HomeMy WebLinkAboutPermit Structural Calculations 2019-01-18225F]fTtl STREET . SPRINGffiLD,OR97477 tPH:(541)726-3753 r FAX: (541)726-3689
Develooment Services Supplemental Submittal Form
Date:
To Staff
From:awY \n
Contact Phone Number:-T1w
Permit Num ber/Journal Number:tE- l17"l-g{@
Descriotion of Submittal Material: ? ,up
'
n I & ryh ,?}Wt 5orS1 0rrf c'.\nhovrs -(r, \ It Vtte
L.f f, $errre,vcr"\ uzr' irrvt?ruv{ rn onfs e+ l\^ e
Wt*ri o"fy \"d'/,^e,n+ T l,otnt ' .
SkLl dats+ {-ru*n^l fi^ wutuq)
brn ;ft")
h0A^)
Instructions for Citv Staff:
T lnus, vtvwn)
Accepted by:
CITY OF SPRINGHELD, OREGON
b
I
=:
Eugene Water & Electric Board
P.O. Box 10148
Eugene, OR 97440
Phone/Fax: 54'1 -685-7435EWEB
SUBMITTAL REVIEW COMMENTS
Date: December 10,2018
Project Name: Hayden Bridge Disinfection System
Submittal No: 36-1 Steel Joist Calculations - Rev. 1
Specification Section/Drawing: 05 50 00
Reviewer: CH2M
Project No. 1605873
Comments:
1. See attached CH2M comments
SUBMITTAL REVIEW ACTION
REVIEW IS FOR GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS. NO
RESPONSIBILITY IS ASSUMED FOR CORRECTNESS OF DIMENSIONS OR DETAILS.
THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DEVIATIONS FROM
CONTRACT REQUIREMENTS NOT SPECIFICALLY INDICATED ON THIS SUBMITTAL.
X nppnovgo
E uor ACCEPTABLE - RESUBMTT
Date: 1211012018
I conorroNALLY APPRovED
E nEvrrw Nor REQUIRED
By: Wally McCullough
EWEB
Sub 36-l Steel Joist Calcs Rev. I Comments Page I of I
SU BM ITTAL REV I EW COM M ENTS eltzntfi-
t) \ I l._ !il. ( l..l \'l.ll):
st lt\lI I I \1. \o.:
st,t..(' s1,l( l'lo\ (s):
I)lrs('RlP I lO\:
r_r_!l,ll
.r(, Iil \ I
t,l{(),tI..( |I \\ I ll Sotlrrrru I lr rrocltlot itc ( )ttSilt (icturttitttt
l'lt(l,ll.( l \O.: ()()-ll()li
05 50 0(r
lltxrl .loirl ('rlcs
stili\ll'!''l \l.l \ l,l,l Esltol, I)lt \\\ I\(;s \\ll,l.l..lNt.'()ttlt,\ l'lo\
1. APPROVED 5. REVISE & RESUBMIT -Resubmittal required
n 2. APPRovED As NorED n 6. NorsuBJEcrroREVIEW
3. PARTIAL APPROVAL - RESUBMIT A5 NOT€D
Resubmittal required
As the primary reviewer of this su[:rnrttal, I have coordinated my review comments with the comments of the following secondary
reviewer(s):
Jarerl Baurlcr
CH2M
ll l0 l8
Date
NO COMMENT
RELATED SPEC
PARA./
DRAWING #
1.
none
2.
lJ
4
aJ
1
U
SUBMITTAL FOR APPROVAL
1831. - EWEB-Onsite Hypo Generation
$ae*lr
DATE: 1210712018
SUBMITTAL #: 36
SPEC #: 05 50 00
REV #: 1
To: Laura Farthing
EUGENE WATER & ELECTRIC
BOARD
P.O. BOX 10148
EUGENE, OR 97440
From: Beau Solesbee
Pacific Excavation
79 N Danebo Ave
Eugene, OR97402
We are transmitting the following Submittal Package: 36 - Roof Joist Calcs; Rev 1
item(s) for your review in accordance with the contract specification # 05 50 00.
Please review and respond to Beau Solesbee by 1211112018 in accordance with the
contract documents.
Additional Notes: Priority Level High
Submittal ltem Status Activity Date Copies Remarks
1 : Roof Joist Calcs P 1
Sincerely,
Beau Solesbee
CONTRACTOR (Authorized Signature)
G
6a-t.:
IE
357A Warner Milne Rd
Oregon City, OR 97045
(s031722-2904 [Voice]
(503) 722-2928 [Faxl
Su bm itta I
Subject : Joist Calculations - Revised lssued for Approval1827 - EWEB-Eugene
To Beau Solesbee
Pacific Excavation, lnc,
79 N Danebo Ave
Eugene, OR 97402
Phone No: (541 | 7 26-7 380
Mobile: (541)619-4196
Fax No: (5411726-7943
bea u@pac ificexc.com
Return To Travis Flora
Eagle's View Construction ll
357-A Warner Milne Rd
Oregon City, OR 97045
Phone No: (503) 722-2904
Mobile: (971) 304-9515
Fax No: (503l 722-2928
travis@evcon lin e.com
Gopy To
Details
none
Notes
Joist Calculations - Revised lssued for Approval
Please return submitted items by 12/14/2018
Number:
Spec Section No :
Submittal Rev No:
Submittal Number:
Date :
Type :
Method Sent :
Reason For Sending :
Status :
1827 -2
1
2
12t7 t2018
Submittal Revision
Email
For Approval
Pending
Signed By:n#Dated: l2l7l20l8
Travis J Flora
Project Coordinator
GANAlut
Joists and Steel Deck
STRUCTURAL
CALCULATIONS
THE STEEL JOISTS DESIGNATED BELOW WERE DESIGNED IN AC(]ORDANCE WITH
STANDARD SPECIFICATIONS ESTABLISHED B)'THE STEEL JOIST INSTIT()TE
AND TO THE INFORNIATION PROVIDED BY CTISTONIER.
JOIST
JlNU, J2NU, J3NU
h
..{f'u
tLl >t/r\t:
il /3o//S
JOB NO. : U06628
JOB NAME : HAYDEN BRIDGE PLANT
LOCATION : SPRINGFIELD,OR
CUSTOMER: PROSTEEL,INC.
22253 W. Southern At,e. * Buckeye, AZ 85326 * Phone: (623)386-1900 * Fax: (62J)386-188S
@7
&GANAlvl Mark:JINU
Projcct: U06628 HAYDEN BzuDGE PLANT
(U06628) t l/30/18 14:1252
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-201s (ASD) (rcv 2017)
Mark : JINU (MS2, Symmetrical,, Frcc ends) aligned on J2
ALL RUI."NINGS ARE GIVEN FROM THE LEFT REFERENCE
t.2 I.l 1.4 1.5 r.6 1.7 l.r,r 1.9 l.l0 l.l0 1.9 1.8 1.'t 1.6 l.s t.4 l.l
CL: 0'-5" EXTL: - 0'-0 1,2" C.iC: .1.1'-0" CR: 0'-5" EXTR: - 0'-0 l'1" ESL: - 0'-0 I l" FISR; - 0'-0 l.l"
at
.;
f
ct
t
al
@
N
al
O
l.l
l.l
l.l
c o
1.2
3a
@N
t.l 23 ll l5 l6 t5 l ,l tl
at €{al r N
,a
t
r r.l n
-.-- LOADING CONDITIONS( THE SHOWN VALUES ARE UN-FACTORED )
TOTAL LOAD. . : 325.25 Lb/tL 25K1O LIVE LOAD. . . : 183.08 lb/ft
-- UPLIFT
Net uplift uniform toad : 131. O0 lblft
---- DEFLECTION
Allowed deflection under live load.
Calculated deflecLion under service
JoisE inertia
Required camber
Wraped angle at l-eft .: L 2 X
Wraped angle at right : L 2 X
l::
156
156
l:i:
29
29
1n
1n
45
29
61
1
1
457
0
in (L/ 360)(L/ 407 )
^q
1n
1n
1n
00
00
-- TOADING CONDITIONS ---( THE SHOWN VALUES ARE UN_FACTORED )
TOTAL LOAD. . : 188.00 ]rb/ft 25KSP1B8/53 LIVE LOAD. . . : 53.00 lb/ft
-i
@cANAnn Mark:JlNU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 t4:t2:52
No Span Left
ltb/ft2) trb/frl105.00 105.000.00 0.00
PARTIAL LOADS (From Axis)
Rj-ghtltb/fL2l tlb/frl0.00 0.00
105.00 105.00
Starttfrl0'0
40'0
Lengthtfrl ',0
4'O
Chord Cat.
1
1
1
2
1
1
2
2
UPLIFT
Net uplif t unif orm l-oad 131.00 lb/fL
A]lowed deflection under live load
Calculated deflection under service l-ive load
End of multiple loads
FoRCES rN MEUBERS [kips1
1-45 1n
0.38 in
360)
1373 )
(L/
(L/
(THE SHOWN FORCES ARE UN-FACTORED)(Fy = 50 Ksi U/N) (Eff. depth =Gap......: 1"
Left Reaction =7 .09 / -2 .8s kips Right Reaction =
24.86 in)
7 .09 / -2 .8s kips
REQU]RED WELD
weld-Ea. side RemarksNo Tension Compres
Top Chord
4.85 -L2
4.73 -tL
o a, _41
8.82 -2L
11.85 -29
1l-.85 -29
13 .88 -34
13 .88 -34
14.89 -36
14.89 -35
Botstom Chord
Ead Diagonal
73.72 -5.53
REQUIRED MATERIAL
x = t.ied at mid-length
186
186
203
BR r-sl16
S1end. Util
1.1
L.2
1,.3
L.4
1.5
1.6
r.7
1a
1.9
L . r0
2.1
)a
2.3
2.4
2.6
4.1
4.3
4.4
5.1
tr,
5.3
5.4
5.5
04
74
89
89
43
4f
45
45
96x
96x
295
zBl
245
246
245
246
246
246
zz 30
zz 30
LL2X
do
do
do
do
do
do
do
do
LL2X
0
0
0
0
0
0
0
0
0
0
64
54
3
3,-Lr L/2t
Lenglh
4,-4 3/8,
z',-5"
2',-tt 3/8il
do
do
2'-tt 3/8\
-3
do
do
do
do
do
do
81
83
92
95
98
98
99 0
00
18
97
25
02
)e
0
t7
32
36
37
0
-5
-10
_14
-14
-15
00
46
99
51
01
z LL5
z LLO
z 110
z 110
z Llo
z LLO
0 .34
0 .54
0.58
0.'72
0.79
0.81
4',-0.
do
do
do
LL2X
do
do
do
do
LL2X
3.1
3.1 r
z L69 O."74 223 - 7 L/zil
Diagonal Towards
6.'78 -2
4.97 -2
3.16 -1
2.46 -0
End
'73
00
27
55
ULxl
U1
L2X.t56
1/8 x 0.118
x 0.091
U I x 0.091
z
z
z
z
75
78
'18
78
0.68
0.66
0.42
0.33
118
090
090
090
t'7/e"
t 7 /8'
do
Diagonal Towards Center
-7.84
-5.88
-4.O7
-2.46
-2.46
d
d
U13/8x0.135
V!3/8xLL/4x0.118
U 1x 1 1/8 x 0.11,8
U 1 x 0.091
U 1 x 0.091
50
64
15
'78
78
2 3/8"11 't /s'
3/a"
3. 16
2 .37
L .64
0.91
0.18
0.90
0.84
0.89
0.'76
o,'76
do
do
do
2'-LL 3/8il
116 - I
l-t8 - 1
118 - 1
090 - 1
090 - 1
SGANAltll Mark:J1NU
Project: U06628 HAYDEN BRIDGE PLANT
I li30l18 14:12:52u06628)
FoRCES rN MEMBERS (cont.) [kipsJ
REQUIRED MATERIAL
x - tied at mid-Ienqth SLend. Uti.1 Length
REQUIRED WEI,D
Weld-Ea. Side RemarksNo Tension Compres.
secondaly Web Member
0.40
o.26
0 .26
o.26
o.25
- 1 . 05
-0.77
-0.81
- 0. 83
-0.84
81 0.29
7'7 0.21
'77 0.22
77 0.22
77 0.23
do
do
do
091 -
IJLx3/4x0.091
do
do
do
VLx3/4x0.091
4L
2
2
-3
2'
do
do
2',
z
z
z
09i7.t
1)
7.4
7.5 1
Maximum spacing between rows of bridging
@ ToP Chord: 15'-1'1,3/8"
@ Bottom Chord 24'-8 t/g'
2 Row(s) Minimum
4 Row(s) Minimum
@ Bottom Chord
4',-0u
15', -0,
28',-0"
40' _0il
Lateral Supports
Deck (35" )
Acc. to the code
POSITION @ Top Chord
8"
8rt
74',-B
29',-3
t/'t/
Equally Spaced Bridging between Uplift Rows : Yes
UpLifts according to sloPe
Fabrication code unless noted
-LL = 2 angles short legs back tso back
-U =lUprofile,
PARTIAL LOADS
Span: l. = Main Joist, 2 = Left Extension.
Chord:1=ToP,2=Botstsom
toad Catsegory (Cat.): 1 = Dead, 2 = Live,
Designer:
v1 - 43 ^ 0
-BL = 2 angles welded in box, -BR = Round bar
-UU = 2 U profiles one inside Ehe otsher, -cL = crimPed angle
3 = Right ExEension
3 = wind, 5 = Non-comPositse Dead, 6 = Norr-composiEe Live
Ziad At-Khalidi AIi shop: Buckeye Arizona [Production]
Area to Paint : 15?.50 ft2 Material Sort : CosEProject no.:
513
u05528
555
223 (241) -223 (241) -25-20ll-L-s13 (5ss) NNN,NNN
--- BRIDGING --
fficANAltll Mark:J2NU
Project: u06628 HAYDEN BzuDGE PLANT
(U06628) I li30l18 14 12:52
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-201s (ASD) (rev 2017)
Mark : J2NU (MS2, Symmetrical,, Free ends)
ALL RUNNINGS ARE G]VEN FROM THE LEFT REFERENCE
IYY.':^ l^ :- o .r s € - o N * I € o N \t Q @ o
-NNalNN-ff666$
l.l l.l 1.4 1.5 1.6 t.7 1.8 1.9 t.lo l.l0 1.9 1.8 t.1 I.6 1.5 1.4 1.3
al
rf
t
al
@N
(L: 0'-5" EXTL - 0'-0 I l" C C: .1.1'-0"
l.l
2.r
d
Ll
2.1
or€3{-.1€C
('R 0'-5" EYIR -0-0ll' ESL:-0-0ll" ESR:-0-()ll"
1.2
@N
l.l 1.1 l6 5 l..l ll :2
$
r el .talr
P
TOTAL LOAD 32s .25 lb/ tt
TOADING CONDITIONS( THE SHOWN VALUES ARE IIN_FACTORED )
26K70 LIVE LOAD. . . : 183 .08 lb/ft
PARTIAL LOADS (From Rxis)
No Span Left
Ll-b/ ft21 t1blf rl25.00 25.0025.00 25.00
Right
[tb/ft2] t1b/frl
25
atr
)q,
Starttfrl
0'0
38'.0
Lengthtfrl
5',0
6',0
Chord Cat
1
1
1
1
1)00
00
3
3
UPLIFT
Net uplift uniform load 128.00 tb/fL = 6'1" * 22.1psf _ .6.1 1.7 plf (self weight)
AL]owed deflect.ion under live loadCalculated deflection under serwice live load
'Joist inertia
Required camber
========== LOAD NO 2 ( J2NU#02 )
LOADING CONDITTONS
45
42
o2
75
1
1
41,6
0
in
in
fn
in
(L/
(L/
4
360)
370)
213.00 lb/fL
( THE SHOWN VALUES ARE IIN_FACTORED )
25KSP2T3/49 LIVE LOADTOTAL LOAD 4e. oo 1blfr
l.l 1.5
&G \NAlvl Mark:J2NU
Project: U06628 HAYDEN BRIDGE PLANT
I l/30/18 14:12:52(u06628)
PARTIAI, LOADS (FTOM AXiS)
No Span Startlfrl0'0
40'0
0'0
38',0
LengLh
t frl Chord Cat
1
1
1
1
1
2
3
4
Lefttrb/rL2) tlb/frl140.00 140.000.00 0.0025.00 25.0025.00 25.00
RighEt\b/fL21 115/frl0.00 0.00140.00 140.0025.00 25.0025.00 25.00
4',0
4',0
5',0
6',0
2
2
3
3
1
1
1
1
Allowed deflection under live 1oad.
Calculated deflection under service
Gap......: 1"
Left Reaction =
Ii-ve load.....
End of multiple loads
185
1.45 in (L
0.39 in (L
360)
1337)
No Tension Compres
FORCES rN MEMBERg lkipsJ
(THE SHOWN FORCES ARE UN-FACTORED)
(Fy = 50 Ksi U/N) (Eff . depth = 24.87 in)
7 . og / -2 .93 kips Right Reaction = 7 ' 09 / -2 .93 kips
REQUIRED MATERTAL REQUIRED WEI,D
x = tied at mid-Iength Slend. UtiL LengEh Weld-Ea.Side Remarks
1.1
1.2
1.3
L.4
1.5
1.5
!.7
1.8
1.9
1.10
2.L
aa
2-3
2.4
2.5
4.1
4.2
4.3
4.4
5.1
5.3
5.4
4 .93
4.79
8.81
8.81
lr. ?8
11.78
13.75
13.75
L4 .'7 4
1_4 -'74
-12.o4
-11.?3
-21.88
-21.88
-29.41
-29 .4L
-34 .43
-34.43
-36 .94
-35.94
95
81
46
46
46
46
46
30
l0
0. ?3
0 .64
0 .64
0.81
0 .83
0.92
0.96
0.98
0.98
0.99
Top Chord
Bottom Chord
0.00 0.00
t'l .r7 -6.96
25.96 -!0.42
32.24 -r2.49
36.00 -L4.37
37.26 -14.86
End Dj-agonal
2X
do
do
do
do
do
do
do
do
LL
z
z
z
zz
zz
/2"
0
-3
do
do
do
do
do
dox
x
LL 2 X .155
do
do
do
do
LL 2 X .L66
1'' SQUARE BAR
LL 2 X .185
u 1x 0.091
z 115 0
yy110 0
yylll 0
l1/i11 0
yyll1 0
yy1l1 0
2 3',-Lt L/2'
4',-On
do
do
do
Wl44 0.85 n,_n rrr,' .Z5O _ ! 1/gt3.1 L3.72 -5.62
-7.83 d
Diagonal Towards End
5.78
4 .97
3.16
2 .46
-2 .67
-t .96
-L.24
- 0 .53
U1x1
U1
1/8 x 0.118
x 0.091
do
z 75 0.68
z '78 0.56
z '78 0.42
z 78 0.33
118 -
090 -
090 -
090 -
L 't /8'
r t /a"
L t/2*
,r-11 1/atr
do
do
a,-11 alat
Diagonal Towards center
tJ L 3/8 x 0.135
ut1/exL!/4x0.118
U1x11/8x0.118
U 1 x 0.091
90
8487
07
46
5
4
2
3.13
2 .31
1.50
0.89
d
2600
2640
z 75 0
z 78 0
89
'76
2'-Lr 3/8'
do
do
do
L36
1t I
118
090
L 7 /8'
r 3/4"
t L/2"
-- UPLIFT
Net uplift uniform load : L28.00 1b/ft
---- DEFIJECTION
&GANAM Mark:J2NU
Project: u06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 14 12:52
FORCES IN MEMBERS (Cont.) tkipsJ
No
.5
Tension Compres.
0.i8 -2.46
Secondary web Memb€r
o.4"7 -t-.05
o -25 -O.77
o.26 -0.81
0.25 -0.83
0.26 -0.84
REQUIRED MATERIAI,
x = tied at mid-IengLh
U 1x 0.091
rJ 1 x 3/4 x 0.091
do
do
do
Vlx3/4x0.091
sIend. UtiI .
z 78 O.76
Length
2, -tr 1 /sn
REQUTRED WELD
Weld-Ea. Side
090 - ). l/2"
Remarks
2',
do
do
7.L
7.2
7.3
'7 .5
81
7'7
77
'77
77
o.29
0.21
0 .22
0.22
0.23
2'-3 )./4"091 -
do
do
do
2
091 - 1'l
BRIDGING
Maximum spacing between rows of bridgj-ng
@ Top Chord: 16' -2 5/8'
@ Bottom Chord: 24'-5 719"
POSITION
2 Row(s) Minimum
4 Row (s ) M j-nimum
@ BoEcom Chord
4',-0"
16', -0I
28',-0r
40'-0u
Lateral Supports
Deck (36 " 1Acc. to the code
14'-8
29',-3
@t/8
7 /8
Top Chord
lr
r
Equally Spaced Bri-dging between Uplift. Rows : Yes
vL.43 . 0
UpIift. according to slope
Fabrication code unless noted
-LL = 2 angJ.es shorE legs back to back,
-U =LUprofile,
PARTIAL LOADS
Span3 1 = Main,roist, 2 = Left Extension,
Chord:1=Top,2=Bottom
Load Category (Cat,) : L = Dead, 2 = Live,
-BL = 2 angles welded in box,
-UU = 2 u protiles one inside the ot.her,
-BR = Round bar
-CL = CrimPed angle
3 = Right Extension
3 = Wind, 5 = Non-composite Dead, 5 = Non-composite Live
Ploj€ct no.:
481
u05528 Designer:
s1t
ziad Al-Kha1idi AIi shop:
Area to Paint r 157.35 ft2
Buckeye Arizona IProductsion]
Material Sort : Coat
209 (222) -209 (222) -25-20/LL-48! (511) NNN,NNN
SG \NArtll Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 l3:4t:00
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-2015 (ASD) (rev 2017)
Mark : J3NU (MS2, Symmetrical,, Frce ends) aligned on J2
ALL RUNNINGS ARE GIVEN FROM TI{E LEFT REFERENCE
O.l
.t .r al .l .l al .l al
ll I.l l.,t 15 1.6 17 l.E le lll) ll() 19 18 1.1 l.() 15 14 1..1 l.l
al
.14'-0" CR:0-5" EXTR: -0'-0 Il" ESL: -0'-0 Il" ESR: -0-0 l'l
at
@
N
al
0'-5" EX'IL: - 0'-0 I l
-+
l6
C
$al
al
€
l5
c
al
c
at
1.3
€
€
at
cl
+€
€
c x
CIC
a
l.ll.l
ll
@N
lt.l ,l 5
f
ar
'P
rr
P
r
P
.t
rnr
-- LOADING CONDITIONS
( THE SHOWN VALUES ARE UN-FACTORED )
TOTAL LOAD. . : 32s.25 ]]b/fL 26KL0 LrvE LOAD. . . : 183. 08 Lb/ft
CONEENTRATED IJOADS (FTOM R:<iS)
No sp Side Hole Total Load Live load Net uplift Position Spacing Cat. Chord Incl' Cmp---it rp"i [kipsJ tkips] tftl tftl o-e 7/2 [des]
1 l Both No o.2a o.ob o.oo o'-0" o'-o'r 3 1 90 0
2 l Both No O'25 O.OO 0'OO 0'-0" 0'-0tr 4 I 90 0
PARTIAL LOADS (FTOM AXiS)
No Span Left
lLb/tt2) 115/ftl
25.00
25.00
Right
ltb/tL2) tIb/frl2s.00 25.00
25.00 25.00
Starttfrl
0'0
38',0
LengthIfr]
6',0
6',0
Chord Cat
1
1
1
2
00
0025
3
3
1
1
Allowed deflection under live load
Calculated deflection under service Iive load
Joist inertia
Required camber
1
1
451
0
45 in (L/ 350)
29 rn (L/ 405)
19 in^4
/5 1n
:l11
t,
lr
UPLIFT
Net uplift uniform load : 135'00 lblft
--- DEFLECTION -
&G \NAM Mark:J3NU
Project: U06628 HAYDEN BzuDGE PLANT
(U06628) I li30l18 13:41:00
I,OADTNG CONDITIONS
( THE SHOWN VALUES ARE UN_FACTORED )
TOTAL LOAD 213.00 l-b/fL 26KSP2a3 / 49 LIVE LOAD 49.00 lb/fL
CONCENTRATED LOADS (From axis)
No Sp Side Hole
Both No
Both No
Tota1 Load
lkipsJ
0 .25
0.25
Live load Net
lkipsl
0.00
0.00
7/2
1
1
11
21,
up
tki
,1ift
psl
Position Spacj-ng Cat. Chord rncL. Cmp
Ideg]90 0
90 0
0.00
0.00
tfrl
0' -0I
[fr] o-e
0, _0I 3
0'-0r' 4
No Span Left
ttb/f821 ttb/ttl140.00 140.000.00 0.0025.00 25.0025.00 25.00
PARTIAL LOADS (FrOM .EXiS)
Right
ltb/tL2) tIb/frl0.00 0.00140.00 140.0025.00 25.0025.00 25.00
Starttfrl Length
tfrl
4',0
4',0
6',0
6',O
Chord Cat
2
2
3
3
1
1
1
1
1
1
1
1
1
2
3
4
0'0
40'0
0'0
38',0
UPLIFT
Net uplift uni-form load 13s.00 )-b/ft
Allowed deflection under live load
Calculated deflection under service Live load. .. . .
1.45 in (L/ 350)
0.35 in (L/ 7469)
End of nultiple loads
FORCES IN MEMBERS [kipsl
(THE SHOWN FORCES ARE UN-FACTORED)
Gap......: 1tr (Fy = 50 Ksi U/N) (Eff . depth = 24.85 in)
Left ReacEion = '7.59/ -3.09 kips Right Reaction = 7.59/ -3.09 kips
REQUIRED MATERIAL REQUIRED WELD
No Tension compres. x = tied aE mid-Iength sLend. Util. Length weld-Ea.side Remarks
0
3
z
z
z
Z
z
z
z
Z
I
2
3
4
5
5
7
I
9
10
I
1
1
1
1
I
1
1
1
1
LL2X
do
do
do
do
do
do
do
do
LL2X
Top
5. 19
5.04
9 .29
9.29
!2.42
12 .42
14.50
14.50
15. 54
15.54
chord
_1,
-23
-23
-31
-31
-36
-36
-39
-39
89
53
44
44
50
50
88
88
57
96
82
46
46
45
46
46
45
46
46
2L6
2r6
).7 6 z 115
yy110
yy110
yyl10
yyll,0
yy110
o.74
0.55
0.65
0.78
0.80
0.89
0.93
0 .94
0.99
0.99
-3
do
do
do
do
do
do
t/2"
2.1
2.2
,c
2.6
Bottom chord
0.00 0.00
18.39 -7.33
2'7 .87 -10.98
34.53 -13.59
38.55 -15.15
39.91 -15.68
a at -i1 1 lanL! L/ -
6
2
I
5
9
do
do
do
4'0
LL2x
do
do
do
do
LL2x t76
0.4
0.6
0.8
0.8
0.9
0.9
- DEFLECTION - -
&G \NAltn Mark:.l3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 l3:41:00
FoRCES IN MEUBERS (Cont.) tkipsl
3.1
No Tension Compres
REQUIRED MATERIAL
x = tied at m1d-length
1' SQUARE BAR
U1xll/8x0.118
U I x 0.091
do
U 1 x 0.091
V]. 3/8x0.136
ut3/8xtt/4x0.1r.8
U1x11/8x0.118
U 1 x 0.091
U 1 x 0.091
VLx3/4x0.091
do
do
do
urxS/4x0.091
REQUIRED WELD
254
WeId-Ea. Side Remarks
End Diagonal
!4.69 -5.92
Sl-end. Util
WL44 0.90
60
64
75
78
78
81
77
77
'77
77
Length
2
Diagonal TowardE End
4.L 7 .35 -2.8L
4 .2 5 .48 -2 .06
4.3 3.51 -l-.31
4.4 2.64 -0.55
Diagonal Towards Center
75
78
78
t6
0.74
0.'73
0.48
0.35
118 -
.090
090 -
090 -
1Z
z
do
do
2'-rt 3/8,
4, -4 3 /s,,
1/a"
2
1 / Ail t/8'
5.1
5.2
5.3
5.4
5.5
3.30
2 .44
I .69
o .94
0.19
44
n)
54
6'7
64
0 .97
0 .92
0.99
0.82
0.81
do
do
do,' -r, arr,'
136
r18
118
090
090
2 r/8"
! t /a"
L r/2,,
d
d z
z
z
t/8,'
-3
2',
do
do
2',
7.t
7.2
't .3
't.4
'7.5
Secondary web
o .49
0.27
o.27
Q.27
0.27
Metnber
-1.58
-1.2't
- L.32
-t .34
-1.35
0 .44
0.34
0.35
0.36
0.36
091 - 1
do
do
do
091 - 1
BRTDGING
Maximum spaci.ng between rows of bridging
@ ToP Chord: 16'-3 314u
@ Bottom Chordl. 24'-6 7/2"
2 Row(s)
4 Row (s)
Minimum
Minimum
LaLeral- Supports
Deck (36 " )Acc. to the code
POS IT ION @ Top Chord
1/ 8',
7 /8"
@ Bottom Chord
4',-0r
16 ', - 0 ',
28',-0u
40' -0rr
14',-8
29,-3
Equally Spaced Bridging between Uplift Rows : Yes
vl .43 .0
Uplift according to sloPe
Fabrication code unless noted
-LL = 2 angles short. legs back to back,
-U =1Uprofile,
PARTIAL LOADS
Span: 1 = Maj-n Joist, 2 = LefE Extension,
Chord:1=ToP,2=Bottom
Load catsegory (Cat.) I l- = Dead, 2 = Live,
2 angles welded in box, -BR = Round bar
2 U profiles one inside the other, -cL = crimped angle
-BL =
-UU =
CoNeENTRATED LoADs (* indicates that the conc. Ioad is not di-rectly on the panel point.)
Span: 1 = Main Joist, 2 - IJeft Extension, 3 = Right' Extension
side3 Both side6, Near side, Far side Hole: roP chord wiEh Holes ats conc- Loads
Definit.ion of the categories (Cat.):
3 = ats any paneL point. along Ehe joist
4 = an)mhere along the joist
Chord: 1 = Top, 2 = Bott.om
Inclinat.ion(Inct.):90=Vertical,O=HorizontalComposite(Cmp):0=standard,l=non-comPosite
3 = Right ExEension
= wind, 5 = Non-composite Dead, 5 = Non-comPosite Live
ziad At-Khalidi ALi Shop: Buckeye Arizona [Production]ProJecE no.: U05628 Des igner :
ffiGANAnn Projcct: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 l3:41:00
Mark :J3NU
/ sss Area to Paint : 757.35 fE2 Material Sort: Cost523
227 (240) -227 (240) -25-20/LL-s23 (55s) NNN,NNN
EWEB
Eugene Water & Electric Board
P.O. Box 10148
Eugene, OR 97440
Phone/Fax: 541 -685-7435
SUBMITTAL REVIEW COMMENTS
Date: November 20,2018
Project Name: Hayden Bridge Disinfection System
Submittal No: 17 Steel Joist Framing Version 2
Specification Section/Drawing. 05 21 19
Reviewer: CH2M
Project No: 1605873
Comments:1. Please see the revised CH2M Hill comments. Resubmittal not required unless the new
wind speed affects the design.2. See attached CH2M comments.
SUBMITTAL REVIEW ACTION
REVIEW IS FOR GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS. NO
RESPONSIBILITY IS ASSUMED FOR CORRECTNESS OF DIMENSIONS OR DETAILS.
THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DEVIATIONS FROM
CONTRACT REQUIREMENTS NOT SPECIFICALLY INDICATED ON THIS SUBMITTAL.
I nppRoveo
I Nor ACcEPTABLE - RESUBMIT
Date: I ll20l20l8
X coruorroNALLY APPRovED
E nrvrrw Nor REoUTRED
By: L. Farthing
EWEB
Sub l7 V2 Comments Page I of I
c c c
SUBMITTAL FOR APPROVAL
1831. - EWEB-Onsite Hypo Generation
$aeirs
DATE: 9/05/2018
SUBMITTAL #: 17
SPEC #: 05 21 19
REV #: 0
To: Laura Farthing
EUGENE WATER & ELECTRIC
BOARD
P.O. BOX 10148
EUGENE, OR 97440
From: Beau Solesbee
Pacific Excavation
79 N Danebo Ave
Eugene, OR97402
We are transmitting the following Submittal Package:17 - Steel Joist Framing; Rev 0
item(s)for your review in accordance with the contract specification # 05 21 19.
Please review and respond to Beau Solesbee by 911412018 in accordance with the
contract documents.
Additional Notes: Priority Level High
Sincerely,
Beau Solesbee
z1
lLd -t -/''I-\f" j{
tl!
CONTRACTOR (Authorized Signature)
Submittal ltem Status Activity Date Copies Remarks
1 : SteelJoist Framing-Shop
Drawinqs P 1
ccc
a
(
r0-s-
P
ffi
1 .e qNtn^L Drsctr cRrtERr^. snucDiAt oasRvaloN,
^N0sEo[ nsPeclil if@riEMtNrs. st m^nf,Gs or-c-m]o rBi&d or-6-@J1.
2. fm *acr[ [gtclN Aio IEsrftG mMftrarlt $a olrfss or-6-m]2finm ot-G-Eas.
tr nP€ 2 [I[ ECr, S( .tLL OICX ${rrt A oP^rS Or-C-oo!r. rm9ar $MM. rsTEx TO $m*B [B ^ ]6/. P^itil.P^RAUIT SPPfiTs: ELir X-EN(22 lHo 12 Prf O 9' O.C. UAlyUy9trr^Ps:
'rO
TEX *iE6 C 2. 0.C.
____31_E!!
q-esl_
@f-'-'-----'-----
]M
SNOW DRIFTING DIAGRAM
A
@t--------
WND LOADING DIACRAM
@
A
/), ROOF FRAMING PLAN\ / ;;;- '=;-
CH2M:10-S-2003
dr2rw,ffiq#
lE* 63;rr-1
:
EWEB
WAfER SYSTEMS
HAYDEN BRIDCT FILTRATION PUNT
ONSITE HYPOCHLORITT SYSTEM
STRUOURAL
ROOf FRAMINC PLAN AND DEIAIL
D-36635-S9
400f 124 0
a\
'-:j-,
-4-'Tll
stt NoTt i/
o
A
trA-
3$7A Warner Milne Rd
Oregon Caty, OR 97045
(S031722-2904 [Voice]
(s03) 722-2e28 [Fax]
Su bm itta !
Subject : Joist Shop Drawings - lssued for Approval
To
1827 - EWEB-Eugene
Return To
Beau Solesbee
Pacific Excavation, lnc.
79 N Danebo Ave
Eugene, OR 97402
Phone No: (541) 726-7380
Mobile: (541) 619-4196
Fax No: (5411726-7943
beau@pacificexc.com
Travis Flora
Eagle's View Construction ll
357-A Warner Milne Rd
Oregon City, OR 97045
Phone No: (503) 722-2904
Mobile: (971) 304-9515
Fax No: (5031722-2928
travis@evconline.com
Number :
Spec Section No :
Submittal Number:
Date :
Type :
Method Sent :
Reason For Sending :
Status :
1827-1
1
91512018
Original Submittal
Email
For Approval
Pending
CopyTo
Details
Notes
Joist Shop Drawings - lssued for Approval
Please return submitted items by 9/11/2018
Line
No Item Copies Date Reference No Description
001 Shop
Drawings
1 91512018 Joist Shop Drawings - lssued for Approval
C
Signed By:Dated: 91512018
Travis J Flora
Project / Safety Coordinator
c c
c
U
l
EE('
z(
oIiliiEiEEEEiEEiEi
Figl!;;iE;5EEslxiiii
i,; ! .E
E:i E ta E:-iiI
:ei3:E!!EE€sg!E fiE EE EE?EET
:Ee E! ti EE!:r;
EEeiiiE;gEgEEg
ta
6E
pS
ee
aZ
:5
36
i=i*-;ti:5!:J6i
EEEieEi
!!E!E$E
;I;Ei*E
IEE6EE!
b: E E ""::,
FiEii;PE
9 * r:;;:;
iiE;EEIE
;pE!;E
ts:E1
:r')i
iE E;
i6E!!
ri9i3
;E:;!
EEi!H
Ei{!::EB?Si:E:l
I
d
5
;l
{!
tg
s
4
iE-- z eE
E:iEa:E;co
Htti'i,E:EEE
i;sriiii,Ei'EE
f;EEii!,EiiEEiEE
sga3EgE?d' ' ' '
e, -a
t;;eXfig,
?ii"e! aea
:;ilEEE;
EEiEiE!;
B:ixi 6:9
EiiEEeffiE
.o,
!iE r-
e cH: i,: UT6 EE; .E
! gE
I F;; iE; li
!+3t
6U
Foz
EoF()
UEU
Fa6
UFoz
EUzUo95
eI
-e
IIilr,t:
;letls
i:
-l
EI
@
EB!F:T
lP.ii!8iE
iEll.
l]E; E g
flciE:
I
!
I
I
T
E
EE
o
oz
P,
EE
dg
iE
as
3i
ls
;!
tl
se
!:
EE
9*
!,
5:
qts
ia.93
Flc e
ir! a
ol; a
it: {
frtE !
T a=,
d
&
i-
a
L
:=
&9
9i
t."
i
i.:
:1.,
:'
:
I6
$
:
I6
I
t
4
d
919
-lr
t"t;3td
ql6
Bl6
dld
ouFo2
dU
o
d.cc
ii
6
_a
t!
*,
*
OF
il6 't
OLEl 3
#$Fdz^oqOBU9
@l5t;1'al$>]at 3
I
:;
!;
c<
IE
fil ti
zl ia,
EI ;;
BI TE
El il;l ii
=l
!i
=l il
Ei
IE
g!
iEiiie
E'E'
ei:!!er3
i!ag
qg;q
a2a=
I!E}ff:iir
i:;: E
!tlr=
g;Ei i
iirii!inf*
ri!; E!aFs iti!
trll
zUo
I
ir
;l
il
c
,llx=lXl I
tsElEl"lzElslul-Et6tito"algizltt
=l llsl llo - "l"li ;l fll'-l-l
q
UE
s9 l
:si
s
=E('
z(
or+t
41
J
?
2
33
rl
EI
ow
I-lslo-l
ol2lsl<l
ul.lal
s13
blIOlr*l*
i
a
P
I
x
3
,
e^?E
$e
6966rJ
Ii
zn
<-H
;E
q,;
t-
lE
E
EI
HI
EI
9+
Eo
i6
EI
aa
9!
6n-
I
I
I
o
;9
i>6;
5
o
9?
EE 8
EL6:;Eqs#eg9
ozUoUJ
Fa
o-
o o
Fz
5
L
Uc
5
I
c
2*
a=
a.
F6
;aF;
4aqi
,.8
357A Warner llilne Rd
Oregon City, OR 97045
(5031 722-2904 [Voice]
$ast 72,2-2928 [FaxJ
Submittal
1827 - EWEB-Eugene Subject : Joist Galculations - lssued for Field Use
To Beau Solesbee
Pacific Excavation, lnc.
79 N Danebo Ave
Eugene, OR 97402
Phone No: (541) 726-7380
Mobile: (541) 619-4196
Fax No: (5411726-7943
beau@pacificexc.com
Number :
Spec Section No :
Submittal Rev No:
Submittal Number:
Date :
TYPe :
Method Sent :
Reason For Sending :
Status :
1827-5
3
5
12t7 t2018
Submittal Revision
Email
For Release
Pending
Return To Travis Flora
Eagle's View Construction l!
357-A Warner Milne Rd
Oregon City, OR 97045
Phone No: (503) 722-2904
Mobile: (971) 304-9515
Fax No: (5031722-2928
travis@evconline.com
CopyTo
Details
none
Notes
Joist Calculations - lssued for Field Use
Signed By:/fr,fr Dated: l2l7l20l8
Travis J Flora
Project Coordinator
s GANAM *ffi^
wws @
THE STEEL JOISTS DESIGNATED BELOW WERE DESIGNED IN ACCORDANCE WITH
STANDARD SPECIPICATIONS ESTABLISHED BY THE STEEL JOIST INSTITUTE
AND TO THE INFORMATION PROVIDED BY CUSTOMER.
JOIST
JINU, J2NU, J3NU
OPfr.B1N
S
Joiste and Steel Deck
u06628
HAYDEN BRIDGE PLANT
SPRINGFIELD, OR
PRO STEEL,INC.
STRUCTURAL
CALCULATIONS
I r7i91PE
u
b
t I A.
tt /3o/ts
JOB NO. :
JOB NAME :
LOCATION:
CUSTOMER:
EXP lf'lL$: lz
22253 W. Southern Ave. * Buckeye, LZ 85326 * Phone: (623) 386-1900 * Fax: (623) 386-1888
Ar
/--
1(
#GANAnn Mark : JINU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) 1 l/30/18 14:12:52
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-2015 (ASD) (rev 2017)
Mark : JINU (MS2, Symmetrical,, Free ends) aligned on J2
ALL RUNNINGS ARE GIVEN FROM THE LEFT REFERENCE
IY;loL=]
o
t.2 1.3 1.4 t.5
CL: 0'-5" EXTL: - 0'-0 l/2" CIC: 44'-0" CR: 0'-5" EXTR: - 0'-0 l/2" ESL: - 0'-0 l/2" ESR: - 0'-0 l/2"
d
t
N
\t
N
O
@N
q
t
1.6 1.7
a
1.8
O
N
o
t.9
ON
O
NN
l.l0 l.l0 1.9 1.8 1.7
2.6
O
tN
N
NN
2.4
N
1.6
N
\t
1.5
€
o
1.4
2.2
*
t.l
2.1
1.1
2.1
o o o
N
o o
1.3 t.2
@N
2.2 2.3 2.5 2.5 2.3
N N
..Jr ..)r r r r .'l
r
.1rnr
- - - -
i
-;;;- ;"*$TiI3,:"HI'JiIi";;;;;;- i
- - -
TOTAL LOAD..: 325.25 l-b/tt 26KL0 LrVE LOAD...: 183.08 ta/ft
-- UPLIFT
Net uplift uniform load : 131.00 1b/ft
---- DEFLECTION
Allowed deflection under live load
CalcuLated deflection under service live load.. . . .
Joist inertia. .
Required camber
1 .45 in
1.29 in
457.61- !n^
0.75 ln
L/ 360)L/ 407)
(
(
4
Wraped angle at left .: L 2 X .156 29.00 in
Wraped angle at right : L 2 X .155 29.00 in
========== LOA"D NO 2 ( iIINU#o2 )
TOTAL LOAD l-88.00 lb/ft-25KSP188/s3 L]VE LOAD s3. oo lb/tt
(c C
\\
&G \NArul Mark:JINU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 14:12:52
No Span Start
tf rl
0'0
40' 0
Chord CatLeft
ltb/ fL2) t1b/f rl10s.00 105.000.00 0.00
PARTIAL LOADS (From A,<is)
Right
ltb/ft2) tlb/frl0.00 0.0010s.00 105.00
Length
1
1
1
2
Ift
4',
4',2
1
1
l
0
0
Net uplift uniform load 131.00 lb/tr.
FORCES IN MEMBERS tKips]
Gap......: 1n
Left Reaction =
(THE SHOWN FORCES ARE UN-FACTORED)(Fy = s0 Ksi U/N) (Eff depth = 24.86 in)
7 .09/ -2.8s kips Right Reaction =
Allowed deflection under live load
Calculated deffection under service five foad
Tension Compres
Top chord
REQUTRED I,IATERIAL
x = Eied at mid-Iength
1 .45 in
0.38 in
Length
(L/ 360)(L/ 1373)
No SIend. Ut.iI
7 .09/ -2.85 kips
REQUIRED WEI,D
WeId-Ea.Side Remarks
1.1
1.2
1.3
L.4
1.5
1.6
L.7
1.8
1.9
1. t0
2.1
2.2
2.3
2.4
2.5
2.6
4.1
4.2
4.3
4.4
4.85
Botstom Chord
0.00 0.00
17.1,8 -5.92
25.97 -10.45
32.25 -L2.99
35.02 -14.51
37 .28 -15.01
End Diagonal
L3.72 -5.53
-t2
-11
-2L
-11
-?q
-29
-34
-34
-35
-36
04
74
89
89
43
43
45
45
95x
96x
295
281
246
245
246
246
246
246
zz 30
zz 30
73LL2X
do
do
do
do
do
do
do
do
185
LL 2 X .186
0
0
0
0
0
0
0
0
0
0
3 -3
2',
do
do
do
do
do
do
/2I
82
82
85
85
88
88
89
89
4
I
I
11
11
13
13
t4
T4
64
54
81
83
0
96
98
98
99 0
LL2X
do
do
do
do
LL2X
203
203
z LL6
z LLO
z !I0
z 1].0
2 LLO
z LLO
0.34
0 .54
0.58
0 .72
o.'79
0.81
do
do
do
3,-Lt r/2n
2',-Lt
3.1
3.1 r
BR 15/15 z 159 O.'74 4,-4 3/8" .223 - r L/zil
L2X.155
Diagonal Tovrards
6.78 -2
4.97 -2
3.16 -1
2.46 -0
uLx1r/8x0.1-18
U I x 0.091
do
U l- x 0-091
End
73
nn
27
55
z 75
z 78
z 78
z 78
0.58
0.65
o .42
0.33
L 7 /8il
t 7/8,
t t/2"
t L/2"
3/s'
do
do
2'-Lt 3/8il
Diagonal Towards Center
d x 0.135
L/4 x 0.LL9
/B x o.l-18
0.09r
0.091
4
2
2
2
I
1
1
1
1
1
2
3
4
5
-7
-5
-4
-2
2'-LL 3/8il
do
do
do
2'-11 3/8il
'7/
3/
7/
r/
t/
3. L5
2.37
7 .54
0. 18
84
88
o7
46
45
d
v \ 3/8
u 1 3/8 x r
U1x11
U1x
Ul-x
60
64
t5
78
78
0 .90
0.84
0.89
o.76
o.75
136 -
118 -
118 -
090 -
090 -
.118 -
.090 -
.090 -
.090 -
#caNAru Mark:JINU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I 1/30/18 14:t2:52
No Tension Compres
S€condary Web Member
7.t 0.40 -1.05
'7.2 0.26 -0.77
7 .3 0.26 -0.81
7 .4 0.26 -0.83
7.5 0.26 -0.84
FORCES IN MEMBERS
REQUIRED MATERIAL
x - tied at mid-l-ength Slend. Util-
rJLx3/4x0.091
do
do
do
ULx3/4x0.091
8t
77
'77
77
77
o.29
0.2t
0 .22
0.22
0 .23
do
do
do
091 - 1n
(Cont. ) [kips]
Length
REQUTRED WELD
Weld-Ea. Side Remarks
), -a 1/ail
2
2
2t
do
do
Maximum spacing between rows of bridging
@ Top Chord: 15'-al 3/8"
@ Bottom Chord: 24'-B l/8,
POSIT]ON @ Top Chord
7/8u
7/8u
2 Row(s) Minimum
4 Row(s) Minimum
@ Bottom Chord
4',-0t
15', -0[
28',-O"
40'-0n
Lateral Supports
Deck (35";
Acc. to the code
L4'-8
29',-3
Equally Spaced Bridging between Uplift Rows : Yes
vL.43 .0
Uplifts according to slope
Fabrication code unless noted
-LL = 2 angles short legs back to back,
-U =1Uprofile,
-BL = 2 angles welded in box,
-IIU = 2 U profil,es one inside th€ other,
-BR = Round bar
-CL = Crimped angle
PARTIAL LOADS
Span: 1 = Main Joigt, 2 = Left Extension, 3 = Right Extension
Chord:1=Top,2=Bottom
LoadCategory(Cat.):1=Dead,2=Live,3=Wind,5=Non-CompositeDead,S=Non-CompoEit.eLive
Prolect no.:
513
u05 52 8
55s
Designer: Ziad Al-Khalidi AIi Shop:
Area to Paint : 157.50 fE2
Buckeye Arizona [Production]
Material Sort : Cost
223 (241,) -223 (24L) -2s-20l11-s13 (ss5) NNN,NNN
(
&G \NArtn Mark : J2NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 14:12:52
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-2015 (ASD) (rev 2017)
Mark : J2NU (MS2, Symmetrical,, Free ends)
ALL RUNNINGS ARE GIVEN FROM THE LEFT REFERENCE
+ab++?++?+++++++++
'-^ :^ : O N sf A @ O N $ I € O N $ I 6
-NNNNNO66oo
o
1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 l.l0 t.t0 1.9
0'-0 1/2' ESL: - 0'-0 1/2" ESR: - 0'-0 1/2"
N
$
N
N
@N
N
O
CL: 0L5" EXTL; - 0'-0 l/2" C/C: zl4'-0" CR: 0'
@
t
1.1
2.1
1.1
2.t
alalalNd
1.8 t.7 l.6 1.5 1.4 1.3 t.2
o o o
@N
2.6 2.5 2.3 2.22.2 2.3 2.1 2.5
N N N N IN€
.lr r r 9r ..1r
I,OADING COIIDITIONS
( THE SHOWN VALUES ARE UN-FACTORED )
TOTAL LOAD..: 325.25 lb/ft 26K10 LrvE LOAD
-- PARTIAIJ LOADS (From Axis)
183.08 tb/fL
No Span
11
21,
Left
ltb/fL2l tlb/frl25.00 25.0025.00 25.00
Right
ttb/tL2l 115/ftJ25.00 25.0025.00 25.00
I ive 1oad.
Start
t frl
0'0
38',0
in (L/ 360)in (L/ 370)
an4
in
Length
tf rl
5',0
6',0
Chord Cat
3
3
1
1
-- UPLIFT
Net uplift uniform load. : 1.28.00 \blft = 6'1u * 22.1psf -.6*11.7 plf (Self Weight)
---- DEFI,ECTION
Allowed deflection under five 1oad.
Calculated defl-ection under service
.Toist inertia
Required camber
45
42
02
t5
1
t_
41_6
0
-- I.OADING CONDITIONS ---
( THE SHOWN VALUES ARE UN.FACTORED )
TOTAL LOAD. . : 2L3.00 \b/ft 25K5P2]-3/49 LIVE LOAD. . . : 49.00 \b/fL
c
\
\:
\
SGANAM Mark:J2NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 14 12:52
No Span Start
tf rl
0'0
40,0
0'0
38',0
6',0
6',0
1)
3
4
Left
llb/fL2) tlb/frlt-40.00 140.000.00 0.0025.00 25.0025.00 25.00
PARTIAL LOADS (From Axis)
Right
ltb/fL2) tlb/frl0.00 0.00140.00 140.0025.00 25.0025.00 25.00
Length
t frl
4',O
Chord Cat
1
1
1
1
2
2
3
3
1
l_
1
1
UPI,IFT
Net uplift uniform load z a28.00 lblft.
Allowed deflection under live load
Calculated deflection under service liwe load.....
1,.45 in (r,/ 350)
0.39 in (L/ 1.337)
==================================== End Of mu1t,iple loadS
FORCES IN MEMBERS tkipsl
(THE SHOWN FORCES ARE UN_FACTORED)
Gap 1rl (ry = s0 Ksi u/N)(Eff . depth = 24.87 in)
Lefr Reaction = 7.09/ -2.93 kips Right Reaction = 7.09/ -2.93 kips
REQUIRED MATERIAL REOUIRED WELD
No Tension Compres. x = Eied aE mid-length Slend. UtiI. Length Weld-Ea.Side Remarks
Top Chord
186 /27301
2
3
4
5
5
I
9
10
1
1
1
t
1
1
1
t
I
1
zLL
)r11 1
yyl1
wtt
)1r1 1
ylr11
4.93
4.79
8.81
8.81-
1r.78
1,1 .7 I
13 .75
13 .75
L4.74
t4.'74
-].2.04
-l-1.73
-2), .88
-21.88
-29 .4L
-29 .4L
-3 4 .43
-34.43
-35.94
-35.94
95
8l-
46
46
46
46
46
46
0 .64
o .64
0.81
0.83
0.92
0.96
0.98
0.98
0.99
LL2X
do
do
do
do
do
do
do
do
LL2X
-3
2',
2'
do
do
do
do
do
do
2',
do
do
do
LL2X
do
do
do
do
LL2X
1
8
0
a
zz 30
zz 30 0
2.r
2.2
2.3
2.4
2.5
2.6
BoEtom chord
0.00 0.00
L7 .17 -5.96
25.95 -70.42
32.24 -12.89
36.00 -1,4.37
37.26 -14.86
Bnd Diagonal
L3.72 -5.62
Diagonal Towards End
Diagonal Towards Ceoter
3.13 -? .A3 d
2.31 -5.87 d
1.50 -4.0'7
0.89 -2.46
185
L66
766
I'I SQUARE BAR
5 0.42
0 0.66
1 0.83
l, 0.87
1 0.95
1 0.98
3'-LL L/2"
4' -4 3/8r .250 - 1, '7 /8"
2
0
0
3.1 WL44 0.86
50
75
4.r
4.2
4.3
4.4
5.1
5.2
5.3
5.4
'18
97
L5
46
6
4
3
2
-1.95
-L.24
-0.53
z 75
z 78
z 78
z 78
0.58
0.66
0 .42
0.33
118
090
090
090
/8"
/s,
3/8.11VLxrt/
Ulx
8 x 0.l-18
0.091
do
U 1x 0.091
77
l7
11
11
do
do
2,-LL 3/sn
uL
r) L 3/g
Ulx
U
3/8 x 0.136
xLt/4x0.118
1 1/8 x 0.118
1 x 0.091
z
z
z
z
0.90
0.84
0.89
0.76
2'-Lt 3/8'
do
do
do
136 -
118 -
118 -
090 -
1 '7/e"
L 3/4"
L 1,/2t
c c
SGANAM Mark : J2NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) lll30l18 14:12:52
FORCES IN MEMBERS (Cont.) [kipsJ
No Tension compres.
0.18 -2.465.5
Secondary Web Menber
0.4'7 -1.05
o.25 -0.77
0.26 -0.81
0.26 -0.83
0.26 -0.84
REQUIRED IIATERIAL
x = Eled at mid-length
U 1x 0.091
ULx3/4x0.091
do
do
do
rJ L x 3/4 x 0.091
slend. UtiI.
z 78 0.76
LengEh
2,-tL 3/s"
REQUIRED WELD
Weld-Ea. Side
090 - t L/2'
Remarks
7.1
7.2
7.3
'7.4
7.5
1
1
z
z
z
z
z
81
77
77
77
77
0 .29
0 .2L
0 .22
0 .22
0.23
091 -
do
do
do
091 -
2'-3 !/4"
do
do
Maximum spacing between rows of bridglng
@ Top Chord: 15'-2 sfgu
@ Bottom Chord: 24'-5 Tfgu
z Row(s) Minimum4 Row(s) Minimum
@ Bottom Chord
4'-0u
16' - 0 "29, -0t
40, -0il
Lateral Supports
Deck (36 " )Acc. to the code
POSITION @ Top Chord
1,4',-8
29',-3
a/8'
7 /8"
Equally Spaced Bridging between Uplift Rows : Yes
v1,,43.0
UpIift according t.o slope
Fabrication code unless noted
-LL = 2 angles short l€ga back to back,
-U =1Uprofile,
-BL = 2 angles welded in box,
-W = 2 U profiles one inside the other
-BR = Round bar
-cL = crimped angle
PARTIAL LOADS
Span: 1 = Main ifoist, 2 = Left Extension,
Chord:1=Top,2=Bottom
Load category (cat.) : 1 = Dead, 2 = Live,
3 = Right Extension
3 = Wind, 5 = Non-Composite Dead, 6 = Non-CompoEit.e Live
Ziad A1-Kha1idi AIi Shop: Buckeye Arizona [Production]
Area !o Paint : 157.35 ft2 lrlaterial sort : cost
Project no.:
481
u05528 Des igner:
/ sLL
209 (222) -209 (222) -25-20/tt-48L (511) NNN,NNN
c
#G \NArtn Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) l1/30/18 l3:41:00
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-2015 (ASD) (rev 2017)
Mark : J3NU (MS2, Symmetrical,, Free ends) aligned on J2
ALL RUNNINGS ARE GIVEN FROM THE LEFT REFERENCE
N
\t
N €N NN +N N N N
@
N
\t
1.1
o
N
c o o o o o
t.2 l.l1.2 1.3 1.4 1.5 t.6 1.7 1.8 t.9 l.l0 l.l0 1.9 1.8 1.7 1.6 1.5 1.4 1.3
@N oN
2.t 2.2 2.3 2.4 2.5 2.6 2.5 2.4 2.3 2.2.2.r
N
O
N €
d tN @
N
N
d
CL: 0'-5" EXTL: - 0'-0 1/2" CIC: 44'-0" CR: 0'-5" EXTR: - 0'-0 l/2" ESL: - 0'-0 l/2" ESR: - 0'-0 l/2"
nr .lrr
LOADING CONDITIONS( THE SHOWN VALUES ARE UN_FACTORED )
TOTAL LOAD 325 .2s lb/ tL 26K!0 LIVE LOAD. . . : 183 .08 lb/fL
- CONCENTRATED I,OADS (FrOM .A,<ig)
No sp Side Hole Total Load Live l-oad Net uplift Position Spacing Cat.
lkipsl [kips] [kips] tftl tftl o-e
l- l Both No 0.25 0.00 0.00 0'-0n 0'-0rr 3
2 l Both No 0.25 0.00 0.00 0'-0n 0'-0rr 4
.- PARTIAL LOADS (F'rom axis)
Chord I ncI. Cmp
Ideg]90 090 0
1/2
1
1
No Span
11
21,
LeftI t1b/frl
25.00
25.00
Starttfrl0'0
38',0
Lengthtfrl
6',0
6',0
Chord Cat
ltb / fL2
25.00
25.00
Right
ltb/fL2) tlb/frl25.00 25.0025.00 25.00
3
3
UPLTFT
Net uplift uniform load
Allowed deflection under l-ive load
Calculated deflection under service live load
.Toist inertia
Required camber
13s. oo Lb/tL
DEFI,ECTION
45
29
t9
75
1
1
457
U
in(in(
in^+
1n
L/ 350)L/ 406)
c
r
\
r
\Y
\=
\
\:
\
1
l-
#cnNArtn Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 l3:41:00
TOTAL LOAD..:213.00 lb/fL
No Sp Side Hole
LOADTNG CONDITIONS( THE SHOWN VALUES ARE UN_FACTORED )
26Ksp2t3/49 LTVE LoAD. . . : 49.00 l-b/tL
CONCENTRATED I,OADS (From Axie)
Live load Net uplift Position Spacing Cat. Chord Inc1. Cmp
11
2L
Both No
Both No
lkipsl
0.00
0.00
lkipsl
0.00
0.00
t frl
0' -0I
0' :0 tt
Ides190 090 0
ToLal Load
IkipsJ
0.25
0.25
tfrl o-9
0, _0[ 3
0, _0I 4
a/2
1
1
No Span Chord Cat
Net uplift uniform load : 135.00 \blft
---- DEFIIECTION
Allowed deflection under 1i-ve load = 1.45 in (L/ 360)
Cafculated deffection under service live 1oad..... = 0.35 in (L/ 1,469)
FoRCES IN MEMBERS [kips]
Left
ltb/ft'z) I1b/frl140.00 140.000.00 0.0025.00 25.0025.00 25.00
PARTIAL LOADS (From Axis)
Right
ltb/tt2) tlb/frl0.00 0.00140.00 140.0025.00 25.0025.00 25.00
Starttfrl0'0
40'0
0'0
38',0
Length
2
2
3
3
1
1
1
1
1
1
1
1
1
2
3
4
tfrl
4',0
4',0
6',0
5',0
Gap
Left Reaction =
No Tension Compres
Top Chord
:1
(THE SHOWN FORCES ARE UN-FACTORED)(Fy = s0 Ksi u/N) (Eff . depth = 2s.86 in\
7-59/ -3.09 kips Right Reaction = 7.59/ -3.09
REQUIRED MATER]AL REQUTRED WELD
x = t.ied at mid-Iength Slend. UEi1. Length Weld-Ea.Side
kips
Remarks
3z
z
z
z
z
z
z
z
z
z
L
2
3
4
5
6
7
I
9
10
1
1
1
1
1
1
1
1
L
1
LL2X
do
do
do
do
do
do
do
do
LL2X
12 .42
14.50
14.50
15.54
r5.54
5.19
5.04
q ?q
9 .29
-12
-12
-)1
-23
-31
-31
-36
-36
-39
-39
89
53
44
44
50
50
88
88
57
96
6Z
45
46
46
45
46
45
45
46
0.74
0.65
0 .65
0.78
0.80
0.89
0.93
o.94
0.99
0.99
216
2]-6
LL 2 x .176
do
do
do
do
LL 2 x .176
t/2"
0,1
-3
do
do
do
do
do
do
2'0
2
2
2
2
2
2
z 115
!]1'110
}11'l10
yyl10
)ry110
fy110
3',-LL 7/2n
Bottom chord
0.00 0.00
18.39 -7.33
27 .8L -10.98
34.53 -13.59
38.55 -15.15
39.91 -15.68
o .42
0.55
o.82
0.88
0.95
o .99
do
do
do
#GANAnn Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) 11/30/18 13:41:00
No Tension Compres.
End Diagonal
L4.69 -5.92
Diagonal Towards End
7 .35 -2.81
5.48 -2.06
3.51 -1.31
2.54 -0.55
Diagonal Towarda Center
d
d
Secondary Web Mernber
FORCES IN MEMBERS
REQUIRED }I,ATERIAL
x = tied at mid-Iength Slend. Util
1I' SQUARE BAR Wl44 0 .90
1/8 x 0.118
x 0.091
do
75
78
78
78
0.74
0.73
0.48
0.35
rl"8 - 2
. UYU -
090- I
090 - 1
(Cont. ) tkipsJ
LengEh
REQUIRED WEI.D
weld-Ea. slde Remarks
3.1 4,-4 3/8"
2,-r7 3/a"
2,-tt 3/ail
do
do
2,-tt 3/ail
do
do
do
250- 2
1
091 - 1
4.1
4.2
4.3
4.4
5.1
5.3
5.4
5.5
U1x1
U1
z
z
z
L/ 8u
2il
r/2"
L/2uU 1 x 0.091
7.t
7.2
7.3
14
7.5
o .49
o.27
0.27
o.2't
0.27
-1.58
-1.27
-7.32
- 1 . 34
-1.35
U t 3/8 x 0.136
U13/8xLt/4x0.118
u 1x 1 l-l8 x 0.118
U t x 0.091
U 1 x 0.091
V]- x3/4x0.091
do
do
do
V]-x3/4x0.091
zBL
z 77
z 77
z '77
277
0.44
0.34
0.35
0.35
0.35
do
do
3.30
2 .44
1.59
0. 94
0.19
-8.44
-6.42
-4.54
-2.67
-2 .64
250
264
z 75
z 78
z 78
0 .97
o.92
0.99
0.s2
0.8r
136 -
118 -
118 -
090 -
090 -
/a"
/8'
2', -Lt 3/8',a1
l7
11
l-L
l-1
2,-3 r/4.09 1-
do
do
do
Maximum spacing between rows of bridging
@ Top Chord: 16'-3 3/4'
@ Bottom Chord; 24'-6 1/2"
2 Row(s) Minimum
4 Row(s) Minimum
@ Bott.om Chord4'-0"
16',-0n
28',-0'
40'-0t
Lateral Supports
Deck (35")
Acc. to the code
POSITION @ Top Chord
1/ 8',
7/8'
1,4',-8
29',-3
Equally Spaced Bridging between Uplift Rows : Yes
vL.43 . 0
CONCENTRATED LOADS (t indicat.es that the conc. load is not directly orr the panet point.)
Span: 1 = Main \foist, 2 = LafE Exten6ion, 3 = Right Bxtension
Side: Both Side6. Near Side, Far Side Holei Top Chord with IIoIeE aE Conc. Loads
Definition of the categorieB (Cat.):
3 = at any panel poine along the joi6t
4 = anlmhere along the Joiet.
Chord:1=Top,2=Botstom
Inclination(Incl.):90=Vertical,0=HorizontatComposite(Crp):0=standard,l=non-compoaite
UpIift according to slope
Fabrication code unleEE noted
-LL = 2 angles short legs back to back
-U =1Uprofile,
PARTIAL LOADS
Span: 1 = Main aIoisE, 2 = Left Extension,
Chord:1=Top,2=Bottom
toad Category (Cat.) : 1 = Dead, 2 = Live,
-BL = 2 angles welded in box, -BR = Round bar
-W = 2 U profiles one inside the other, -CL = g1ia1r.d angle
3 = Right Exten6ion
3 = Wind, 5 = Non-CoEposite Dead, 5 = Non-CoDposite Live
Ziad Al-Khalidi AIi Shop: Buckeye Arizona lProduct.ionlProject no.: Ir05528 Desigmer:
C c
ffiGANAnn Mark : J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 l3:41:00
523
227 (240) -227 (240) -2s-20/LL-s23 (sss) NNN,NNN
/ sss Area to Paint : L57.35 ft2 Material Sort : cosE
c c
EWEB
Eugene Water & Electric Board
P.O. Box 10148
Eugene, OR 97440
Phone/Fax: 541 -685-7 435
SUBMITTAL REVIEW COMMENTS
Date: December 10,2018
Project Name: Hayden Bridge Disinfection System
Submittal No: 36-1 Steel Joist Calculations - Rev. 1
Specification Section/Drawing: 05 50 00
Reviewer: CH2M
Project No: 1605873
Comments:
1. See attached CH2M comments
SUBMITTAL REVIEW ACTION
REVIEW IS FOR GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS. NO
RESPONSIBILITY IS ASSUMED FOR CORRECTNESS OF DIMENSIONS OR DETAILS.
THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DEVIATIONS FROM
CONTRACT REQUIREMENTS NOT SPECIFICALLY INDICATED ON THIS SUBMITTAL.
X nppnovEo
E ruOT ACCEPTABLE - RESUBMIT
Date:1211012018
E coltotloNALLY APPRovED
E nrvrrw Nor REQUTRED
By: Wally McCullough
EWEB
Sub 36-l Steel Joist Calcs Rev. I Comments Page I of I
ccC
SU BM ITTAL REVI EW COMM ENTS c*tzyyt
D,\I'U ltI-('LIVUD: 12, l()'18 Pll,OJL('-l': LW[:B Sodiunr lhpochlorite OnSite (]encration
PRO.Il.(''l- N0.: 693 168SUB\rI',l'-t'{L N0.:.l(r IIF.V I
SPI-C St_('TIO\ (S):05 50 0()
DESCRIPTlON: Roof .Ioist (lalcs
SI-IBNI IT-t,\I, '[YPE DRAWIN(;NitPl,ll INI.-ORNTAl-I0N
1. APPROVED 5. REVISE & RESUBMIT - Resubmittal required
n 2. APPRovED As NorED tr 6. NorsuBJEcrroREVIEW
tr 3. PARTIAL APPROVAT _ RESUBMIT A5 NOTED
Resubmittal required
As the primary reviewer of this submittal, I have coordinated my review comments with the comments of the following secondary
reviewer(s):
Jared Bauder ll,t0 l8
CH2M Date
NO COMMENT
RELATED SPEC
PARA./
DRAWING #
none
2.
3
4.
5.
L
c
1.
c
SUBMITTAL FOR APPROVAL
1831. - EWEB-Onsite Hypo GenerationPacifiic DATE: 1210712018
SUBMITTAL #: 36
SPEC #: 05 50 00
REV#:1
To: Laura Farthing
EUGENE WATER & ELECTRIC
BOARD
P.O. BOX 10148
EUGENE, OR 97440
From: Beau Solesbee
Pacific Excavation
79 N Danebo Ave
Eugene, OR 97402
We are transmifting the following Submittal Package: 36 - Roof Joist Calcs; Rev 1
item(s) for your review in accordance with the contract specification # 05 50 00.
Please review and respond to Beau Solesbee by 1211112018 in accordance with the
contract documents.
Additional Notes: Priority Level High
Submitta! ltem Status Activity Date Copies Remarks
1 : Roof Joist Calcs P 1
Sincerely,
Beau Solesbee
CONTRACTOR (Authorized Signature)
35?A Warner Milne Rd
Oregon City, OR 97045
(5031722-2904 [Voicel
(503) 722-2928 [FaxJ
Su bm itta I
Subject : Joist Calculations - Revised lssued for Approval
To
1827 - EWEB-Eugene
Beau Solesbee
Pacific Excavation, Inc.
79 N Danebo Ave
Eugene, OR 97402
Phone No: (541) 726-7380
Mobile: (541) 519-4196
Fax No: (5411726-7943
beau@pacificexc.com
Return To Travis Flora
Eagle's View Construction ll
357-A Warner Milne Rd
Oregon City, OR 97045
Phone No: (503) 722-2904
Mobile: (971) 304-9515
Fax No: (5031722-2928
travis@evconline.com
Copy To
Details
none
Notes
Joist Calculations - Revised lssued for Approval
Please return submitted items by 12/14/2018-
Number:
Spec Section No :
Submittal Rev No:
Submittal Number:
Date :
Type :
Method Sent :
Reason For Sending :
Status :
1827-2
1
2
12t7 t2018
Submittal Revision
Email
For Approval
Pending
Signed By:n#Dated: l2l7l20l8
Travis J Flora
Project Coordinator
c
T GANAlul @ffi
THE STEEL JOISTS DESIGNATED BELOW WERE DESIGNED IN ACCORDANCE WITH
STANDARD SPECIFICATIONS ESTABLISHED BY THE STEEL JOIST INSTITUTE
AND TO THE INFORMATION PROVIDED BY CUSTOMER.
JOIST
JlNU, J2NU, J3NU
rti
.GIN
Ev
l/19lPE
I
t,i?,
Joists and Steel Deck
u06628
HAYDEN BRIDGE PLANT
SPRINGFIELD, OR
PRO STEEL,INC.
STRUCTURAL
CALCULATIONS
I
FSKE
tthol/s
JOB NO. :
JOB NAME :
LOCATION:
CUSTOMER:
, : lll
22253 W. SouthernAve. * Buckeye, AZ 85326 * Phone: (623)3S6-f900 * Fax: (623)336-13SS
&G \NAltn Mark:JINU
Project: U06628 HAYDEN BRIDGE PLANT
(u06628)I l/30/18 14:12:52
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-2015 (ASD) (rev 2017)
Mark : J1NU (MS2, Symmetrical,, Free ends) aligned on J2
ALL RUNNINGS ARE GIVEN FROM THE LEFT REFERENCE
:-:^iooooooooooooooovu-.1
t.2 r.3 t.4 1.5 1.6 1.7 1.8 1.9 l.l0 t.lo 1.9 1.8 t.7 t.6
0'-0 l/2" ESR: - 0'-0 l/2"
N
sf
d
d
@N
N
0'-5" EXTL: - 0'-0 I/2" C/C: 44'-0" CR: 0'-5"
l.l
2,I
l.l
2.1
o ooo
NNN
1.5 |.4 1.3
2.3
1.2
O
*
o c o o o
@N
2.5 2.4 2.22.2 2.3 2.4 2.5 2.6
<i'
N
O
N N aNIN<f
O
Rr r .lr
I,OADING CONDITIONS
( THE SHOWN VAI,UES ARE UN_FACTORED )
TOTAL LOAD..: 325.25 lblft 26K1,0 LTVE LOAD...: 183.08 lb/fL
-- UPLIFT
Net uplift uniform load : 131.00 \b/ft
- - - DEF'LECTION
Allowed deflection under live load
Calculated deflection under service live load.. -
,foisL inertia....
Wraped angle at 1eft. .
Wraped angle at right.
45)a
6t
75
1
1
457
0
1n
1n
1n
(L/
(1, /
4
360)
407 \
1n
tL2 X.155 29.00
;L2 X.155 29.00
1n
IN
TOADING CONDITIONS( THE SHOWN VALUES ARE UN_FACTORED )
TOTAL LOAD.188.00 l-b/fL 25KSP188/53 LIVE LOAD s3. oo lb/fL
N
\\
rn
\
\:
\\
&G \NAltn Mark : JINU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 14:12:52
No Span SLarttfrl0'0
40'0
Length
I fr]
4',0
4',0
Chord Cat
a
a
1
1
1
2
t-
1
Left
tl-b/ ft2l tlb/f rl105.00 105.000.00 0.00
PARTIAL LOADS (From AxiS)
Right
ltb/f.L21 tlb/f rl0.00 0.00t-os.00 105.00
UPLIFT
Net uplift uniform load
Al-lowed deflection under live load.
Calculated deflection under service
Gap......: 1rr
Left Reaction =
No Tension Compres
l-ive load.....
End of multiple loads
13r-. oo \b/fL
---- DEFI,ECTION
1.45 in
0.38 i-n
(L/ 360)(L/ 1.373)
FORCES IN MEMBERS lKips]
(THE SHOWN FORCES ARE I'N-FACTORED)(Fy = s0 Ksi U/N) (Ef f . depth = 24.86 in)
7 .09/ -2.85 kips Right Reaction = 7 .09/ -2.85
REQUIRED MATERIAL REQUIRED WELD
x = tied at mid-Iength Slend. Util. Length weld-Ea'Side
kips
Remarks
L
2
3
4
5
6
7
8
9
10
1
1
1
I
l-
I
1
1
1
1
Top Chord
4.85 -t2.04
Bottom Chord
0.00 0.00
17.18 -5.92
25.97 -10.46
32.25 -L2.99
36.02 -14.51
3't .28 - 15 . 01
Bnd Diagonal
t3.72 -5.53
Diagonal Torarda End
6.78 -2.73
4.97 -2.00
3.15 -]-.27
2.46 -0.55
Diagonal Towards Conter
185
186
LL 203
LL 203
BR rsl1G
L 2 X.156
l-l8 x 0.118
x 0.091
do
LL2X
do
do
do
do
do
do
do
do
LL2X
4
I
I
11
11
13
13
t4
L4
73 -11
82 -2L
82 -2t
85 -29
85 -29
88 -34
88 -34
89 -36
89 -35
74
89
89
43
43
45
45
95x
95x
295
zgL
246
246
246
246
246
246
zz 30
zz 30
o.73
o.54
0 .64
0.81-
0.83
0.95
0.98
0.98
0.99
z 169 0.'74
2',-8"
do
do
do
do
do
do
3'-LL L/2il
4'-01
do
do
do
4', -0"
4,-4 3/8il
2,-5
3',-3 L/2"
2'-11,
223 - t L/2"
2.1
2.2
2.3
2.4
2.6
4.t
4.2
4.3
4.4
5.1
5.2
5.3
5.5
72
'79
81
2X
do
do
do
do
2X
zLL6 0
zLLQ 0
zLLo 0
z].L0 0
zILo 0
z!L0 0
34
54
58
3.1
3.1 r
Ulxl
U1
z 75
z 78
z 78
z 78
0.58
0 .56
0 .42
0 .33
118
090
090
090
3/8'
7 /a"
1
1
I
IU I x 0.091
do
do
2',-).L 3/8'
2'-LL 3/8n
do
do
do
2'-rL 3/8t
3
2
1
0
0
t6
64
Ut3/8x0.135
v L 3/B x 1, 1"/4 x 0.11e
U1x11/8x0.rr8
U 1 x 0.091
U 1 x 0.09118
-7.A4 d
-5.88 d
-4.07
-2.46
-2 .46
z60
264
z 75
z 78
z 78
0.90
0.84
0.89
0.76
u - 16
136 -
118 -
118 -
090 -
090 -
r 7/8"
t 3/4"
L L/2"
L 7/2"
L r/2'
#GANAnn Mark:JINU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I 1/30/18 14 12:52
FORCES IN MEMBERS (Conts.) [Kips]
No Tension Compres.
Secondary Web Member
0.40
REQUIRED MATERIAL
x = tied at mid-Iength Sfend. Util Lengt.h
REQUIRED WELD
Weld-Ea. Side Remarks
26
26
25
26
7.t
7.2
7.3
'7.4
7.5
- 1 . 05
-0.77
-0.81
-0.83
- 0 . 84
81 0.29
7'7 0.21,
77 0.22
77 0.22
77 0.23
do
do
do
uLx3/4x0.091
do
do
do
urx3/4x0.091
z
z
z
z
z
2'-3 L/4"
2',
do
do
2',
2
2
Maximum spacing between rows of bridging
@ Top Chord: 15'-L]. 3/8n
@ Bottom Chord: 24'-8 1, 19"
2 Row (s ) Mi-nimum
4 Row(s) Minimum
@ Bottom Chord
4',-1il
16', -0[
28'-0il
40' -0,,
Lateral Supports
Deck (36" )
Acc. to the code
POSITION @ Top Chord
1/ 8u
7/8u
1,4',-B
29'-3
Equally Spaced Bridging between Uplifc Rows : Yes
v1.43 .0
uplift according to EIope
Fabrication code unless noEed
-LL = 2 angles shorE legs back to back
-U =1Uprofile,
PARTIAL LOADS
spans 1 = Main,foist, 2 = Left Extengion,
Chord:1=Top,2=Boltom
Load Category (cat.) : 1 = Dead, 2 = Live,
Project no.: u05528
s13 /
Designer:
s55
223 (24L) -223 (24L) -2s-20/LL-sL3 (sss) NNN,NNN
-BL = 2 angles welded in box,
-Iru = 2 U profiles one inside the other
-BR = Round bar
-CL = CrimPed angle
3 = Right. ExEension
3 =wind, 5 =Non-compositeDead, 5 =Non-composite Live
ziad A1-Khalidi Ali Shop:
Area to Paints : L57.50 ft2
Buckeye Arizona [Production]
Material sort : cost
&GANAM Mark:J2NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I 1/30/18 14:12:52
Project: 1J06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-201s (ASD) (rev 2017)
Mark : J2NU (MS2, Symmetrical,, Free ends)
ALL RUNNINGS ARE GIVEN FROM THE LEFT REFERENCE
O
N
t.2 t.3 1.4 1.5 1.6 t.'l 1.8 1.9 l.l0 l.l0 1.9 1.8 1.1 1.6 1.5 1.4 1.3
N
44'-0" CR; 0 -5"
N
\t
N
d
@N
N
O
O
2.3
O
2.4
I
EXTR:-0-0 l/1"
2.5
N
O
N
NN
2.6
ESL: - 0'-0 l/2" ESR: - 0'-0 1/2"
sN
*N
IN
2.5
N
N N
2.3
O
I
C
2.2.
\f€
2.2
l.l
2.t
N
l.l
2.1
o o o o c o o o
N d
t.2
o o
@N
<f
r nr..1r ar r ..]..1
TOTAL LOAD 325.2s l,b/tL
LOADING CONDITIONS( THE SHOWN VALUES ARE UN-FACTORED )
26K1,0 LIVE i.OAD...: l-83.08 l.b/tL
PARTIAL LOADS (From .U<is)
No Span Leftltb/tL21 t1b/frl25.00 25.0025.00 2s.00
Righttl-b/tL2l trb/frl25.00 25.00
25.OO 25.OO
Start
I frl
0'0
38',0
ngthlfrl
5',0
6',O
Chord CatLe
1
1
1
1
1
2
3
3
Net uplift uniform load 128.00 lb/ft = 6'1" * 22.1psf - .6*1 1.1 plf (self weight)
Al]owed deflection under live load
Calculated deflect.ion under service l-ive 1oad..
Joist inertia
Requj-red camber
==================================== LOAD NO 2 ( .l2NU#02 )
I,OADING COIIDITIONS( THE SHOWN VALUES ARE UN_FACTORED )
45
42
02
75
l"
1
4L6
0
in
in
1n
in
(L/
(L/
4
350)
370)
TOTAL LOAD. . : 213.00 l-b/ft 25K5P21,3 /49 LIVE LOAD 4e. oo lb/fE
c
\-,
\
\:
\
\.
&G \NAlul Mark:J2NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I 1/30/18 t4:12:52
No Span Starttfrl0'0
40' 0
0'0
38',0
Length
t frl Chord Cat
1
1
1
1
1
2
3
4
Left
llb/tL2) t1b/frl140.00 l_40.000.00 0.0025.O0 25.0025.00 25.00
PARTIAL LOADS (Frour Axis)
Right
ltb/ft2l tlb/frl0.00 0.00140.00 140.0025.00 25.0025.00 25.00
4',0
4',0
5'.0
6',0
)
3
3
1
1
1
1
UPLIFT
Net uplift unj-form load 128.00 l.b/ft
Allowed deflection under l-ive load
Calculated deflection under service five foad
185
185
Bottom Ctrord
0.00 0.00
t7 .t7 -6.96
25.96 -t0.42
32.24 -12.89
35.00 -L4.37
37 .26 -14.86
L66
155
3.1
End Diagonal
L3.'72 -5.62 1N SQUARE BAR
Diagonal Towards End
U 1x I 1,/8 x 0.118
U 1 x 0.091
do
U L x 0.091"
ToP
4 .93
4.79
8.81
8.8r-
11.78
11.78
13.75
L3.75
]-4.74
L4.74
chord
-L2
-11
-2].
-29
-29
-34
-34
-35
-36
04
88
88
4L
4L
43
94x
94x
295
z 81-
245
246
246
245
246
246
zz 30
zz 30
0.73
0 .64
0 .64
0.81
0.83
0.92
0 .96
0.98
0.98
o .99
do
do
do
do
do
do
2',
1.45 in (
0.39 in (
L/ 360)
L/ 1.331)
End of multiple loads
FORCES IN MEMBERS [Kips]
(THE SHOWN FORCES ARE UN-FACTORED)
Gap......: 1" (Fy = 50 Ksi U/N) (Eff . depth = 24.87 tn)
Left Reaction = 7 .09/ -2.93 ki-ps Right Reaction = 7 .09/ -2.93 kips
REQUIRED MATERIAI, REQUTRED WELD
No Tension Compres. x = Eied at mid-length S1end. Ut.j.t. Length Weld-Ea.Side Remarks
0
1
3
4
5
5
7
8
9
l0
1
1
1
t-
I
I
I
I
1
1
LL2X
do
do
do
do
do
do
do
do
LL2X
LL2X
do
do
do
do
LL2X
at i 1lan
8',
z-r
2.2
2.5
2.6
4.1
4.2
4.3
4.4
5.1
5.2
5.3
5.4
z LL5
)ryl1 0
yyI11
).y11 1
yy111
yy111
0 .42
0.56
0.83
0.87
0.95
0.98
3'-!L ),/2r
:r.y744 0.85 n, -n ,rr,'
4',-O'
do
do
do
4',-0"
2'-Lt 3/8n
do
do
do
25O - r 7/8"
6.78
4 .97
3.16
2 .46
z
z
z
2
I
I
0
6'7
95
24
53
75
78
7A
78
0.58
0.66
0 .42
0.33
-11
do
do
118 -
090 -
090 -
090 -
r t /a"
L 7 /s"
L 1/2n
2
2'-LL 3/8"
3/8',
Diagonal Towardg center
3.13 -7.83 d
2.31 -5.87 d
1.50 -4.07
0.89 -2.46
rJL3/8x0.136
u!3/8xL1,/4x0.118
u 1 x l- 1/8 x 0.118
U l" x 0.091
1
1
1
I
z
z
z
z
50
64
75
78
0.90
0.84
0.89
0.76
L36
LtI
118
090
7 /a"
3/4',
L/2"
SGANAM Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 14 12:52
FORCES IN MEMBERS (Cont.) IKiPSJ
No
.5
Tension compres
0.18 -2.46
0 .47
REQUIRED Ii'ATERIAL
x = tied at mid-length
U 1x 0.091
rJLx3/4x0.091
do
do
do
vLx3/4x0.091
Slend. Uti1.
z 78 O.76
Length
2,-tt 3/s"
2,-3 L/4"
do
do
REQUIRED WEIJD
Weld-Ea. Side
090 - 7 L/2"
Remarks
secondary web Member
7.L
7.2
'1 .3
'1.4
7.5
-1.05
-0.77
-0.81
-0.83
-0.84
81
77
77
77
77
o.2l
u - 22
o.23
10 1
091- 1
O"
do
do
26
26
26
26
0
0
0
0
BRIDGING
Maximum spacing between rows of bridging
@ Top Chord: 15'-2 5fg'
@ Bottom Chord: 24'-5 Tfgu
2 Row(s) Minimum
4 Row(s) Minimum
@ Bottom Chord
4',-0f
16'-0u
29, -0n
40, _0,
Lateral Supports
Deck (35")
Acc. Lo Lhe code
POSITION @ Top Chord
a/8'
7/8'
1,4',-B
29',-3
Equally Spaced Bridging between Uplift Rows : Yes
Uptift according to 6lope
Fabricat.ion code unless noted
-LL = 2 angles short legs back to back,
-U =l.Uprofile,
PARTIAL LOADS
span: l, = Main aloist, 2 = Left. ExEenEion,
Chord:1=Top,2=Bottom
Load Category (Cat..) : 1 = Dead, 2 = Live, 3 = Wind,
Project no.: U05528
481 /
Designer:
-BL = 2 angles welded in box, -BR = Round bar
-IrU = 2 U profiles one inside the other, -CL = Crimped angle
3 = Right Extension
5 = Non-composite Dead, 5 = Non-composite Live
s11
Ziad A1-Khalidi AIi Shop:
Area to Paint t 157.35 ft2
vl.43.0
Buckeye Arizona [Production]
Material Sort : Cost
209 (222) -209 (222) -25-20/tl-48t (511) lu$r,r\rlrN
Mark: J2NU
&G \NArul Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I 1/30/18 13:41:00
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-2015 (ASD) (rev 2017)
Mark : J3NU (MS2, Symmetrical,, Free ends) aligned on J2
ALL RUNNINGS ARE GIVEN FROM TIIE LEFT REFERENCE
: :^ : o N :f I @ o N s I @ o N <f a € oNNNNNO666-*
1 .2 1 .3 L4 1.5 1.6 1.7
N
t
N
N
C
@N
N
CL: 0'-5" EXTL; - 0'-0 l/2" C/C; 44'-0"
l.l
2.1
N
l.l
2..t
o c
EXTR: - 0'-0 l/2" ESL: - 0'-0 l/2" ESR: - 0'-0 l/2"
ccocoooocoo6
N al al d al d cl ol ot ct at .t
1.8 1.9 Lto 1.10 t.9 1.8 1.7 1.6 1.5 1.4 r.3 1.2
2.5
@il
2.6 2.5 2.3 2.22.2 2.3
c N N ol d aN
r .t
r
.lr 1r .1rrr
I,OADING CONDITIONS
( UTP SHOWN VALUES ARE UN-FACTORED )
TOTAL LOAD..: 325.25 lb/fL 26K1-O LIVE LOAD...: 183.08 l-b/ft
CONCENTRATED I,OADS (FTOM A,<ig)
No Sp Side Hole Total Load Live load Net uplift Position Spacing Cat. Chold Inc1. Cmp- - -Jr.ip"t [kips] ikipsl tf rl [f t] o-e a/2 [deg]
L L Both No o.zi o.ob o.oo o'-otr o'-ot' 3 1 90 0
2 l Both No 0.25 O.OO 0'OO 0'-Orr O'-Oil 4 1- 90 0
PARTIAL LOADS (From A"is)
Chord CatLengthNo Span
11
21
Left
ltb/fL21 t1b/f rl
25.00 25.00
25.00 25.00
Right
ttb/ft2) tIb/f rl
2s.00 25.00
25.00 25.00
Starttfrl
0'0
38',0
I fr]
OU
6',0
3
3
1
1
- - - UPI'IFT
Net uplift uniform load : l-35 ' 00 lblft
--- DEFLECTION -
Allowed deflection under live load
Cal-cul-ated. deffection under service live load" '
,Ioist inertia
Required camber
1.45
L.29
457.79
0.75
(L/
(L/
4
inin
1nin
350)
405)
c
\\\
&G \NAlta Mark :J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 l3:41:00
TOTAL LOAD 213 . oo lb/ fL
No Sp Side Hofe
I,OADING CONDITIONS
( THE SHOWN VALUES ARE UN-FACTORED )
2GK9P21,3 / 49 LIVE LOAD...: 49.00 lb/tl
CONCENTRATED LOADS (From AxiS)
Total Load
lkipsJ
0.25
0.25
Live load Net uplift Position
[kipsJ [kips] tftl0.00 0.00 0'-0r,0.00 0.00 0'-0'
PARTIAL LOADS (From Axis)
Rj-ght
ltb/tL2) tlb/frl0.00 0.00140.00 140.0025.00 25.0025.00 25.00
Cat. Chord fncl-. Cmp
ldegl90 090 0
Spacinglfrl 1/2
1
1
11
21,
Both No
Both No
0' -0I
0' -0[
0-9
3
4
No Span Start
tfrl
0'0
40' o
0'0
38',0
Chord Cat.
1
1
1
1
1
1
1
1
1
2
3
4
Left
ltb/tL2) tlb/frl140.00 140.000.00 0.0025.00 25.0025.00 25.00
Length
I fr]
4',0
4',0
6',0
5',0
3
3
Top chord
5.19 -12.A9
5.04 -12.53
9.29 -23.44
9.29 -23.44
L2.42 -31.50
L2.42 -31 . 50
LL 2L6
1.45 in (L/ 360)
0.35 in (L/ 7469)
========== ====== End of multiple loads
FORCES IN MEMBERS [kips]
(THE SHOWN FORCES ARE UN_FACTORED)
^^- : 1r' (Fy = 50 Ksi U/N) (Eff . depth = 24.85 in)udP..
Left Reaction = 7 .59/ -3.09 kips Right Reaction = 7 .59/ -3.09 kips
REQUIRED MATERIAL REQUTRED WELDNo Tension Compres. x = Eied at mid-length Sl-end. Util. Length weld-Ea.Side Remarks
t-
2
3
4
5
6
7
I
9
10
1
t
1
1
l-
1
1
I
1
1
1
2
3
4
5
2X
do
do
do
do
do
do
do
do
2X
296
282
246
246
245
246
246
246
246
0.74
0.65
0.55
0.78
0.80
0.89
0.93
0 .94
0.99
0.99
3,-3 r/2'
14.50
14.50
15.54
00
39
81
53
55
9r
0
18
27
34
38
39
-36.88
-36.88
-39.57
-39.57 LL 2t6
LL2x
do
do
do
do
LL2x
z lLs
yyl10
yy110
yy110
}1/110
yyI10
]',-tt L/2n
do
do
do
do
do
do
4',-0r
do
do
do
4'-0r
Bot,tom Chord
1750.00
-10.98
-13.59
-15.15
-15.68 t75
0 .42
0.65
o.82
0.88
0.95
0.99
-- UPLIFT
Net uplift uniform load : 135.00 1b/ft
AIlowed deflection under liwe load
Calculated deflection under service live 1oad.....
&GANAnn Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 l3:41:00
Tension Compres.
Bnd Diagonal
14.69 -5 .92
Diagonal Tovrards Bnd
Diagonal Towards CenEer
PORCES IN MEMBERS
REQUIRED MATERIAL
x = tied at mid-length Slend. ULit
1il SQUARE BAR Wt44 0.90
(Conc. ) [kipsJ
Length
REQUIRED WELD
Wel-d-Ea. Side RemarksNo
3.1 a,-a z1s"250- 2
4.1
4.3
4.4
5.1
5.2
5.3
5.5
7.L
7.2
7.3
7.4
'7.5
7 .35
5.48
3 .6L
-2 .81
-2.O6
-1.31
-0.55
0.118
91
z 75
z 78
z 78
z 78
o.74
0 .73
0.48
0.35
2' -L1, 3/8il
do
do
2'-LL 3/8il
Ulxl-l/8x
U I x 0,0
do
U
u 13,
U1
U 1x 0.091
118 - 2 r/8,
090 - L 7/2"
090 - 1 t/2"
3.30
2 .44
1.69
0.94
0.19
-8 .44
-6.42
-4.54
-2 .64
d
d
1 3/B x 0.13G
/B x r 1/4 x o.r-1e
x11/8x0.118
U 1 x 0.091
50
64
75
78
78
o .97
0.92
0.99
0.82
0.81
136
118
118
090
090
2
1
I
I
tU 1 x 0.091
do
do
2,-LL 3/8"
do
do
do
2,-LL 3/st
t/e"
7 /a'
L/2"
t/2'
Secondary Web l.{ember
0.49 -1.58
o.27 -t.27
0.27 -),.32
0.2'1 -r.34
0.27 -1.36
VLx3/4x0.091
do
do
do
urx3/4x0.091
81
'77
77
77
77
0.44
0.34
0.35
0.35
0.36
do
do
do
2',-3 L/4'091 1
2
2
Maximum spacing between rows of bridging
@ Top Chord: 15'-3 3/+'
@ BoLtom Chordz 24'-5 I12"
2 Row(s) Minimum
+ Row(s) Minimum
@ Bottom Chord
4'_0,
16',-0"
28', -0[40'-0,
Lateral Supports
Deck (36")
Acc. to the code
POSITION @ Top Chorda/8'
7/8u
1_4',-8
29,-3
Equally Spaced Bridging between Uplift Rows : Yes
v1.43 .0
CoNCENTRATBD LOADS (* indicates that the conc. 10ad is noE direcEly on the panel point.)
Spans 1 = Main Joist, 2 = Left Extension, 3 = Rights Extenaion
Side: Both sideE, Near Side, Far side HoIe: Top Chord with Eoles at conc. Loads
Definition of the categories (Cat.):
3 = at any panel point, along the joist
4 = anlruhere along the joist
Chord:1=Top,2=Bottom
Inclination(Inc1.):90=Vertical,0=HorizontalComposite(Cmp):0=sta:rdard,1=non-comPosite
uplift according to 6loPe
Fabricat,ion code unless noted
-LL = 2 angles short legs back to back
-U =1Uprofile,
PARTIAL LOADS
Span: 1 = Main .foisE, 2 = teft ExEension,
Chord:1=Top,2=Botlom
Load Category (Cat.): 1 = Dead', 2 = Live,
-BL = 2 angles welded in box, -BR = Round bar
-W = 2 U profiles one inEide the other, -CL = Crimped angle
3 = RighE Exten6ion
3 = wind, 5 = Non-comPosite Dead, 5 = Non-comPosite Live
ziad Al-Khalidi AIi shoP: Buckeye Arizona [Productioa]Projects no.: u05528 Designer:
z
z
z
z
z
z
z
z
z
ScANAM Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 l3:41:00
523 / sss Area to Paint : 157.35 ft2 Material Sort : Cost
227 (2401 -227 (240) -25-20/LL-523 (s55) NNN,NNN
ccc
Eugene Water & Electric Board
P.O. Box 10148
Eugene, OR 97440
Phone/Fax: 541 -685-7435
SUBMITTAL REVIEW COMMENTS
Date: November 20,2018
Project Name: Hayden Bridge Disinfection System
Submittal No: 17 Steel Joist Framing Version 2
Specification Section/Drawing: 05 21 19
Reviewer: CH2M
Project No: 1605873
Comments:1. Please see the revised CH2M Hill comments. Resubmittal not required unless the new
wind speed affects the design.
2. See attached CH2M comments.
SUBMITTAL REVIEW ACTION
REVIEW IS FOR GENERAL COMPLIANCE WITH CONTRACT DOCUMENTS. N o
RESPONSIBILITY IS ASSUMED FOR CORRECTNESS OF DIMENSIONS OR DETAILS.
THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DEVIATIONS FROM
CONTRACT REQ UIREMENTS NOT SPECIFICALLY INDICATED ON THIS SUBMITTAL
E nppnovro X couotloNALLY APPRovED
E nevrEw Nor REQUIRED
By: L. Farthing
I ruOT ACCEPTABLE - RESUBMIT
Date: 1112012018
EWEB
Sub l7 V2 Comments Page I of I
SUBMITTAL FOR APPROVAL
1831. - EWEB-Onsite Hypo Generation
$r"elfls
DATE: 9/05/2018
SUBMITTAL #: 17
SPEC #: 0521 19
REV #: 0
To: Laura Farthing
EUGENE WATER & ELECTRIC
BOARD
P.O. BOX 10148
EUGENE, OR 97440
From: Beau Solesbee
Pacific Excavation
79 N Danebo Ave
Eugene, OR 97402
We are transmitting the following Submittal Package'. 17 - Steel Joist Framing, Rev 0
item(s) for your review in accordance with the contract specification # 05 21 19.
Please review and respond to Beau Solesbee by 911412018 in accordance with the
contract documents.
Additional Notes: Priority Level High
Sincerely,
Beau Solesbee
CONTRACTOR (Authorized Signature)
Submittal ltem Status Activity Date Copies Remarks
1 : SteelJoist Framing-Shop
Drawinqs P 1
0 to EE!r!-4ffiw
ltvlilc oNV Nrd ,Ntnvul toou
rvEnltnEls
nrrsls 3ltuottlf odlH l-LrsNo
IN\fU NO|IYUI]U ]DOIU8 N]OAYH
snl tsls xt I vM
ElMl
-
-?a#.ltwup
i*I
to0z-s-0r ir{zH3
-O-.r --9rlt
NV-12_5My\-VUJ JOOU
v
".@@.,"orrtr I50r lttrs -,@
ywE5Vm-cllEVol-oNl,1
?
rf C,l9:wD
t-v
frV85Vm-5NllliE6-^ ONS
n
-lt-i
tid T-
I0 rz c 9*$ rx 0r, serr6l0 .5 a ry! ar oHr a,)Nl-r rlrr srs&G llnvrvdu11r3 r/9C Y Ufr Sl&ddm 01 NSISY' rnnftfi nYdilfvro ro i)rctHs ,110 rYrln ll5 rrn tril z ld^r f l- p.;,o.9 -0 r .r 9
$m-9-lo HwH
zcm-9 lo ssrrro l5 srnlnlarcI gMrsl oNr rc{lt6{ !1116 &J ,
icfi-!-ro Em!{ orm-c-ro !gN(v& l$ srilfflurrc!! rc[]ldsM lYrfld
ony io{v^rsEo ranrlnus vrr}rEa m6l0 5tr0N rrunltnes rllnI &i r
3ti6n
I
LI
81 054
F+t+i+14l-t*,l""tel
--+
,€
rodJ-0,.*ili-0,
r@
,€
r
l
v
I Z',)
1827 - EWEB-Eugene
357A Warner Milne Rd
Oregon City, OR 97045
(5031 722-2904 [Voicel
(5031 722-2928 [Fax]
Submittal
Subject : Joist Shop Drawings - lssued for Approval
To Beau Solesbee
Pacific Excavation, lnc.
79 N Danebo Ave
Eugene, OR 97402
Phone No: (541 \ 726-7380
Mobile: (541)619-4196
Fax No: (5411726-7943
beau@pacificexc.com
Travis Flora
Eagle's View Construction ll
357-A Warner Milne Rd
Oregon City, OR 97045
Phone No: (503) 722-2904
Mobile: (971) 304-9515
Fax No: (503)-722-2928
travis@evco n line.com
Number:
Spec Section No :
Submittal Number:
Date :
Type :
Method Sent :
Reason For Sending :
Status :
'1827-1
1
91512018
Original Submittal
Email
For Approval
Pending
Return To
Copy To
Details
Notes
Joist Shop Drawings - lssued for Approval
P/ease return submitted items by 9/11/2018
Line
No Item Copies Date Reference No Description
001 Shop
Drawings
1 9t5t2018 Joist Shop Drawings - lssued for Approval
Signed By:/ft Dated:91512018
Travis J Flora
Project / Safetl' Coordinator
.:;ii#i';i'
lt It,' t J,,,,I i /1drt'b*0t/r+:4
ta
TYPICAL HORIZONTAL BRIDGING
JE1,O1u06628
H{*"-*-**,*,..*
SINGLE JOIST SPACE
DISCONTINUOUS BRIDGING PUgEMENT
r-=T--l
t-qdU'
AVAILABLE CONTRACT DRAWlEgQ!!G,' p.4lE
DRA\4/ING INDEX
JOIST ERECTOR NOTES
sHT_ I qRAVJNG NA[1E
APPROVER NOTES
NOIED ITEMS COMWNl
cs!<r c3*3ss5 D5r*5 JE2,O1 NOT USED
JE3,O1 R@f JOIST FRNING PLAN0-3€635S7 r3653tsl. r3S3tS9 MY 2013
rs3s10 D!6ats1r ra#r2 MAY201l
D.3S35-Sr6 D-16534S17 0-!5635S14 MAY20ra
rs3*r9 B3*3!S20 BlS3*21 UY20rl
GENERAL NOTES
8
GANATUI
L
-
lf'il
I h., ,
h
l
TYPICAL UPLIFT BRIDGING
":r:"^"'":. .., .
0illY
USI
r-Tt- '- ,' ,':-,EDl.\ -. " "I\+
,iI. HAYDEN BRIDGE PLANT
TllR APPROUA1
ltoT toB fltut lotsi cpven a wn
#caruAm
PLANT
u06628 JE3,O1
r-=T--\
L!dU.
s
JOST SECIO{ 1
JoIST LEGEND
1 AECEURIOENO6TrcENOONPLAN
3 SEOU€f,CE I,
uPllFI 6RlOCtN6 (R6FONLY) -
h2.rl li4'r1 1/arO.lG
SEE JEI.OI FOR SECTIOilS
5 LIVE LOAo DEFLECTION ' l,so
L__l
l1
6 STAiDARo SJ C&AER - APPROX lr4"
UPLIFT DIAGRAM
V&UESME SERUCE TEVELAXOM NOT
INCIUDESELFMEHT
wPrcAL BRTDGTNG SPAEING CIWPLTFD
r l. - :..":1]. l,:';.
2
-_4,_
Roor Jorsr Fnrurruc Pulr \ Affi1r
tol- o Tolffi;Ebl rldB ts+-r N
, i. ".1
.; ,,
c Ii i
'. i
i
TllN APPI|IUAI llIIlY
IIOI T(lR TIE1D UST
.f
IE!H'
ct-.l':
Cons
Return To
Copy To
Details
none
Notes
Joist Calculations - lssued for Field Use
Beau Solesbee
Pacific Excavation, lnc.
79 N Danebo Ave
Eugene, OR 97402
Phone No: (541) 726-7380
Mobile: (541)619-4196
Fax No: (5411726-7943
beau@pacificexc.com
Travis Flora
Eagle's View Construction ll
357-A Warner Milne Rd
Oregon City, OR 97045
Phone No: (503) 722-2904
Mobile: (971) 304-9515
Fax No: (503l,722-2928
travis@evconline.com
357A Warner Milne Rd
Oregon City, OR 97045
(503lr722-2904 [Voice]
{.503l.722-2928 [Faxl
Submittal
Subject : Joist Galculations - lssued for Field Use
Number:
Spec Section No ;
Submittal Rev No:
Submittal Number:
Date :
Type :
Method Sent :
Reason For Sending :
Status :
1827-5
Dated: l2l7l20l8
1827 - EWEB-Eugene
To
Signed By:
3
5
12t7 t2018
Submittal Revision
Email
For Release
Pending
/4F
Travis J Flora
Project Coordinator
GANAlul
THE STEEL JOISTS DESIGNATED BELOW'WERE DESIGNED IN ACCORDANCE WITH
STANDARD SPECIFICATIONS ESTABLISHED B}'THE STEEL JOIST INSTITT]TE
AND TO THE INFORNIATION PROVIDED B}'C['STONIER.
JOIST
JlNU. J2NU" J3NU
Joists and Steel Deck
I"r06628
HAYDEN BRIDGE PLANT
SPRINGFIELD, OR
PRO STEEL,INC.
STRUCTURAL
CALCULATIONS
lrE Bil
\r:t.
,l/J3 .
tr /lo/tB
JOB NO. :
.IOB NAME :
LOCATION:
CUSTOMER:
22253W. Southern Ave. * Buckey'e, AZ 85326 * Phone: (623)386-1900 * Fax: (623)386-1888
@
SGANAnn Mark:JINU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 11:12:52
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-2015 (ASD) (rev 2017)
Mark : JINU (MS2, Symmetrical,, Free cnds) aligned on J2
ALL RUNNII.T.GS ARE GIVEN FROM TIIE LEFT REFERENCE
+++i:???33:33333i:i;.at=i===RRxsK3sss=3
t.7 t.8 1.9 1.10 Llo 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2
ESR: - 0'-0 1,2"
.l
-
d
j
N
O
O
@N
0'-5" EXTL: - 0'-0 lr'2" CrC: .14'
LlLl
2t
c c
0'-5" EXTR: - 0'-0 l'1" ESL:
o
1.2 l.l l,l 1.5
c
1.6
@N
l.,l l.l ll 2.tll2.5 t.5l.l
tal
C
at €al €al -+N
r r .t
r r.lr r
( THE SHOWN VALUES ARE UN-FACTORED )
TOTAL LOAD. . : 325.25 l-b/fL 26Kto LIVE LOAD. . . : 183.08 lb/ft
- - UPI,IFT
Net uplj-f t unj.form load : 131.00 1blf t
---- DEFI,ECTION
Allowed deflection under live l-oad.
Calculated deflection under service
Joist inertia
Required camber
Wraped angle at left .: L 2 X
Wraped angle at right : L 2 X
ii"; i;;;
;;; ' ;;
156 29
L/ 360)
L/ 407 )
OO
00
1n
1n
i-n (
in(
r-n 4
in
45
29
6t
75
1
1
457
0
T.OAD NO 2 ( J1NU*O2 )---=== LOAD NO 2 ( 'J1Nu#02 )
I.OADING CONDITIONS ---
( THE SHOWN VALUES ARE I]N-FACTORED )
188.OO Lb/tt 25KSP188/53 T,rvE LoADTOTAL LOAD s3. oo lb/tL
\\
#c^NArul Mark:J1NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 14:12:52
No Span Left
ttb/fL2) t1b/frl105.00 10s.000.00 0.00
PARTIAT LOADS (From Axis)
Right
ltb/ft2) t1b/frl0.00 0.0010s.00 105.00
Starttfrl0'0
40'0
LengthIfr]
4',0
4',0
Chord Cat
2
2
1
1
1
1
1
2
UPLIFT
Net uplift uniform foad
DEFLECTION
Alfowed deflection under l-ive load.
Calculated deflection under service
1.45 in (L/ 350)
0.38 in (L/ 1373)I ive
End
]oad
Gap......: 1rl
Left Reaction =
FORCES I
(THE SHOWN(Fy =
7 .09 / -2 .85
of multiple loads
N MEMBERS [kips]
FORCES ARE TIN_FACTORED)
50 Ksi U/N) (Eff. depth
kips Riqht Reaction =
= 24.85 in)
7 .09 / -2 .85 kips
REQUIRED WELD
l^leld-Ea. Side RemarksNo Tension Compres
REQUIRED IVIATERIAL
x = tied at mi-d-length SIend. Util
z
z
zz
zz
z !69 O .'74
x
x
1
2
3
4
5
6
7
I
9
10
1
1
1
1
1
1
1
1
1
1
2.t
2.2
2.3
2.4
2.5
2.6
Top Chord
Bottom Chord
0.00 0.00
17.18 -5.92
25 .97 - 10 .45
32.25 -12.99
36.02 -14.51
37 .28 -15.01
End Diagonal
13.'72 -5.53
Diagonal Towards End
4.L 6.78 -2.73
4.2 4-9'7 -2.00
4.3 3.15 -1.2'l
4.4 2.46 -0.55
Diagonal Towarda Center
5.1 3.16 -7.A4 d
5.2 2.37 -5.88 d
5.3 L.64 -4.O7
5.4 0.91 -2.46
5.5 0.18 -2.46
LL2X
do
zu6
z LLO
z 110
z 1L0
z 110
z l]-9
0.34
0.54
0.58
0.72
0.79
0.81
4.85
4.73
8.82
8.82
r1.85
I1.85
13.88
13.88
L4 .89
t4 .89
_14
-11
-2L
-21
-29
-29
-34
-34
-36
-35
04
74
89
89
43
43
45
45
96
96
do
do
do
do
do
do
LL2X
95
81
46
46
46
46
30
30
0.73
o .64
0 .54
0.81
0.83
0.92
0 .96
0.98
0.98
0.99
LL 2 X .185
185
do
do
LL2X 203
BR 15li6
L 2 X .155
do
do
3
3'-),! L/2"
4 3/8,'
5
Length
do
do
2'-Lt 3/8il
aa1 - 1 i lrn
L/2"
0
-3
2'
do
do
do
do
do
do
2'
do
0
0
do
do
do
-4
r1
U 3/8'2t 7/
l-x
do
1x
x
U
U
8 x 0.118
0.091
z 75 0.58
z 78 0.55
z 78 O.42
z 78 0.33
118
090
090
090
t t /a"
t 7/8il
t L/2'
L r/2"0.091
x 0.136
1/4 x 0.118
/8 x 0.118
0.091
0.091
3/s'au 1 3/e
U 1 3/8 x 1
U1x11
U1x
U1x
z50
264
z 75
z 78
z 78
0.90
0.84
0.89
u. /b
o.'76
do
do
do
z',-Lt 3/8"
136
118
118
090
090
L 7/8"
L 3/4'
: 131.00 1blft
#G \NArtn Mark: JINU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/lU 11:12:52
FORCES rN I{EMBERS (Cont.) [kipsJ
No Tension Compres.
secondary Web Member
0.40
REQUIRED MATERIAL
x = tied at mid-length
Vrx3/4x0.091
do
do
do
U1x3/4x0.091
s]end. util Length
REQUIRED WEI,D
we1d-.La. slde Remarks
7.L
1)
7.3
7.4
'7.5 2
2',
do
do
z
z
z
z
-1
-0
-0
-0
-0
05
77
81
83
84
81
'77
'77
77
77
0 .2L
o .22
o.23
2,-3 t/4"09 1
091 - 1il
1-
do
do
do
0
0
0
0
25
26
26
26
Maximum spacing between rows of bridging
@ ToP Chord: 15'-1'1' 3/8"
@ Bottom Chord: 24'-8 I/8"
2 Row(s) Minimum
4 Row(s) Minimum
@ Bottom Chord
4',-0t
15',-0r'
28',-0"
40' -0[
Latera] Supports
Deck (36")
Acc. to the code
POSlTION @ Top Chord
7/8"
7/8u
1,4',-8
29',-3
Equally Spaced Bridging between Uplift Rows : Yes
v1.43.0
UpIift according to slope
Fabrication code unless noEed
-LL = 2 angles short legs back t.o back,
-U =]'Uprofile,
-BL - 2 angles welded in box,
-W = 2 u profiles one inside the other,
-BR = Round bar
-cL = crimped angle
PARTIAL LOADS
Span: L = Main Joists, 2 = Lefts Extension, 3 = Rights ExEension
Chord: 1 = Top, 2 = BotE,oB
Load Category (Cat.): 1 = Dead, 2 = Live, 3 = Wind, 5 = Non-ComPosite Dead, 5 = Non-ComPosite Live
ProjecE no.: U05528
513 /555
Designer: ziad Al-Khalidi Ali shoP:
Area to Paint : 157'50 ft2
Buckeye Arizona [Production]
llaterial Sort,: CoEt
223 (24L) -223 (241) -2s-20/LL-s13 (555) NNN,NNN
&G \NAltn Mark:J2NU
Project: U06628 HAYDEN BRIDGE PLANT
I l/30/18 14:12:52(u06628)
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-2015 (ASD) (rev 2017)
Mark : .I2NU (MS2, Symmetrical,, Free cnds)
ALL RUNNINGS ARE GIVEN FROM THE LEFT REFERENCE
iar+?+?++++++++++++
:-'- : o .l d € € o N sl € € c N'+ € € o
t.2 1.3 t.4 1.5 1.6 1.7 1.8 1.9 l.l0 l.l0 1.9 1.8 l.'1 1.6 1.5 1.4 1.3 1.2
-0 l1l" CrC: 44'-0" CR: 0 -5" EX[R: - 0'-0 I l" ESL; - 0'-0 12" F-SR: - 0'-0
al
al
al
O
c
@N
0 -5"
tt
6l
l.r
l.l
c
@
N
1.2 ltl.-1 ll ti l(,1.5 ll 2.1t.l
€
c
tataln.t
C{
1
P
t r .lr
TOTAL LOAD 325 .25 lb/ ft
( THE SHOWN VALUES ARE I]N-FACTORED )
26K7O LIVE LOAD. . . :
PARTIAL LOADS (From Axis)
Right
ltb/ tt2) trb/fLl25.00 25.0025.00 25.00
183.08 tb/fL
No Span LefL
ltb/ tL2) tlb/frl
25.00 25.00
25.00 25.00
Start
tf r.l
0'0
38',0
Lengt.h
I frl
6',0
6',0
Chord Cat
1
1
1
1
1
2
3
3
Net uplift uniform load 128.00 Lb/fL = 6'1" . Z2.1psf -.6.1 l.T plf (self weight)
Allowed deflection under live load
Calculated deflection under servi-ce l-ive load
.Toist inertia
Required camber
========== LOAD NO 2 ( J2NU#02 )
LOADING CONDITIONS( THE SHOWN VALUES ARE UN.FACTORED )
1
1
476
0
45 in (L/ 360)
42 in (L/ 370)
02 in^+
/5 1n
TOTAL LOAD 213.00 lb/fL 25K5P273 / 49 LIVE LOAD 49.00 lb/fL
&G \NAltn Mark:J2NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 14:12:52
PARTIAL LOADS (From AxiS)
No Span Left
ltb/fL21 tIb/frl140.00 140.000.00 0.0025.00 25.0025.00 25.00
Ri
llb / t L2)
0.00
140.00
25.00
25.00
ght
t 1bl fr
0
140
25
25
l
00
00
00
00
Start
lfrl0'0
40'0
0'0
38',0
Lengthtfrl
4',0
4',0
6',0
6',O
Chord Cat
2
2
3
3
1
1
1
1
1
1
1
1
1
2
3
4
UPLIFT
Net uplift uniform load
Al]owed deflection under live load
Calculated deflection under serwice live load
128.00 lb/ft
DEFLECTION
1.45 in (L/ 350)
0.39 in (L/ L337)
End of multiple loads
FoRCES IN MEMBERS [kipsJ
(THE SHOWN FORCES ARE UN.FACTORED)
Gap......: 1't (Fy = 50 Ksi U/N) (Eff . depth = 24-87 in)
Left Reaction = 7 .09 / -2.93 kips Right Reaction = 7 .09/ -2.93 kips
REQUIRED MATERIAL REQUTRED WEI,D
No Tension Compres. x = tied aE mid-Iength Slend. UEil. Length Weld-Ea.Side Remarks
I
2
3
4
5
6
7
6
9
10
I
I
t
1
I
I
I
I
1
1
Top
4 .93
4.79
8.81
L81
1l-.78
1r.78
13 .75
),3.75
L4.74
L4.74
chord
_12
-11
-2L
-29
-34
-34
-35
-36
04
73
88
88
41
43
43
94x
94x
186
LL 2 X .186
166
L66
1" SQUARE BAR
x]-l/8x0.118
U 1 x 0.091
do
u 1 x 0.091
u L 3/8 x 0.135
U13/8xLL/4x0.118
U 1 x 1 l,/8 x 0.118
U I x 0.091
LL2X
do
do
do
do
LL2X
o .42
0.65
0.83
0 .87
0.95
0.98
), 11 1/a,r
4',-47/8" .2s0 - L7/8"
LL2X
do
do
do
do
do
do
do
do
z l!5
yyL10
yyl11
yyl1 1
yy111
1T!LL
3'-3 l/zil
2'-O\
do
do
do
do
do
do
2'-0r
2,-tL 3/eil
do
do
2'-Lr 3/8"
95
81
46
46
46
45
46
0.73
0 .54
0.64
0.81
0.83
0 .92
0.95
0.98
0.98
0.99
zz 30
zz 30
2.7
2.2
2.3
2.4
2.5
2.6
4.L
4.2
4.3
4.4
5.1
5.2
5.3
5.4
BottoD Chord
0.00 0.00
L7 .77 -5.96
25.96 -]-0.42
32.24 -12.89
35.00 -L4.37
37 .25 -14.86
End Diagonal
4',
do
do
do
4'
0
0
3.1 -5.62
Diagonal fowards End
6.78 -2.5'7
4.97 -1.96
3 . 16 -t.24
2.45 -0.53
Diagonal Tordards Cent€r
3.i3 -7.83 d
2.31 -s.87 d
i.60 -4.0"t
0.89 -2.46
75
78
78
78
0.68
0.66
o .42
0.33
118 -
090 -
090 -
090 -
L3.72 Wl44 0.85
0.90
U 1
I
1
1
z
z
z
s4
89
75
'?/s,
7 /8',
L/2',
0
0
0
z
z
z
2'-Lr 3/sn
do
do
do
60
64
75
78
135
118
118
090
L 7/s,
t 3/a'
I L/2n
L t/2"
&cINAlvt Mark:J2NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/3O/lti 14:12:52
FORCES IN MEMBERS (Cont.) tkiPsJ
Tension compres.
0.18 -2.46
secondary web Member
a .4'7 - 1 . 05
REQUIRED Ii{,ATERTAI,
x = tied at mid-length
U 1x 0.09i
urx3/4x0.091
do
do
do
utx3/4x0.091
Slend. UEil .
z 78 0.'16
LengEh
2,-rt 3/8n
REQUIRED WEI,D
Weld-Ea. Side
090 - 1 7/2r
RemarksNo
5.5
'1 .7
'7.2
7.3
7.4
81
77
77
77
'77
o -29
0.21
0 .22
0.22
0 .23
do
do
a, -) l
2'-3 L/4t 1-
do
do
do
9 1'l
-0
-0
-0
0
0
0
0
26
zb
26
25
-0.77
Maximum spacing between rows of bridging
@ ToP Chord: 15'-2 5/gn
@ Bottom Chord: 24'-5 7/gt
2 Row(s) Minimum
+ Row(s) Minimum
@ Bottom Chord
4'_0,
15', -0[
28',-0r
40' -0I
Lateral Supports
Deck (35 " )Acc. to the code
POS IT ION @ Top Chord
8n
8il
L4'-8
zJ - )
L/
1/
Equally Spaced Brj-dging between UpJ-ift Rows : Yes
v1 .43 .0
Uplift according to sloPe
Fabricatsion code unless noEed
-LL = 2 angles shor! Iegs back to back,
-U =1UProfile,
Proj ect no. :
481
u05628
s11
-Bf = 2 angles welded in box,
-W = 2 U profiles one inside the other,
-BR = Round bar
-cL = crimped angle
PARTIAL LOADS
Span: 1 = Main Joist, 2 = Left Extension, 3 = Right Extension
Chord: 1 = ToP, 2 = Bott.om
Load Category (Cat,): 1 = Dead, 2 = Live, 3 = Wind, 5 = Non-ComPosite Dead, 5 = Non-Composite Live
Designer: Ziad AI-KhaIidi AIi shop:
Area to Paint : 157.35 ft2
Buckeye Arizora lProduction]
Material Sort ! cosE
2Og (222) -209 (222) -25-20l11-481 (511) NNN,NNN
z
z
z
z
z
#clNArta Project: U06628 HAYDEN BRIDGE PLANT
(U06628) I l/30/18 l3:41:00
Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
JOIST CALCULATION ACCORDING TO SJI-2015 (ASD) (rev 2017)
Mark : J3NU (MS2, Symmetrical.. Free ends) aligned on J2
ALL RUNNINGS ARE GIVEN FROM THE LEFT REFEREIT.CE
I al €at atat +al €al +€C$f
l.l
c
l.l Ll1.2 1.3 1.4 1.5 1.6 1.7 l.ti t.9 Llo l.l0 1.9 1.8 1.7 1.6 1.5 1.4 1.3
@N a @N
2.1 t.l t.l 1.5 l6 l5 l.l l.l 2.2 2.t
al
at
C
€.l
O
al al €I
at
f
CL: 0'-5" EXTL: - 0'-0 l/2" CiC: 44'-0" CR: 0'-5"- 0'-0 ESL: - 0'-0 l.'1" ESR: - 0'-0 1,3"
.t
rr'tr
P
ratr
LOADING CONDITIONS( THE SHOWN VALUES ARE UN-FACTORED )
TOTAL LOAD 325 .25 Lb/ fx 26KL0 LIVE LOAD 183.08 \b/ft
CONCENTRATED LOADS (From ExiS)
No Sp Side Hole
t
0
0
00
00
1 18
2 LB
oth No
oth No
Tot.al- Load
Ikipsl
0 .25
0 .25
Live foad Net
kips l
uplift
lkips)
0.00
0.00
Posj.tion Spacing Cat. Chord fnc1. Cmptftl tftl o-e 7/2 [des]
0,_0r 0,_0r 3 1 90 0
0,-0il 0,_0r 4 1, 90 0
No Span Leftltb/tt2) t1b/frl2s.00 25.0025.00 25.00
PARTIAL LOADS (From Rxis)
Right
llb / ft2) tlblfrl
25 . 00 25 .0025.00 25.00
SLaTL
i frl
0'0
38',0
Lengthtfrl
6',0
6',O
Chord Cat
1
1
1
2
3
3
1
1
Net uplift uniform load 13s.00 Lb/ft
Allowed deflecti-on under l-ive 1oad.Calculated deflection under service,Joist inertia
Required camber
45
,o
19
75
1
1
457
0
in (L/
in (L/
in^4
in
1 ive l-oad
360)
406)
#G \NArtn Mark:J3NU
Projcct: U06628 HAYDEN BRIDGE PLANT
(U0662ti) l1/30/18 li:41:00
==================================== LOAD NO 2 ( J3NU#02 )
TOTAL LOAD 213.00 lb/fL
LOADING CONDITIONS( THE SHOWN VALUES ARE UN_FACTORED )
2GK9P21,3/49 LrvE LoAD 49.00 lb/fL
CONCENTRATED LOADS (From exis)
No Sp Side Hole
Both No
Both No
a/2
1
1
112L
Total Load
Ikips ]
u.25
0 .25
Live load Net uplj-ft Position
lkipsJ [kips) tft]
0.00 0.00 0'-0'i,
0.00 0.00 0'-0,,
PARTIAL LOADS (From Axis)
Right
ltb/ ft2) t1b/f rl0.00 0.00140.00 140.0025.00 25.0025.00 25.00
Cat. Chord Incl. Cmp
Ides]90 090 0
Spacingtfrl
0' -0,
0/ _0I
0-9
3
4
No Span Starttfrl0'0
LengLh
Ifr]
A',0
4',0
6',0
6',0
Chord Cat
1
1
1
1
1
2
3
4
Left
LLb/tL2) trb/frl140.00 140.000.00 0.0025.00 25.0025.00 2s.00
40' 0
2
a
3
3
1
1
1
1
0'0
38',0
UPLIFT
Net uplift uniform load 13s. oo lb/tL
DEFLECTION
Allowed deflection under live load = 1.45 in (L/ 350)
Calculat.ed deflection under service five load..... = 0.35 in (L/ 7459)
==================================== End of multiple ]-oads ====================================
FORCES IN MEMBERS IKiPS]
(THE SHOWN FORCES ARE I]N-FACTORED)
Gap......: 1',r (Fy = 50 Ksi u/N) (Eff . depth = 24'85 in)
Left Reaction = 7 .59/ -3. 09 kips Right Reaction = 7 '59/ -3 ' 09 kips
REQUIRED MATERIAL REQUIRED WELD
No Tension compres. x = Eied at mid-length sIend. utit. Length weld-Ea'side Remarks
Top chord
-),2
-L2
-23
-23
-31
-31
-36
-36
-39
-39
89
53
44
44
50
50
88
88
57
57
296
246
246
246
246
246
246
246
246
LL 2 X .2l.6
do
do
do
do
do
do
do
do
LL 2 X .2L6
0.'74 -3
2',
do
do
do
do
do
do
ll- .1
r.2
L.3
1.4
1.5
1.6
L.'7
1.8
r.9
1.t0
2.!
2.2
2.3
2.4
2.5
2.5
5.19
0
0
0
0
0
0
0
0
0
5
9
t2
L2
t4
L4
04
29
42
55
65
'78
80
89
93
94
99
99
15.54
15.54
50
50
Bottom chord
0.00 0.00
18.39 -7.33
27.81 -1"0.98
34.53 -13.59
38.56 -r5.15
39.91 -15.68
l'7 6 z Ll5
yy110
yy110
yy110
yyl10
yy110
3'-:.1 L/2'
do
do
do
do
LL2x
0 .42
0 .66
0.82
0.88
0.95
0.99
4',-0tr
do
do
do
4'-4',
0
#GANArta Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
(U06628) ll/30/18 l3:41:00
No Tension Compres
FORCES IN MEMBERS (Cont.) tkipsJ
REQUIRED !,TATERIAI,
x = tieci at mid-lenqt.h SLend. Utrl. Length
REQUIRED WELD
Weld-Ea. Side Remarks
3.1
End Diagonal
14.59 -5.92 itr SQUARE BAR 4',-4 3/8tr
Diagonal Towardg End
4.L '7 .35 -2.5t
4.2 5.48 -2.06
4.3 3.61 -1.3r
4.4 2.64 -0.56
Diagonal Toward6 Cent€r
3.30 -A.44 d
2.44 -6.42 d
1.69 -4.54
0.94 -2.67
, 0.19 -2.64
secondary web Member
75
'78
78
78
0.'74
0.73
0.48
0.35
118 -
.090
090 -
090 -
U1x I1i2
2
U
1/8 x 0.ii8
W!44 0 .90
8i
77
77
77
77
do
do
LL 3/s,
250- 2
091 - 1
2 t/8,'
7/2"
t/2'
x0
do
091
091Uix0
1
1
5.1
5.2
5.3
5.4
5.5
7.t
'7.2
'7 .3
7.4
7.5
U
u13
U1
r 3/B x 0.1.35
/8xL1/4x0.118
xLL/8x0.118
U 1 x 0.091
U 1 x 0.091
60
54
75
'78
78
o .97
o.92
0.99
0.82
0.81
2'-Lt 3/8"
do
do
do
2'-\t 3/8"
135
118
118
090
090
2 1/8"
r 7 /8"
L L/2,
t L/2"
L t/2,
0.49
o.27
o.27
0 .27
0 .27
1.58
i.27
t.32
L .34
1.35
0.44
0.34
0 .35
0.36
0.36
2',-3
2',
do
do
vrx3/4x0.091
do
do
do
ULx3/4x0.091
7/4"
do
Z
z
do
do
091 - 1
BRIDGING
Maxj.mum spacing between rows of bridging
@ Top Chord: 16'-3 3/4"
@ Bottom Chord: 24'-6 l/2"
POS I T ION @ Top Chord
I KOW tS)
4 Row (s)
Minimum
Minimum
Lateral Supports
Deck (36")
Acc. to the code
14',-8
29',-3
t/8'
7 /8"
Equally Spaced Bridging between Uplift Rows : Yes
@ Bottom Chord
A, nIa -u
15', -0I
28',-0"
40'-0,,
w1.43 .0
CONCENTRATED LOADS (* indicates thaE the conc. load is not directsly on the panel point.)
Span: 1 = Main Joist., 2 = LefE ExEension, 3 = Right ExEension
Side: Both Sides, Near Side, Far Side HoIe: Top Chord with Ho1es at Conc. Loads
Definition of t.he categories (Cats.):
3 = at any panel points along Ehe joist.
4 = an)mhere along the joist
Chord:1=top,2=BotEom
Inclinalion (Incl.): 90 = Vertical, O = HorizonEal Composite (Cmp): 0 = standard, l, = non-comPogite
Uplift according to slope
Fabrication code unless noted
-LL = 2 angles short legs back to back,
-U =lUprofile,
PARTIAL LOADS
Span; 1 = Main .Toists, 2 = Left. Extension,
Chord:1=Top,2=Bottom
toad Category (Cat.) : 1 = Dead, 2 = Live,
-BL = 2 angles welded in box, -BR = Round bar
-UU = 2 U profiles one inside the other, -cL = crimped angle
3 - Right. ExEension
3 = Wind, 5 = Non-compositse Dead, 6 = Non-Compoeite Live
Ziad A1-Khalidi Ali ShoP: Buckeye Arizona lProduction]Project no.: U05528 Des igner :
&GANArul Mark:J3NU
Project: U06628 HAYDEN BRIDGE PLANT
11i30/18 l3:.11:00(u06628)
523 / sss Area to Paint z 157 -35 fL2 Material sort: Cost
227 Q40\ -227 (24O) -25 -20 / aa-523 ( 5 5 5 ) NNN, NNN