Loading...
HomeMy WebLinkAboutPermit Plumbing 1995-01-2799!t M ERCTAL/ r N D USTRTALPEBMIT APPLICATION 225 Fifth Street, Springfietd, Oregon g7477 INSPECTTON LtNE: 726.3769 OFFICE: ?26-gtig SP'II}IGFIELO LOCATION OF PROPOSED WORK: ASSESSOFIS MAP: JOB NUMBEB TAX LOT OWNER: ADDR CITY STATE: PHONE: ZIP: ADDITION DEMOLISH OTHER DESCRIPTION OF WOR 'NEW ,:/"nvloDEL NAME ADDRESS PHONE ADDRESS EXPIRES PHONE ELECIRICAL: MECHANICAL: PLUMBING: GENERAL: CONTRACTOR'S NAME ARCHITECT; CONST. CONTRACTOR # NO.FEE CHARGE Slngle Flxture Relocated Bldo. (new fix. addtti ce ft. Sanitary Sewer ft. Storm Sewer ft. Backflow Devlce TOTAL PERMIT N..t FFF CHARGFFurnace/burner & vent F urnace/burner & vent Floor furnace and vent Appliance Vent separate Stationary evap. cooler Vent Fan/SingJe duct Vent trom System apart AC or htg. Mechanical exhaust hood and duct Permit lssuance $10.00 TOTAL PERMIT - OFFICE USE -HANDICAP ACCESS: QUAD AREA: * OF BLDGS: FLOOD PLAIN: * OF UNITS:ZONING OCCY GROUP: - CONSTR. TYPE: HEAT SOURCE: LIGHTING POWER BUDGET I OF STORIES:WATER HEATER: SQ. FT.$/so. FT.VALUE SQ. FTG MAIN SQ. FTG ACCESS SQ. FTG OTHER X X x TOTAL VALUE OF PROJ PLAN CHECK FEE RCPT#DATE BY i TOTAL PERMIT FEES EXCLUDING ELECTRICAL 2i) BUILDING PERMIT PLUMBING t5.ct-,DEMOLITION 5% State Surcharoe 644r€ta*esffie -1-S MECHANICAL EEl,lCEVEE*€---4s 5% State Surcharoe SIDEWALK FT. SUBTOTAL PERMITS PAVING CURBCUT FT. SYSTEMS DEVELOPMENT Suspended wall oiiloor mounted unit heater LAND USE: REOUIRED INSPECTIONS It is the responsibillty of the permit holder to see that all lnspectlons are made at the proper time' To req.uest an lnspectlon' call 726.g769(recorder), state your city designat;Jj"b ;;;oer, iou "ooiuss, type of inspection requested and when you will be ready for lnspectlon. nequesG ieceived-beforu Z,OO *.n' will be made the same worklng day' requests made af ter 7:OO a'm' wlll be made the following work day. SITE INSPECTION: To be made after excavatlon, but Prlor to setuP of forms' UNDERSLAB PLUMBING' ELECTRICAL & MECHANICAL: To be made before anY work is covered' FOOTINGS & FOUN DATIONS: To be made after trenches are excavated and forms are erected, all steel ln Place, but Prlor to Placlng concrete' CONCRETE SLAB: To be made alter all inslab bullding servlce equlPment, condult, plPing, accessories and other anclllarY equiPment items are ln place but before anY concrete ls Placed. UNDERGROUND: Plumbi ng, electrlcal, gas, sanitary sewer, storm sewer, water and dralnage llnes' To be made prlor to coverlng or f illlng trenches. UNDERFLOOR: Plumbing, electrlcal, mechanlcal. To be made prlor to lnstallation of floor lnsulallon, decking or floor sheathlng. POST & BEAM: To be made prlor to lnstallatlon of floor lnsulatlon, decklng or floor sheathlng. FLOOR INSULATION & VAPOR BARBIERS: To be made prlor to lnstallatlon of decklng or floor sheathlng. MASONRY Steel location, bond beams groutlng or vertlcals ln accordance with uBc 2415. ROOF SHEATHING AND NAILING: Prlor to lnstalllng any roof coverlng. ROUGH PLUMBING, ELECTR]CAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FIREPLACE: Prlor to Placing faclng materials and before framing InsPection. FRAMING: To be made after the roof, all framlng, fire blocking and bracing are ln place and all PlPes, chimneYs and vents are comPlete and the rough electrical, Plumbing and mechanlcal are approved' INSULATION & VAPOR BARRIER: To be made after all insulation and required vaPor barriers are ln Place but before any lath or gYPSum board lnterior wall covering is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. LATH AND'OR GYPSUM BOARD: To be made after all lathing and\ gYPSUm board, lnterlor and\exterlor, ls ln place but before any plasterlng ls applied or before gypsum board joints and fasteners are taped and f lnlshed. SIDEWALK & DRIVEWAY: Requlred for all concrete pavlng withln street right of way, to be made after all excavating complete and form work and sub-base material in place. CURB AND APPROACH APRONS: After forms are erected but prlor to placing concrete. PAVING: After gravel is in Place but Prior to Placlng asPhalt or concrete' SPECIAL INSPECTIONS: ln accordance Section 306 of the State Specialty Code a special lnspector shall be employed bv the Owner/ Contractor durlng construction of the following work. A copy of the speclal testing reports shall be'furnlshed to the Bullding Divlslon. STBUCTURAL CONCRETE: ]N excess of 2500 P.S.l. (306 a.1) STRUCTURAL WELDS: Performed on the lob. (2722 ll HIGH STRENGTH BOLTING: During all bolt installatlon and tightenlng operations. (306 a.6) SPRAYED ON FIREPROOFING: U.BC' Standards 43-8. SPECIAL GRADING, EXCAVATION AN D FILLING: Durlng earthwork. (306 a.11 & Chapter 29) GLU-LAM BEAMS: lnspectlon Certificate by an approved agency, furnished to the Clty's Bulldlng Dlvision before beams are placed. (2501 U.BC. srDs. 25-10J1). STRUCTUBAL a.' 'ln addltion to the lnspec- tlons speclfied, the Bulldlng Officlal may make or requlre other lnspectlons of any constructlon work to ensure compllance wlth the Bulldlng, Clty or Development Code. (306 permlt c V DATE PAID: RECEIVED VALIDATION;AMOUNT RECEIVED: RECEIPT *: FINAL PLUMBING FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPABTMENT SITE PLAN REVIEW BOARD: Must be requested 2 days ln advance of the date you wlsh lnspection. All project condltlons such as landscaping, parking lot striping, etc. must be completed before requesting thl.s lnspection. F]NAL BUILDING: Requested after the final plumblng, electrlcal, mechanlcal and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certlflcate of Occupancy has been issued by the Bullding Dlvlslon and posted on the premises. ADDITIONAL COMMENTS: PLANS REVIEWED BY DATE By slgnature, I state and agree, that I have caref ully examlned the completed applicatlon and do hereby certlfy that all lnformailon hereln is true and correct, and I further certify that any and all work performed shall be done in accordance wlth the Ordlnances of the Clty of Springfield, and the Laws of the State of Oregon pertainlng to the work described herein, and that NO OCCUPANCY will be made of any structure without permlssion of the Bulldlng Safety Division, I further certify that only contractors and employees who are in compllance with ORS 701.055 will be used on this project. I further all required ins Date are requested at the proper time, that project address is readable from the the property, and the approved set of plans wlll remaln on the site at all mes ls located at the