Loading...
HomeMy WebLinkAboutPermit Building 1998-03-31SiTF|llGFIELE, 225 North Fifth Street Springfield, OR 97477 Location of proposed Work: 3500 COMMERCfAL STAssessors l"tap #: 1_7e231,2L ,o COMMERCTAL/TNDUSTRTAL PERMIT APPLICATTON CfTy OF SPRINGFIELD ilob Number: COMMI'NrTY SERVICES DIVTSION BUILDING SAFETY Office fnspection Line Page 1 9 80 052 726 -3759 726-3769 Tax Lot #: 02700 OwneT: GREAT WESTERN cHEMIc Address: 90 HWy 99 Phone #: 343-7744 City/State/ZLp: EUGENE, OREGON 974O2 Descript.ion Of Work: WAREHOUSE & OFFTCE NEW Val-ue:0.00 Archit.ect Name R,.] H]LL ENGINEE Address Phone General: Plumbing: Mechanical- Electrical Contractor ORDELL CONSTRUC OO53O3O 350 SHELLEY ST SPRINGFIELD OR 97477 TWIN RIVERS PLU 0017695 PO BOX 40397 EUGENE OR 97404oOOO HARVEY & PRICE OOOOOTT PO BOX 1910 EUGENE OR 974400000 WEILAND ELECTRI OO585OO 870 W 2ND AVE STE D EUGENE OR 97402 Const. Contractor #Expires 01,/02/oo 03/t1-/ee ro /31,/ e8 01,/23/e8 Phone 747 -8734 688 -a444 7 46 -L62L 485-3539 --- PLI'MBTNG --- No))Fee Charge 220 . OO 55.00 40.00 430.00 20.00 70.00 835 .00 Single Fixture Sanitary Sewer Wat.er Service SEorm Sewer 2 BACKFLOW DEVICES 270' FIRE LINE TOTAL PERMIT 186 115 267 0 fr. ft.fr. No --- MECHATiIICAL --- Furnace/burner & vent < 1000,000 BTUs Vent Fan,/Single Duct 4 CONDENSOR UNITE GAS P]PING Permit Issuance TOT,AL PERITTIT Fee Charge 106.50 45.00 24 .00 5.50 10.00 191.00 15 =$ SPFINGFIELD Job Number: 9gOOs2 ROUGH GR.LDING - AfIer ROUGH PLITMBTNG - prior gravel is in place butto cover. o Page 3 prror to placing concrete ROUGH MECHANTCAL - Prior Io cover.Roue* GAs - after r-ine is instar-red and capped if not attached. to anappliance ROUGH ELECTRICAL - prior to cover. ELECTRT.AL SERVT.E - Must be approved to obtain permanent power.FRAIIfNG - prior to cover. CEILTNG GRID rNsuLATroN - Floor; prior t.o decking wa1l/ceiring; pri_or Lo coverINSUL-V.B./SUE: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECTDRYWALL - prior to taping. BoLTs TNSTALLED rN coNcRETE - To be done by state certified speciarInspector. Provide inspection,/test reports to City Building InspectorHrcH STRENGTH BOLTTNG - To be done during constr by state Certified.special rnspector. Results provided to citsy Building Division.srRucruRAL coNcRETE in excess of 2500 psi. To be done during constr.by Stat.e Cert. Insp. Results to City Building InspectorsrRucruRAl wELDs - To be done during constr by state cert specialrnspector. Resul-ts of inspection/test to Ci_ty Builaing rnspector.FINAL PLIIMBING - When all plumbing work is complete.FfNAL GAS - When all gas work is complete. GAs SERVICE - After l-ine is installed and line has been connected. to aminimum of one appliance. pressure test done at this point.FrNAL ldEcHANrcAr. - when aIl mechanical work is complete.FrNAL ELEcrRrcAr. - when all el-ectrical work is complete. FrNAr. FrRE - when aLl- Fire Department reguirements have been met.been met.. FrNAL BurrJDrNc - when all required inspections have been approved andthe buil_ding is complete. --- ADDITIONAL COMMENTS --- DRC 97-O6-L49, PLANNER IS .fIM DONOVAN SITE REVIEW JOURNAL #gI-06-L49, ,.fTM DONOVAN, PLANNER Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOppER Date: 03/04/98 By signature, f state and agree, application and do hereby certify that I have carefully examined t.he completed that al-l- information hereon is true andcorrect, and I further certify that any and al-I work performed shalL be donein accordance with t.he Ordinances of the City of Springfield, and the Lawsof the St.ate of Oregon pertaining to the work described. herein, and that NO OCCUPANCY will be made of any structure without permission of the Communi-ty Services Division, Building Safety. I further certify t.hat only cont.ractors and employees who are in compliance with ORS 701.055 will be used on this project.. I further agree to ensure that al-I required inspections are reguested at theproper Lime, t.hat project address is readable from the streeL, that thepermit card is l-ocated at the front of the property, and t.he approved set of plans will remain on the site at all times during construction. ?Date z/s,/t / 'BPFINGFIELD Job Number: 980052 Page 2 HANDICAP ACCESS: Y ZONING CODE: HI QUAD AREA: 3INC LAND USE: 3999 It.em Sq. Ftg Main Square Feet 33500 x $/Square Feet = Value L,400, 000. 00 TOTAI, VALUE OF PRO.TECT 1, 400, 000 . 00 Plan check Fee: 1,743.95 Rec #: 28468 Date: ot/1,4/gB Rec By: LoRNE PLEGER BUILDING Surcharge/Admin MECHANICAL Surcharge/admin PAVING VALUE PLUMBING Surcharge/admin CTTY SDC FEES LADAP & PENALTY SEWER HOOKUP SUBTOTAL PERMITS TOTAI. PERMIT FEES EXCLI'DING ELECTRICAL 100, 000. 00 2,583 .00 21,4 .54 191.00 L4 ,48 433.00 835.00 56.80 33 ,438 .L4 1, ,439 . Og 21,057 .96 60, 373 .11 50, 373 . 11 --- REQUIRED INSPECTIONS It is the responsibility of the permit holder to see thaL all inspections are made aL the proper t.ime. To request an inspection, call 725-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. wilL be made the same working day, requests made after 7:00 a.m wil-I be made the following work day. Special Inspections: In accordance with Section 306 of the State Specialty Code a special inspector shaLl- be employed by the Owner/Contractor during const.ruction of any following "*" work. A copy of the special testing reports shall be furnished to Building Safety. In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. cRADTNG/ExcAvATING/rrr.r,rrte - To be done during consLr by Special_ StaLe Certified Inspector. Provide reports/tests to City Bullding fnspector PILING, DRIIJIJED PfERS/CAISSIONS - To be done during constructlon by State Certified Special Inspector employeed by ovrner/contractor. WATER LINE - Prior to filling trench. SANITARY SEWER LINE - Prior to filling trench. STORI{ SEWER LINE - Prior to filling trench. ITIIDERGROITND ELECTRICAL - Prior to Cover. FOOTING - After trenches are excavated. SLAB - To be made after a1l- insfab building service equipment, conduit piping, and ot,her equipment items are in place but prior to concrete SPFTilGFTELO Job Number: 9BOO52 Receipt Number: Date paid: Amount Received: Received By: --- VALIDATION --- 2q ^b L 3-3r-?r c)a . tl ?(u) o Page 4