Loading...
HomeMy WebLinkAboutPermit Building 2019-08-27SPRINGFIELD—,,,, A � H. per.... OREGON Web Address: www.springfield-or.gov Permit Issued: August 27, 2019 Building Permit Residential Structural Permit Number: 811-19-001363-STR IVR Number: 811082531665 City of Springfield Development and Public Works 225 Fifth Street Springfield, OR 97477 541-726-3753 Email Address: permitcenter@springfield-or.gov 1260 Framing TYPE OF WORK I Category of Construction: Single Family Dwelling Type of Work: Addition Pending Calculated Job Value: $82,273.60 Struct Res Pending Description of Work: Addition Struct Res Pending 1220 Underfloor Framing/Post and Beam ]OB SITE INFORMATION Pending Worksite Address Parcel Owner: SODERHOLM ROBIN MARIE 273 W M ST 1703274405900 ANN & JOSEPH M 1440 Insulation Ceiling Address: 273 W M ST Springfield, OR 97477 SPRINGFIELD, OR 97477 LICENSED PROFESSIONAL INFORMATION Business Name License License Number Phone MINISTRY CONSTRUCTION LLC - CCB 175375 541-520-8051 Primary PENDING INSPECTIONS Inspection Inspection Group Inspection Status 1999 Final Building Struct Res Pending 1260 Framing Struct Res Pending 1020 Zoning/Setbacks Struct Res Pending 1110 Footing Struct Res Pending 1120 Foundation Struct Res Pending 1220 Underfloor Framing/Post and Beam Struct Res Pending 1410 Underfloor Insulation Struct Res Pending 1430 Insulation Wall Struct Res Pending 1440 Insulation Ceiling Struct Res Pending 1530 Exterior Shearwall Struct Res Pending SCHEDULING INSPECTIONS Permits expire if work is not started within 180 Days of issuance or if work is suspended for 180 Days or longer depending on the issuing agency's policy. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. Granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain copies of the rules by calling the Center at (503) 232-1987. All persons or entities performing work under this permit are required to be licensed unless exempted by ORS 701.010 (Structural/ Mechanical), ORS 479.540 (Electrical), and ORS 693.010-020 (Plumbing). Printed on: 8/27/19 Page 1 of 2 C:\myReports/reports//production/01 STANDARD V SOI N 0O N N a co a O � a) r- o � a C It Y N n Ln O LO LO 7 f, OI Q 3 ON, T <O O L KN 'O r O O � v UCL w LL d In "r m O U N N N C Q E C N Ol n U c @� o r= cM a) OL E U) a+ v CL O U Z w Y > E a0 v rr C• a V SOI N 0O N N a co a O � a) r- o � a C It O) LO O Q O <O O r O p D) cq r O N I0-0 T O Q E N r O O o r= cM Q v CD Z I- a0 r V- O rr C• _Q d � N r V SOI N 0O N N a co a O � a) r- o � a C It O) LO O 00 O LO 00 O r O p D) I- Cl) O h O OD It O 7 It o r= cM O LO N i0 I- a0 M 00 I— M w00 O O LO O O M N r 10 EA io r 6% 6% •p 69 •� 69 EH d9 _ d4 in (fl (A (A E+9 d9 a b4 64 N (O LO O O N N .+ c v rn u7 o aD o LO ao o LO O 3 O t` M O rl-: o OD o 7 It Cl) O O OO0M0000O w w ¢ co M ¢ coM E MO O O LO O O M N r— M M 0 0 i 1,44r N M• (fl (A 00 E+9 d9 dHM4 b4 64 N (O LO O O N N d N O O � O O (D O O LL O O (D (D O (D O LO O O O O O O O O O O Mi O O O O O O O Cl) O O OO0M0000O w w ¢ Q ¢ CL ¢ ¢ w Q' w O O LO O O M O 00 f— 0? 0 0 0 0 0 i O N It 0) 00 I -T LO v v N (O LO O O N N N N O O O O O (D O O O O O (D (D O (D O LO OV cli ❑ R s a) d N a � Q It It N N N N N d' N LL IM O 0 O O O O O O O O O O O y 0 O O O O O O O O O O L O O O O O O O0 C O0 O = O O O o O O O O O O O p OO O O O 4 OO O O O O O V V Q t- ^ r r O) O O O O (! Q N ONO CD O O to f— I— O O O t6 C 0 w M0) 0) 0) 0) 0) 0) 0) 0) rn 0)ea G) go rNr r r r r r r r r IIN N N ti ti � ti IN CN n N � R N N N N N N N N N M LO r CL Z v m c O w a) C Q a3 C CC Y N L w as U a G' To `o m M a_ U 7 :3 O : R cc E O O O O O O O cr w w ¢ Q ¢ CL ¢ ¢ w Q' w O O LO O O M O (D 00 f— O O LO 00 00 O O O O r r 4 LO U) 00 LO°° O 00O r r O N ' w O C a) N a3 N LL rn $ cli ❑ R s a) (D Q O E U LL LL IM O O J U O CO 0i y O 05 i O J N i w O ' O ' C C r>.• C U o U oE E U O CL (D m Q Q o Ito m o c , m aEi in 'L o o E > o E > �o U F 3 a� rn Z a o m E H o p IN U C U ,cr o in a5 Q (n cn 0 (n CIO fn 3: cn cn 0 cn N a N .0.• iL a t6 C 0 w M0) 0) 0) 0) 0) 0) 0) 0) rn 0)ea G) go rNr r r r r r r r r IIN N N ti ti � ti IN CN n N � R N N N N N N N N N M LO r CL Z v m c O w a) C Q a3 C CC Y N L w as U a G' To `o m M a_ U 7 :3 O : :3 cc E O O O O O O O cr w w ¢ Q ¢ ¢ ¢ ¢ w Q' w O O LO O O M O (D 00 f— O O LO 00 00 O O O O r r 4 LO N 00 LO°° O 00O r r O N w t6 C 0 w M0) 0) 0) 0) 0) 0) 0) 0) rn 0)ea G) go rNr r r r r r r r r IIN N N ti ti � ti IN CN n N � R N N N N N N N N N M LO r CL Z v m c O w a) C Q a3 C CC Y N L w as U a G' To `o m M a_ Structural Permit Application 225 Fifth Street ♦ Springfield, OR 97477 ♦ PH(541)726-3753 ♦ FAX(541)726-3689 6SPRINGFIELD i ' OREGON This permit is issued under OAR 918-460-0030. Permits expire if work is not started within 1 DEPARTMENT USE ONLY Permit no.: %cam' 130q Date:,Cv � ('� 2619 80 days of issuance or if work is suspended for 180 days. V LOCAL GOVERNMENT APPROVAL This project has final land -use approval. Signature: Date: This project has DEQ approval. Signature: Date: Zoning approval verified: ❑ Yes ❑ No Property is within flood plain: ❑ Yes ❑ No CATEGORY OF CONSTRUCTION Residential I ❑ Government ❑ Commercial JOB SITE INFORMATION AND LOCATION Job site address: ZI3 }, City: State:6Z ZIP: Subdivision: Lot no.: Reference: Taxlot: PROPERTY OWNER Name: )051) a- 5e Address: 2'73 WAW- < yre (- City: i %1^t State: ZIP: Phone: Fax: - - E-mail: WIcK« I.C& Building Owner or Owner's agent authorizing this application: Sign here: ❑ This installation is being made on residential or farm property owned by me or a member of my immediate family, and is exempt from licensing requirements under ORS 701.010. CONTRACTOR INSTALLATION Business name: Address: City: State: OR, ZIP: 9?k6I Phone: Sq I - 57-0- $C5 I Fax: -- E-mail: ►s1 �wi. �1: GonS� Y�cT vrnl[G �Wtr ♦f C�+a/` CCB license no.: /-753-75 Print name: t[,�y �1 rCuort� Signature: SUB -CONTRACTOR INFORMATION Name CCB License # Phone Number Electrical Occupancy L �S Plumbing JD f-l'�w~b "9 �g96t5 5LII, 337 30!:`I Mechanical Cost per square foot: Last edited 5-5-2017 BJones FEE SCHEDULE 1. Valuation information (a) Job description: Occupancy L �S Construction type: Square feet: 2 q 1) Cost per square foot: Other information: Type of Heat: Energy Path: ❑ new ❑alteration ❑ addition (b) Foundation -only permit? ❑ Yes [].No Total valuation: $ 2. Building fees (a) Permit fee (use valuation table): $ (b) Investigative fee (equal to [2a]): $ (c) Reinspection ($ per hour): (number of hours x fee per hour) $ (d) Enter 12% surcharge (.12 x [2a+2b+2c]): $ (e) Subtotal of fees above (2a through 2d): $ 3. Plan review fees (a) Plan review (65% x permit fee [2a]): $ *4 (b) Fire and life safety (65% x permit fee [2a]): $ (c) Subtotal of fees above (3a and 3b): $ 4. Miscellaneous fees (a) Seismic fee, 1% (.01 x permit fee [2a]): $ (b) Tech fee, 5% (.05 x permit fee[2a]+PR fee [3c]) $ TOTAL fees and surcharges (2e+3c+4a+b): $ ��� � �/eed � ems► es✓�. ��•�� c91a -tq L tri IF PZCA_5!-' s LABe-LC-(':za.►SS W�I�t:J2l�j� 16 Seg (mac S,Zg L-5 'i-ltasll_l LA I D e TLS �- / R q / [ § a �krF, \Ln o § Q S k£§/) k �� 2 0 }Ln m ■ a » CN= m o C & q � 3 / E � 0 / k { a f - E § R $ \ ■ °w § 64 £ / C) 2 e k / \ CL C14\ C 0 \ n to k 9 o L 2 C§ &Go 0 CD \ 0 i�l / $ E � 9 e b k § CL / £k 0k § o / E e � k CL n e k Lij c � �n �o$k % »z n o CF) L) S» % % - k \ (n / 2 0 7 5 '0 q 133 cc F- / / -Al 5 % (D Q 9.2A0 §E \ i a.I v / R q / [ § a CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT WORKSHEET JOURNAL OR JOB NUMBER: 19-001363 NAME OR COMPANY: Joseph and Robin Soderholm LOCATION: 273 West M St TAX LOT NUMBER: 1703274405900 DEVELOPMENT TYPE: Single Family Residence NEW DWELLING UNITS 1 UILDING SIZE (SF): 145' IMPERVIOUS AREA MAX 45% 22% 1. STORM DRAINAGE DIRECT RUNOFF TO CITY STORM SYSTEM LOT SIZE (SF)ll 6534 A. REIMBURSEMENT COST AREA DRAINING TO IMPERVIOUS S.F. x COST PER S.F. DRYWELL CHARGE 525.00 $0.294 = 0 $154.35 $154.35 B. IMPROVEMENT COST IMPERVIOUS S.F. x COST PER S.F. CHARGE 525.00 $0.424 = 0 $222.60 $222.60 ITEM 1 TOTAL - STORM DRAINAGE SDC $376.95 2. SANITARY SEWER - CITY A. REIMBURSEMENT COST: NUMBER OF DF[Ps x COST PER DFU 7 $1,158.78 B. IMPROVEMENT COST: NUMBER OF DFU` x COST PER DFU 7 $81.54 = 357n,7k ITEM 2 TOTAL - CITY SANITARY SEWER SDC = $1,729.56 1. TilANSPORTATION A. REIMBURSEMENT COST: ADT TRIP RATE x NUMBER OF UNITS x COST PER TRIP x NEW TRIP FACTOR 9.57 0 19.28 1.00 B. IMPROVEMENT COST: ADT TRIPRATE x NUMBER OF UNITS x COST PER TRIP x NEW TRIP FACTOR 9.57 �j 0 $366.41 1 F-1.00 = $0.00 ITEM 3 TOTAL - TRANSPORTATION SDC = $0.00 4. SANITARY SEWER - MWMC A. REIMBURSEMENT COST: NUMBER OF FEVs I x ICOSTPERFEU 0 $131.89 = $0.00 B. IMPROVEMENT COST: NUMBER OF FEVs x I COST PER FEU 0 $1,597.44 = $0.00_ C. COMPLIANCE COST: NUMBER OF FEUs x ICOSTPERFEU 0 1 $22.82 = $0.00 MWMC CREDIT ]F APPIK'Allif (SFE REVIERSE) _ $0.00 MWMC ADMINISTRATIVE FEE _ $0.00 ITEM 4 TOTAL - MWMC SANITARY SEWER SDC = $0.00 SUBTOTAL (ADD ITEMS 1, 2, 3, & 4) _ $2,106.51 5. ADMINISTRATIVE FEE: SUBTOTAL x ADM. FEE RATE CHARGE $2,106.51 5% $105.33 TOTAL STORM ADMINISTRATION FEE TOTAL SEWER ADMINISTRATION FEE: TOTAL TRANSPORTATION ADMINISTRATION FEE: TOTAL MWMC ADMINISTRATION FEE - LOCAL TOTAL SDC CHARGES PREPARED BY Steven Petersen DATE 6/21/2019 $18.85 86.48 $0.00 $0.00 $2,211.84 0 1091 1092 1093 1094 1055 1056 079 077 078 DRAINAGE FIXTURE UNIT (DFU) CALCULATION TABLE NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = DRAINAGE FIXTURE UNITS (NOTE: FOR REMODELS, CALCULATE ONLY THE NET ADDITIONAL FIXTURES) _ FIXTURE TYPE NO. OF FIXTURES UNIT NEW OLD EQUIVALENT DRAINAGE FIXTURE UNITS BATHTUB 1 0 3 = 3 DRINKING FOUNTAIN 0 0 1 = 0 FLOOR DRAIN 0 0 3 = 0 INTERCEPTORS FOR GREASE / OIL / SOLIDS / ETC. 0 0 3 = 0 INTERCEPTORS FOR SAND / AUTO WASH / ETC. 0 0 6 = 0 LAUNDRY TUB 0 0 2 = 0 CLOTHESWASHER / MOP SINK 0 0 3 = 0 CLOTHESWASHER - 3 OR MORE EA 0 0 6 = 0 MOBILE HOME PARK TRAP (I PER TRAILER 0 0 12 = 0 RECEPTOR FOR REFRIG / WATER STATION / ETC. 0 0 1 = 0 RECEPTOR FOR COM. SINK / DISHWASHER / ETC. 0 0 3 = 0 SHOWER, SINGLE STALL 0 0 2 = 0 SHOWER, GANG (NUMBER OF HEADS) 0 0 2 = 0 SINK: COMMERCIAL/RESIDENTIAL KITCHEN 0 0 3 = 0 SINK: COMMERCIAL BAR 0 0 2 = 0 SINK: WASH BASIN/DOUBLE LAVATORY 0 0 2 = 0 SINK: SINGLE LAVATORY/RESIDENTIAL BAR 1 0 1 1 = 1 URIN A L, STALL / WALL 0 0 5 = 0 TOILET, PUBLIC INSTALLATION 0 0 6 = 0 TOILET, PRIVATE INSTALLATION 1 0 3 = 3 MISCELLANEOUS DFU TYPE NUMBER OF EDU'S 20 = TOTAL DRAINAGE FIXTURE UNITS *EDU (Equivalent Dwelling Unit) is a discharge equivalent to a single family dwelling unit (20 DFUs) set at 167 gallons per day 0 7 MWMC CREDIT CALCULATION TABLE: BASED ON COUNTY ASSESSED VALUE YEAR ANNEXED CREDIT RATE/$1,000 ASSESSED VALUE $5.29 $5.29 $5.19 $5.12 $4.98 $4.80 $4.63 $4.40 $4.07 $3.67 $3.22 $2.73 $2.25 $1.80 $1.59 $1.45 $1.25 $1.09 $0.92 $0.72 $0.48 $0.28 $0.09 $0.05 IS LAND ELGIBLE FOR ANNEXATION CREDIT? 2 (Enter 1 for Yes, 2 for No) IS IMPROVEMENT ELGIBLE FOR ANNEX. CREDIT? 2 (Enter 1 for Yes, 2 for No) BASE YEAR 1979 CREDIT FOR LAND (IF APPLICABLE) VALUE / 1000 CREDIT RATE $0.00 x $5.29 = $0.00 CREDIT FOR IMPROVEMENT (IF AFTER ANNEXATION) VALUE/ 1000 CREDIT RATE $0.00 x $5.29 = 0 TOTAL MWMC CREDIT = $0.00 BEFORE 1979 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 S S 3• ro ro ro n n n O (SD (D Ln o_ 3 rD -0 rD O (Dh r+3 CL (D N 1 o ro " ar N N, m3. p� rD Oq <' vii S OJ N � 3• Q- Q 0 rD flJ O N m <n O nni NCD (A rt - O 3- 3 3 ro O y an � H 3 Q h =Ln y O ems+ 3 3 v w m m ro 3 Q (rD O O r• Ln O 00 0 A < (Am 0 ro Q- Q (D O X 0 0-0 3 a rr m a O FT O Q O rDID r L" a rD-1 m � � =+. N O 3 !D .Q C m 3 m 3 rr iF dF ODJ Q ro O (A r+ � O m � r+ 3 0 Q M n� � 3 ro n ro m Q x O c 3 O M 3 1 O_ '+ _r S O ro y (D 3 Q (D O 3 < rD n O rr 0- O ro - N ni 3 L m 3 (D O rr 0 3 CL m ro � n 3 ,.. f O O ro 3 0 Z --' FA rr F� S O rD N ro W � g W m a O_ m 70 Z v N � F� (D O FA t, 2C � •� n rD n n(D n 171, n n 3 a 3 3• 3• rD 3 C: 00 m OO 0 0 0 O --h n Q n n rF =r rF S N c rD y O r -r O ::a r N m = rt O 'S+m W m o p o O_ m 3 3 n + c_n <_n 3 -0 a rr o ro =+; O w 3 3 Q ro(D '� N• N• `� 3 3 En 3 s v, n 3 -�, r cr `^ ,�.y. S =3+ Ln v < m 3 Oo m O a- p wX- CD CD aQ q n S• an < Mao m O 3" y m N (MD -0S '* O ro r m� (�D '" C ro Q 3 Q C �' 3 (D n S rt O w X 0 S e S Q--hr+ N O 1, O O p Ort m 3 m O Q. -%O 0 �, y N 3 rr ((D C 1+ O- Q c cn N ro N 3 QJ 3 3 n d Q rD 3 Or Q 0 r+ 3 0 w < 0 r mD o L N M - o D 3' v e -F (DM y rD N O M d `" '•p 0 m �_ rD N 00 m Vf S 01 --hS N o S 3 77 S v 0 0 CD Q *k N 3 �. ro Q. n y m r+ O a rD 3 O r+ -� w v SCL < 0 3 m rD °° N rr m3 a rr 3 rr rDa 3 rr n m m '+ r+ 0 v< 3 S <n 3 m n N Oq rn ' w LnrDO cn ,.ter C Q < 3 S O r+ rF 1• 0 S O 3 O C 3 rD v n S m a ((D rD CL -a CL Or � r+ m ' `n ''+ O. M cr (DO_ C O _0 ro - < N m 1+ 0 1 rD< _ �' 0 C Cr rD n* Lq E Q m -0 N 'a 3 a' �' rD 0 3 S < Q h r n S cn' n -a O X CL a 0 — 3 N m [ ro 3 C 0 3 0 y cn (D 3 ro 3 ro 3 3 O 0 3 fD (p r -r S m r+ S cn m mrD< 0 -I Q mCL cn ro rDrD m v m v m O_ ahi 0 '_n. ; 3 O Or rD 3 ro O w 3 OQ 3 m < 0 m w m Q m. Cr rD3 n S 3 Q- r+ Oar 3� -1 rD rDv v O O_ 0 ro n O -1 � 1+ 0 N c C: � Q rm m rD O rr 3 (D z �y Q O S d rD C S m S N n 2q; t, l'. V 3 M 2C � •� 3 a 3 3• 3• rD S 3 n n p n 3 n n n Q n n rF =r rF S N c rD y O r -r O ::a r N m = rt O v Q. rD W � mr+ v,' rr (D ro =+; O w 3 3 ro rD N to m -7 0 3 v, rD -�, r O °n' ,�.y. S o v, m r+ ID (ID `n rD Oo v ID o 3 3 p 3 aQ q n S• Or C m O 3" 3 N m N (MD -0S �< n ro a• 'a Q (�D O 3 t tA 3 Q C �' 3 (D n S rt O w X 3 0 S m m n O Q--hr+ Ort 3 N O -%O �, y `� ((D T a O- O c cn N ro o O O 3 3 n X- Or Q rD 3 Or CL = 0 r+ 3 0 w 0 r mD v r+ N M Q (A D v e -F (DM , Q- a' O d rr oN '•p D m �_ N m m Vf S 01 --hS S (D S ro 0 *k 3 �. ro Q. � y m = ro a rD 3 O w _. < n 3 S rD °° N rr 3 ro O rr n m m rD 0 v< 3 v 3 m n N Oq rn Q vi ,.ter C Q v n 3 S '+ S r+ 1• 0 S O T O C 3 rD v n S m a ((D Q Q CL in � m ' `n ''+ Or M cr (DO_ C O _0 n < N m 1+ + O a' rD< 0 3 y Q m -0 N 'a 3 a' �' rD 0 3 S < 'DD O_ h r n S cn' n -a O X CL a 0 — 3 CL O [ ro 3 C 3' op 0 y (D 3 ro 3 ro 3 -�i Q 0 fn m v cn m 0 r2 - (D ro m v m v m m n 3 O ro Q ro O w 3 m < w m. Cr rD3 n S Q- Oar 3' -1 rD rDv O_ 0 m O 1+ 0 N rm Ln rD rr C (D (D z O d 7� C. S m di N 2q; W l'. V 3 M ma ii u ma SMITH Thayne From: Rob Adams<ministryconstructionllc@gmail.com> Sent: Wednesday, August 21, 2019 9:11 AM To: SMITH Thayne Subject: Re: FW: 273 W M Street Good Morning, Additional energy measures will be #3 the underfloor insulation and lighting updates. I think Ric sent over the brace panel info. And plumbing and electrical are: Jeff. JD Plumbing 541.337.3067 ccb 189615 Ben: Johnsen Electric ccb 205560 Do they need to pull their permits before the building permit is issued or before they do work? On Tue, Aug 20, 2019 at 3:27 PM SMITH Thayne <tsmith(c1�snripgfield-or.9ov> wrote: Just got back from my vacation. I checked my email this morning and saw an email from your Geo -Tech. He sent me the soils report with recommendations before the footings are poured. How are we looking on the other items on the list? Thayne From: SMITH Thayne Sent: Tuesday, July 23, 2019 4:34 PM To: ' ainistryconstructionllc@gmail.com' Subject: 273 W M Street I just completed my initial review of the 2 story addition at 273 W M Street. I still need a couple things before I can approve the permit. • Need the wall bracing information and it needs to be designed for seismic design category D1. • The program that I use on my computer shows that the entire lot is covered with hydric soils so I need a geo-technical report with results of soils tests and any recommendations by the engineer for the foundation. Because of the fact that this is on a flat lot, I don't need that before issuance but it will be required in order to approve the footing inspection. SMITH Thayne From: SMITH Thayne Sent: Tuesday, July 23, 2019 4:34 PM To: 'ministryconstructionllc@gmail.com' Subject: 273 W M Street Attachments: Additional Energy Measures for Addition.pdf I just completed my initial review of the 2 story addition at 273 W M Street. I still need a couple things before I can approve the permit. `• Need the wall bracing information and it needs to be designed for seismic design category D1. 'rwat.t0h,-% . The program that I use on my computer shows that the entire lot is covered with hydric soils so I need a geo- technical report with results of soils tests and any recommendations by the engineer for the foundation. Because of the fact that this is on a flat lot, I don't need that before issuance but it will be required in order to approve the footing inspection. . Need to know which additional energy measure is being incorporated into the construction. See the attachment. Subcontractors still need to pull their individual permits for their specific disciplines, or we need completed applications from each of the subs indicating the extend of the work that they are performing. For additions and alterations, each of the disciplines have their own specific permit number. Have a great evening, J J_J .aJ yJJ SJJJJrJJ EXP-' ft lDJ, CITY OF SPRINGFIELD 225, 5TH STREET SPRINGFIELD, OR 97477 TMMITH@SPRINGFIELD-OR.GOV P — 541-726-3783 F — 541-726-3689 Project Name: Project Address: Designer: Company: Ilnstructions: Stormwater Surface Filtration/Infiltration Facility Sizing Spreadsheet 24 Hour Storm, NRCS Type 1A Rainfall Distribution City of Eugene Version 2.1 Ministry Const. 273 W. M St. Springfield, OR 97477 R. Christian Geomax, Inc. Date: 7/9/2019 Permit Number: Catchment ID: Addition 1. Complete this form for each drainage catchment in the project site that is to be sized per the Presumptive Approach. 2. Provide a distinctive Catchment ID for each facility coordinated with the site basin map to correlate the appropriate calculations with the facility. 3. The maximum drainage catchment to be modeled per the Presumptive Approach is 1 acre (43,560 SF) 4.For infiltration facilities in Class A or B soils where no infiltration testing has been perfromed use an infiltration rate of 0.5 in/hr For all facilities use a maximum soil infiltration rate of 2.5 in/hr for topsoil/growing medium. "Yes" from the dropdown boxes below next to the design standards requirements for this facility. Pollution Reduction (PR) Yes Flow Control (FC) No Destination (DT) NO 'An infiltration facility must be chosen as the facility type to meet destination requirements Data -Post Deve Total Square Footage Impervious Area=1 620 sqft Impervious Area CN=l 98 Total Square Footage of Drainage Area=1 620 sft Weighted Average CN=l 98 Total Square Footage Pervious Area=sqft Pervious Area CN= 85 Time of Concentration Post Development= min Site Data -Pre Development (Data in this section is only used if Flow Control is required) Pre -Development CN= 85 Time of Concentration Pre -Development= �min Soil Data Tested Soil Infiltration Rate= In/hr (See Note 4) Destination Design=Whir Design Soil Infiltration Rate= 0.5 Whir Soil Infiltration Rate Used For Calculations Requirement Rainfall De th Design Storm Pollution Reduction 1.4 inches Water Quali Flow Control 3.6 inches Flood Control Destination 3.6 inches Flood Control Facility Type= Surface Width= Surface Length= Facility Side Slopes= Max. Ponding Depth in Stormwater Facility= Depth of Growing Medium (SoiQ=I Infiltration Rain Garden Facility Surface Area= 3 ft Facility Surface Perimeter= 24 ft Facility Bottom Area= 3 to 1 Facility Bottom Perimetem- 6 in Basin Volume= 81 in Ratio of Facility Area to Impervious Area= 72 sqft ft sqft ft cf 54 0 42 20.3 0.116 7/11/2019-1:20 PM Pollution a uc ion- a cu a ion Results Peak Flow Rate to Stormwater Facility = 0.005 cfs Peak Facility Overflow Rate= 0.000 cfs Total Runoff Volume to Stormwater Facility= 61 cf Total Overflow Volume= 0 cf Max. Depth of Stormwater in Facility= 5.8 in Drawdown Time= 9.5 hours Facility Sizing Meets Pollution Reduction Standards? BMeets Requirement of No Facility Flooding? Meets Requirement for Maximum of 18 Hour Drawdown Time? Flow Control-Calculation Results Peak Flow Rate to Stormwater Facility = 0.013 cfs Peak Facility Overflow Rate= 0.013 cfs Total Runoff Volume to Stormwater Facility= 174 cf Total Overflow Volume= 91 cf Peak Off -Site Flow Rate Max. Depth of Stormwater in Facility= 6.0 in Filtration Facility Underdrain= N\A cfs Drawdown Time= 12.8 hours Pre-Development Runoff Data Peak Flow Rate = 0.007 cfs Total Runoff Volume = 109 cf N\A Facility Sizing Meets Flow Control Standards? N\A I Meets Requirement for Post Development offsite flow lessor equal to Pre-Development Flow? N\A j Meets Requirement for Maximum of 18 Hour Drawdown Time? Destination-Calculation Results Peak Flow Rate to Stormwater Facility = N/A cfs Peak Facility Overflow Rate=' NIA cfs Total Runoff Volume to Stormwater Facility = N/A cf Total Overflow Volume= N/A cf Max. Depth of Stormwater in Facility= N/A in Drawdown Time= N/A hours N/A Facility Sizing Meets Destination Standards? NIA I Meets Requirement of No Facility Flooding? N/A Meets Requirement for Maximum of 30 hour Drawdown Time? 7/11/2019-1:20 PM