Loading...
HomeMy WebLinkAboutPermit Mechanical 1995-09-28COMM ERCIAL/I N DUSTRIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 SPFl]NGFIELO JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOSED WORK:IIL; A h q,,-)l( tJ I le ASSESSORS MAP 2 TAX LOT: PHON E ar{STATE: t \ i4q1 o ? ZIP:4zqz )CITY: ADDRESS OWNER: NEW - REMODEL ADDITION DEMOLISH OTHER VALUE a_DESCRIPTION OF WORK: ARCHITECT CONST. CONTRACTOR'S NAME ADDRESS CONTRACTOR # EXPIRES PHONE PLUI"4 BING: ELECTRICAL: NAME ADDRESS PHON E "..MECHANICAL: PLU MBIN G NO.FEE CHARG E Single Fixture Relocated Bldg (new f ix. addtl) Water Service ft Sanitary Sewer ft Storm Sewer ft Backf low Device TOTAL PERMIT MECHANICAL NN trFtr CHAQGtr Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap cooler Vent Fan/Single duct Vent Systern apart f rom AC or htg. I Mechanical exhaust hood and duct Typi -tr 4"/aoZ44s A/4)e 5 P/ 22A' 6r)r=, )-< .7 oa) Permit lssuance $10.00 TOTAL PERMIT 4ra),/5:e - OFFICE USE _ ZONING HANDICAP ACCESS: LIGHTING POWER BUDGET: WATER HEATER: CONSTR. TYPE: HEAT SOURCE: LAND USE: , OF UNITS OCCY GROUP: * OF STORIES: QUAD AREA: # OF BLDGS SQ. FT,$/SQ. FT.VALUE TOTAL VALUE OF PROJ X X X SQ. FTG MAIN SQ, FTG ACCESS SQ. FTG OTHER RCPT#BYDATE -2 t' 2/Oz-t€,. BUILDING PERMIT PLUMBI NG DEMOLITION 5% State Surcharqe 5% State Surcharoe MECHANICAL/.Stk-lxtre- / 2),u-* /o,6@ FENCE VALUE S 3ill.?Tl& t75'r,y':/,2o SIDEWALK FT, SUBTOTAL PERM ITS PAVI NG CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL B.OK R ,....' FLOOD PLAIN: PLAN CHECK FET -Y REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 126.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same worki ng day, requests made after 7:00 a.m. will be made the following work daY. SITE INSPECTION: To be made after excavation, but prior to setup of forms. BING, covere U ntil these UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or f illing trenc hes. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or f loor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. RO No work is to inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of wa% to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be f urnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 P.S.l. (306 a.1) STRUCTURAL WELDS: Performed on the iob. 12722 1\ HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.11 & Chapter 29) cLU.LAM BEAMS: lnspection Certif icate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7) Y.4*s 'ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. HANI By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUpANCywill be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employeeswho are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from thestreet, that the permlt card is located at the front of the property, and the approved set of plans will remain on the site at all Signature Date times during constructlon. 2oVALIDATION .4'1^ AMOUNT RECEIVED RECEIPT *:RECEIVED BY: DATE PAID: *+ FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking Iot stplping, etc. must be completed before requesting thls inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanlcal and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. ADDITIONAL COMMENTS PLANS REVIEWED BY DATE -<