Loading...
HomeMy WebLinkAboutPermit Encroachment 2019-04-17City of Springfield Application to Work in the Right of Way Once the application has been approved, a permit will be issued 225 Fifth Street Springfield, Oregon 97477 Engineering & Transportation Services Division Phone (541) 726-3753 Step 1-Location of Work Applicant: Phone: Site Address or Location :Tax Map Owner:Phone: Address: Tax Lot City:State:ZIP: Contractor:Phone: Contractors Registration (CCB) #:Expiration Date: Project Supervisor:Phone: Email Address: Step 2: Description of Project Project Description: Utilities Name of other utilities if this is a joint project : Intent of project for other utility who will own any facilities placed in right of way: Franchise Agreement License Does your utility company have a franchise agreement or license with the City? Who is filling out the application? In this section, you will need to identify the Applicant, Owner of the abutting property, and the Contractor, if applicable. Example: John Doe is the owner of the abutting property. You would need to put name, address and contact information. Jane Doe is the Applicant. This is the person filling out the application and filing for a permit. You would put in the contact information. Utility Doe is the utility company that is doing work in the right of way and would be an considered an applicant. You would put in the contact person's information. Contractor Doe is the contractor who will be doing the work in the right of way. You will need to put this contact and license information. What type of work do you need to do? In this section you will describe the location, intended use, and what measures you are implementing, such as traffic control measures, dust control measures, and types of backfill material to be used. -Provide the start and end dates, start time of day and end time of day, of your project. It is important that you give time of day that you are requesting for your project work. There are codes and inspections that are time sensitive. -Identify your method of intrusion into the surface of the right of way, such as cut, bore, or drilling. -Describe the surface area length, width, depth, and height of your project. -Identify what type of surface material is currently there, what you will do with this material, what is the replacement type of surface material you will use, and what type of backfill material you will be using. -Any required separation from other facilities. Please identify which type of agreement you currently have with the City. Insurance Proof of Insurance, minimum $500,000 coverage limit Placing new facilities in the right of way Repairing/maintaining existing facilities This application can be emailed to LDS@springfield-or.gov. You will need to complete application, save as, then attach to email or print and bring to Public Works City Hall. You will need to come to Public Works, City Hall to process permit. Print Form CenturyLink 541-484-8887 3505 E 17TH AVE, GLENWOOD OR 17033434 400 C-2 Utility 541-741-2211 154786 3-20-21 Sam Hare 503-320-6827 John.Pilon@centurylink.com THIS PROJECT WILL PROVIDE SERVICE TO 3505 E 17TH AVE. PUSH FIBER COUNTS FROM MH228 TO MH226 TO MH223 TO HH1400 TO HH-GLENWOOD TO HH-2 THROUGH EXISTING CABLES PASSING THROUGH MH'S, HH'S IN EXISTING CONDUIT. PLACE NEW 24 FIBER CABLE FROM HH-2 TO CUSTOMER MPOP PASSING THROUGH PEDS N EXISTING CONDUIT. Reset Form Page 2 of 3 Directions: You will need to submit a Traffic Control Plan, which will need to be in compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and Oregon Temporary Traffic Control Handbook. Safety and Environment Type of Dust Control to be utilized: Stormwater Pollution Prevention Air Quality Traffic Control Plan Criteria for City of Springfield Traffic Control Plan Submittals Wastewater Spill/Overflow Prevention Description: To Stub Wastewater Connection System Connections to City Infrastructure Other: Stormwater Connection Catch Basin/Bubbler Stub Main Line Backfill material to be utilized: Existing Surface Material: Surface replacement material to be utilized: Directions: Submit plans that identify in detail the scope of work to be performed in the City right of way/easement. The work shall be performed by a licensed contractor that is aware of wastewater spills/overflow reporting requirements and City design standards. Your permit shall have specific instructions from the City inspector on how to perform the work. Keep these instructions on site. Directions: The City is required by Federal and State law to monitor the discharge of construction stormwater and site runoff. Applicants shall develop and submit a Stormwater Pollution Prevention Plan (SWPPP) that minimizes to the maximum extent practicable the discharge of sediment and other pollutants to the public stormwater system. Call LDAP with questions, 541 726-5489. Listed below are some of the most common issues on right of way construction projects. How will you address these items on your SWPPP? Please be aware that each project is unique and may present challenges not addressed in this set of examples. Directions: City policy requires that all work performed in the City right of way/easement is in full compliance with DEQ and EPA regulations. No spillage of raw sewage shall occur during construction, including spillage in an open trench or excavation. The contractor shall take all reasonable precaution to avoid spills and shall immediately notify City of Springfield Maintenance 541 726-3615 or 541 726-3761; After hours Emergency Response Team 541 953-3428 in the event of a spill. Sawcut slurry runoff Dewatering Soil Erosion Bypass pumping HeightWidthLengthDepth Other:BoreCut Step 2a: Work Site Area Temporary plugging of sanitary main Main Line Plan Submittal requirements: Submit your Traffic Control Plan (TCP) with the following information on 8.5"x11" or 11"x17" paper. Fill out and submit this form with your TCP. You are required to call: The Lane Utilities Coordinating Council's "One Call Number" 811 or 1-800-332-2344 48 hours before digging. Site runoff/sedimentation Plan submittal for Wastewater main line work Are you storing material/objects in the right of way other than during hours of work? If yes, continue at Step 3: Submit a Work Plan Are you working in the right of way or connecting to City facility? If yes, continue at Step 2a: Work Site Area STOP: Answer these questions next From Date:To Date: Period of use or time of construction: 7am to 6 pm only, unless it's an emergency. Daily Start Time:Daily End Time: Hazardous material storage/spill prevention Pulling in Existing & Splicing You are required to call: The Lane Utilities Coordinating Council's "One Call Number" 1-800-332-2344, 48 hours before before digging. Date: Page 3 of 3 Fee Encroachment/Placement Permit $267.00 Fees that may apply -A 5% Technology Fee will be applied to the total cost of the permit for processing the application. -A $880.00 Asphalt deposit is required when the asphalt will be disturbed. -Additional financial security may be required. Work Plans attached in an email to Land Development; send to LDS@springfield-or.gov. Reference site location and name in subject line. Show location of utilities within right of way. Identify pipe size and type, mainline connection location, and connection type. Identify extent of excavations or bore locations. identify staging/material storage areas. Outline limits of disturbance/ of work area. Site location and vicinity map include North arrow. What kind of work plan do you need? You will need to submit a copy of the work plan, which includes: Step 3-Submit a Work Plan Traffic Control Plan attached in email to Land Development; LDS@springfield-or.gov No Traffic Control Plan There are no public traffic safety issues with this application. Signature Step 5: Signature Information Deposits and Financial Security Projects involving work within public right of way in the City of Springfield are subject to deposits or other approved forms of financial security that may include performance bonds, set-aside letters, or irrevocable letters of credit. The type of financial security is determined by the project's size, scope, and potential impact to public infrastructure. Examples of typical impacts that will require financial security include asphalt trench cuts and sewer repairs that involve cuts to a main line. Warranties Financial security is held by the City during a warranty period that typically lasts one year and begins when the project passes final construction inspection. The warranty period allows the City to monitor the structural integrity of repairs and determine their long-term viability. Financial security provides the City with the means to repair infrastructure should failures that remain uncorrected by the applicant or applicant's representative occur during the warranty period. A final warranty inspection will be conducted eleven months after the final construction inspection. Financial security will be released when the warranty period has passed final inspection. When do you need an Encroachment permit? Municipal code 3.208 Work On or Under Surface—Encroachment Permit Required (http://www.qcode.us/codes/springfield/) defines when you need an encroachment permit. When do you need a Placement permit? Municipal code 3.224 Placement of Devices or Structures in the Public Way ( http://www.qcode.us/codes/springfield/) defines when you need a placement permit. Restoration of City facilities It will be determined by the Public Works Director at the time of the 11 month inspection as required in Municipal Code 3.222 that the work area in the public right-of-way is in as good a condition or better than it was before the issuance of the encroachment permit. . Municipal Code 3.210 (2). Owner Applicant Contractor Utility Project ManagerCheck one: The TCP shall be a legible hand drawing, or a computer aided design with the following information: A vicinity map: That includes the north arrow, road names, intersection/driveway access points, curb lines, the work zone, and any special features such as buildings, access points, sight obstructions, that could affect the TCP. Location: Where will the TCP be active? This can be a line drawing of the work zone(s) and/or a map that clearly indicates where traffic control devices will be placed, including spacing and cone tapers. Attachments of the appropriate traffic control diagram(s) as shown in the current MUTCD and/or the ODOT Oregon Temporary Traffic Control Handbook that reflect the work zone may be included as a standard reference. ODOT's Traffic Control Handbook website: www. oregon.gov/ODOT/HWY/TRAFFIC-ROADWAY/docs/pdf/OTTCH_06.pdf?ga=t Traffic Control Plan form is located at www.springfield-or.gov/menuonlineforms 4-17-2019 JJJJJJJJTETETEA AAAAAA AAAAAAAAAAA AA AAAAA A A AA AAAAAA AAAAAAAAAAAHHHHHHHHHHHHHHMHHHHHHHHH PBMHHHHH MHHH HHHHHH MHHHHHMHMHHHHH MHHH HHSENECA BROOKLYN AVE E 15TH AVELEXINGTON AVE BROOKLYN AVE16TH AVEE 14TH AVEGLENWOOD BLVD HENDERSON AVE17TH AVEMOBILE PARK WAY HENDERSON AVEHENDERSON AVE CONCORD AVE FRANKLIN BLVDSENECA 16TH AVEMISSISSIPPI AVE17TH AVEHENDERSON AVE SENECA SPICER RD MISSISSIPPI AVE CONCORD AVE E 14TH AVEMOBILE PARK DRIVE17TH AVELEXINGTON AVE 19TH AVE SPICER RDHENDERSON AVE LEXINGTON AVE MAIN STCONCORD AVE MISSISSIPPI AVE E 14TH AVEE 15TH AVECONCORD AVE LEXINGTON AVE HENDERSON AVE CONCORD AVEMOBILE PARK WAYE 14TH AVEFRANKLIN BLVD17TH AVECONCORD AVE HENDERSON AVE LEXINGTON AVE MISSISSIPPI AVE BROOKLYN AVE17TH AVESENECA FRANKLIN BLVDPRIVATE DRMH 228START LOCSEE SHT 43505 E 17TH AVECUSTOMER LOCSEE SHT 10CUSTOMER HH1400SEE SHT7MH226SEE SHT5MH223SEE SHT6HH GLENWOODAT E 17THSEE SHT8 WORK LOCATIONCOFRANKLIN BLVDMH227HH3746MH225MH224HH GLENWOOD& FRANKLINHHHH HH GLENWOODS-O FRANKLINHHHHHH 2SEE SHT9EXISTINGCONDUITECD:A.2622960N.531563104/09/201910FED EX FREIGHT EUGN/A2018/063/ POSTING2018/063/ CYIENT DESIGN2013/130/ CONSTRUCTIONNOYESNONONO3505 E 17TH AVE3505 E 17TH AVE,EUGENE, OR.3505 E 17TH AVENA0000NAA.262296007/12/2019THIS PROJECT WILL PROVIDE CDFS SERVICE TO 3505 E17TH AVE. PUSH FIBER COUNTS FROM MH228 TO MH226TO MH223 TO HH1400 TO HH-GLENWOOD TO HH-2THROUGH EXISTING CABLES PASSING THROUGH MH'S,HH'S IN EXISTING CONDUIT. PLACE NEW 24 FIBER CABLEFROM HH-2 TO CUSTOMER MPOP PASSING THROUGHPEDS N EXISTING CONDUIT.TRAFFIC CONTROL PLAN :YESLCON: KENT PETERS 541-632-2724:NOLSP11,85-86NO ASSOCIATED JOBS JJJJJJJJTETEA AAAAAA AAAAAAAAAAAA AAA AAAAA A A AA AAAAAAA AAAAAAAAA HHHH HHHH HH HHHHHH HHHH MHHHHH HH HHPBMHHHH H MHHH HHHH HHMHHH HHMHMHHHHH MHMHBROOKLYN AVE E 15TH AVELEXINGTON AVE BROOKLYN AVE16TH AVEE 14TH AVEGLENWOOD BLVD GLENWOOD BLVD17TH AVEMOBILE PARK WAY HENDERSON AVECONCORD AVE FRANKLIN BLVDFRANKLIN BLVDSENECA 16TH AVEMISSISSIPPI AVE17TH AVEHENDERSON AVE SENECA SPICER RD MISSISSIPPI AVE FRANKLIN BLVDCONCORD AVE E 14TH AVEMOBILE PARK DRIVE17TH AVELEXINGTON AVE SPICER RD HENDERSON AVE LEXINGTON AVE MAIN STMISSISSIPPI AVE E 14TH AVEE 15TH AVECONCORD AVE LEXINGTON AVE CONCORD AVEE 15TH AVEMOBILE PARK WAYE 14TH AVE17TH AVECONCORD AVE HENDERSON AVE LEXINGTON AVE MISSISSIPPI AVE BROOKLYN AVEE 15TH AVE17TH AVESENECA FRANKLIN BLVDPRIVATE DR17TH AVEMH 228START LOC3505 E 17TH AVECUSTOMER LOCCUSTOMER HH1400MH226MH226HH GLENWOODAT E 17THMH227MH225MH224 LCON :KENT PETERS 541-632-2724COP-1N.531563.E.50 - XUDNHO1(25-48) QTY: 14UO FIBER STUB – PER FT LBR & QTY: 150WHAP-RF QTY: 1WHUO QTY: 1HO8 QTY: 10P-2N.531563.E.50 - XUDNHO1(25-48) QTY: 2WHAP-RF QTY: 1WUMS-S QTY: 1P-5N.531563.E.50 - XUDNHO1(25-48) QTY: 2WHAP-RF QTY: 1P-6N.531563.C.51 - PLUFHO1(25-48) QTY: 2HO8 QTY: 10WHUO QTY: 1P-3N.531563.E.50 - XUDNHO1(25-48) QTY: 2WHAP-RF QTY: 1WUMS-S QTY: 1P-4N.531563.E.50 - XUDNHO1(25-48) QTY: 2WHAP-RF QTY: 1WUMS-S QTY: 1S-7N.531563.C.51 - PLUFUO24 QTY: 450BM-OCCUPIED QTY: 400P-1HH3746HH GLENWOOD& FRANKLINHHHHHH 2LEAVE LOOP 50'ON NEW 24 FIBERP-2P-3P-4P-5P-6EXISTINGCONDUITP-8(SEE SHT10)S-7EXISTINGCONDUITABCDEFGNOTE: SEE SHT3 FOR CABLEANNOTATIONS.A.2622960N.53156321004/09/201907/12/2019 A1TZS150'SR-5BW2LT-072PLUFLSP11,85-96 (Fibers: 1-12)MH228,13-72 (Fibers:13-72)<N.531563,1>HD972479' 1998PC-3X12LT-048PLUFTLG01,17-40 (Fibers: 1-24)LSP5,97-102 (Fibers: 25-30)(A,31-32)LSP11,85-86 (Fibers: 31-32)LSP5,105-108 (Fibers: 33-36)LSP5,13-18 (Fibers: 37-42)LSP5,49-52 (Fibers: 43-46)LSP5,5-6 (Fibers: 47-48)<N.291868,1>ABCCM121979' 1998PC-3X12LT-048PLUFTLG01,17-28 (Fibers: 1-12)TLG01,29-40 (Fibers: 13-24)LSP5,97-102 (Fibers: 25-30)LSP5,17-18 (Fibers: 31-32)A,33-36 (Fibers: 33-36)LSP5,49-52 (Fibers: 37-40)([DEAD]DD,41-42)LSP11,85-86 (Fibers: 41-42)[DEAD]DD,43-46 (Fibers: 43-46)LSP5,5-6 (Fibers: 47-48)<Unknown,0>DHUQ31198' 2014PC-5B12LT-072PLUFLSP5,99-100 (Fibers: 1-2)(B,3-4)LSP11,85-86 (Fibers: 3-4)B,5-6 (Fibers: 5-6)LSP5,17-18 (Fibers: 7-8)B,9-12 (Fibers: 9-12)LSP5,49-52 (Fibers: 13-16)B,17-72 (Fibers: 17-72)<N.528272,1>EA1TZU450'PC-54W2LT-024PLUFLSP11,85-86 (Fibers: 1-2)HH2,3-24 (Fibers: 3-24)<N.531563,1>HXV01184' 2014PC-5B12LT-072PLUFLSP5,99-100 (Fibers: 1-2)(B,3-4)LSP11,85-86 (Fibers: 3-4)B,5-6 (Fibers: 5-6)LSP5,17-18 (Fibers: 7-8)B,9-12 (Fibers: 9-12)A,13-16 (Fibers: 13-16)B,17-48 (Fibers: 17-48)B,49-72 (Fibers: 49-72)<Unknown,0>A1TNN124'PC-54W2LT-024PLUFLSP5,17-18 (Fibers: 1-2)(HH-1,3-4)LSP11,85-86 (Fibers: 3-4)HH-1,5-24 (Fibers: 5-24)<N.528272,1>FGNOTE: SEE SHT2 FOR CABLE ROUTE.A.2622960N.53156331004/09/201907/12/2019 SC3 3 5 --1 4 -5 -2 2 --1 SCSC[A1NOY]SHEET 5TO CUST.[A1TZR][CH34][GW93][HRP3][HD91][HD97][HUV3][HQX7][A1TZS]70'PLACE NEW 72 STUB CABLE IN MH 228. PUSH FIBER COUNTS "LSP11,85-96" FROM432 FEEDER CABLE [A1N0Y] TO NEW 72 STUB CABLE [A1ZS] AND THEN PUSH FIBERCOUNTS "LSP11,85-86" FROM NEW 72 STUB TO EXISTING FIBER CABLE [HD97]FROM MH228 TO MH226 PASSING THORUGH MH227 IN EXISTING CONDUIT.SOURCEA1N0Y8352' 1.85" 2017PC-5B12LT-432PLUFLSP11,1-288 (Fibers: 1-288)LSP11,289-432 (Fibers: 289-432)<N.040797,1>TO CO.A1TZR1475' 10.16" 2017PC-5B12LT-432PLUFLSP11,1-84 (Fibers: 1-84)(LSP11,85-96)MH228,85-96 (Fibers: 85-96)LSP11,97-288 (Fibers: 97-288)LSP11,289-432 (Fibers: 289-432)<N.040797,1>A1TZS150'SR-5BW2LT-072PLUFLSP11,85-96 (Fibers: 1-12)MH228,13-72 (Fibers:13-72)<N.531563,1>HH-228192 Cu ft.A1MQ82225'PC-5B12LT-072PLUFLSP5,13-18 (Fibers: 1-6)[DEAD]DD,7-16 (Fibers: 7-16)LSP5,5-6 (Fibers: 17-18)Fibers,19-20[DEAD]DD,21-24 (Fibers: 21-24)LSP5,25-72 (Fibers: 25-72)<N.027432,1>A1MQ91970'PC-3412LT-072PLUFLSP5,73-102 (Fibers: 1-30)A,103-104 (Fibers: 31-32)LSP5,105-108 (Fibers: 33-36)TLG01,29-40 (Fibers: 37-48)TLG01,17-28 (Fibers: 49-60)TLG01,9-16 (Fibers: 61-68)LSP5,141-144 (Fibers: 69-72)<N.291868,1>HD972479' 1998PC-3X12LT-048PLUFTLG01,17-40 (Fibers: 1-24)LSP5,97-102 (Fibers: 25-30)(A,31-32)LSP11,85-86 (Fibers: 31-32)LSP5,105-108 (Fibers: 33-36)LSP5,13-18 (Fibers: 37-42)LSP5,49-52 (Fibers: 43-46)LSP5,5-6 (Fibers: 47-48)<N.291868,1>CH344335' 1997PC-3412LT-072PLUFLSP5,73-96 (Fibers: 1-24)LSP5,25-36 (Fibers: 25-36)LSP5,37-48 (Fibers: 37-48)A,49-60 (Fibers: 49-60)A,61-68 (Fibers: 61-68)LSP5,141-144 (Fibers: 69-72)<Unknown,0>HRP3150' 2011PC-5B12LT-144PLUFC,1-4 (Fibers: 1-4)LSP5,53-72 (Fibers: 5-24)LSP5,97-102 (Fibers: 25-30)C,31-46 (Fibers: 31-46)Fibers,47-48C,49-72 (Fibers: 49-72)[DEAD]DD,73-144 (Fibers: 73-144)<N.181150,1>HUV34768' 2014PC-5B12LT-144PLUFLSP5,97-102 (Fibers: 1-6)[REV]A,727-732 (Fibers: 7-12)[REV]LEU16,65-66 (Fibers: 13-14)[REV]LSP5,97-102 (Fibers: 15-20)[REV]TLG01-EUSP,9-16 (Fibers: 21-28)[REV]TLG01-CWEU,1-4 (Fibers: 29-32)[REV]TLG01-CGEU,1-4 (Fibers: 33-36)[REV]TLG01-CGEU,5-12 (Fibers: 37-44)[REV]TLG01,17-40 (Fibers: 45-68)[REV]B,69-144 (Fibers: 69-144)<Unknown,0>HQX74674' 2011PC-5B12LT-144PLUFC,1-4 (Fibers: 1-4)LSP5,53-60 (Fibers: 5-12)LSP5,61-62 (Fibers: 13-14)LSP5,63-72 (Fibers: 15-24)TLG01-EUSP,9-14 (Fibers: 25-30)TLG01-EUSP,15-16 (Fibers: 31-32)TLG01-CWEU,1-4 (Fibers: 33-36)TLG01-CGEU,1-4 (Fibers: 37-40)C,41-72 (Fibers: 41-72)C,73-144 (Fibers: 73-144)<N.181150,1>A.2622960N.53156341004/09/201907/12/2019 SCHD99897' 2008PC-5X12LT-144PLUFA,1-2 (Fibers: 1-2)A,3-4 (Fibers: 3-4)A,5-6 (Fibers: 5-6)A,103-104 (Fibers: 7-8)LSP5,105-108 (Fibers: 9-12)DLG226,13-24 (Fibers: 13-24)LSP5,13-16 (Fibers: 25-28)MH226,29-30 (Fibers: 29-30)DLG226,31-144 (Fibers: 31-144)<N.291868,1>CM121979' 1998PC-3X12LT-048PLUFTLG01,17-28 (Fibers: 1-12)TLG01,29-40 (Fibers: 13-24)LSP5,97-102 (Fibers: 25-30)LSP5,17-18 (Fibers: 31-32)A,33-36 (Fibers: 33-36)LSP5,49-52 (Fibers: 37-40)([DEAD]DD,41-42)LSP11,85-86 (Fibers: 41-42)[DEAD]DD,43-46 (Fibers: 43-46)LSP5,5-6 (Fibers: 47-48)<Unknown,0>SOURCEMH 226192 Cu.ft[CM12][HD97][HD99]TO C.O.TO CUST.SHEET 6SHEET 4PUSH FIBER COUNTS "LSP11,85-86" FROM 48 FEEDER CABLE[HD97] TO EXISTING 48 FIBER CABLE [CM12] FROM MH226 TOMH223 PASSING THROUGH MH'S AND HH'S IN EXISTING CONDUIT.HD972479' 1998PC-3X12LT-048PLUFTLG01,17-40 (Fibers: 1-24)LSP5,97-102 (Fibers: 25-30)(A,31-32)LSP11,85-86 (Fibers: 31-32)LSP5,105-108 (Fibers: 33-36)LSP5,13-18 (Fibers: 37-42)LSP5,49-52 (Fibers: 43-46)LSP5,5-6 (Fibers: 47-48)<N.291868,1>A.2622960N.53156351004/09/201907/12/2019 SCA2VN3450' 2017PC-5B12LT-048PLUFFibers,1-46 LSP5,5-6 (Fibers: 47-48)<N.181150,1>HUQ31198' 2014PC-5B12LT-072PLUFLSP5,99-100 (Fibers: 1-2)(B,3-4)LSP11,85-86 (Fibers: 3-4)B,5-6 (Fibers: 5-6)LSP5,17-18 (Fibers: 7-8)B,9-12 (Fibers: 9-12)LSP5,49-52 (Fibers: 13-16)B,17-72 (Fibers: 17-72)<N.528272,1>SOURCEMH 223230 Cu.ft[CM12][HUQ3][A2VN3]TO CUST.TO C.O. SHEET 5 SHEET 7PUSH FIBER COUNTS "LSP11,85-86" FROM 48 FEEDER CABLE [CM12]TO EXISTING 72 FIBER CABLE [HUQ3] FROM MH223 TO HH1400PASSING THROUGH HH IN EXISTING CONDUIT.CM121979' 1998PC-3X12LT-048PLUFTLG01,17-28 (Fibers: 1-12)TLG01,29-40 (Fibers: 13-24)LSP5,97-102 (Fibers: 25-30)LSP5,17-18 (Fibers: 31-32)A,33-36 (Fibers: 33-36)LSP5,49-52 (Fibers: 37-40)([DEAD]DD,41-42)LSP11,85-86 (Fibers: 41-42)[DEAD]DD,43-46 (Fibers: 43-46)LSP5,5-6 (Fibers: 47-48)<Unknown,0>A.2622960N.53156361004/09/201907/12/2019 HH-140030 Cu.ftSCSC[HUQ3][HXV0][HXV2][HXV3]HXV2512' 2015PC-5X11LT-024PLUFLSP5,49-52 (Fibers: 1-4)C,5-24 (Fibers: 5-24)<Unknown,0>HXV01184' 2014PC-5B12LT-072PLUFLSP5,99-100 (Fibers: 1-2)(B,3-4)LSP11,85-86 (Fibers: 3-4)B,5-6 (Fibers: 5-6)LSP5,17-18 (Fibers: 7-8)B,9-12 (Fibers: 9-12)A,13-16 (Fibers: 13-16)B,17-48 (Fibers: 17-48)B,49-72 (Fibers: 49-72)<Unknown,0>HXV3422' 2015PC-5B12LT-072PLUFLSP5,49-52 (Fibers: 1-4)[DEAD]DD,5-72 (Fibers: 5-72)<Unknown,0>SOURCETO C.O. SHEET 6 TO CUST SHEET 8 PUSH FIBER COUNTS "LSP11,85-86" FROM 72 FEEDER CABLE [HUQ3]TO EXISTING 72 FIBER CABLE [HXVO] FROM HH1400 TO HH GLENWODAT E PASSING THROUGH EXISTING CONDUIT.HUQ31198' 2014PC-5B12LT-072PLUFLSP5,99-100 (Fibers: 1-2)(B,3-4)LSP11,85-86 (Fibers: 3-4)B,5-6 (Fibers: 5-6)LSP5,17-18 (Fibers: 7-8)B,9-12 (Fibers: 9-12)LSP5,49-52 (Fibers: 13-16)B,17-72 (Fibers: 17-72)<N.528272,1>A.2622960N.53156371004/09/201907/12/2019 SCA1TNN124'PC-54W2LT-024PLUFLSP5,17-18 (Fibers: 1-2)(HH-1,3-4)LSP11,85-86 (Fibers: 3-4)HH-1,5-24 (Fibers: 5-24)<N.528272,1>HUQ51288' 2013PC-5B12LT-048PLUFLSP5,99-100 (Fibers: 1-2)B,3-12 (Fibers: 3-12)A,13-16 (Fibers: 13-16)B,17-48 (Fibers: 17-48)<Unknown,0>[A1TNN][HUQ5][HXV0]TO C.O.TO CUST SHEET 7SOURCE HH GLENWOOD AT E17THSHEET 9 PUSH FIBER COUNTS "LSP11,85-86" FROM 72 FEEDER CABLE [HXVO]TO EXISTING 24 FIBER CABLE [A1TNN] FROM HH GLENWOOD AT E TOHH 2 THROUGH EXISTING CONDUIT.HXV01184' 2014PC-5B12LT-072PLUFLSP5,99-100 (Fibers: 1-2)(B,3-4)LSP11,85-86 (Fibers: 3-4)B,5-6 (Fibers: 5-6)LSP5,17-18 (Fibers: 7-8)B,9-12 (Fibers: 9-12)A,13-16 (Fibers: 13-16)B,17-48 (Fibers: 17-48)B,49-72 (Fibers: 49-72)<Unknown,0>A.2622960N.53156381004/09/201907/12/2019 A1TZT1009'PC-54W2LT-024PLUFLSP5,17-18 (Fibers: 1-2)HH-1,3-24 (Fibers: 3-24)<N.528272,1>A1TZU450'PC-54W2LT-024PLUFLSP11,85-86 (Fibers: 1-2)HH2,3-24 (Fibers: 3-24)<N.531563,1>[A1TNN][A1TZT]TO C.O.TO CUSTSHEET 8SOURCEHH-230 Cu.ft50'[A1TZU]PLACE NEW 24 FIBER CABLE FROM HH 2 TO CUSTOMER MPOP. PUSHFIBER COUNTS "LSP11,85-86" FROM 24 FEEDER CABLE [A1TNN] TONEW 24 FIBER CABLE [A1TZU] PASSING THORUGH EXISTING CONDUIT.A1TNN124'PC-54W2LT-024PLUFLSP5,17-18 (Fibers: 1-2)(HH-1,3-4)LSP11,85-86 (Fibers: 3-4)HH-1,5-24 (Fibers: 5-24)<N.528272,1>SCA.2622960N.53156391004/09/201907/12/2019 3505 E 17TH AVECDFS : N.531563 \ A.2622960CUSTOMER : FED EX FREIGHT EUGADDRESS : 3505 E 17TH AVE EUGENE, OR, 97403.CUSTOMER CONTACT: KENT PETERS 541-632-2724FEED FIBERS F1: LSP11,85-86 A: SPFDOR01\ Z: EUGPORCICO CLLI : SPFDOR01CUSTOMER CLLI : EUGPORCIFIBER FOOTAGE TO CO : 3 MISERVICE : ME / MOEPROPOSED 24 PORT FDP AND CIENA 3916 EQUIPMENTWILL BE PLACED ON EXISTING BB ON EAST WALL OF1ST FLOOR IN MPOP ROOM.24 Port FDP24 Port FDPBay Internals WALLMOUNT BACK BOARD WLMT.01PROPOSED FDPIN CUSTOMER MPOPA1TZX3505 E 17TH AVEPorts: 1-24LSP11,84-86 (Ports: 1-2)HH-2,3-24 (Ports: 3-24)<N.531563,1>01A1TZW50'PC-54W2LT-024INBFLSP11,84-86(Fibers: 1-2)HH-2,3-24 (Fibers: 3-24)<N.531563,1>Bay(WALLMOUNT BACK BOARD), Number = WLMT... [Conn.Point]WALL MOUNT BACKBOARD WLMT.01172618311615513414111210978232422211920NOTE: GROUND AND AC BEING INSTALLED BY CUSTOMER.[A1TZW]50'AATO CO.NOTE: CUSTOMER HAS EXISTING BACKBOARD,AC ANDGROUND.NOTE: CTL LEC TO PLACE NEW 24 PORT FDP ANDCIENA 3916.NOTE: CUSTOMER TO PLACE CAT5E IN EXISTING CLEARPATH 141'.P-8N.531563.C.52 - INBFHO1(25-48) QTY: 24BM-FDP(24)MAT1 QTY: 1UO24 QTY: 50BM-FDP QTY: 13WN.531563101004/09/201907/12/2019