Loading...
HomeMy WebLinkAboutPermit Electrical 2019-07-15S Electrical Permit Application C IT Y O F SP R IN G F IE L D , O R E G O N 225 Fifth Streete Springfield, OR 97477 • PH(S41)726-3753t F AX(S41)726-3689 DEPARTMENT USE ONLY Date: This permit is issued under OAR 918-309-0000. Permits are nontransferable. Permits expire if work is not started within 180 days of issuance or if work is suspended for 180 days. ,ocAL:GOVERNMENT-APPROVAL- -· -~ ~':. :.. ? ,,; "_ FEE SCHEDULE Zoning approval verified? n-- 0No """ Cost Total CATEGORY Of· CONSTRUCTION - Number of Inspections per Item () , Qty. ea. cost D Residential 1-K(Govemment I D Commercial Residential, per unit, service Included: ~JOB SITE- INFORMATION AND LOCATION 1,000 sq. ft. or Jess (4) $186.00 $ Job site address: 0~C:- Por/", '<;· Each additional 500 sq. ft. or portion $36.00 $ thereof <:: JI_/' /J I State: ri if. I ZIP:(} 7 c/7 7 City: Limited energy (2) $44.00 $ I I Tax.lot.: . Reference: Each manufactured home or modular -DESCRIPTION OF WORK - - dwelling service or feeder (2) $89.00 $ -. L J ,·..r.'/Ja ./2. - L _ -f- t. ,,,-,HJ ,.,,,, c::; Services or feeders: installation, alteration, relocation I , , 200 amps or less (2) I $112.00 $ . - - . PROPERTY -OWNER ;_ 201 to 400 amps (2) $131.00 $ . ,i;) Name: W ,"f/lL,,.,,_a/a ,,,_, 401 to 600 amps (2) $221.00 $ Address: 601 to 1,000 amps (2) $285.00 $ City: I State: I ZIP: Over 1,000 amps or volts (2) $654.00 $ Phone: - - I Fax: - - Reconnect only (2) $89.00 $ E-mail: Temporary services or feeders: installation, alteration, relocation This installation is being made on residential or farm property 200 amps or less (2) $89.00 $ owned by me or a member of my immediate family. This 20 I to 400 amps (2) $122.00 $ property is not intended for sale, exchange, lease, or rent. OAR 479.540(1) and 479.560(1). 401 to 600 amps (2) $177.00 $ Signature: Over 600 amps or 1,000 volts, see services or feeders section above : - CONTRACTOR INSTALLATION - r>e..1:: '~-- Branch circuits: new, alteration, extension per panel - Business name: LJ-r ~/4_J/-r,~I I IL a. Fee for branch circuits with purchase of a service or feeder fee: ~ I "?'7 -~ - Address: vvl /J • ',,,, <; ;- Each branch circuit JDI ss.oo $ r - ,,, I( - I State: tJ/ I ZIP: q. 7 «sa City: b. Fee for branch circuits without purchase of a service or feeder fee: Phone:W.fl-S-'9 it./.) I 1 Fax: - - First branch circuit (2) $89.00 $ E-mail: I V\v.P .A/) /,p,,1-¥"- ',. ~ q. LAC/'!r C -~ Each additional branch circuit $8.00 $ <../ T '1 / r Miscellaneous fees: service or feeder not included CCB license no.: aoo ~ J;. 7 BCD license no.: C 9 /,, ?- Signing supervisor's license no.: _(,...J:10 O 5" Each pump or irrigation circle (2) $89.00 $ Print name of signing supervisor: ~ - ~~-A :j?.,. --Each sign or outline lighting (2) $102.00 $ - Signature of signing supervisor: / / / j? /2z._ Signal circuit or a limited-energy panel, $102.00 $ /' alteration, or extension (2) Each additional inspection: (1) $102.00 $ ' ,---~. " .- .,DEPARTMENT USE __ , ..,;_, ~ - (A} Enter subtotal of above fees $ (Minimum Permit Fee $102.00) (B) Enter 12% surcharge (.12 x [A]) $ (C) Technology Fee (5% of[A]) $ TOT AL fees and surcharges (A through D): $ Last edited 7/1/2019 B.Jones