Loading...
HomeMy WebLinkAboutPermit Encroachment 2019-09-038-5/8"(W)'656-5/8"(W)'66 .188WT GrB251' (05)6-5/8"(W)'666-5/8"(W)'668-5/8"(W)'65 .188WT GrB (P )1"(P)R(P)'051"(P)136' 1"(P )155' #829 (W) (W)(P)(P)(P) (P) (P) (P) (P) (W) (P)JASPER RD.(P)(W) (W)(P)(P)(P) (P)(P)(P)(P)(P)(P) (P)(W)(P)(P)(P)(P)(P)(P)1"(P)(P)(P)(P)(P)(P)(P)(P) 25' 2"(P)'95 (P)(P)1"(P)(W) 1"(P)#1020#1020#4300(00)#4324(06)#10 3 7 #1165 #870 #885 #875 #4318(96)#820 #1001 #4433#936 #955#978 (95)#1088 #4 4 3 1 #10 1 5#853 #954 #1059 #4380#995(99) #1002(99) #1126 #4202(00)#4203(94)#4312#1143#4359#4343#4381#992 #4380(94)(95)#4380(93)#1010 (94)(97)#4377S1 (08)#871 (#1063)#940 2 3 '34'524'49'14'6'3' 460' 364'4' 2'54'64'129'9'544'574'1'1029'189'7'10'166'54'- M.BALLON MAIN VLV165'8-5/8"(W)'056-5/8"(W)'056-5/8"(W)'05.280WT BURIED -NOT MAINTAINED 8' 6"BV#32"BV 192'6"FBV 8"FPBV#41'(05) 189' 0' 1 2 1 '143'54'69' 148'139' 675'135'54' 176'169' 325'273'258' 383'92'212'121' 384' 184' 228'137'5'14 5' 90' 131 ' 37 7 ' 187' 231'149'156'142'3 7 3 '162'143'134'141'179'277'240'281'384'400'311' 84'232'171'57'5'216'33'156'464'1'0'140'534'37'352'1'191'98'503' 495' 2"(W)'82 2"(W)'822"(W)'822"(P)'992"(P)'052"(P)'972"(P)'05 12'OFFSET1"(W)'82 2"(W)'822"(W)'821"(W)1"(W)'821"(W)'821" (W)'80 1"(W)'711"(W)'82 1"(W)'82 1"(W)'82 4"(P)'97 2"(P)'992"(P)'972"(P)'05/JT2"(P)'992"(P)/JT 2"(P)/JT2"(P)/JT2"(P)/JT2"(P)1"(W)'704'4'5'4'11'5'5'5'5'4'5'7'16'4' 7' 5'16'4'5' 5 ' 29' 8'23'5'4'7'12' 9' 2' 2' 2'2'2'8' 8' 2' TL'S ON 8-5/8"(W)'05/ABN2"(W)'05/ABN 2532"(W)'05/ABN2"(W)/ABN58'20'1"(W)'05/ABN 6-5/8"(W)'05/ABNABAN. 4"-'985' UTIL EAS ALONG ALL DOTTED LOT LINESHWY. PERMIT#5M3587836 37 38 39 74 40 42 14 3215163031 9 64 41 43 2 COLE WAY RD. RD.44TH ST.HOLLY 42ND AVE.MT.VERNON HWY. PERMIT #05M3674610 63 7 8 9 10 35 3 5 12 4 KALMIA 5 6 7 8 1 (SPRINGFIELD - CRESWELL HWY. NO.222)2 11 JASPER 44 73 34 7' UTIL. EAS. ALONG EXTERIOR SUB. LINES4 6 11 13 33 1 3 S.11 10 1 12ST.9OLD R/WHWY. PERMIT #5M38417LITE POLE PERMIT #10048 PERMIT #109571 2 3 4 678910 HORACE ST HO R A C E S T 5 THE RESERVE AT BRIDLEWOODTRACT AS 43RD STSKETCH OUT00023585-SUB 0+00 = MT VERNON RD 5+03 5+880+000+080+02TIEDHORACE ST 4+904+95 1# Anode INSTALL:TF w/ LW & TLREPLACE w/ 1"P& 775 OR 800 EFV 2" PE VALVE NOTE: EXISTING 1"W MAIN & #940SERVICE CONNECTION UNDER TREE 1"W FROM 4+90 TO 5+03ABANDON: FUSE &INSTALL:LW CROSS SECTION VARIANCE (S) Variance (s) made : Reason (s): Mitigation taken (if any ): Approval Name :Signature :Date : GENERAL NOTES Engineering Department PLAT TWN RNG SEC PROJECT/REVISION# JOB TYPE: PM #: 0 10050Feet1 in = 50 ft CITY BETWEEN NAME ADDRESS COUNTY STATE AND PLATTED DATE DATE DATE DATE DATE CREW LDR. APPROVED DRAWN DESIGNED PIPELINE ID - Class “B”PRESSU RE TEST INFOR MATION (circle & label test area on as -built drawing )Test by NN G –Other ____________________________________ Test Area PipeSize Steel -Poly PipeFootage TestPressure Gauge # AB DC PassY/NONOFFDateTimeDateTime E F Print Name and Initial 8' EX 1"(W) 60' E/SW/S EGGE S 43 R D ST 20 '10 '10 '20' LC 8' N EW 2"(P) 1.Call the following Utilities Notification Center 48 hours prior to any excavation : Oregon: 811 or 1-800-332-2344Washington: 811 or 1-800-424-55552.ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center . Those rules are set forth in OAR 952-001-0090. You may obtain copies of the rules by calling the center . (Note: the telephone number for the Oregon Utility Notification Center is (503 ) 232-1987 or 811).3.Fill out construction sketch as -built supplied with job packet and return with work order . Only one as -built is required .4.All distribution mains must have a minimum depth of 24" and services must have a minimum depth of 18" unless there is an approved variance .5.All transmission lines must have a minimum depth of 30" in Class '1' locations and 36" in Class '2, 3, & 4 ' locations , unless there is an approved variance .6.Written dimensions on this construction sketch have precedence over scaled dimensions .7.Pressure test shall be tested in accordance with standards in CFM and Engineering Standard Practice .8.Test medium for class "B" main shall be air , unless otherwise noted. Test medium for class "C-F" main shall be water, unless otherwise noted .9.For Class C or higher tests, see Design Document and Hydrostatic Report.10.All work to comply with NW Natural Erosion and Sediment Control Plan unless specific plan provided . NW Natural Erosion and Sediment Control Plan to be available on each job site . Protect all Catch Basin Inlets.11.Protect City Trees according to identified Critical Root Zones “CRZ”. Roots larger than1-1 /2” may be cut only with city approval . Hole-hog or directional drill through tree Critical Root Zone at 36’ minimum depth . Excavation to be by Vac -X in tree Critical Root Zone unless accepted by city . 43rd St Springfield Lane OR Horace St 43rd St MX New Construction - Mains 03575929 000235851-235-001 T18S R02W NW 5 FOOTAGE SIZE M P GRADE W.T. WELDS% X-RAYED CERT.MAOP OPER.MAOP NOP PMACTIVITY #PMORDER #108'2"P B P24 .216 60 60 50 710 03575929 BJBSVA 05/03/201908/29/2019 Mt Vernon Rd BMK 08/30/2019 Order Street Description Plat Numbe r Costing Pipe Size Type3586984940 S 43rd St Repl ace svc w/1" (p) svc Install 775 or 1-235-001 Z316 P-0100 SM05 INSTALL ABAN 13'1"W B