HomeMy WebLinkAboutPermit Field Test & Inspection Report 2010-04-15Carlson Testing, Inc.
Bend Office
Geotechnical Office
Eugene Office
Salem Office
Tigard Office
(s4r) 330-9lss
(s03) 601-82s0
(s4l) 34s-0289
(s03) s89-12s2
(s03) 684-3460
Daily Report of Proprietary Anchors
Client:BURT WALTER CONSTRUCTION
Project:RADIOLOGY ASSOCIATES TENANT IMPROVEMENT CTI Job #:E1001058.
Address:445 HARLOW RD - SPRTNGFIELD oF.Jurisdiction:SPRINCF'IELD
P,L. SANETRA OBOA 447CTI representative
was on site this date Apr.15,2010 to perform Special lnspection for
Permit CoM2009-017?0
DFS #(s)PO Number:
SCOPE OF INSPECTION
1. Checked in with superintendent or client representative
Name i,AYNE
Company:BURT WALTERS CONSTRUCTION
2. lnspection was "lBC''Continuous Periodic
PROPRIETARY ANCHORS
YesNoN/A
1. Reviewed previous inspection reports?x
2. Reviewed evaluation report?x
Verified foliowing items meet manufacturer's
published instal lation instructions.
Evaluation report number & date:
ER 5B9O
Location of proprietary anchors inspected [to include grid
lines. elevations (floors) and drawing details]:
ON S]TE FOR INSTALLATJON OE' (ii) RED HEAD LDT
ANCHORS ON SECOND LEVEL FOR CHANNEL BEAMS OVER
WINDOV,]S AT A.5 G 1, 3-5 G AND A-C G 5, EMBED
irl
REPORT SUMMARY
1. Work inspected was: [l Completed [-l In prog.ess
2. Completed work inspected u'as in compliance with
[I Approved plans and specifications I Strop drawings
E nrt f oesign change Submittal
Document #(s) s2 REV i Dated:
3. Noncompliance item(s) were noted this date. details on
following page(s). I ves E ^o I xie
4. Noncompliance item(s) were reinspected this date, details
on following page(s). f V"r E No [] NZe
I Conform f Remain in progress
Report(s) findings were discussed and left with
fl Nra
72/t4/09
3. Verified minimum embedment depth of the
anchors.x
4.Verified installation of the anchors X
5. Verified anchor diameter ):
6. Verified steel grade.x
7. Verified hole diameter x
8. Verified type of drill bit used X
9. Verified hole cleanins method X
10. Verified adhesive application.x
I 1. Verified edge distance.x
12. Verified spacing x
13. Verified installation torque.x
of
Batch Number
Expiration Date
Based on the Code, approval is required from the Building
be covered. Carlson Testins has no authority to direct woik
Official before the SPECIAL INSPECTED items noted above can
of contractors or subcontractors.
Page
-
of
-
f] see additional report page(s) E Distribute attachments.
Name of product being installed REDHEAD LDT
Daily Report of Proprietarl Anchors
CTI Job #: El0010s8.
For: a4/$/20lo
Project:
Notes:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
In some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material testediinspected only. Information contained herein is not to be reproduced, except in-fi
without prioi authorization from this office. Under all circumstances, the information contained in this repg{ is provided
subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. N9 Parry other
than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfu lly submitted,
CARLSON TESTING. INC.
Reviewed By: Steven Dugger
Review Date: 04120 1201 0
PLS /KMF
BURT WALTER CONSTRUCTION
CITY OF SPRINGF]ELD BUILDING DEPAF.TMENT
SHERMAN ENGINEERING ]NC - DONALD SHERMAN
TONY KOACH ARCHITECT
BURTWALTER@MAC. COM
DON@SHERMANENGINEERS . COM
KOACH@TELEPORT. COM
TO:
Carlson Testing, Inc.
Bend Office
Geotechnical Office
Eugene Office
Salem Office
Tigard Office
(s4r) 330-915s
(s03) 601-82s0
(s4r) 34s-0289
(s03) s89-12s2
(s03) 684-3460
Daily Report of Proprietary Anchors
CIient:BURT WALTER CONSTRUCTION
Project RADIOLOGY ASSOCIATES TENANT IMPROVEMENT CTI Job #:E1001058
Address:445 HARI-OW RD - SPR]NG FTELD, OR Ju risdiction:SPRINGFIELD
P.L. SANETRA OBOA 447CTI representative
was on site this date Apr. 15, 2010 to perform Special Inspection for:
Permit CoM2009-01770
DFS #(s)PO Number:
SCOPE OF INSPECTION
l. Checked in with superintendent or client representative
Name WAYNE
Company:BURT WALTERS CONSTRUCTION
2. lnspection was "IBC"Continuous Periodic
PROPRIETARY ANCHORS
YesNoNiA
1. Reviewed previous inspection reports?x
2. Reviewed evaluation report?X
Verified foliowing items meet manufacturer's
pubiished installation instructions.
Evaluation report number & date
ESR 2251
Location ofproprietary anchors inspected [to include grid
lines. elevations (floors) and drawing details]:
ON SITE E'OR INSTALLATION OF (2) 3/4"X12" RED
HEAD TRU BCLTS OVER STAiR WE].L FOR BEAM AT LINES
3 G A EMBED OF 5"
REPORT SUMMARY
1. Work inspected was: [] Completed I in progress
2. Completed work inspected was in compliance with
[] Approved plans and specifications f] Sirop drawings
RFI
Document #(s)
Desigr change
52 REV 1
T Submittal N/A
Dated 72/14/09
3. Noncompliance item(s) were noted this date, details on
following page(s)Yes No I Nia
4. Noncompliance item(s) were reinspected this date, details
on following page(s).Yes No I Nra
I Conform f] Remain in progress
Report(s) findings were discussed and left with
3. Verified minimum embedment depth of the
anchors.X
4.Verified installation of the anchors.x
5. Verified anchor diameter X
6. Verified steel grade.X
7. Verified hole diameter v.
8. Verified rype of drill bit used.):
9. Verified hole cleaning method.x
10. Verified adhesive application.>:
I l. Verified edge distance.x
12. Verified spacing.x
13. Verified installation torque x
of
Name of product being installed RED HEAD TRU BOLT
Batch Number
Expiration Date
Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can
be covered. Carlson Testing has no authority to direct work ofcontractors or subcontractors.
f] S"e additional report page(s). f] oistribute attachments. page _ of _
Daily Report of Proprietary Anchors
CTI Job #: E1001058.
For: o4/15/2oto
Project:
Notes:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
In some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only. lnformation contained herein is not to_be reproduced. except in.fi
withoui prior authorization from this office. Under all circumstances, the information contained in this rePol is provided
subject tb all terms and conditions of CTI's General Conditions in effect at the time this-report is prepared. N.o Parry other
than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING. INC.
Reviewed By: Steven Dugger
Review D ate: 0 4 I 20 120 I 0
PLS /KMF
BURT WALTER CONSTRUCTION
CTTY OF SPRINGEIELD BUILDING DEPARTMENT
SHERMAN ENGINEERING INC - DONALD SHERMAN
TONY KOACH ARCHITECT
BURTWALTER@l.4AC . COl4
DON@SHERMANENGINEERS. COM
KOACH@TELEPORT, COM
ro
Carlson Testing, Inc.
Bend Office
Geotechnical Office
Eugene Office
Salem Office
Tigard Office
(s4l) 330-9rss
(503) 601-82s0
(s4r) 34s-0289
(s03) s89-12s2
(s03) 684-3460
Daily Report of Proprietary Anchors
Client:BURT ViALTER CONSTRUCT]ON
Project:RADIOLOGY ASSOCIATES TENANT IMPROVEMENT CTI Job #E1001058.
Address 445 HARLOIi RD - SPRINGF]ELD OR Jurisdiction:S PRINGFIELD
P.L. SANETRA OBOA 447CTI representative
was on site this date Apr. 15, 2010 to perform Special lnspection for:
Permit COM2009-0i770
DFS #(s)PO Number:
SCOPE OF INSPECTION
1. Checked in with superintendent or client representative.
Name:WAYNE
Company:BURT WALTER CONSTRUCTION
2. inspection was "IBC"Continuous Periodic
PROPRIETARY ANCHORS
YesNoN/A
1. Reviewed previous inspection reports?x
2. Reviewed evaluation report?x
Verifieci following items meet manufacturer's
published installation instructions.
Location ofproprietary anchors inspected [to include grid
lines. elevations (floors) and drawing details]:
ON SITE FOR INSTALLAT]ON .ND TOROUE OF (24)
3/4"X5" TITEN HDS OVER WI DOWS ON FIRST LEVEL
FOR CLIPS, EMBED 5". AND (7) 3/4"X1 '' TITEN HDS
FOR COLUMN BASES AT LINES 3 G A,2. BG A,4 G A.5,
EMBED 5'" LINES F'OR WIND CLIPS WERE A-B G
1,1-5 G A AND A-C G 1. ENGINEER OF RECORD WROTE
MEMO FOR USE OF TITENS IT HAS NOT BEEN RECIEVED
ON SITE
REPORT SUMMARY
l. Work inspected was: fl Completed
2. Work inspected in progress
I epproved plans and specifications
following page(s)Yes
f, nni f, oesign change Submittal
Document #(s) 2 / s2,2,/ sl ?EV 7 Dated:
3. Noncompliance item(s) were noted this date. details on
I In progress
fl strop drawings
! Nre
t2/14/09
I NreNo
Evaluation report number & date:
t,5K _:. i-1
4. Noncompiiance item(s) were reinspected this date, details
on following page(s). f ves E No [] Nle
Conform fl Remain in progress
Report(s) findings were discussed and left with
3. Verified minimum embedment depth of the
anchors.x
4.\rerified installation of the anchors.x
5. Verified anchor diameter,>l
6. Verified steel grade.x
7. Verified hole diameter x
8. Verified type of drillbit used x
9. Verified hole cleaning method x
10. Verified adhesive application x
11. Verified edge distance.x
12. Verified spacing x
13. Verified installation torque.x
9/r/2008 of
Name of product being installed SIMPSON TITEN HD
Batch Number
Expiration Date
-
Based on the Code, approval is required from the Building'
be covered. Carlson Testing has no authoritv to direct work
Official before the SPECIAL INSPECTED items noted above can
. of contractors or subcontractors.
I See additional report page(s) E Distribute attachments Page
-
of
tr u
Daily Report of Proprietary Anchors
cTI Job #: 81001058.
For: 04/15/2oto
Project:
Notes:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
ln some cases more than one box ma1,be checked for a given item on the front page.
Our reports pertain to the material tested/inspected onlv. lnformation contained herein is not to be reproduced, except in fr
without prior authorization from this office. Under all circumstances. the information contained in this repoft is provided
subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No parry other
than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING.INC.
Reviewed B5,: Steven Dugger
Review Date: 0412012010
PLS /KMF
BURT WALTER CONSTRUCTION
CITY OF SPRINGFTELD BUILD]NG DEPARTMENT
SHERMAN ENGINEERING INC - DONALD SHERMAN
TONY KOACH ARCHITECT
BURTWALTER@MAC. COM
DONGSHERMANENGINEERS. COM
KOACH@TELEPORT, COI\4
TO:
Carlson Testing, Inc.
Bend Office
Geotechnical Office
Eugene Office
Salem Office
Tigard Office
(s4r ) 330-9rss
(s03) 601-82s0
(s4l) 34s-0289
(503) s89-r2s2
(s03) 684-3460
Daily Report of Structural Steel
Client:BURT WALTER CONSTRUCTION
Project:RADIOLOGY ASSOCIATES TENANT IMP CTI Job #:E1001058
445 HARLObT RD - SPRINGEIELD OR
C. HALSTEAD OBOA 448
Jurisdiction:SPRINGFIELD
CTI representative
was on site this date Eeb. 26 2 010 to perform Special lnspection for:
Permit coM2009-01770
DFS #(s)PO Number:
SCOPE OF INSPECTION
l. Checked in with superintendent, client or shop rep.
Name WAYNE
Company:BURT iTiALTERS CONST TION
WELDER INFORMATION
Location of steel inspection [to include grid lines, elevations
(floors) and drawing detailsl:
GLU_LAM BUCKETS (SIMPSON EG9 & EGTX ) WELD ED TO
2. lnspection was "lBC" [-il Continuous []
3. work performed: E ,n the field fl o, fab shop
4. Ifshop inspection do they have fabrication and QC
procedures?tr Yes No N/A
INSPECTION
TUBE STEEL COLUMNS VIITH FLARE BEVEL GROOVE T{ELDS
WELDMENTS WERE COMPLETED PRIOR TO ]NSPECTION
Periodic coNTRACToB. NEEDS To cLEAN-up wELDS AND wELD covER
PASSES ON ALL CONNECTIONS AS WELDMENTS HAD
V]SUALLY UNACCEPTABLE WELD PROFILES.(2) HANGER
PLATES WERE EXTENDED ON GRIDLI NES A/2 & A,/4
WELDMENTS WERE COMPLETED PRIOR TO INSPECTION
MINIMUM OVER ViELD AND PLAC]NG A 3/16" FILLET WELD
OI.i EACH SIDE. NO WELDER CERTIE]CATIONS WERE
Yes NoN/A
NOT AVAILABLE
NOT AVAILABLE
AVAIT,AFL;' Cli- SiT[. ::EAN-UF I,,]-CRI{ :[S fN-PROGF'ESS
T
CTI TO RETURN AND RE-INSPECT. CONTRACTOR TO HA VE
WELDER CERTIFICATiONS ON SITE FOR REVIEW A
TlME
Welders Name
Certification #:
REPORT SUMMARY
1. Work inspected was: l_l Completed E tn progress
2. Work inspected in progress
lrl approved plans and specifications f] snop drawings
E *, fl Design change Submittal N/A
Document #(s)1 /a)Dated:1'/1A/)OOa
3. Noncompliance item(s) were noted this date, details on
following page(s)Yes tr No N/A
4. Noncompliance item(s) were reinspected this date. details
on following page(s). f] ves E .o E *^
[_l Conform ! Remain in progress
Report(s) findings were discussed and left with
WAYNE
of BURT WALTERS CONSTRUCTION
Based on the Code. approval is required from the Building Official before the
SPECIAL INSPECTED items noted above can be covered. Carlson Testine
has no authoritv to direct work of contractors or subcontractors.
Page
-of -
Yes No N/A
1. Reviewed previous inspection reports?x
2. Verified steel materials are in compiiance b1'
random samples of the mill test reports. steel
markings or other documentation.
reviewing
ID x
3. Verified weld filler materials conlbrm.X
4. Checked steel members to see thel'were fabricated and
erected in accordance with the workmanship and
tolerances required.
x
5. Checked welded studs and structural connections were
installed as required.x
6. Verified hi-eh strength bolts and fasteners conform.x
7. Verified the qualiq,of welds produced bv welders.
welding operators, and tackers conform.x
8. Verified steel frame joint details for bracing. stiffening.
member locations. and application ofjoint details at each
connection are in compliance bv random sampling.
x
Verilied the contractor's Welding Procedure
Specifications are in conformance with
AWS requirements.
x
2. Verified the essential variables outlined in the
Welding Procedure Specifi cations were
employed during execution ofthe work.x
3. Verified the weldabilit_v of reinforcing steel
other than ASTM A70it.x
I S.. additional report page(s).Distribute attachments.
Address:
ENGINEER APPROVED WELDING COVER PLATE 1/4" THICI(
Daily Report of Structural Steel
CTI Job #: E10010s8.
For: a2 /26 /zoto
Project:
Notes:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
ln some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only. lnformation contained herein is not to be reproduced, except in fi
withoul prioi authorization from this office. Under all circumstances, the information contained in this repofi is provided
subject tb all terms and conditions of CTI's General Conditions in effect at the time this repo{ is prepared. N9 Party other
thai those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfu lly submitted,
CARLSON TESTING,INC.
Reviewed By: Steven Dugger
Review Date: 03/1 1 12010
AU /T C
BURT WAITER CONSTRUCTION
CITY OF SPRINGEIELD BUTLDING DEPARTMENT
SHERMAN ENGTNEERING ]NC - DONALD SHERMAN
TONY KOACH ARCH]TECT
BURTWALTER@MAC. COM
DON@SHERMANENGINEERS. COM
KOACHGTELEPORT. COM
TO:
Bend Office
Geotechnical Office
Eugene Office
Salem Office
Tigard O{fice
) 330-9155
60 I -8250
34s-0289
(s03) s89-r252
(s03) 684-3460
(s4r
(s03
(s4ICarlson Testing, Inc.
Daily Report of Structural Steel
Client:BURT WALTER CONSTRUCTION
Project:RADIOLOGY ASSOCIATES TENANT IMPROVEMENT CTI Job #E1001058.
Address:445 HARLOW RD - SPRINGFIELD OR
C. HALSTEAD OBOA 448
Jurisdiction:S PRINGFIELD
CTI representative
was on site this date Mar.02 2010 to perform Special Inspection for:
Permit coM2009-01770
DFS #(s)PO Number:
SCOPE OF INSPECTION
1. Checked in with superintendent, client or shop rep
Name BURT
Company:BURT WALTERS CONSTRUCTION
2. Inspection was "IBC"Continuous
3. Work performed: E ,n the field E ot fab shop
4. lf shop inspection do they have fabrication and QC
procedures?Yes No NA
INSPECTION
Periodic DATED A2-26-tO. WELDING wAs pERF9RMED By (1)
Location of steel inspection [to include grid lines, elevations
(flbors) and drawing detailsl:
PERFORMED CONT]NUOUS VISUAL INSPECTION OF ELAF,E
BEVEL GROOVE WELDS ON SIMPSON GLU-LAM BUCKETS ON
LINE A/2 & A/ 4. REPAIRS WERE MADE FROM REPORT
CERTIFIED WELDER USING SMAW PROCESS i/ilTH E7O].8
ELECTRODES. ALSO ADDED COVER PLATE TO (:)
EXTENDED TiANG ER PLATES LINES A2/ & A/4
Yes NoN/A
REPORT SUMMARY
l. Work inspected was: [] Completed E h progress
2. Completed work inspected was in compliance with
[] epproved plans and specifications I Sirop drawings
I Design change Submittal NiARFI
Document #(s)1/<)Dated 12 /i4 /2009
Welders Name;
WELDER INFORMATION
TOM WISHART
3. Noncompliance item(s) were noted this date. details on
following page(s)Yes No N/A
4. Noncompliance item(s) were reinspected this date. details
Yes No N/A on following page(s)tr Yes No
Certification #: c-24:
N/A
I Conform I Remain in progress
Report(s) findings were discussed and left with
BURT
of BURT WALTERS CONSTRUCTION
Based on the Code. approval is required from the Building Official before the
SPECI-AL INSPECTED items noted above can be covered. Carlson Testing
has no authorit-v to direct work of contractors or subcontractors.
Page
-of -
x
L Reviewed previous inspection repons?x
2. Verified steel materials are in compliance b1'reviewing
random samples of the mill test reports, steel ID
markings or other documentation.
X
3. Verified weld filler materials conform.x
4. Checked steel members to see thel,were fabricated and
erected in accordance with the workmanship and
tolerances required.
x
5. Checked welded studs and structural connections were
installed as required.x
6. Verified high strengh bolts and fasteners conform X
7. Verified the qualit],of welds produced bv welders.
welding operators, and tackers conform.X
8. Verified steel frame joint details for bracing" stiffening.
member locations. and application ofjoint derails at each
connection are in compliance bl,random sampling.
x
x
Verified the contractor's Welding Procedure
Specifications are in conformance with
AWS requirements.
>i
2. Verified the essential variables outlined in the
Welding Procedure Specifi cations were
employed during execution of the work.x
3. Verified the weldabilit_v of reinforcing steel
other than ASTM A706.x
[] See additional report page(s).Distribute attachments
Daily Report of Structural Steel
cTI Job #. 810010s8.
For: a3/a2/2oro
Project:
Notes:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
In some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in fi
without prioi authorization from this office. Under all circumstances, the information contained in this report is provided
subject tb all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other
than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted.
CARLSON TESTING.INC.
Reviewed By: Steven Dugger
Revieu, Date: 03/l | 12010
CH/LS
BURT WALTER CONSTRUCTION
CITY OF SPRINGFIELD BU]LDING DEPARTMENT
SHERMAN ENGINEERING INC _ DONALD SHERMAN
TONY KOACH ARCHITECT
BURTWALTER@MAC. COM
DON@SHERMANENGINEERS. COM
KOACH@TELEPORT. COM
TO
Carlson Testing, Inc.
Incompleted Items List (NCL)
Mar 12, 2010
Et00r058.
Pro.ject Name:
Project Address
Perrnit No:
P.O. No:
RADTOLOGY ASSOCIATES TENANT IMPROVEMENT
445 HARLOW RD - SPRINGFIELD, OR
coM2009-01770
Project Manager: D. BRowN
Itenr #lnsp.Date Item Description Compliance CT'l Sign-Off Date
Corrected
1 AT 02/71 /2010 SHOP FABRICATOR MADE SADDI,E WITH 3/B'' PLATE
BOTTOM AND 1,/4'' PLATE SIDES WITH I/4" EILLET
WELDS, PLANS SPECIFY SIMPSON SADDLE. ENGINEER'S
WRITTEN APPROVAL FOR ''AS-BUILT'' SADDLE ]N LIEU OF
SIMPSON SADDLE TS REQUIRED,
I
2 C}I 03/0r/2070 ENGINEERIS WRITTEN APPROVAL FOR USE OE SIMPSON
STRONG-TIE TITEN HD'S & WEDGE_ALL ANCHORS II'I LIEU
OF HILTI AS SPECIFIED.
)
BURT WALTER CONSTRUCTION
TO: CITY OF SPRINGF]ELD BUILDlNG DEPARTMENT
SHERMAN ENGINEERING INC _ DONALD SITERMAN
TONY KOACII ARCIIITECT
Page: I
)
Carlson Testing, Inc.
Bend Office
Geotechnical Office
Eugene Office
Salem Office
Tigard Office
(s4l) 330-9rss
(s03) 601-82s0
(s41) 34s-0289
(503) 5E9-12s2
(s03) 684-3460
Daily Report of Proprietary Anchors
BURT WALTER CONSTRUCTIONCIient:
Project . RADIOLOGY ASSOCIATE S TENANT IMPROVEMENT CTI Job #:E1001058.
Address: 445 HARLOW RD - SPRINGFIELD, OR Jurisdiction:S PRINGFIELD
C. HALSTEAD OBOA 448CTI representative
was on site this date Mar. 02, 2010 16 perform Special Inspection for:
Permit CoM2009-01770
DFS #(s)PO Number:
SCOPE OF INSPECTION
l. Checked in with superintendent or client representative.
Name BURT
2. Inspection was "IBC" lil Continuous Periodic
PROPRIETARY ANCHORS
YesNoN/A
1. Reviewed previous inspection reports?x
2. Reviewed evaluation report?>l
Verified following items meet manufacturer's
published installation instructions.
Evaluation report number & date
Location ofproprietary anchors inspected [to include grid
lines, elevations (floors) and drawing details]:
(110) 3/1X10" STMPSON S TTE WEDGE ANCHORS
ON PT 4X12 AND 4XB. i24\ I/2X70 SIMPSON
company: BURT WALTERS coNsrRucrroN srRoNG-TrE wEDGE ANCHoRS. HoLES DRTLLED To A
MINIMUM OF 5" EMBEDMENT.
REPORT SUMMARY
l. Work inspected was: I Completed f] In prog.ess
2. Completed work inspected was in compliance with
[] Approred plans and specifications I Strop drawings
E nrr f] oesign change I suumittat N/A
Document #(s)1 /a^ I a /c1+ / r- |Dated 72 /74 /2A09
3. Noncompliance item(s) were noted this date, details on
following page(s). I ves E Xo E X,'o
4. Noncompliance item(s) were reinspected this date, details
on following page(s). f] ves E xo I xue
! Conform n Remain in progress
ICC ESR +139 6 SIMPSON STRONG TIE
Report(s) findines were discussed and left with
BURT
3. Verified minimum embedment depth of the
anchors.>,
4.Verified installation of the anchors x
5. Verified anchor diameter ),
6. Verified steel grade )i
7. Verified hole diameter x
8. Verified type of drill bit used x
9. Verified hole cleaning method x
10. Verified adhesive application.)l
1 1. Verified edge distance x
12. Verified spacing >i
I 3. Verified installation torque.x
72/07/2006 of BURT ViALTERS CONSTRUCTI ON
Name of product being installed REDHEAD TRU BOLT
LOT + 'S ws-34100Batch Number
Expiration Date N/A N/A
Based on the_Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above canbe covered. Carlson Testin-e has no authoriry to direct woik of contractors or subcontractors.
I See additional report page(s) E Distribute attachments Page of
WA751OOMG
Daily Report of Proprietary Anchors -
CTI Job #: E1001058.
For: fi/a2/2OtO
Project:
Notes:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
ln some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only- lnformation contained herein is not to-b.e reproduced, except in.fi
*iit ori f.io'r authorization from this office. Under all circumstances. the information contained in this rePq{ is provided
ruUp"itl, atl terms and conditions of CTI's General Conditions in effect at the time this-report is prepared' N.o Part"v other
thai those to whom Cil tras distributed this report shall be entitled to use or rely upon the information contained in this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfu lly submitted,
CARLSON TESTING. TNC.
Reviewed By: Steven Dugger
Review Date: 03/1 1 12010
BURT WALTER CONSTRUCT]ON
CITY OF SPRINGEIELD BUI],DING DEPARTMENT
SHERMAN ENGINEER]NG INC - DONALD SHERMAN
TONY KOACH ARCHITECT
BURTWALTERGI4AC, COM
DON@SH ERMANENGINEERS. COM
KOACH@TELEPORT. COM
TO:
Carlson Testing, Inc.
Bend Oflice
Geotechnical Office
Eugene OIfice
Salem OlIice
Tigard Office
(54r) 330-9rss
(s03)
(s41)
(s03)
(s03)
601-8250
34s-0289
589-1252
684-3460
Daily Report of Proprietary Anchors
BURT WALTER CONSTRUCT]ONClient:
Project:RADIOLOGY ASSOCIATES TENANT ]MP MENT CTI Job #:E1001-058.
Address:445 HARLOW RD - SPRINGFIELD OR Jurisdiction:SPRINGFIELD
C. HALSTEAD OBOA 148CTI representative
was on site this date Mar.01 2470 to perform Special Inspection for:
Permit COM2 0 0 9- 017 7 0
DFS #(s)PO Number:
SCOPE OF INSPECTION
1. Checked in u'ith superintendent or client representative.
Name:BURT
Company;BURT WALTERS CONS TRUCT I ON
2. Inspection was "IBC"Continuous Periodic
PROPRIETARY ANCHORS
Yes NoN/A
1. Reviewed previous inspection reports?x
2. Reviewed evaluation report?X
Verified following items meet manufacturls
pubiished installation instructions.
Evaluation report number & date:
Location ofproprietary anchors inspected [to include grid
lines, elevations (floors) and drawing detailsl:
(24) 3/4x1" STMPSON TrrEN HD'S (3) LOCATIONS ON
LINES3&4FORGLU-I,AMS IMPSON HANGERS INTO
EXiSTING T]LT PANELS. (8 3 4X1 II STMP.SON
WEDGE-A],L ON (2) TUBE STE EI COLUMNS GRIDLINES
3&4/ts.2. ALL HOLES WERE DRiLLED TO A MINIMUM
EMBEDMENT OE 5''. NOTE S CTFTCATTONS CALL OUT
FOR USE OF SIMPSON IN LIEU OF.
REPORT SUMMARY
l. Work inspected was: [] Completed [_l In prog.ess
2. Completed work inspected was not in compiiance with
[] epproved pians and specifications f] Sf,op drawings
E nn fl oesign change I suumlttal E N/A
ICC ESR +1056 & lCC ESR #1396 SIMPSON STRONG_T1E
Document #(s)Dated:72 /L4 /2009
3. Noncompiiance item(s) were noted this date, details on
following page(s). [] ves I No N/A
4. Noncompliance item(s) were reinspected this date, details
on foliowing page(s). I ves E No I Nla
fl Conform l_l Remain in progress
Report(s) findings were discussed and left with
BURT
J,/>- & -/
3. Verified minimum embedment depth of the
anchors.x,
4.Verified installation of the anchors.x-
5. Verified anchor diameter x
6. Verified steel grade.x
7. Verified hole diameter x
8. Verified type of drill bit used.x
9. Verified hole cleaning method.)l
10. Verified adhesive application.x
1 1. Verified edge distance x
12. Verified spacing.x
13. Verified installation torque x
7/Ai/2008 & L2/Ai/2006 of BURT WALTERS CONSTRUCTiON
Name of product being installed TJTEN HD & WEDGE_ALL
Batch Number
Expiration Date
THo75500H wA62700LoT +rq,
N/A N/A
Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can
be covered. Carlson Testing has no authorir.v- to direct work of contractors or subcontractors.
Page
-
of
-
f S". additional report page(s)Distribute attachments.
HILIT ANCHORS, NEED ENGINEEF.'S WRITTEN APPROVAL
'l
Daily Report of Proprietary Anchors -
CTI Job g. E1001058.
For: a3/ar/20rc
Project:
Notes:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
ln some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only. lnformation contained herein is not to be reproduced. except in fi
without prior authorization from this office. Under all circumstances, the information contained in this report is provided
subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No parfy other
than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfull1, submitted,
CARLSON TESTING.INC.
Reviewed By: Steven Dugger
Review Date: 03/l 1 12010
au /1 c
BURTWALTER@MAC. COMBURT WALTER CONSTRUCTION
CITY OF SPRINGTTELD BUTLDING DEPARTMENT
SHERMAN ENGINEERING INC - DONALD SHERMAN
TONY KOACH ARCHTTECT
DON@SHERMANENGINEERS. COM
KOACH@TELEPORT. COM
TO:
\-.
Carlson Testing, Inc.
Incompleted ltems List (NCL)
Mar 12,2010
E1001058.
Project Name:
Project Address
Permit No:
P.O. No:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
445 HARLOVi RD _ SPRINGFIELD, OR
coM2009-01770
Pro.iectManager: D' BRowN
Item #I nsp.Date Item Description Compliance CTI Sign-Off Date
Corrected
2 CH 03/01/2010 ENG]NEER S WRITTEN APPROVAL EOR USE OF' S]MPSON
STRONG.TIE TITEN HD'S & WEDGE_ALL ANCHORS IN LIEU
OF HILTI AS SPECIFIED.
)
)
BURT WALTER CONSTRUCTION
'fO: CI'fY OE SPRINGF'IELD BUILDING IIEPAR'IMENT
SHERMAN ENG]NE]ERING INC - DONALD SHERMAN
TONY KOAC}I ARCIIITTCT
Page: I
Carlson Testing, Inc.
Bend Office
Geotechnical Office
Eugene Office
Salem Office
Tigard Office
(s4l) 330-9lss
(s03) 60r-82s0
(541) 345-0289
(s03) s89-r2s2
(s03) 684-3460
Daily Report of Structural Steel
BURT WALTER CONSTRUCTIONClient:
Project:RADIOLOGY ASSOCIATES TENANT IMPROVEMENT CTI Job #:E1001058.
Address:445 HARLOW RD - S PRINGFIELD, OR Jurisdiction:S PRlNGFIELD
A. TURNER OBOA 844CTI representative
was on site this date ra l-'t'7 , 2At0 to perform Special Inspection for:
Permit coM2009-01770
DFS #(s)PO Number:
SCOPE OF INSPECTION
l. Checked in with superintendent, client or shop rep.
Name:MIKE
Company WISHART
2. Inspection was "IBC" l-l Continuous lil Periodic
3. work performed: E ,, the field E o, fab shop
i,{ 1S HART
4. lf shop inspection do they have fabrication and QC
procedures? []ves X*o INle
INSPECTION
Yes NoN/A
Welders Name
Certification #:
WELDER INFORMATION
MATT MILLER
Location of steel inspection [to include grid lines, elevations
(floors) and drawing detailsl:
VISUAL INSPECTION AI 3/76" EILLET WELDS ON COLUMN
BASE PLATES AND SADD LE ATTACHMENTS, (4) COLUMNS
TOTAL. SADDLE MADE WITH 3/B'' PLATE BOTTOM AND
7/4" PLATE SIDES WITH L/4'' FII,LET WELDS. PLANS
CALL FOR SIMPSON SADDI,E.ENGINEER'S WRiTTEN
APPROVAT, FOR ''AS-BUILT'' SADDLE IN L]EU OF SIMPSON
SADDLE IS REOUIRED
WELD PROCESS ECAW E71T-1 WITH CO2 SHIELD GAS
ALL WELDS APPEAR VISUALLAY ACCEPTABLE PER AViS
}1 . 1 AND APPP.OVED PLANS TO THE BEST OE TI{IS
REPORT SUMMARY
1. Work inspected was: lll Completed E ,n progress
2. Completed work inspected was not in compliance with
I epproved plans and specifications f, St op drawings
tr *, f Design change I-l suumittal E N/A
Document #(s)
3. Noncompliance item(s) were noted this date, details on
following page(s). I ves tr x N/ANo
4. Noncompliance item(s) were reinspected this date, details
Yes No N/A on following page(s)Yes Iro [Nra
Conform l_l Remain in progress
Report(s) findings were discussed and left with
M]KE
of WI SHART
51&52 Dated:t4 / 20a972/
C-L2B 6
Based on the Code. approval is required from the Building Offrcial before the
SPECIAL INSPECTED items noted above can be covered. Carlson Testing
has no authorit-v to direct work of contractors or subcontractors.
Page
-of -
1. Reviewed previous inspection reports?X
2. Verified steel materials are in compliance by reviewing
random samples of the mill test reports, steel ID
markings or other documentation.
x
3. Verified weld hller materials conform.x
4. Checked steel members to see they were fabricated and
erected in accordance with the workmanship and
tolerances required.
x
5. Checked welded studs and structural connections were
installed as required.x
6. Verified high strength bolts and fasteners conform.x
7. Verified the quality of welds produced by welders.
welding operators. and tackers conform.x
8. Verified steel fiame joint details for bracing. stiffening.
member locations" and application ofjoint details at each
connection are in compliance by random sampling.
x
Verified the conffactor's Welding Procedure
Specifications are in conformance with
AWS requirements.
x
2. Verified the essential variables outlined in the
Welding Procedure Specifications were
employed during execution of the work.x
3. Verified the weldabiliry of reinforcing steel
other than ASTM 4,706.x
See additional report page(s)Distribute attachments
INSPECTOR' S KNOWELDGE.
n
tr
Daily Report of Structural Steel
cTI Job #. E10010s8.
BURTWALTER@MAC. COM
DON@SHERMANENGINEERS, COM
KOACH@TELEPORT. COM
For: 02/11 /2oto
Project: RADIOLOGY ASSoCIATES TENANT IMPRoVEMENT
Notes:
ln some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in fi
without prior authorization from this office. Under all circumstances, the information contained in this report is provided
s.ubjegt to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other
than those to whom CTI has distributed this report shall be entitled to use or rely upon the-inform^ation contained iri ttiis
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfu lly submitted,
CARLSON TESTING,INC.
Reviewed By: Steven Dugger
Review D ate: 02 I 22 I 20 1 0
AT,/LS
BURT WALTER CONSTRUCTION
TO: CITY OF SPRINGEfELD BUITDTNG DEPARTMENT
SHERMAN ENGINEERING INC - DONALD SHERMAN
TONY KOACH ARCHITECT
Carlson Testing, Inc.
Incompleted ltems List (NCL)
Feb 23,2010
E1001058.
Project Name:
Pro.iect Address:
Permit No:
P.O. No:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
445 HARLOW RD - SPRINGFIELD, OR
coM2009-01770
Project Manager: D. BRowN
Itenr #lnsp.Date Item Description Compliance CTI Sign-Off Date
Corrected
1 AT 02/t7 /2010 SHOP FABRICATOR MADE SADDLE WITH 3/B'' PLATE
BOTTOM AND 1/4'' PLATE SIDES WITH 1,/4'' FILLET
WELDS. PLANS SPECIFY SIMPSON SADDLE. ENGINEERIS
WRITTEN APPROVAL FOR ''AS_BUILT'' SADDLE IN LIEU OF
SIMPSON SADDLE ]S REQUIRED.
i
BURT WALTER CONSTRUCT]ON
TO: CITY OF SPRINGEIELD BUILDING DEPARTMENT
SHERMAN ENGINEERING lNC _ DONALD SHERMAN
TONY KOACH ARCHITECT
Page: I
)
Carlson Testing, Inc.
Bend Office
Geotechnical Office
Eugene Office
Salem Office
Tigard Office
(s4r) 330-9155
(s03) 601-82s0
(s41) 34s-0289
(s03) s89-12s2
(s03) 684-3460
Daily Report of Structural Steel
Client:BURT WALTER CONSTRUCT]ON
Project:R}-DIOLOGY ASSOCIATES TENANT IMFROVEMENT CTI Job #:E1001058.
Address:445 HARLOW RD - SPRINGEIELD OR Jurisdiction:SPRINGFIELD
CTI represenlnlive S ' CoRBETT oBoA 15 5
was on site this date Mar. 44, 2470 to perform Special Inspection for:
Permit coM2009-01770
DFS #(s)
SCOPE OF INSPECTION
1. Checked in with superintendent, client or shop rep.
Name:MATT
Company:WISHART WELDING
2. lnspection was "IBC" lT Continuous
3. Work performed: E ,, the field
WlSHART WELDING
E o, fab shop
4. If shop inspection do they have fabrication and QC
STEEL FABF.IC.ATED FOR ABOVE PROJECT
Periodic n rr\rr r VISUAL INSPECTION WAS PERFORMED ON THE
FOLLOWiNG:
HSS COLUMNS (2) PER 11lS2
HSS HEADER (1) PER 10lS2
procedures? [ves E*o
INSPECTION
N/A
Welders Name:
Certification #:
WELDER INFORMATION
ON FILE AT SHOP
WORKMANSH]P WAS ACCEPTABLE TO AWS D1.1
Yes NoN/A
REPORT SUMMARY
1. Work inspected was: [Tl Completed [l tn progress
2. Completed work inspected was in compliance with
lil App.ored plans and specifications f] st op drawings
RFI l_l Desisn chanse N/A
Document #(s)
3. Noncompliance item(s) were noted this date, details on
following page(s). I Yes No N/A
4. Noncompliance item(s) were reinspected this date, details
Yes No N/A on following page(s).tr I*o [NraYes
tr Conform l-l Remain in progress
Report(s) findings were discussed and left with
MATT
of WISHART WELDING
Based on the Code, approval is required from the Building Official before the
SPECIAL INSPECTED items noted above can be covered. Carlson Testing
has no authority to direct work of contractors or subcontractors.
Page of
-
52 REV 3
Submittal
Dated:) /) /1A
1. Re'r,ie*'ed previous inspection reports?X
2. Verified steel materials are in compliance by
random samples of the mill test reports, steel
markings or other documentation.
revlewlng
ID x
3. Verified weld filler materials conform.x
4. Checked steel members to see they were fabricated and
erected in accordaace with the workmanship and
tolerances required.
x
5. Checked welded studs and structural connections were
installed as required.x
6. Verified high strength boits and fasteners conform.x
7. Verified the quality of weids produced by welders.
welding operators" and tackers conform.x
8. Verified steel frame joint details for bracing. stiffening.
member locations. and application ofjoint detaiis at each
connection are in compliance by random sampling.
x
1. Verified the contractor's Welding Procedure
Specifications are in conformance with
AWS requirements.
x
2. Verified the essential variables outlined in the
Welding Procedure Specifi cations were
empioyed during execution ofthe work.x
3. Verified the weldabilit"v of reinforcing steel
other than ASTM 4'706.x
! S"eadditionalreportpage(s) tr Distribute attachments
PO Number:
Location of steel inspection [to include grid lines, elevations
(floors) and drawing detailsl:
PRESENT AT WISHART WELDING ]N CLACKAMAS OR, TO
PERFORM VISUAL WELDING INSPECTION ON STRUCTURAL
Daily Report of Structural Steel
CTI Job #: E10010s8.
For: fi/04/2oLa
Project:
Notes:
RADIOLOGY ASSOCIATES TENANT IMPROVEMENT
ln some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in fi
without prior authorization from this office. Under all circumstances, the information contained in this report is provided
subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other
than those to whom CTI has distributed this repot shall be entitled to use or rely upon the information contained in this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfu lly submitted,
CARLSON TESTING" INC.
Reviewed By: Steven Dugger
Review Date: 03 I 1212010
SLC/KMF
BURTWALTER@MAC, COMBURT WALTER CONSTRUCTION
CITY OF SPRINGFIELD BU]LDING DEPARTMENT
SHERMAN ENGINEERING INC _ DONAID SHERMAN
TONY KOACH ARCHITECT
DON@SHERMANENGINEERS. COM
KOACH@TELEPORT. COI\4
TO:
Bend Office
Geotechnical Office
Eugene Office
Salem Office
Tigard Office
(s4r)
(s03)
(s41)
(s03)
(s03)
330-9155
601-8250
345-0289
589-1252
684-3460
Carlson Testing, Inc.
Daily Report of Proprietary Anchors
BURT WALTER CONSTRUCTIOb]Client:
Project:RAD]OLOGY ASSOCIATES TENANT IMPROVEMENT CTI Job #; E10010s8.
SPRINGFIELDAddress:445 HARLOW RD - SPRING D, OR Jurisdiction:
C. HALSTEAD OBOA 448CTI representative
was on site this date Mar. 16. 2010 1s perform Special lnspection for:
Permit CCM20C9-01770
DFS #(s)PO Number:
SCOPE OF INSPECTION
1. Checked in with superintendent or client representative
Name BURT
Company:BURT WALTERS CONST TION
2. lnspection was "lBC" [] Continuous Periodic
PROPRIETARY ANCHORS
YesNoN/A
1. Reviewed previous inspection reports?x
2. Revieu,ed evaluation report?x
Verified ioilowing items meet manufacturer's
published installation instructions.
Location ofproprietary anchors inspected [to include grid
lines, elevations (floors) and drawing details]:
{6)+5 BARS INTO EXISTING FOOTTNC TO EN T ARGF,
FOOTING EOR NEW TS COLUMN AT LINE A.3/4 HOLES
WERE PRE-DR]LLED TO 6" E DMENT. t163\ i/2X5
1/2" WEDGE ANCI]OP.S (RED HEAD T RUBOLT) WITH 4"
EMBEDMENT ON SECOND FLOOR'CICHAN}']EI BOVF,
i/iiNDOW OPENINGS. (4 ) SiMPS ON ANCHORS 5 / B ''X7 '' ON
TS CCLUMh] BASE PLATES AT LJNE A 5/3 I^rTTH 5"
EMBED. (72) 3 / 4''Xi2"TRUtsOLT WEDGE ANCHOR CN TS
BPACE FRAME hIITH 6'' EMBEDMENT
REPORT SUIvIIvIARY
1. Work inspected was: f, Completed I In prog."ss
2. Work inspected in progress
[] App.ored plans and specifications f Strop drawings
f nEI I Design change f] suum;ttal f] N/A
Document #(s)DETAIL 4/Dated: 72/74/49
d_ate, details on
No NiA
)
Evaluation report number & date:
rcD - 1 ?- rcD ^'tr1 ESR i3961,49!\ LLJLI
3. Noncompliance item(s) were noted this
following page(s). I ves
4. Noncompiiance item(s) were reinspected this date, details
on following page(s). I ves I No I NZe
f, conform fl Remain in progress
.
Report(s) findings were discussed and Ieft with
3. Verified minimum embedment depth of the
anchors.x
4.Verified installation of the anchors.x
5. Verified anchor diameter X
6. Verified steel grade.x
7. Verified hole diameter )a
8. Verified type of drill bit used.x
9. \,'erified hole cleaning method.x
10. Verified adhesive application.x
1 1. Verified edge distance.)i
12. \uerified spacing x
13. Verified installation torque.)i
of
Name of product being installed S IMPSCN .EPCON, REDHEAD
Batch Number
Exprratlon Date
253931
r/29/2077
Based on the Code. approval is required from the Building Official before the SPECIAL INSPECTED items noted above can
be covered. Carlson Testing has no authoritvto directwork ofcontractors or subcontractors.
tr See additional report page(s)Distribute attachments.Page
-
of
wA62700
I
Daily Report of Proprietary Anchors -
cTI Job #: El0010s8.
For: a3/16/2oto
Project:
Notes:
RADIOLOGY ASSOCIATES TENANT ]MPROVEMENT
In some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only- Information contained herein is not to be reproduced. except in fi
without prior authorization from this office. Under all circumstances, the information contained in this report is provided
s.ubject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No pirry other
than those to whom CTI has distributed this report shall be entitled to use or rely upon the'information contained iri this
document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfu lly submitted,
CARLSON TESTING.INC.
Reviewed By: Steven Dugger
Revie.w, Date: 03/i 9/201 0
CH,/KMF
BURT WALTER CONSTRUCT]ON
CITY OF SPRINGEIELD BUILDTNG DEPARTMENT
SHERMAN ENGINEERING INC - DONALD SHER}4AN
TONY KOACH ARCHITECT
BURTWALTER@[4AC. COM
DON@SHERMANENGINEERS . COM
KOACH@TELEPORT, CO14
TO: