Loading...
HomeMy WebLinkAboutPermit Building 2019-10-08 (2)CitY of SPringfield D ev er o p m e nt . 1I Xtffi :;'Il SPringfield' OR97477 541-725-3753 SPRINGfIELD OREGON Web Address: www'springfield-or' gov €b Building Permit Commercial Structural Permit Number: 81 1-18-O01933-STR IVR Number: 811021233370 Email Address : permitcenter@springfield-or'gov Permit Issued: October 08, 2019 CategorY of Construction : Commercial Calculated Job Value: $689,625'00 Type of Work: New DescriPtion of Work: New Warehouse Building Shell - EAST BLDG Worksite Address 4107 INDUSTRIAL AVE Springfield, OR 97478 Parcel Unknown Owner: Address: LULU LLC PO BOX 2266 EUGENE, OR97402 Business Name DORMAN CONSTRUCTION INC License CCB License Number 68801 Phone 541-984-00 12 Inspection 8999 Final Fire 8675 Overhead SPrinkler Systems 1999 Final Building 1260 Framing 1110 Footing 1150 Slab/Flatwork 1530 Exterior Shearwall 1540 Gypsum Board/Lath/DrYwall Inspection GrouP Fire Fire Struct Com Struct Com Struct Com Struct Com Struct Com Struct Com Inspection Status Pending Pending Pending Pending Pending Pending Pending Pending Various inspections are minimally required on each project and often dependent on the scope of work. Contact the issuing jurisdiction indicated on the permit to determine required inspections for this project' Schedule or track inspections at www.buildingpermits.oregon.gov Call or text the word "schedule" to 1-888-299-2821 use IVR number: 8ttl2t23337o Schedule using the Oregon ePermitting Inspection App, search "epermitting" in the app store permits expire if work is not start€d within 18O Days of lssuance or if work is suspended for 180 Days or longer depending on the issuing agency's pollcy. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. Granting ofa permit does not presume to give authority to violate or cancel the provisions ofany other state or local law regulating construction or the performance of construction. ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set fofth in oAR gs2-ool-ooto throush OAR 952-OO[-OO9O. You may obt5in copies of the rules by calling the Center at (503) 232-r.9A7. Alt persons or entities perforning work under this permit are required to be ticensed unress exempted by oRi 701.0L0(stfucturar/Mechanicat), oRs 479.540 (E ectricat), and oRS 693.oro-o20 (ptumbing). Printed on: 7O/e/79 page 1 of 2 c : \my Repofts / re w rts/ / p rod u cti on/ 0 lsIAlvDA RD \r *. ra TYPE OF WORK JOB SITE INFORMATION INFORMATIONPROFESSIONALLICENSED PENDING INSPECTIONS SCH EDULING INSPECTIONS Permit Nurnber.. gf I-tg-OOt933-STR Fee Description Technology Fee SDC: Improvement Cost - MWMC Regional Wastewater SDC SDC: Improvement Cost _ Local Wastewater SDC: Reimbursement Cost _ Local Wastewater SDC: Total MWMC Administration Fee _ Local SDC: Reimbursement Cost _ Storm Drainage SDC; Improvement Cost - Storm Drainage SDC: Reimbursement - Transportation SDC SDC: Improvement - Transportation SDC SDC: Reimbursement Cost - MWMC Regional Wastewater SDC SDC: Total Sewer Administration Fee SDCt Compliance Cost - MWMC Regional Wastewater SDC SDC: Administrative Fee - MWMC Regional Wastewater SDC SDC: Total Storm Administration Fee SDC: Total Transportation Administration Fee Fire SDC - New Com Construction Sq Ft fee _ enter sq ftg Structural building permit fee Structural plan review fee State of Oregon Surcharge - Bldg (L2o/o of applicable fees) Quantity 5134.73 2283.t2 4635.12 282.L 7482.3 10790.8 1509.62 28689.9 423.9 345.91 73.35 10 913.66 1509.98 1 1250 Total Fees: Page 2 of 2 Fee Amount $336.19 $5,L34.73 $2,283.t2 $4,635.72 9282.10 $7,482.30 $10,790.80 $ 1,509.62 $28,689.90 $423.90 $345.91 $73.3s $ 10.00 $913.66 $ 1,s09.98 $1,237.50 $4,075.06 $2,648.79 $489.01 $72,877.O4 Construction Type VB Printed on: 10/8/19 Occupancy Type S-1 moderate hazard Unit Amount 11,250.00 Page 2 of 2 Unit Sq Ft Unit Cost $61.30 Tota! Job Value: Job Value $689,625.00 $689,625.00 C:\myReports/reports//prcduction/01 STANDARD PERMTT FEES VALUATION INFORMATION \ SPRI NGHELD # OREGON vtnrtw. sprin gfie Id_or. gov Transaction ReceiPt 81 1 -1 8-001 933-STR Receipt Number: 472628 Receipt Date: 1018/19 CitY of SPringfield DeveloPment and Public Works 225 Fifth Street SPringfield' OR97477 s4l-7264753 permitcenter@springfield-or'gov Worksite address: 4107 INDUSTRIAL AVE, Springfield, OR 97478 Transaction dateru/B/1 9 1 0/8/1 I Units 1.00 Ea Fees Paid Description Structural building permit fee State of Oregon Surcharge - Bldg (12% of applicable fees) Technology Fee SDC: Reimbursement Cost - Storm Drainage SDC; lmprovement Cost - Storm Drainage SDC: Reimbursement - Transportation SDC SDC: lmprovement - Transportation SDC SDC: Reimbursement Cost - MWMG Regional Wastewater SDG SDC: lmprovement Cost - M\ /MC Regional Wastewater SDC SDC: Compliance Cost - MWMC Regional Wastewater SDC SDC: Administrative Fee - MWMC Regional Wastewater SDC SDC: Total Storm Administration Fee SDC: Total Transportation Administration Fee SDC: Total M\ JIvlC Administration Fee - Local Account code 224-00000425602-1030 82 1 -00000-2 1 5004-0000 1 00-00000-425605-0000 61 7-00000-448029-8800 61 7-00000-448028-8800 434-00000-448026-8800 434-00000-448027-8800 433-00000-448024-88 1 0 433-00000-448025-881 0 433-00000-426607-881 0 61 1 -00000-426604-8800 7 1 9-00000-426604-8800 7 1 9-00000-426604-8800 7 1 9-00000-426604-8800 Fee amount $4,075.06 $489.01 $336.19 $7,482.30 $10,790.80 $1,509.62 $28,689.90 $423.90 $5,134.73 $73.35 $10.00 $913.66 $1,s09.98 $282 10 Paid amount $4,075.06 $489'01 $36.19 $7,482.30 $10,790.80 $1,509.62 $28,689'90 $423.90 $5,134.73 $73.35 $10.00 $913.66 s1,509.98 $252.1O 10/8/19 1 0/8/1 9 1 0/8/1 I 1 0/8/1 I 1 o/8/1 I 1 0/8/1 I 1 0/8/1 I 1 0/8/1 9 10/8/.19 10/8/19 1 o/elt s 10/8/19 1.00 Ea 1.00 7,482.30 10,790.80 1,509.62 28,689.90 423.90 Automatic Amount Amount Amount Amount Amount 5,134.73 Amount 73.35 Amount 10.00 Amount 913.66 Amount 1,509 98 Amount 282.10 Amount Printed:1o/8/1 9 1:13 pm Page 1 of 2 Fl N-TransactionReceiPt-Pr Transacfton ReceiPt 8{ { -{ 8'oot 933'sTR ReceiPt number: 472624 Fees Paid Description Fire SDC - New Com Construction Sq Ft fee - enter sq ftg SDC: Reimbursement Cost - Local Wastewater SDC: lmprovement Cost - Local Wastewater SDC: Total SewerAdministration Fee Transactron date 10/8/19 1o/8/19 1o/8/19 1o/8/19 Units 11,250.0O SqFt 4,635.12 Amount 2,283.12 Amount 3\45.91 Amount Account code 1 00-00000-424005-1 091 61 1 -00000-448024-8800 61 I -00000-448025-8800 7 1 9-00000-426604-8800 Fee amount $1,237.s0 $4,635.12 $2,283.12 $345.91 Paid amount $1,237.50 $4,635.12 $2,283.12 $345.91 Gheck number:7846 Payer: Divine & Hammer Cashier: Katrina Anderson Amount:$70,222.2s Receipt Total:$70,222.25 Printed: 1O/8/19 'l:13 Pm Page 2 of 2 Fl N_Tra nsaction Receipt_pr Crrv or SpnrNcrmrn, oREGoN Structural Permit APPlication ll5 Fifth Street o Sprirgfieid. OR 97477 o PH(541)726-375-1 ' F'AX(541 )726-3689 This permit is issued under OAR 918-460-0030. Permits expire if work is n suspended for 180 da1's. Date: ot stafted u'ithin 180 davs issuance or if work is H#DEPARTMENT USE ONLY Pennit no.: l$-t%3 9 f BlDk- No o.re. ova\\<r\rte .+> ao tnta,re_ revte-rJ Date FEE SCHEDU 1. \raluation information (a) Job description: Occupancl, Construction qpe: Square feet:?s-4 o Cost per square foot: 20 Other information Type ofHeat: Energl,Path: ffn"* flalteration fl addition No(b) Foundation-onll,permit? n Yes Total valuation:s(oft>ct{s, 2. Building fees (a) Permit fee (use valuation table):$ (b) Investigative fee (equal to [2a]):$ (c) Reinspection ($ per hour) (number ofhours x fee per hour)$ (d) Enter 12% surcharge (.12 x [2a+2b+.2cl):$ (e) Subtotal offees above (2a through 2d):S 3. Plan review fees l2al):(a) Plan ."u;s\r, (65% x permit fee s (b) Fire and life safety (659i, x permit fee l2al):$ (c) Subtotal offees above (3a ard 3b):s 4. Miscellaneous fees (a) Seismic fee, I % (.01 x permit fee [2a]):$ (b) Tech fee, 5% (.05 x permit fee[2a]+PR fee [3c])s/ IOTAL fees and surcharges (2e+3rr4a+b):I LOCAL GOVERNMENT APPROVAL S This project has final land-use approval. This pro.iect has DEQ approval. Date Zoning approval verified: E Yes E Xo Properq,is within flood plain: fl Yes n No CATEGORY OF CONSTRUCTION n Residential ! Government Commercial JOB SITE INFORMATION AND LOCATION Job site State: Subdivision:Lot no. Reference:@Taxlot:l oL3 PROPERTY OWNER Name: Address: State:ZP: Phone:J Fari: E-mail: authorizing this applicationBuilding Owner Sign here: Th.is installation is being made on residential or farm propeny- owned b1, me or a member of ml,immediate famil1,, and is exempt from licensing requirements under ORS 701 .010. D CONTRACTOR INSTALLATION Business name: Address: State:ZD Phone:Fax: E-mail: CCB iicense no, Print name Signanrre INFORMATIONSUB.CONTRACTOR Name CCB License #Phone Number Eiectrical Plumbing Mechanical Last edited 5-5-201; Biones P\"^n\ Dh'trL Vvr, tta+ffi R€& utetD , oP CITY OR *.^unoncoMPANY: LOCATION: MAP & TAX LOT NUMBER: Hammer Sub -00100 s1 Hammer 4107 7 1 East ITE:MWMC: TOTAL IMPERVIOUS EXISTING DEVELOPED AREA (S'F'):-Tt6"-Lor-szB 25,450 25,450 x $ 0.294 PER SF TOTALSTORM DRAINAGECostSF= $ 0.718 IMPERVIOUS SQ. FT REIMBURSEMENT COST: SQ. FT IMPROVEMENT COST:$ 0.424 PER SFx25,450V1OUS SQ. FT $7,482.30 $10,790.80 .38REIMBURSEMENT COST: NUMBER OF DFU'S IMPROVEMENT COST: NUMBEROF DFU's x97 97 TOTAL LOCALWASTEWATER No New Fixtures(see reverse $ 165.54 PER DFU x $ 81.54 PERDFU s 247.08 I@ $ 385.69 x x x x $ 19.28 PER TRIP x $ 366.41 PER TRIP 1 NTFx x AREA TGSF X TRIP RATE X COST PER ADT X NEW TRIP FACTOR IMPROVEMENT x 6.9611.25 TING: REIMBURSEMENT COST: 6.960.00 x TOTAL TRANSPORTATION REIMBURSEMENT TOTAL TRANSPORTATION SDC TOTAL TRANSPORTATION NTF NTF xINTF $ 19.28 PERTRIP $ 366.4I PER TRIP REIMBURSEMENT COST: 11.25 x 6.96 IMPROVEMENT COST: 0.00 x 6.96 $.36 $423.90 $73.3s $0.00 $0.00 tt.25 11.25 tt.25 $37.68 SUBTOTAL x x x x x $456.42 x $6.s2 ITEMS $37.68 PERFEU $456.42 PER FEU $6.52 PERFEU TOTAL MWMC SDC: PER FEU PER FEU PER FEU REIMBURSEMENT COST: NUMBER OF FEU's IMPROVEMENT COST: NUMBER OF FEU's COMPLIANCE COST: NUMBEROF FEU's TOTAL MWMC REIMBURSEMENT FEE: TOTAL MWMC IMPROVEMENT FEE: TOTAL MWMC COMPLIANCE FEE: MWMC ADMINISTRATIVE FEE: REIMBURSEMENT COST: NUMBEROF FEU's 0.00 IMPROVEMENT COST: NUMBER OF FEU's 0.00 COMPLIANCE COST: NUMBER OF FEU's 0.00 CREDIT IF APPLICABLE (SEE REVERSE) 78,081.36 x 5%o STORMDRAINAGE SEWER ADMINISTRATION TRANSPORTA TION ADMINIS TRA TION LOCALMWMC 07 91 $s Iirwf'a BASECHARGE(SUBTOTALABOVE) $ 9/12/20 I I TOTALSDC CIIARGES $0.00 I COST: 1,509.9 DRAINAGf, FD(TURE UNIT (DF'U) CALCULATION TABLENUMBER OF NEW FIXTURES x UNIT EQUIVALENT:DRAINAGE FIXTURE UNITS #REF! FOR CALCULATE ONLY THE NET FIXTURE TYPE BATHTUB DRINKING FOUNTAIN FLOORDRAIN, FLOORSINK INTERCEPTORS FOR GREASE/OILISOLIDS/ETC- INTERCEPTORS FOR SAND/AUTO WASH/ETC. LALINDRY TTIB CLOTHES WASHER/MOP SINK CLoTHES WASHER _ 3 OR MORE (EA) MOBILE HOME PARK TRAP (1 PER TRAILER) RECEPTOR FOR REFRIGERATOR/WATER STATION/ETC. RECEPTOR FOR COMMERCIAL SINK/ DISHWASHER/ETC. SHOWER, SINGLE STALL sHowER, GANG (NUMBER OF HEADS) SINK: COMMERCIAL, RESIDENTIAL KITCHEN SINK: COMMERCIAL BAR SINK: WASH BASIN/DOUBLE LAVATORY SINK: SNGLE LAVATORY/RESIDENTIAL BAR URINAL, STALL/WALL TOILET, PUBLIC INSTALLATION TOILET, PRIVATE INSTALLATION MISCELLANEOUS: NUMBER OF EDU'SX *EDU (Equivalent TOTAL DRAINAGE FIXTURE UNITS : IT ADDITIONAL FIXTURES NEW OLD t6 LTNIT FIXTURE T]NITS 0 0 0 7 3 I 3 3 6 2 3 6 t2 1 J 2 2 3 2 2 1 5 6 3 0 0 48 0 0 0 0 0 0 0 0 0 7 7 0 Dwelling Unit) is a discharge equivalent to a sinele family dwelling (20 DFU) set at 167 gallons per 44v CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEPARATELY YEAR ANNEXED RATE PER ,000 ASSESSED VALUE $ l.4s $ l.2s $ 1.09 s0 CREDIT TORPARCEL OR LAND ONLY IF APPLICABLE i,il-.**tt*i 0r mtt* o''*ExArroN DArE) x x RATE PER $I,OOO ASSESSED VALUE YEAR ANNE)GD 1992 t993 1994 199s 1996 1997 1998 1999 2000 200 I 2002 2003 2004 $4.40 $4.07 $3.67 $3.22 $2.73 $2.25 $ 1.80 $5.29 $5. l9 t979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 or before CREDTT'|OTAL --- 42 0