Loading...
HomeMy WebLinkAboutPermit Building 1991-11-12 (2)CO M M E RCIAL/ I N DUSTRIAU PERMIT APPLICATION LOCATION OF PROPOSED WORK: ASSESSORS MAP: SPRIHGFIELO ,2 JOB NUMBER INSPECTION LINE: 726-3769 OFFICE: 726-3759 TAX LOT: 225 Fifth Street, Springfield, Oregon n VAl afr, (/ '2 /LS oiuSTATE:ztP 4'7 yo PHoN E: /,9/ - z Y4/ / trr sr./U /- CITY: fCrt ts ADDRESS: OWNER: 6"- q7A fru'. Lf ,0tt 0VALU L0tlJDESCRIPTION OF WORK: ADDITION DEMOLISH OTHER*.* /REM.DEL A'EAUATIIA I. PHONENAMEADDRESS EXPI RES PHONE GENERALIUzaA/54 6 arol.e.a.e* PLUM BI NG ELECTRICAL: CONTRACTOR'S NAME ARCH ITECT: ADD RESS CONST. CONTRACTOR # PLU MBING No. I FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtl) Water Service It Sanitary Sewer ft. Storm Sewer ft. Backf low Device TOTAL PERMIT MECHANICAL Nr)trFF CHA FIG F Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100.000 BTUs Floor furnace and vent Suspended wall or f loor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT ZONING - OFFICE USE _ LAND USE: HANDICAP ACCESS FLOOD PLAIN LIGHTING POWER BUDGET: WATER HEATER * OF UNITS: OCCY GROUP: * OF STORIES: QUAD AREA: * OF BLDGS: CONSTR. TYPE: HEAT SOURCE: $/sQ. FT.SQ. FT. 65aooTOTAL VALUE OF PROJ X X VALUE Z6*SQ. FTG MAIN SQ. FTG ACCESS SO. FTG OTHER 2/3ZL 7e90RCPT#DATEPLAN CHECK FEE BUILDING PERMIT 3z*-e PLUMBI NG DEMOLITION 5% State Surcharge /a.72 5% State Surcharge MECHANICAL FENCE VALUE $ 5% State Surcharge SIDEWALK FT, SUBTOTAL PERMITS PAVI NG CURBCUT FT. SYSTEMS DEVELOPMENT /r./. TOTAL PERMIT FEES EXCLUDING ELECTRICAL {uL'rr? ,0/6- s7 BY 7//.le V REOUIRED INSPECTIONS V It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:O0 a.m. will be made the following work day. stTE INSPECTTON: To be x EATTSH-eLUMBING, PAVTNG: After gravet is in made after excavation, but <E!.gRlCAtr& place but prior to placing prior to setup of forms. MECHANICAL: No work is to asphalt or concrete. be covered until these UNDERSLAB pLUMBING, inspections have been made SpEC;AL INSpECTIONS: ln accordance ELECTRICAL & and approved. Section 306 of the State Specialty Code X MECHANICAL: To be made before any work is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in place, but prior to placing concrete. CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. UNDERGROUND: PIumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or f illing trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. POST & BEAM: To be made prior to installation of floor insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. MASONRY: Steel location, bond beams grouting or verticals in accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prior to installing any roof covering. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prior to placing facing materials and before framing inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering is applied or before gypsum board joints and fasteners are taped and f inished. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. a special inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. f STRUCTURAL CONCRETE: tn excess of 2500 P.S.l. (306 a.1) x STRUCTURAL WELDS: Performed on the job. (2722 t) HIGH STRENGTH BOLTING: During all bolt installation and ti ghteni ng operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMST lnspection Certif icate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25-10J1). STRUCTURAL MASONRY: (306 a.7, )( *ln addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT FINAL BUILDING: Requested alter the final plumbing, electrical,mechanical and Fire Department inspections are made andapproved. No occupancy of the premises can be made until acertificate of occupancy has been issued by the Building Divisionand posted on the premises. SITE PLAN REVIEW BOARD: Must be requested 2 days in advanceof the date you wish inspection. All project conditions such aslandscaping, parking lot stri ping, etc. must be completed beforerequesting this inspection. ADDITIONAL COMMENTS: PLANS REVIEWED BY axz112^/*-7r/_ By signature, I state and agree, that I have caref ully examined the completed application and do hereby certify that all informationherein is true and correct, and I further certify that any and all work performed shall be done in accordance with the ordinancesof the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that No OCCUpANCywill be made of any structure without permission of the Building safety Division. I further certify that only contractors and employeeswho are in compliance with oRS 70i.055 wiil be used on this project. I further agree to ensure that all required inspections are requested at the Signature Date roper time, that project address is readable f rom theapproved set of plans will remain on the site at all p street, that the permit card is located at the front of the property, and thetimes during co ction. VALIDATION AMOUNT RECEIVED RECEIPT g:v2??RECEIVED BY: DATE PAID: ,, \,/ 3 y'a