Loading...
HomeMy WebLinkAboutPermit Plumbing 1999-03-24IAL BK:t 3zdl z I NSPECTION LIN E: 726-3769 oFFICE:726-3759 JOB NUMBER ,J TAX LOT SPF|Ilt.GFTELD 33S-HlF1"J$l"3xP,BiT- 225 Fifth Street' SPring iield, Oregon LOCATION OF PROPOS 6a ASSESSORS MAP . PHONE:Lslr € ZIP: ER N] A) E lL) CITY: DESCRIPTION OF WORK: ADDRESS: OWNER STATE: ADDITION DEMOLISHNEW- REMODEL PHONE PHON EEXPIRES Center is 1 -800-332'2344). tires vou tohi"'f!ftN:()reo*n law ELECTRICAL: ARCFI ITECT: CONTRACTOR'S NAME MECHANICAL: PLUMBING: GENERAL: NAME ADDRESS CONST. CONTRACTOFI #follow rules adoptp^clhythe Oregon Utiiity Notif icati on Cente rll'fl6SB?u I es are set f orth MECHANICALPLU MBIN G NO FFF EHA RGFtrEECHARGENO.Furnace/burner & vent < 100.000 BTUsSingle Fixture Furnace/burner & vent >100,000 BTUsRelocated Bldg.(new fix. addtl) Floor furnace and ventWater Service ft Suspended wall or f loor mounted unit heater*/0 Y0'loo Sanitary Sewer ft. Appliance Vent separateStorm Sewer ft.NC Stationary evap. Backiiow Device THII DH/q((-Vent Fan / Single F,[Petrc,^ u{O6fi 'fiffifled{flIrhnr ' /rf /,s .l -Mechfi|UEI EXharlst ',"tr{$61pn4-o ucl" "r L},r 7,J _.,,.uf0& /. c,- 77,l. LL Permit lssuance $10.00 TOTAL PERMIT TOTAL PERMIT11- Lt FN _ OFFICE USE - ZONINGr OF UNITS: FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER LAND USE: OCCY GROUP: * OF STORIES: QUAD AREA: # OF BLDGS CONSTR. TYPE: HEAT SOURCE: HANDICAP ACCESS: SQ. FT.$/SQ. FT,VALUE TOTAL VALUE OF P x X X SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER PLAN CHECK FEE RCPT#DATE BY BUILDING PERMIT PLUMBING DEMOLITION 5% State Surcharoe 5% State Su rcharge MECHANICAL FENCE VALUE $ 5% State Su rcharge SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT TOTAL PERMIT FEES EXCLUDING ELECTRICAL REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call726'3769 (recorder), state your city designated job number, job adJress, type of inspection requested and when you wi, be readyfor inspection' Requests received before 7:00 a.m. will be made the same working day, requests made after 7:oo a.m. will be madethe following work day. UNDERG electrical D: Plumbing, sanitary sewer, SITE INSPECTTON: To be made after excavation, butprior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in oo spl anyplace ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to facing materials and framing inspection. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. placing before SPECIAL INSPECTTONS: tn accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner/ Contractor during construction of the following work. Acopy of the special testing reports shall be furnished to the Building Division. PAVING: After gravel is inplace but prior to placing asphalt or concrete. STRUCTURAL CONCRETE: In excess of 2500 PS.t. (306 a.1) STRUCTURAL WELDS: Performed on the iob. (2722 t) HIGH STRENGTH BOLTING: During all bolt installation and ti ghtening operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLING: During earthwork. (306 a.'11 & Chapter 29) GLU-LAM BEAMS: lnspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10,11). STRUCTURAL MASONRY: (306 a.7\ "ln addition to the inspec- tions specif ied, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. storm water and d llnes. To be made to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of deci<ing oi' fiooi- siieathiiig. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Reouired for all concrete paving within street right of way, to be made after all excavating comPlete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but Prior to Placing concrete. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I f urther certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that prolect address ls readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all 3 - Z+^eg Signatu Date times during construction L{7 L.VALIDATION Li,2 2 AMOUNT RECEIVED: RECEIPT *:RECEIVED BY: DATE PAID FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this insPection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the Premises. PLANS REVIEWED BY DATE I