Loading...
HomeMy WebLinkAboutPermit Building 1996-11-12COM M ERCIAL/I N D USTRIAL PERMIT APPLICATION 225 Fillh Street, Springfietd, Oregon g7477 SPNINGFIELO JOB NUMBER INSPECTION LtNE: 726-3769 OFFICE: 726-3759 LOCATION OF PROPOS K:Miil ASSESSORS MAP:5 e OWNER: ADDRESS CITY: PHON E: STATE:ZIP: ADDITION OLISHD DESCRIPTION OF WORK: NEW- REMODEL OTHER VALUE: NAME ADD PHONE ADDR trV PHON Eu,r Ll,r S AM ESII ELECTRICAL: ARCHITECT: CONTRACTOR'S L MECHANICAL: CONST. CONTRACTOR ' G EN ERA L: PLUM B I NG NO.FEE CHA RG E Single Fixture dg. t l) Reiocated Bl (new f ix. add Water Service ft Sanitary Sewer ft. Storm Sewer ft Backf low Device TOTAL PERMIT NO trFtr CHA RG trFurnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs Floor furnace and vent Suspended watloill,ror mounted unit heater Appliance Vent se parat e Stationary evap. cool er Vent Fan/Single duct Vent f rom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT _ OFFICE USE - ZONING HANDICAP ACCESS: FLOOD PLAINLAND USE: OCCY GROUP: * OF STOFIIES: QUAD AREA: I OF BLDGS: CONSTH. TYPE: HEAT SOURCE: * OF UNITS: LIGHTING POWER BUDGET: WATER HEATER: SQ. FT.$/SO. FT,VALUE TOTAL VALUE OF PROJ X X X 0q) SQ. FTG MAIN SQ, FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RCPT#DATE BY BUILDING PERMIT n1.50 PLUMBING DEMOLITION 5% State Surcharge 5% State Surcharge MECHANICAL FENCE VALUE $ 5% State Su rch arg e SIDEWALK FT. SUBTOTAL PERM ITSPAVINGCURBCUT FT. SYSTEMS DEVELOPMENT I .fi7TOTAL PERMIT FEES EXCLUDING ELECTRICAL TAX LOT:( REOUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726.g769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same worki ng day, requests made after 7:0o a-m' will be made the following work daY. SITE INSPECTION: To be made after excavation, but prior to setuP of forms. SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before anY work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in Place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equiPment, conduit, piPing, accessories and other ancillarY equiPment items are in place but before anY concrete is placed. UNDERG ROUN D: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or f illing trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made Prior to installation of f loor insulation, decking or f loor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or f loor sheathi n g. \_>\ \-FtOOF INSULATION &I vAPoR BARRIERS: To be made Prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uac 2415. the rough electrical, Plumbing and rlg;!"asrqal are aPProved' V (r.r-g!J*rroN-u vAPoR/" BARRIER: To be made after all ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these lnspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to Placing facing materials and before framing inspection. FRAMING: To be made after the roof, all f raming, fire blocki ng and bracing are in place and all piPes, chimneYs and vents are comPlete and insulation and required vaPor barriers are in place but before any lath or SYPSum board interior wall coveri ng is applied. FIRE & SEPARATION WALL: Located and constructed according to Plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gYPsum board, interior and exterior, is in place but before anY plastering is aPPlied or before gypsum board loints and fasteners are taPed and finished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating comPlete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to Placing concrete. PAVING: After gravel is in place but Prior to Placing asphalt or concrete. STRUCTURAL CONCRETE: IN excess of 2500 PS.l. (306 a.1) STRUCTURAL WELDS: Performed on the iob. (2722 f\ HIGH STRENGTH BOLTING: Duri ng all bolt installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: lnspection Certif icate by an approved agency, f urnished to the CitY's Building Division before beams are placed. (2501 U.BC. sTDS. 25-10,11). STRUCTU RAL MASON RY: (306 a.7) - ln addition to the insPec' tions specified, the Building Off icial may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to installing any roof coveri ng. By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify th.at all information herein is true and correct,ind I further certify thit any and allwork performed shall be done in accordance with the ordinances of the city of springfield, and the Laws of the state of oregon pertaining to the work described herein, and that No occuPANoY will be made of any struciure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with oRS 701.055 will be used on this proiect. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, tnat the permit card is located at the front of the property, and the approved set of plans will remain on the site at all n stru ct i on.times du Signatu re q - 12-1(4, VALIDATI DC' RECEIVED BY: DATE PAID:AMOUNT R RECEIPT *: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All proiect conditions such as landscaping, parking lot stri ping, etc. must be completed before requesting this insPection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a iertificate of Occupancy has been issued by the Building Division and posted on the Premises, ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE N