HomeMy WebLinkAboutPermit Compliance Report 1977-04-11PW-15
,ITY OF SPRINGFIELD, OREGON
Bullding llePartmenE
CERTIFICATE OF COI,lPLIANCE
Thls certifies that the buil-ding and propelEy locaEed at
has b c found to comply;,with the ordinances of the City of
Springfield, Oregon.
Owners Name ,, t' , rl ,-,^
City
Items of special consideration axe:
Da Building Ins tcrr
Address
L-.,
CIIrY OF SPH,IISGFIET-,1:)
SPRINGFIELD. OREGON 97477
April ll, 1977
346 MAIN STREET
7 47 -4221DEPARTMENT OF
PUBLIC WORKS
Mr. J. D. Carter
2735 Merryh'ill Court
Springfield,0R 97477
I
Dear Mr. Carter:
At your request the Building Department of the City of Springfield made a housing
insi,eition'on April 8, l9l7-, at ,l306 M'ill Street, S-pringllglg: The followjng 'items
were found in need oi'repaii or rep'lacement to conform w'ith the Uniform Housing
Code as adopted by the City of Springfield'
A firewall must be provided between the house and garage. .Thjs will require
u tuy.r of 5/B,,iVpL-X sheetrock from the concrete foundation to the roof
;^ ["h; gi.ugl siJ6'or il,. wail, all-ioints shal] be filled w'ith ioint compound.
Al I windows shal l oPen free]Y.
ihe rotted floor in the restroom shall be replaced'
House numbers shall be readable from the street'
The hot water tank shall be provjded wjth a pressure-temperature relief valve.
Approved waste lines shall be provided for the washer.
All electrical r.l.ptiCie boxei shall be flush with the face of the paneling'
Grounded receptacles shall not be used with two-wire cable'
Baseboard heaters shall be securely fastened to the walls'
l5 and 20 amp breakers shall not bL located in the top half.of a split-buss
ilr;l': -At i i 5-20 amp breakers shal I har19 a ma j n ahead of them.
Non-metallic wiring in the garage less than 8 feet high sha11 be protected
or be in a metal racewaY.
i"rri.. panet shali-U.6.ornded to the cold water piping w1th an approved
ground clamp and not leis than #4 bore copper wire'
Wiiing to the hot water tank shall be in a metal raceway.
2
3
4
5
6
7
B
9
0I
il.
12.
.l3.
All necessary permits shall be obtained before work begins, and all work shall be
accomplished according to appticiUte codes and inspected before a Certificate of
Compliance will be issued.
Should you need further information please feel free to contact the Springfield
Build'ing OePartment at 726'3753
S'incenely, z'n/),';fu2
Dan Smith
Building InsPector
DS: smm