HomeMy WebLinkAboutPermit Building 1998-03-31SiTF|llGFIELE,
225 North Fifth Street
Springfield, OR 97477
Location of proposed Work: 3500 COMMERCfAL STAssessors l"tap #: 1_7e231,2L
,o
COMMERCTAL/TNDUSTRTAL PERMIT APPLICATTON
CfTy OF SPRINGFIELD ilob Number:
COMMI'NrTY SERVICES DIVTSION
BUILDING SAFETY
Office
fnspection Line
Page 1
9 80 052
726 -3759
726-3769
Tax Lot #: 02700
OwneT: GREAT WESTERN cHEMIc
Address: 90 HWy 99
Phone #: 343-7744
City/State/ZLp: EUGENE, OREGON 974O2
Descript.ion Of Work: WAREHOUSE & OFFTCE NEW Val-ue:0.00
Archit.ect
Name
R,.] H]LL ENGINEE
Address Phone
General:
Plumbing:
Mechanical-
Electrical
Contractor
ORDELL CONSTRUC OO53O3O
350 SHELLEY ST SPRINGFIELD OR 97477
TWIN RIVERS PLU 0017695
PO BOX 40397 EUGENE OR 97404oOOO
HARVEY & PRICE OOOOOTT
PO BOX 1910 EUGENE OR 974400000
WEILAND ELECTRI OO585OO
870 W 2ND AVE STE D EUGENE OR 97402
Const.
Contractor #Expires
01,/02/oo
03/t1-/ee
ro /31,/ e8
01,/23/e8
Phone
747 -8734
688 -a444
7 46 -L62L
485-3539
--- PLI'MBTNG ---
No))Fee Charge
220 . OO
55.00
40.00
430.00
20.00
70.00
835 .00
Single Fixture
Sanitary Sewer
Wat.er Service
SEorm Sewer
2 BACKFLOW DEVICES
270' FIRE LINE
TOTAL PERMIT
186
115
267 0
fr.
ft.fr.
No
--- MECHATiIICAL ---
Furnace/burner & vent < 1000,000 BTUs
Vent Fan,/Single Duct
4 CONDENSOR UNITE
GAS P]PING
Permit Issuance
TOT,AL PERITTIT
Fee Charge
106.50
45.00
24 .00
5.50
10.00
191.00
15
=$
SPFINGFIELD
Job Number: 9gOOs2
ROUGH GR.LDING - AfIer
ROUGH PLITMBTNG - prior
gravel is in place butto cover.
o
Page 3
prror to placing concrete
ROUGH MECHANTCAL - Prior Io cover.Roue* GAs - after r-ine is instar-red and capped if not attached. to anappliance
ROUGH ELECTRICAL - prior to cover.
ELECTRT.AL SERVT.E - Must be approved to obtain permanent power.FRAIIfNG - prior to cover.
CEILTNG GRID
rNsuLATroN - Floor; prior t.o decking wa1l/ceiring; pri_or Lo coverINSUL-V.B./SUE: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECTDRYWALL - prior to taping.
BoLTs TNSTALLED rN coNcRETE - To be done by state certified speciarInspector. Provide inspection,/test reports to City Building InspectorHrcH STRENGTH BOLTTNG - To be done during constr by state Certified.special rnspector. Results provided to citsy Building Division.srRucruRAL coNcRETE in excess of 2500 psi. To be done during constr.by Stat.e Cert. Insp. Results to City Building InspectorsrRucruRAl wELDs - To be done during constr by state cert specialrnspector. Resul-ts of inspection/test to Ci_ty Builaing rnspector.FINAL PLIIMBING - When all plumbing work is complete.FfNAL GAS - When all gas work is complete.
GAs SERVICE - After l-ine is installed and line has been connected. to aminimum of one appliance. pressure test done at this point.FrNAL ldEcHANrcAr. - when aIl mechanical work is complete.FrNAL ELEcrRrcAr. - when all el-ectrical work is complete.
FrNAr. FrRE - when aLl- Fire Department reguirements have been met.been met..
FrNAL BurrJDrNc - when all required inspections have been approved andthe buil_ding is complete.
--- ADDITIONAL COMMENTS ---
DRC 97-O6-L49, PLANNER IS .fIM DONOVAN
SITE REVIEW JOURNAL #gI-06-L49, ,.fTM DONOVAN, PLANNER
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOppER
Date: 03/04/98
By signature, f state and agree,
application and do hereby certify
that I have carefully examined t.he completed
that al-l- information hereon is true andcorrect, and I further certify that any and al-I work performed shalL be donein accordance with t.he Ordinances of the City of Springfield, and the Lawsof the St.ate of Oregon pertaining to the work described. herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Communi-ty Services Division, Building Safety. I further certify t.hat only
cont.ractors and employees who are in compliance with ORS 701.055 will be
used on this project..
I further agree to ensure that al-I required inspections are reguested at theproper Lime, t.hat project address is readable from the streeL, that thepermit card is l-ocated at the front of the property, and t.he approved set
of plans will remain on the site at all times during construction.
?Date
z/s,/t /
'BPFINGFIELD
Job Number: 980052 Page 2
HANDICAP ACCESS: Y
ZONING CODE: HI
QUAD AREA: 3INC LAND USE: 3999
It.em
Sq. Ftg Main
Square Feet
33500
x $/Square Feet = Value
L,400, 000. 00
TOTAI, VALUE OF PRO.TECT 1, 400, 000 . 00
Plan check Fee: 1,743.95 Rec #: 28468 Date: ot/1,4/gB Rec By: LoRNE PLEGER
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/admin
PAVING VALUE
PLUMBING
Surcharge/admin
CTTY SDC FEES
LADAP & PENALTY
SEWER HOOKUP
SUBTOTAL PERMITS
TOTAI. PERMIT FEES EXCLI'DING ELECTRICAL
100, 000. 00
2,583 .00
21,4 .54
191.00
L4 ,48
433.00
835.00
56.80
33 ,438 .L4
1, ,439 . Og
21,057 .96
60, 373 .11
50, 373 . 11
--- REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see thaL all inspections are
made aL the proper t.ime. To request an inspection, call 725-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. wilL be made the same working day, requests made after
7:00 a.m wil-I be made the following work day.
Special Inspections: In accordance with Section 306 of the State Specialty Code
a special inspector shaLl- be employed by the Owner/Contractor during
const.ruction of any following "*" work. A copy of the special testing reports
shall be furnished to Building Safety.
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
cRADTNG/ExcAvATING/rrr.r,rrte - To be done during consLr by Special_ StaLe
Certified Inspector. Provide reports/tests to City Bullding fnspector
PILING, DRIIJIJED PfERS/CAISSIONS - To be done during constructlon by
State Certified Special Inspector employeed by ovrner/contractor.
WATER LINE - Prior to filling trench.
SANITARY SEWER LINE - Prior to filling trench.
STORI{ SEWER LINE - Prior to filling trench.
ITIIDERGROITND ELECTRICAL - Prior to Cover.
FOOTING - After trenches are excavated.
SLAB - To be made after a1l- insfab building service equipment, conduit
piping, and ot,her equipment items are in place but prior to concrete
SPFTilGFTELO
Job Number: 9BOO52
Receipt Number:
Date paid:
Amount Received:
Received By:
--- VALIDATION ---
2q
^b
L
3-3r-?r
c)a . tl
?(u)
o
Page 4