HomeMy WebLinkAboutPermit Encroachment 2019-05-06City of Springfield
Application to Work in the Right of Way
Once the application has been approved, a permit will be issued
225 Fifth Street
Springfield, Oregon 97477
Engineering & Transportation Services Division
Phone (541) 726-3753
Step 1-Location of Work
Applicant:
Phone:
Site Address or Location :Tax Map
Owner:Phone:
Address:
Tax Lot
City:State:ZIP:
Contractor:Phone:
Contractors Registration (CCB) #:Expiration Date:
Project Supervisor:Phone:
Email Address:
Step 2: Description of Project
Project
Description:
Utilities
Name of other utilities if this is a joint project :
Intent of project for other utility who will
own any facilities placed in right of way:
Franchise Agreement License
Does your utility company have a franchise agreement or license with the City?
Who is filling out the application?
In this section, you will need to identify the Applicant, Owner of the abutting property, and the Contractor, if applicable.
Example:
John Doe is the owner of the abutting property. You would need to put name, address and contact information.
Jane Doe is the Applicant. This is the person filling out the application and filing for a permit. You would put in the contact information.
Utility Doe is the utility company that is doing work in the right of way and would be an considered an applicant. You would put in the
contact person's information.
Contractor Doe is the contractor who will be doing the work in the right of way. You will need to put this contact and license information.
What type of work do you need to do?
In this section you will describe the location, intended use, and what measures you are implementing, such as traffic control
measures, dust control measures, and types of backfill material to be used.
-Provide the start and end dates, start time of day and end time of day, of your project. It is important that you give
time of day that you are requesting for your project work. There are codes and inspections that are time sensitive.
-Identify your method of intrusion into the surface of the right of way, such as cut, bore, or drilling.
-Describe the surface area length, width, depth, and height of your project.
-Identify what type of surface material is currently there, what you will do with this material, what is the replacement type
of surface material you will use, and what type of backfill material you will be using.
-Any required separation from other facilities.
Please identify which type of agreement you currently have with the City.
Insurance
Proof of Insurance, minimum $500,000 coverage limit
Placing new facilities in the right of way
Repairing/maintaining existing facilities
This application can be emailed to LDS@springfield-or.gov.
You will need to complete application, save as, then attach to
email or print and bring to Public Works City Hall.
You will need to come to Public Works, City Hall to process permit.
Print Form
Alpesh Patel, ALKO 501 LLC
541-554-8440
3111 Franklin Blvd, Eugene, OR 97403
17-03-34-33
Alpesh Patel 541-554-8440
1857 Franklin Blvd
500
Eugene OR
HamCon Builders, Inc. 541-826-2777
204091
Dave Hammonds 541-826-2777
al@alkohotels.com
Demo existing ADA ramp and construct new ADA ramp per Site Plan Review approval (Case # 811-19-000064-TYP2)
N/A - NO UTILITIES INVOLVED
Reset Form
Page 2 of 3
Directions: You will need to submit a Traffic Control Plan, which will need to be in compliance with the Manual on Uniform
Traffic Control Devices (MUTCD) and Oregon Temporary Traffic Control Handbook.
Safety and Environment
Type of Dust Control to be utilized:
Stormwater Pollution Prevention
Air Quality
Traffic Control Plan Criteria for City of Springfield Traffic Control Plan Submittals
Wastewater Spill/Overflow Prevention
Description:
To Stub
Wastewater Connection
System Connections to City Infrastructure
Other:
Stormwater Connection
Catch Basin/Bubbler
Stub
Main Line
Backfill material to be utilized:
Existing Surface Material:
Surface replacement material to be utilized:
Directions: Submit plans that identify in detail the scope of work to be performed in the City right of way/easement. The work shall be
performed by a licensed contractor that is aware of wastewater spills/overflow reporting requirements and City design standards. Your
permit shall have specific instructions from the City inspector on how to perform the work. Keep these instructions on site.
Directions: The City is required by Federal and State law to monitor the discharge of construction stormwater and site runoff. Applicants
shall develop and submit a Stormwater Pollution Prevention Plan (SWPPP) that minimizes to the maximum extent practicable the
discharge of sediment and other pollutants to the public stormwater system. Call LDAP with questions, 541 726-5489.
Listed below are some of the most common issues on right of way construction projects. How will you address these items on your
SWPPP? Please be aware that each project is unique and may present challenges not addressed in this set of examples.
Directions: City policy requires that all work performed in the City right of way/easement is in full compliance with DEQ and EPA
regulations. No spillage of raw sewage shall occur during construction, including spillage in an open trench or excavation. The contractor
shall take all reasonable precaution to avoid spills and shall immediately notify City of Springfield Maintenance 541 726-3615 or
541 726-3761; After hours Emergency Response Team 541 953-3428 in the event of a spill.
Sawcut slurry runoff
Dewatering Soil Erosion
Bypass pumping
HeightWidthLengthDepth
Other:BoreCut
Step 2a: Work Site Area
Temporary plugging of sanitary main
Main Line
Plan Submittal requirements:
Submit your Traffic Control Plan (TCP) with the following information on 8.5"x11" or 11"x17" paper. Fill out and submit this form with
your TCP.
You are required to call: The Lane Utilities Coordinating Council's "One Call Number"
811 or 1-800-332-2344
48 hours before digging.
Site runoff/sedimentation
Plan submittal for Wastewater main line work
Are you storing material/objects in the right of way other than during hours of work? If yes, continue at Step
3: Submit a Work Plan
Are you working in the right of way or connecting to City facility? If yes, continue at Step 2a: Work Site Area
STOP: Answer these questions next
From Date:To Date:
Period of use or time of construction: 7am to 6 pm only, unless it's an emergency.
Daily Start Time:Daily End Time:
Hazardous material storage/spill prevention
N/A - NO UTILITIES INVOLVED
Crushed Rock
Concrete
Concrete
N/AVariesVaries 10"