HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-07-16CorvrAPf- O\or, i 1
4
rcLarr )6Ls
Compressive Strength of Concrete
c-39
Project Management x Consulting Engineers * Certified Plan Review and Inspection Services x Code Consulting
Hilton Garden InnProject Na
Client Hilton Garden Inn
Batch Time 12:34 PM
Truck #
Neoprene Pads ASSHTO T-22 N/A
Load Number 1
Spec Slump 4+l-L
Slump
ASTM C143
3.5 in.
Concrete Temp. 77 oF
ASTI.I C105,1
Initial Cure Min/Max Temp.
Structure Placed Footings N/17
#1266-001 Building Hotel
Contractor A &A
Sample Time 12:55 PM
ASTM C172
Concrete Supplier E.S.G.
58010199
843 Mix Design 313068
Date Cast
Load Size
Ticket #
Cast By
ASTM C31
717612009 Pickup Date
10.25 yds Water Added
2 +l- 7.5 Admixtures
N/A
lim Law
1712009
N/A
Spec Air
Unit Wt.
ASTM C138
P022 -80
Entrained Air
ASTM C231
Ambient Temp._ 90 oF Specified Strength 3000psi
N/A
Date Tested Age
(Days)
Total
Load
(lbs)
Average
Diameter
(in)
Cylinder
Area
(in)
Compressive
Strength
(psi)
Percent
Spec
Fracture
Type
Tested
By
Time Of
Test
Cylinder
Number
079-A
079-B
079-C
079-D
712312009
BlL312009
8lL3/2009
30495
0
t2.57
0.00
0.00
0.00
4
0
0
0
2427 81 ]DH 8:00 AM6
28
28
H
Remarks Smooth move on-site bv hose. mech vib, samoled tO chute
rure ffiil
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
525 NW Second Street x Corvallis, OR 97330 * (541) 758-1302 x (B0O) 383-8855" * Fax (541) 753-2264
,,P
i
I't
CAnAaDot- D Lotr> ,\ -
reLarr
Compressive Strength of Concrete
c-39
Project Management x Consulting Engineers x Certified Plan Review and Inspection Services x Code Consulting
Project Name Hilton Tnn
Client Hilton Garden Inn
Batch Time 1:09 PM
Truck #Bs0
Neoprene Pads ASSHTO T-22 N/A
Project# - __1266-001
Contractor A & A
ig;t3,9," rime 1:30 PM
Mix Design _ __3_96829
Date Cast 717612009
Buitding
Concrete Supplier
Ticket #
Cast By
ASTM C31
Pickup Date
Load Size 10.25 vds Water Added
Hotel
E.S.G.
58010203
Jim Lalv
717712009
Load Number 1 5 qal
Spec Slump
Slump
ASrM C143
6.5 in.
Concrete Temp. 77 "F
ASTM C1064
Initial Cure Min/Max Temp.
Structure Placed Column N/9 First Lift Below First Floor
7+l-7 Spec Air 2 +l- t.5 Admixtures GLEN303O
Unit Wt.N1A Entrained Air
ASTM CBT
N/A
ASTM C138
Ambient Temp. 90 "F SpecifiedStrength 5000psi
Date Tested Age
Total
Load
(lbs)
Average
Diameter
(in)
Compressive
Strength
(psi)
Percent
Spec
Fracture
Type
Tested
By
3537 7L
Time Of
Test
]DH 7:40 AM
Cylinder
Area
(in)Number
L2.57
0.00
0.00
0.00
Cylinder
34
0
0
0
144454
28
28
H
80A
808
80c
BOD
712012009
BlL3/2009
81t312009
0
0
0
Remarks
I?T:i. r t {
slllltL{l
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
525 NW Second Street x Corvallis, OR 97330 * (541) 758-1302 x (800) 383-8855 * Fax (541) 753-2264
(Days)
i'1il:-l
ctrnSDOO- olDDa \ \
lffiLarr
Compressive Strength of Concrete
c-39
Pqect Management x Consulting Engineers x Certified Plan Review and Inspection Services x Code Consulting
Project Name Hilton Inn
Client Garden Inn
Batch Time 9:51 AM
Truck #875
Neoprene Pads ASSHTO T-22 N/A
Load Number
Spec Slump
Slump
ASTM C143
5 in.
Concrete Temp. 75 oF
ASTM C1054
Initial Cure Min/Max Temp.
Structure Placed Footing gl 0/8.75
Project #1266-001
Contractor A & A
Sample Time 10:20 AM
ASTM C172
Mix Design 313068
Date Cast 7ll0l20!9 Pickup Date 717u2009
Building Hotel
Concrete Supplier E.S.G.
Ticket # 58009930
Cast By Jim_Lalu
ASTM C31
Load Size 11 yds Water Added N/A
4+l-1 Spec Air 1.5 +/-1.5 Admixtures P022 -80
N/A Entrained Air N/A
ASTM C231
Ambient Temp. 70 "F Specified Strength 3000psi
Date Tested Age
(Days)
Total
Load
(lbs)
Average
Diameter
(in)
Cylinder
Area
(in)
Compressive
Strength
(psi)
Percent
Spec
Fracture
Type
Tested
By
Time Of
Test
Cylinder
Number
28
28
H
69A
698
69C
69D
711712009
81712009
8l7l2oo9
26390 L2.57
0.00
0.00
0,00
4
0
0
0
0
2100 70 6 JDH 11:43 AM
0
Remarks Set A - Se-t 1 of 3 - Mech Vib- olaced bv hose- smooth move on site. samoled (O chute.
ruroffiN
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
525 NW Second Street * Corvallis, OR 97330 * (541) 758-1302 * (800) 383-8855 * Fax (541) 153-2264
1
Unit Wt.
ASTM C138
I&!Larr
C,DrY\E6DS'U0q2-
Compressive Strength of Concrete
c-39
Project Management x Consulting Engineers * Certified Plan Review and Inspection Services x Code Consulting
Project Name Hilton Inn
Client _ ____ HiltplGarden Inn
Batch Time 11:28 AM
Truck #
Project # 1266-001
Contractor A&A
Sample Time 11:50 AM
ASTM C172
Mix Design 313068
Date Cast 717012009
Load Size 10 yds
Building
Concrete Supplier
Ticket #
Cast By
ASTM C31
Pickup Date
Water Added
Hotel
E.S.G.
s8009939
862 Jim Law
7lLu2A09Neoprene Pads ASSHTO T-22 N/A
Load Number 1q
Spec Slump
Slump
ASTM C143
4 in.
Concrete Temp. 75 "F
ASTM C1064
Initial Cure Min/Max Temp.
Structure Placed Footings gl AlI4
N/A
l: L SPec Air 1.5 +/-1.5 Admixtures P022 -80
Unit Wt.N/A Entrained Air
ASTH C231
NIA
ASTM C138
AmbientTemp. 70 oF_ Specified Strength 3000psi
Cylinder
Number
Age
(Days)
Total
Load
(lbs)
Average
Diameter
(in)
Tested
By
Tlme Of
Test
Date Tested
71t712009
817120cE
81712009
0
3
28
704
708
70c
70D
t295 4
0
0
0
t2.57
0.00
0.00
0.00
2490 83 2 JDH 11:45 AM
oi
0H
Remarks Set B - Set 2 of 3 - Mech Vib. nlaced bv hose- smooth move on slte- samoled tO chute.
Cylinder
Area
(in)
Compressive
Strength
(psi)
Percent
Spec
Fracture
Type
Hm- ruro ffi
rrf7\it
-t
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
525 NW Second Street * Corvallis, OR 97330 * (541) 758-1302 * (800) 383-8855 * Fax (541) 753-22@
l&ILarr
CDrneDoS' DI,D6I :
Compressive Strength of Concrete
c-39
Project Management x Consulting Engineers x Cedified Plan Review and Inspection Services x Code Consulting
Project Name Hilton Garden Inn
Client
Batch Time
Truck #
-
853
Neoprene Pads ASSHTO T-22 N/A
Load Number 27
Spec Slump 4+l-L
Slump
ASTM C143
4 in.
Concrete Temp. 75 "F
ASTM C1064
Initial Cure Min/Max Temp.
Structure Placed Footings gl Cl24
Project #1266-001 Building
A&A Concrete Supplier
Ticket #
Cast By
ASTM C31
E.S.G.
58009957
Pickup Date 7fi712tr99
Water Added N/A
Admixtures P022 -80
Entrained Air
ASTM C231
N/A
SpecifiedStrength 3000psi
Hotel
Hilton Garden Inn Contractor
1:41 PM Sample Time 2:10 PM
ASTM C172
Mix Design 313068 Jim Law
Date Cast 71t012009
Load Size _ 10.15_yds
Spec Air
Unit Wt. N/A
ASTM C138
Ambient Temp. 80 :F
Cylinder
Number
7tA
7tB
7LC
7LD
28
H
711712009
81712009
81712009
28145
0
L2.57
0.00
0.00
0.00
4
0
0
0
2240 75 3 JDH 11:47 AM
Remarks Set C - Set 3 of 3 - Mech Vib. olaced bv hose
Date Tested Age
(Days)
Total
Load
(lbs)
Average
Diameter
(in)
Cylinder
Area
(in)
Compressive
Strength
(psi)
Percent
Spec
Fracture
Type
Tested
By
Time Of
Test
il
Type 1 Type 2 Type 3 Type 4 Type 5 Type 6
525 NW Second Street * Corvallis, OR 97330 * (541) 758-1302 * (800) 383-8855 * Fax (541) 753-2264
Em* ruru ffi N
[\lar 15 10 01:20p JonF u1 746 5725 p.1
A & A CONSTRUCTION & DE\TETOPMENT INC.
621 West lt{allon Avenue. Suite 509, Spokane, Washington 99201 (s09) 624-1 l70fax (5091 624-t?5s
FAN TRANSMITTAL
To: ?,"Ir-^* C^^ti9,Date: ?-ij-lD
Page I of
Fa>r#ltu - 7Jb L7LFrorn
Re:
I
U
5{l ^ n54 - V3 JB t.e.-
q cl -llo- oStqI C.Ii -
Contfcctot's licenses Alaska AA2O704 Arizotlo 24027A CaUfortin 760705 hlaho RCEI4?73 66668 Utah 0000431 130 :|ICONDIl34LE
.,
ryrW
p.2il1 76 5725Mar 15 10 01:20p JonF
rrli t! iul
I tdiirl ].*i ljr-i0 IJ,! !('ta lt : lt:. I"il:'if*
1,1'.;al
,i
rirlll
lr
#
i.it,':
L;I .lt.'.r: '-.
I
,ill,l
.!l
0
-:
-f'
(-
L/
.J
i
t.
(^
t
rlt
Lr
IIS\
s_s
T
i9
T
0
I,
r)..t
$
r.!)
r:\
;it
Irtl
J
6,
F
>u
f.r.{
trl
i i5E
siF 3
d: E*g$*r
BI
EI
.;
l!,
l,-
lr',\.
il
oiof '.r
$.;u..
HSrr (J
d:'
:o'
,ta
t;
irn1-l4lil
o
i.
d Iii\.t
,ii I
jl
IE{
sl
$t(<t
G
\
q
=
tss
CNs:-s
sl
=
EtIato
E
a
o
G
o
{
st(
lI
+
6I
I
I
'D'
:
.)
f.l
ni:I'
t r::-+
il1 76 5725
.-tj"''
D.,Ji
p.3
- jl!=l
Mar 15 10 01:20p JonF
lL
iv
l:-lrlr
Ir l
.C
:6-'F,i
rcl -{
!\ l.C1l!
.r lt. l,-rr,i !r,
i.l.'5.:
,iF,
it
I'l
, :.i
iet:t.-
[*l'zJ.o
i't.
i -tt-
:i\
i-'
I
e
N
,qI
.J
i!:
'l
f
t 6.
0
5t:
;r.t
!
, .:'i! .'Ir,.:{
i) '
"
J
5 rr.'. .j
Y'j \ .-i !,-"..it
i
=
Rs(\
S)::--s
S)-
=
ts$!
$
T
.;.-.:!t -
o!pri;i"
-:-P
tt
'
'l-"
,Tl r.:.t _: :--,-l t
r-lQ
O l*.':l
'r.
;
i
'rr( -
rt-
:(
l!ig{._;F
u
L.O
TI
ri7
JD'oF\
6
i.*t!, ,.
it,( F
.( i'
n t,
Li
c
tt{
Jr
f
:;
U
-t
iri
;:
1iil
ii
| 1=':r
Im
jz
F
!
-ti
':l f,s
!
L
o
5
4
sq
tlr)-
).
\,rt rll'
r
I
.
*
.:-
E lgq
g;F:
g;iE
tEo'E
5
J.
n':(.9l!
F
a\
tr
,,
t-
-:l
lr
ii.t-JiqItls
I
.,r ii
i;iq(t+
..! t.:! d't- l-aril fr
li9 C'lg (
, li'
iat
'Jf
''c
it
;:.
\.
li
t\..t
li==,.
ll
L:i
=ll i I
I?=!---
s
?ll
'l
J":7. -r-
t
I
I
_1
r"L ill
t-h-'T
<,
G--
).
)
I
(\
t
uflclilJ:
aEl6g
B;
d
ts96
oc-!
a
s
_'-!
ti
I Jl
I
Hi
.Tx\
I
I
I
I[[!La,r 525 NW Secocij Slreet, Coruallis.0regon 9?33S
{ 800.3E3 8855 ph 5a1 75ti.13.1? St541.1n.7264
wwwctaircompe ny.com
Daily Field Report
Time Arrived: 8:00 AM Project # : 1266-001 No.: 84Date: 2/25/2010
Project Name: Hilton Garden Inn
Address: 3528 Gateway, Springfield, OR
Building: Hotel
Permit # :c8 I 082
Special Inspection:
ClientName: AssociatedConsultant
Period:
Type of Inspections Performed
WeatherConditions: clear
E Reinforcing Steel
n Reinforced Concrete
I Concrete Forms
E Structural Masonry
E shotcrete
I epory Anchors
E rir. Proofing
M Ott"r, wood nailing
l)
I Structural Steel Fabrication
E Structural Steel Erection
E Expansion Bolts
E Geotech Observations
M Structural Fills
fJ Sub-grade (footings/slabs)
E rit. o.iuing
Type
Type of Material:
Supplier
Mix #
Slump/Flow (in.)
Material Temp. (oF)
Ambient Temp. (oF)
Time Placed
No. of Samples
Design Strength (PSI)
Total Cubic Yds.
Equipment
Serial Number
Concrete Grout Mortar
l-
Specific Placement Locations
l) Storm trench, south side ofbuilding
Roof framing llE-F &241E-F
Note:
E Previously listed uncorrected items
fl Ch"ng., to approved plans and/or specifications by Architect,or Engineer
E Corrections ofpreviously listed items
X It... requiring correction
f] Materials and methods of construction
tr Equipment used (i.e. what was used to proof roll or obtain compaction)
Field Observations and Comments
IReinforcing steel was checked in locations listed above, for grade, size, lap, placement and clearances where applicable,
density testing on 3/4" minus material used to backfill above noted trench. Density test taken meet or exceed min project
See field density sht for test results.
At above noted locations, blocking in areas previously noted as incomplete, has been installed. Blocking for bracing per I 0/56.2. Bracing
in progress.
As a mutual protection lo cliens, the public, and ourselves, all reports are submitted as confidential property ofclients and are int€nded for the use ofour climts or
No other person or mtity may utilize the report or any portion thereof without our wrinen pe mission.
To the best ofmy knowledge, the work inspected was in accordance with the building department approved design drawings, specifications
and applicable workmanship provisions of the I.B.C. except as noted:
Inspector Name: Dave Tilton Reviewed by: Ron Tiland
nffiLa,r
5?5 NW Secocij Streei. Crrvallis, 0regon 97330
tt800.3i13.i}055 ph 541 7$.1302 h 541.751.2264
www.clairconpony.com
Daily Field Report
Time Arrived: 8:00 AM Project #I 266-00 I
Project Name: Hilton Garden Inn
Date:3t2t20t0
Hotel
Address: 3528 Gateway, Springfield, OR
No.: 85
Permit #c8 l 082 ClientName: AssociatedConsultant
Speciat Inspection: g Period:
Type of Inspections Performed
WeatherConditions: rain
I Reinforcing Steel
E Ruinforced Concrete
n Concrete Forms
I Structural Masonry
I shotcrete
E rpo*y Anchors
I rir" Proofing
I Structural Steel Fabrication
f] Structural Steel Erection
I Expansion Bolts
I Geotech Observations
E Structural Fills
E Sub-grade (footingVslabs)
E Pil" D.i"iog
Type
Type of Material:
Supplier
Mix #
Slump/Flow (in.)
Material Temp. (oF)
Ambient Temp. (oF)
Time Placed
No. of Samples
Design Strength (PSI)
Total Cubic Yds.
Equipment
Serial Number
Concrete Grout Mortar
Other: Exterior shear wall nailing
Specific Placement Locations
, Gl9-23 Znd floor to 5th floor f'raming
ling at exterior sheathing ofshear walls
Note:
E Previously listed uncorrected items
E Ch"ng". to approved plans and/or specifications by Architect,or Engineer
E Corrections of previously listed items
E It.., requiring correction
E Materials and methods of construction
D Equipment used (i,e. what was used to proof roll or obtain compaction)
Field Observations and Comments
EReinforcing steel was checked in locations listed above, for grade, size, lap, placement and clearances where applicable.
progressinspectionofnailingandexteriorholddownstrapsinstallationatsheathingofabovenotedshearwalls. l5/32 OSB installed with
I l8 and.l3l Pnails in general conformance with schedules Sl.3 Rev 69123109. CMST l2 x9'straps installedat4th floorframing. MSTC66
installed at 5th floor framing. Areas with missing nailing was marked with paint. At 2nd & 3rd floor framing contractor is in process of
additional studs in shears. Studs were left out for hold down installation, when completed. Sheathing nailing will need to be verified
added studs.
As a mutral protection to clients, the public, and ourselves, all reports are submitted as confidential property ofclients and are intended for the usc ofour clients or
No other person or entity may utilize the report or any portion thereofwithout our written pemission.
To the best ofmy knowledge, the work inspected was in accordance with the building department approved design drawings, specifications
and applicable workmanship provisions olthe I.B.C. except as noted:
Inspector Name: Dave Tilton Reviewed bv: Ron Tiland
ffiLffirr
CCI Project#'1266-001
Rev Date: 3-10-10
Covering lssued Daily Field
Report Through #5
Non-Compliance Report
Specific Placement Locations Description of Problem
Type of lnspections Performed
MReinforcing Steel
EReinforced Concrete
EConcrete Forms
Estructural Masonry
Eshotcrete
MEpoxy Anchors
EFire Proofing
Eotner:
I Structural Steel Fabrication
f] Structural Steel Erection
trExpansion Bolts
IGeotech Observations
f Structural Fills
E Sub-graOe (footings/slabs)
Ieite Driving
No. 40 Date 8/4/2009 Building Hotel
Permit # 09-C8-1082 Period periodic
lnspector mike
No. 6'l Date 9/15/2009 Building llolel
Permit # 09-C8-1082 Period
lnspecto r Dave Tilton
A) Columns @ 181A, C,E.25, H; 16/,c,
C, E.25:21|H.
B) Shearwall @ A-C123
C) Epoxy @ column N/8.75.
Observed epory of rebar in footing: dowels for columns. Epoxy was Hilti Hit RE
500 with exp. Date 10/09. Work reflects "as-built" condition. Need RFI approved.
Embed depth of 8" into column. Holes were drilled with 5/8" diameter carbide tip
bit in roto hammer and are ANSI approved. Embed on (2) western holes was 8"
and 8-112" on north side 8-1/4" and 8". Holes were cleaned by wire brush and
compressed air. Holes uere filled and rebar inserted with a twist. Columns and
shearwall appear complete, in place and have proper clearances and are ready to
close up and pour. Work appears to comply with manufacturers recommendations
(epoxy), approved plans and job specs. except as noted.
Reference Documents: Epoxy ESR2322, 52.'l
1) 2nd level deck A-H/1 1.5-24
2) 2nd level deck A-R/1-1 1.5
1) On site for in progress inspection of reinforcing steel placement for above
noted deck. Contractor placing misc. trim steel and tying tendons. Received copy
of structural observation report by Babrak Amiri dated 9/14109, including revised
details for column steel hooks and add steel at elevator for conflict with
penetrations.
2) lt has been determined that the stud rails for the type 2 columns were shipped
in two pieces. At the columns of pour #1 ('1-1 '1 .5 line) only ('1) of the pieces was
installed,so(9)railswith(18)studseachis installed."As-built"conditionisbeing
reviewed by EOR.
Type of lnspections Performed
MReinforcing Steel
EReinforced Concrete
nConcrete Forms
Estructural Masonry
Ishotcrete
[lEpoxy Anchors
EFire Proofing
Eother:
I Structural Steel Fabrication
I Structural Steel Erection
IExpansion Bolts
EGeotech Observations
nstructural Fills
E Sub-grade (footings/slabs)
IPile Driring
Page 1 of2
LAt r CCI Project #1 266-001
Rev Date: 3-10-10
Covering lssued Daily Field
Reporl Through #5
Non-Compliance Report
Specific Placement Locations
City Building lnspector
Description of Problem
Cc: Owner
Building Otfical
General Contractor
Designer
(
Page 2 ot 2
Feb 25 10 p5'02p JonF 541 746 5725 p.1
A &,A CONSTRUCTION & DEWLOPMEIW INC.
621 lfest htallon Avenue, Suite 509, Spokane,Washington 99201 (509) 624-1 170 Fax (509) 624-12s5
F.,4X TRANSMITTAL
To:ftb."t Co.{t..
1g* F..\ - tl.lt-"Gau Intil..
Date: (l-&f * to,
Page 1of I
Fax # ,rll - laG -1 1"7 tFrom:
Re:P
T1^r.,-kl - -Sot.:
So?-qQl-94 yu
Conrractor'sLicens$ AlaskaAA2070l Arizona240270 CiliIornid760705 fulahoRCE|4773 Oregon66668 Utah0000431130 Washington,4ACONDII34LE
Feb 25 10 05:02p JonF u1 745 5725 p.2
t.-.
ELAIl-
DAILY FIELD REPORT
OATE a,-1O nME: ARRTVED:DEPARTED:
Type of lllaterlal Concnte Grout illorE
Srrpplier
Mix#
Siltmg/FIorY
UlderlalTemP-
Amb'ErtTetnp.
Time Plaoed
hb. of Samphs
D€slen SlrBnglh (PSl)
Trfil Cubic Yds Phsd
ilo5: flpsscbr belry stEtd cdaln trc followlm clrack if apPlcdb''---
-;.rt",.tytst€duroolt€frdiEns nOEng€bapprold
Erutrrequlrtqg Eo.tectuL flc,srcstiqs*fr€t'bucy Hltsru'
dars rd/or spedficuorc by Art thct' d Engh€er'
{Ee, @tProiedNu.ISc
Itlgne ofPagp
Conmcbr:
Bulk1tg:
Clent Name:*W€lherCsrdtiqs:Md'rcCdihrnrs
Equlpment
Scrtal NumborTyPe
PstunrdollnspoctlonrType
Eesrdfil BoIs
Gdcdl Obcety.tions
Strrraural Fitb
Subgnde (froh$/dabs)
PIe DiYing
RooffE
Reiffordtg
nffirced Cono€t€
Ecssetrrc
Masonry
Suctural HFdrbuons
Sh.6rral scd &€ction
f gructrat
]*rtrete
Epory Ardtors
FIre ProofirB
f cnc coatines
D0o,".t+eorvt
EItrI
F'iald Obsarvadons and Comments
checkcd irl tv
V-'Y-
Af B mutrj Fffi b dimlr. $c il,b|ts.!ftdOurss{v6, dl r€9dtr nE anbaitLd .t Gonfid6tial
d rn0ty maY udltrr lho rEport or rny Po.ton thffiol
prcperty ol dl€rrs era tnlen&d br ltp u8€ ot ol.r dlgtts oltiy'
I sithout arr rrdfln frmd$,]qt .l{oo$dpsl3on
appl@ble
the
cpcciflcadontfarrings,derignapprovsdlhawith@argnenlbuldfitgaccordancewastheo{kflledge,my
rptcd:6tfroo.s.s.c.orcspto{
Control Docurnent #Sl OOs
No. .
bv: