Loading...
HomeMy WebLinkAboutPermit Sidewalk 2019-08-13Driveway/Sidewalk Perm it Application City ofSpringfield Application Date: Permit Number lssue Date: 225 Fift h Street, Springfiel d, Oregon 97 477 8 I I - I 1- M22t-Pt7o n"' i o n u " n i;"1':nr1T;iltirg"' *" *s De pa rtm e nt SITE INFORMATION Location of Work: Applicant: Address: City: ch Phone: Tax Map Tax Lot 74-?2sy L h F.np.State: aL zte, 17{o?J- Subdivision Owner: Address: City: Phone: State:ZIP: REQUESTED PERMITS: [- Sidewalk Amountofsidewalkinexcessof90feet -fr-Sidewalk Repair f- Curb Cut/Driveway: Number of Driveways_ T Multiple Permit Discount each: (Maximum 2) Multi permit discount good for one site and one site inspection only applies to 2nd and 3rd permits only. Not sidewalk repairs .fiotorechnology fee [- Proof of lnsurance: 5500,000 Minimum if work is done by property owner f Facility Meets 201 'l PROWAG For ADA Compliance 5125.00 IstCut X567 2ndCut Total due with permit $ Fees @S0.12 sF KIs23.00 CONTRACTOR's Name: Address: City: 5 ttt -q28tu1Phone: State:ZIP:'740 Contractor Expiration date:z Project Supervisor Phone: 4ta_t_ INSPECTIONS: An inspection request should be made prior to pouring concrete, after the proposed work has been formed and made ready to pour. Curbcutandsidewalkinspectionscall:541 726-3769(recording)StateyourdesignatedCityjobnumber/permitnumber,jobaddress, typeofinspectionrequested,andwhenyouwillbereadyforinspection,Contractor'sorOwner'sname,andphonenumber. Requests received before 7:00 am will be made the same day, requests after 7:00 am will be made the next working day. lnspections are to be called in after excavations are made and form work is in place, but prior to pouring con(rete. L 2) SIGNATURE: Amount Received:Date Paid: Received By:Receipt No. By signature, I state and agree that I have carefully examined the completed application and do here by certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of 5pringfield applicable City Standard specifications and drawings and the laws of the State of Oregon pertaining to the work described herein, I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used. The City may inspect the work site described in this permit at any time during a one year period following receipt by the City of notice of completion of the described work and specify, at the City's sole discretion, any additional restoration work required to return the site to a standard acceptable to the City. The permittee will be notified in writing of any work required and will have thirty days (30) from the date of the notice to complete the work not completed at the end of the thirty days will be performed by the City and the costs will be billed to the permittee. I further agree to ensure that all required inspections are requested at the proper time that project address is readable from the street and the approved set of plans will remain on the site at all times during construction. Signature Date: