HomeMy WebLinkAboutPermit Field Test & Inspection Report 2010-03-18ITffiLAT 525 NSi Secr.rnii Street, Crrvallis.Oregon 97330 It800.33ij.8855 ph 541 i5$.13{i? fi 541.i53.?264 wl/vilclaarc0npanl.com Daily Field Report TimeArrived: ll:30AM Project#: 1266401Date: 3ll8l20l0 Project Name: Hilton Garden Inn No.: 8'7 Address:3% Gateway, Springfield, OR Building: Hotel Permit#: 09-C8-1082 ClientName: AssociatedConsultant Special Inspection: I E Reinforcing Steel E Reinforced Concrete E Concrete Forms E Structural Masonry E shotcrete E opo*y Anchors I ri.. Proofing I oth.., Period: Type of Inspections Performed WeatherConditions: clear Type Type of Material: Supplier Mix # Slump/Flow (in.) Material Temp. (oF) Ambient Temp. (oF) Time Placed No. of Samples Design Strength (PSI) Total Cubic Yds. I Structural Steel Fabrication I Structural Steel Erection I Expansion Bolts E Geotech Observations M Structural Fills M Sut-grade (footings/slabs) E titu Dri"ing Equipment Concrete Grout Mortar Specific Placement Locations parking area Note: E Previously listed uncorrected items E Ch"rg.. to approved plans and/or specifications by Architect,or Engineer E Corrections of previously listed items n It"-, requiring correction E Materials and methods of construction E Equipment used (i.e. what was used to proof rolt or obtain compaction) Field Observations and Comments I Reinforcing steel was checked in locations listed above, for grade, size, lap, placement and clearances where applicable. contractor's request, on site to verify areas previously rnarked as pumping have been over excavated. At areas marked on 3/l 7/10, contractor removed the gravel fill to orjust above the fine-grained material below. Areas were walked and probed with a metal rod. Areas appear firm un-yielding to probing. L clarification of over ex requirements from John Mahoney of PBS. Per Geotech Eng all gravel fine in pavement area should be and replaced and compacted. Documents: See attached for areas ofover ex. As a mutual protection o clients, the public, ud ourselves, all reports are submitted as confidential property ofclients and are itrtmded for fte use ofour climts or No other person or entity my utilize the report or any portion thereof without our writtcn pemrission. the best ofmy knowledge, the work inspected was in accordance with the building department approved design drawings, specifications applicable workmanship provisions of the I.B.C. except as noted: Serial Number l&La,r 525 N$i Secord Street. Crrvallis. 0regon 9?330 tt 800."1ii3.8855 ph 54 1.751). 1 3C2 lx 541.753.2264 www.claircoope ny.com Daily Field Report Time Arrived: 12:30 PM Project#I 266-00 IDatei 3/1712010 Project Name: Hilton Garden Inn No.: 86 Address: 3328 Gateway, Springfield, OR Permit # : Hotel 09-c8-1082 ClientName: AssociatedConsultant Special Inspection: g Period: Type of Inspections Performed WeatherConditions: clear Equipment fl Reinforcing Steel f] Reinforced Concrete E Concrete Forms E Structural Masonry E Shotcrete E Bpo*y Anchors E ri." Proofing E otl,"r, E Structural Steet Fabrication E Structural Steel Erection E Expansion Bolts I Geotech Observations U Structural Fills M Sub-grade (footingVslabs) E Piru D.iring Type Type of Material: Supplier Mix # Slump/Flow (in.) Material Temp. (oF) Ambient Temp. (oF) Time Placed No. of Samples Design Strength (PSl) Total Cubic Yds. Serial Number Concrete Grout Mortar Spccific Placement Locations parking area Note: E Previously listed uncorrected ltems E Changes to approved plans and/or speci{ications by Architect or Engineer E Corrections ofpreviously listed items n It.., requiring correction X Materials and methods of construction E Equipment used (i.e. what was used to proof roll or obtain compaction) Field Observations and Comments E Reinforcing steel was checked in locations listed ebove, for grade, size, lap, placement and clearances where epplicable. contractor's request, obserued proof rolling of subgrade ofabove noted area. Area has been excavated to approx 16" below finished asphalt Proof rolling was performed with a loaded l0 wheel dump truck. Areas of noted pumping were marked with paint. Areas were at the edge of lot at the southem most east and west comers of lot. Contractor notified. Required clarification of Geotech repon by PBS over ex of all existing site fill prior to placement construction As a muEal protection to clients, the public, md ourselves, all reports are submitted u confidential property ofclients md are intended for the use ofour clients or No other peron or entity may utilize the report or atry portion thereof witltout our wrinm pemission. the best of my knowledge, the work inspected was in accordance with the building department approved design drawings, specifications applicable workmanship provisions ofthe I.B.C. except as noted Inspector Name: Dave Tilton Reviewed by: Ron Tiland ll rcLarr Date: 3119/2010 Name: Hilton Garden Inn Address: S{U nZAGateway, Springfield, OR Building: Hotel Daily Field Report Time Arrived: 10:00 AM Project # : 1266401 5?S NW .ia*cr:r Slrsiil, Ci:rvlliit;, flrrgrir !i?311) r, Stli].Ifi3.tJn5i ph 541 iffi 1 3t7 fx i4t ?iJ ??t;i www.claircrmpa*y.com No.: 88 Permit #09-c8- 1082 Special Inspection: M Period: Type of Inspections Performed n Reinforcing Steel I Reinforced Concrete E Concrete Forms n Structural Masonry E Shotcrete E EpoxyAnchors E ri.u Proofing M Oth"r, shear wall nailing ClientName: AssociatedConsultant WeatherConditions: clear Equipment tr tr n Tr n tr Structural Steel Fabrication Structural Steel Erection Expansion Bolts Geotech Observations Structural Fills Sub-grade (footings/slabs) Pile Driving Type Serial Number I Specific Placement Locations sheathing @ shear walls. See below for locations. Note: E Previously listed uncorrected items I Changes to approved plans and/or specifications by Architect,or Engineer E Corrections of previously listed items E It"-. requiring correction E Materials and methods of construction E Equipment used (i.e. what was used to proof roll or obtain compaction) Field Observations and Comments EReinforcing steel was checked in locations listed above, for grade, size, lap, placement arrd clearances where applicable. 1) Verified that studs noted previously as missing at 2nd and 3rd floor framing, A & H lines, have been installed. Nailing at sheathing has been Areas previously noted and marked as needing additional nailing have been nailed. Inspected nailing ofOSB sheathing at exterior of3-story wing ofhotel, K to R lines. Nailing found to be in general conformance with schedule (Rev 6), except than (4) shear walls. Panels were marked for additional nailing. Inspected nailing of sheathing at shear walls 23 line and 4 line. Several areas marked as needing additional nailing. Shear walls @ 2 line not led at this time. Work in progress. As a mutal protection to clieuts, the public, and ourselves, all reports are submitted as confdential property ofclients aud are intended for tle use ofour clients or Type of Material: Supplier Mix # Slump/Flow (in.) Material Temp. (oF) Ambient Temp. (oF) Time Placed No. of Samples Design Strength (PSI) Total Cubic Yds. Concrete Grout Mortar No other person or mtity may utilize the report or any portion ther€of without our written pemission. the best ofmy knowledge, the work inspected was in accordance with the building department approved design drawings, specifications applicable workmanship provisions ofthe I.B.C. except as noted: I