Oregon 97477
LOCATION OF PBOPOSED WORK:
ASSESSORS MAP:,2 r2
SPFINGFIELO JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
rAX Lor: /2
22 z-7
h,
orLSTATE:
721-777{PHONE
ZIP:TrzT
ADDRESS fa-o s
Cr"tlOWNEBIFlN
CITY:vqntWteup
mopl,q71. g'1)O -
loooVALUEADDITION DEMOLISH OTHER
DESCRIPTION OF WORK
NEW- REMoDEL g
NAME ADDRESS PHONElBlxth
ADDRESS EXPI RES PHONELE{N,
MECHANICAL:
ELECTRICAL:
CONTRACTOR'S NAME
ARCHITEC-II
PLUMBING:
GENERAL:
CONST.
CONTRACTOR #
NO.FEE CHARGE
Single Fixture
Relocated Bldg.
(new fix. addtl)
Water Service
ft.
Sanitary Sewei
ft.
Storm Sewer
ft
Backflow Device
TOTAL PERMIT
NO FFtr EHA RGtr
burner & vent
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
an evary p.
Icoo er
an
duct
ng
Vent Sys
from AC
tem apart
or htg.
Mechanical exhaust
hood and duct
Permit lssuance $10.00
TOTAL PERMIT 4x ,/)*
FLOOD PLAIN:
ZONING:
LIGHIING POWER BUDGET:
WATER HEATER:
- OFFICE USE _
HEAT SOURCE
HANDICAP ACCESS
LAND USE:
/ OF UNITS
OCCY GBOUP:
C OF STORIES:
QUAD AREA
, OF BLDGS
CONSTR. TYPE: --
SQ. FT.$/sQ. FT.VALUE
TOTAL VALUE OF PROJ
X
X
SQ. FTG MAIN
SQ. FTG ACCESS
SO. FTG OTHEB
PLAN cHEcK FEE //.74 RCPT#DATE BY
5Y./?
BUILDING PERMIT 12>PLUMBING DEMOLITION
% State
rcha
MEC L
50
NG
arEfr 5% State
Surcharge
r--,FENCE
VALUE $
SIDEWALK
FT.
SUBTOTAL
PERMITS
CURBC SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUOING ELECTRICAL
REOUIRED INSPECTIONS
It ls the responslblllty of the permlt holder to see that all lnspectlons are made at the proper tlme. To request an inspectlon' call
726.3269 (recorder), state your Clty deslgnated job number, lob address, type of inspection requested and when you will be ready
for lnspeclon. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work daY.
stTE |NSPECT|ON: To be /Y ROUGH PLUMBING, PAVING: After gravel is in
made after excavatlon, but E]IECTRICAL & place but prior to placing
priortosetupofforms.ft"@cffiworkistoasphaltorconcrete.
UNDERSLAB pLUMBlNc, inspections have been made SPECIAL lNsPEcTloNS: ln accordance
ELECTRICAL & and approved. Section 306 of the State Specialty Code
MECHANTCAL: To be made a special inspector shall be employed
before any work ls covered. ATTIC DRAFT STOPS & Oy ine Owner/ Contractor during
CURTAIN WALLS construction of the following work. A
FOOTINGS & FOUNDATIONS: EroEDr Ar-tr. r copy of the special testing reports shall
To be macle after trenches are FIREPLACE: Prior to placing be furnished to the Building Division.
excavated and forms are facing materials and before
erected, all steel ln place, but framing lnspection'
-
srRUcruRAL CoNCRETE: ln
coNcRErE sLAB: ro be $:J,::f; i'lJ'3['"llfli,'x,? ,, srRUcruRAL wELDS:
made after att lnstaO building place and alt pipes, chimneys Performed on the iob (2722f)
service equlpment, condult, and vents are'complete and
pi ping, accessories and other the rough electrical, plumbing HIGH STRENGTH BOLTING:
ancillary equipment items are and melhanical are approved. During all bolt installation and
ln place but before any tightening operations. (306
concrete is placed. INSULATION & VAPOR a.6)
BARRIER: To be made after all
UNDERGROUND: Plumbing, insulation and required vapor SPRAYED ON
electrlcal, gas, sanltary sewer, barrlers are ln place but FIREPROOFING: U.BC.
storm sewer, water and before any lath or gypsum Standards 43-8.
dralnage llnes. To be made board interior wall covering is
prlor to coverlng or filling applied. SpECIAL GRAD;NG,
trenches.
UNDERFLooR: prumbins ,
-
I:?:,S"fffH3[gi"' EI:iXTi3il-tlP,5Jb'i]'";
electrical, mechanical. To be according to plans. chapter 29)
made prlor to installation of ,/ , a?ri ar,^,A6 ^voc,' GLU.LAM BEAMS: lnspectionfloor insulatlon, decklng or ,( LAT{ 4\N-D'oR GYPSUM
floor sheathlng. -----7-
BOARD: To be made after all Certificate by an approved
lathingandgypsumboard,agency'furnishedtotheCity's
posr & BEAM: To be made interio-r and exierlor, ls in Building Division before
prlor to lnstallatlon of floor f lace but before any beams are placed' (2501 U BC'
insulation, decklng or floor plasterlng ls applied or before STDS' 25-10'11)'
sheathrns.
Jevr\rrrY
?J$l:l"o:il0,]i5$",i:o srRUcruRAL MASoNRy: (306
FLooR TNSuLATIoN & finished' a'7\
MASONRY: Steel location,
bond beams groutlng or
vertlcals in accordance wlth
uBc 2415.
ROOF SHEATHING AND
NAILING: Prlor to lnstalllng
anY roof coverlng.
VAPOR BARRIERS: To be
made prior to lnstallatlon of
decking or floor sheathing.
SIDEWALK & DRIVEWAY:
-
Required for all concrete
paving within street right of
way, to be made after all
excavating comPlete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but Prlor to Placing
concrete.
By slgnature, I state and agree, that I have carefully examlned the completed application and do hereby certlfy that all lnformatlon
hereln ls true and correct, and lfurther certlfy tnat any and all work performed shall be done ln accordance wlth the ordlnances
of the city of sprlngfleld, and the Laws of the state of bregon pertalnlng to the work described hereln, and that No occuPANcY
will be made of any structure wlthout permission of the Bullllng safety olvtsion. I further certlfy that only contractors and employees
*ho "r" ln compllance with oRS 701.055 wlll be used on this prolect'
I further agree to ensure that all requlred inspections are requested at the proper tlme, that proiect address ls readable from the
street, that the permlt card ls located at the front of the property, and the approved set of plans wlll remaln on the site at all
Signature Date HYsftimes durlng constructlon
VALIDATION %,AMOUNT RECEIVED:
RECEIPT *:?1660 RECEIVED BY:
DATE PAID:
FINAL PLUMB!NG
FINAL ELECTRICAL
Y FINAL MEcHANIcAL--.---7-
FINAL FIRE OEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wlsh lnspection. All project condltions such as
tanOscaptng, parking lot stri ping, etc' must be completed before
requestlng thls insPection.
FINAL BUILDING: Bequested after the final plumbing, electrical,
mechanlcal and Flre Department lnspectlons are made and
ipproveO. No occupancy of the premlses can be made until a
Clrtlftcate of Occupancy has been lssued by the Building Divlsion
and posted on the Premises.
.r
ADDITIONAL COMMENTS:
PLANS FIEVIEWED BY o^rE ?'//'=?
'ln addition to the insPec-
tions specifled, the Bullding
Official may make or require
other inspections of any
construction work to ensure
compllance with the Bulldlng,
_crtyj,' D=:r:prnat crg:. _