HomeMy WebLinkAboutPermit Building 1995-07-13^1
COMM ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
225 Fifln Street, Springf ield, Oregon 97477
SPFINGFIELO JOB NUMBER
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK
ASSESSOHS MAP:TAX LOT:
-/l 33Zr/PHON E:
?ZzzlZIP:STATE:
rz-
J
Or?CITY:
ADDRESS:
OWNER
VALUEOTERMADITION
og/ u. oooODEL
ARCHITECT
CONST,
CONTHACTOR'S NAME ADDRESS CONTRACTOR # EXPIRES PHONE
PHONEADDRESSNAME
srt 73
- oL?osr.
2
tuv
d
z7k7 o(RLS R"
PLUM BI NG:
GENERAL:
MECHANICAL:
ELECTRICAL:
PLU MBING
NO. I FEE CHARGE
LJ sinsre Fixture (*mo,i,)/4 ep-*
Relocated Bld
(new fix. addtl s
)
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft
Backf low Device
TOTAL PERMIT -/t';d2L/.
M ECHAN ICAL
NO FFF I CHARGF
Furnace/burner & vent
< 100,000 BTU s
Furnace/burner & vent
>100,000 BTUs
Floor furnace and vent
Suspended wall or f loor
mounted unit heater
Appliance Vent
separate
7 Stationary evap.
cooler 6 ,2-*
Vent Fan/Single
duct
Vent
f rom
System apart
AC or htg.
Mechanical exhaust
hood and duct,4mfu-ro.z<_/zPle'
Perm it lssuance $10.00
TOTAL PERMIT ,/B-->
- OFFICE USE _
53DO
WATER HEATEB
* OF UNITS:
LAND USE
LIGHTING POWER BUDGET:
HANDICAP ACCESS
FLOOD PLAI
ZONING
CONSTR. TYPE:
HEAT SOURCE:
OCCY GROUP:
Y OF STORIES:
QUAD AREA:
# OF BLDGS
SQ. FT.$/so. Fr.VALUE
X
X
SQ, FTG MAIN
SQ. FTG ACCESS
SO. FTG OTHER
PLAN cHEcK FEE S?-73 2.2e,DATE BYRCPT#
/72 77
BUILDING PERMIT %P PLU M BI NG 4?.e DEMOLITION
5% State
Surcharqe
7.a r>2. q'2 5% State
Surcharge
f2_?-g>-se
ME zdz>
.PB FENCE
VALUE $
5o/o e
Su rch e
?5l SIDEWALK
FT.
SUBTOTAL
PERM ITS /?".37
PAVI NG CURBCUT
FT.
SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
3:
//35 &rr". S/u,u.rnn
/z=
Al ee"t
.QC \!,)
TOTAL VALUE OF PROJECT-
/q. -
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call726'3769 (recorder), state your city designated job number, job address, type of inspeciion requested and when you will be readyfor inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:O0 a.m. will be madethe following work day.
SITE INSPECTTON: To be
made after excavation, but
prior to setup of forms.
7u !g_U-qt llrlMBtNG, pAVING: After sravet is in' ELECTRICAL & ptace but priorlo ptacingMECHANICAL: No work ts to asphalt or concrete.be covered untll these
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
FOOTINGS & FOUN DATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placlng concrete.
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
plping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
UNDERGROUN D: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or f illing
t renc hes.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathlng.
POST & BEAM: To be made
prior to installation of floor
insulatlon, decking or floor
sheathlng.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILINGT Prlor to installing
any roof coverlng.
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after alt
insulation and required vapor
barriers are in place but
before any lath or gypsum
board interlor wall covering is
applied.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
,N LATH AND/oR GYPSUM' BOARD: To be made after all
lathing and gypsum board,
interior and exterior, ls in
place but before any
plastering ls applied or before
gypsum board Joints and
fasteners are taped and
fl ni shed.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
SPECIAL INSPECTIONS: tn accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Owner/ Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
STRUCTURAL CONCRETE: In
excess of 2500 pS.t. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2222 t)
HIGH STRENGTH BOLTING:
During all bolt instaltation and
tightenlng operations. (306
a.6)
SPRAYED ON
FIREPROOFTNG: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AN D FI LLING:
During earthwork. (306 a.11 &
Chapter 29)
GLU.LAM BEAMS: tnspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.BC.
STDS. 25-10,11).
STRUCTURAL MASONRy: (306
a.7)
,L
*ln addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information
herein ls true and correct, and I further certify that any and all work performed shall be done in accordance witn tne Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUpANCy
will be made of any structure without permission of the Bulldlng Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
lfurtheragree toensure that all reQuired inspections are requested at the propertime, that project address is readable from the
street, that the permit card ls located at the front of the property, and the approved set of plans will remain on the site at all
Signatu re Date
times during construction
VALIDATION 2'v,/,tr-AMOUNT RECEIVED
RECEIVED BY:
DATE PAID
/
r'
,,
7V
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All proJect conditions such aslandscaping, parking lot stri ping, etc. must be completed beforerequesting this inspection.
FINAL BUILDING: Requested after the final ptumbing, etectrical,
mechanical and Fire Department inspectlons are made and
approved. No occupancy of the premises can be made until aCertiflcate of Occupancy has been issued by the Building Divisionand posted on the premises.
ADDITIONAL COMMENTS:
-PLANS REVIEWED E7
-{--
REcErPr ., 15? 7A=,
,V
1^
OREGONCITY OF SPR
SPP FIELO
The {ollowing
zoning, and d
apProral.
l:ffi,l,?il,"f :"Sill',"'ffi
iorrov"ins
'!
225 TIPTE STREET
SPRINGFIEI.,D, OREGON
INSPECTTON REQUEST:
OFPICE: 726-3759
/ i35
ON
Permits are non-transferable and expire
if vork is not started vithin 180 days
of issuance or if vork is suspended for
180 days.
2. COMRACTOR INSTATI.ATION ONLY
Electrical Contnactor
Address f ck(
Ci ty Phone )aq -136e
Supervisor License Number 34a: s
Exp iration Date iOlqS
Constr Contr. Number C
Expiration Date .t
Signature of rvising Electrician
Ovners Name
Addr
Ci ty Phone
OVNER INSTALI,ATION
The installation is being made on
property I ovn vhich is not intended
for sale, lease or rent.
0wners Signature:
DATE:
ELECTRICAT PERHIT APPLICATION
ty Job Nunber ?Y/O
COHPLETE FEE SCffiDtII..B BELOS
Nev Residential-Single or
MuIti-Family per dvelling unit.
Service Included:Items Cost
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereof
Each Manuf'd Home. or
Modular DvelIing
Service or Feeder
$ 8s.00
s 15.00
$ 40.00
Services or Feeders
Installation, Alterations
or Relocation:
-l
1. LOCATION OF INSTALLATION
3
EDTEZA A'Bzzo.
fllls f
B
C
Sum
s s0.00
s 50.00
s100. 00
$130. 00
s300.00s 40.00
s see "B* a56G-
200 amps or less
201 amps to 400 amps _401 amps to 600 amps _601 amps to 1000 amps_
0ver 1000 amps/voIts
Reconnect OnIy
One Circuit
Each Additional
ns-w
SUBTOTAL OF ABOVE
5Z State Surcharge
3Z Administrative Fee
TOTAL
Temporary Services or Feeders
Installation, Alteration or Relocation
200 amps''or Less
20L amps to 400 amps _0ver 401 to 600 amps
Over 600 amps or 1000 voTt
s 40.00
$ ss.00
s 80.00
D. Branch Circuits
Nev, Alteration or Extension Per Panel
I $ 3s.oo Jf-
Circuit or vith ServicQ. -or Feeder Permi t I0 $ 2.00 JA
Miscel-Ianeous (Service/feeder not included)
-Each installation
Pump or irrigation
Sign/OutIine Lighti
Limited Energy/Res
Limited Energy/Comm
E
5
$ 40.00
s 40.00
$ 20.00
s 36.00
RECEIVED
.<2ae'a'
?-E=
DESCRIPTION