Status of FY 18-19 Capital Program
Proposed FY 19-20 Capital Program
Proposed 5-Year Plan
Capital Improvement Plan
Asset Management Capital Plan
Presentation Objectives
2
Projects Completed
FY 18-19
Increase Digestion Capacity
Electrical Distribution System Replace / Upgrade
3
Projects Carried Over to
FY 19-20
Operations & Maintenance Building Improvements
Renewable Natural Gas (RNG) Upgrade Facilities
Decommission WPCF Lagoon
Thermal Load Mitigation: Pre-Implementation
Poplar Harvest Management Services
Facilities Plan Engineering Services
Recycled Water Demonstration Project
Class A Disinfection Facilities
Riparian Shade Credit Program
Resiliency Planning
4
Projects Carried Over to
FY 19-20
Maintenance Building Improvements
New Laboratory Building
Decommission WPCF Lagoon
5
Projects Carried Over to
FY 19-20
Renewal Natural Gas Upgrades
Facilities Plan Engineering Services
Resiliency Planning
RNG – Includes the gas upgrading and interconnection facilities design and construction working to complete in the spring/summer of 2020
Fac Pl Eng. Serv – provides plant wide improvements The photo shows – stormwater flow metering consultant on site
Resiliency planning – goal is to develop a plan to improve our ability to provide services following a major disaster -- photo shows the structural consultant team during site visits
6
Projects Carried Over to
FY 19-20
Poplar Harvest Management Services
Thermal Load Mitigation: Pre-Implementation
Poplar harvest services – planting activities will continue, some replanting is required, followed by initial round of MU 3 harvest in 2020. Last picture of saw logs prior to milling
at Urban Lumber’s shop.
Thermal load pre-implementation will be finishing up with completion of the phase three study report (Todd Miller)
7
Projects Carried Over to
FY 19-20
Class A Disinfection Facilities
Riparian Shade Credit Program
Recycled Water Demonstration Project
Class A Disinfection – will allow us to produce Class A level recycle water suitable for use outside of the MWMC’s fence line
The Recycled Water Demonstration Projects -- includes the urban street tree watering project in partnership with Eugene Parks and Open Space, And pumping Class A recycled water to Delta
S&G for equipment washing and dust control operations
The Riparian Shade Credit program which will develop shade credit under the PWP framework to potentially apply as offsets to the MWMC’s thermal load under a renewed MWMC NPDES permit
8
New Projects for FY 19-20
Aeration Basin Improvements – Phase 2
Administration Building Improvements
AB Phase 2 – The bulk of that project is deferred to 2021 but a smaller portion will be implemented in 2020 to do a predesign study looking at improving the aeration efficiency of the
existing phase 1 work. We will re-evaluate and potentially defer the full project anticipated for 2021 (which would modify the four western basins). For now, it is scheduled for 2021.
Administration building improvements will address the needs for remodeling that were identified in the original bid package that also included the new maintenance building and new laboratory…but
that bid option was not implemented yet those improvements are still needed.
9
FY 19-20 Capital Improvement Program Budget
This is a partial rolled up version of Exhibit 13 that shows the total carryover and new funding adding up to the total FY 19-20 budget.
10
Regional Wastewater Asset Management Capital Program
Equipment Replacement
Major Rehabilitation
11
FY 19-20 Equipment Replacement
Three Farm Tractors
BMF and Biocycle Farm
12
FY 19-20 Equipment Replacement
Pro Anion MCS ION Chromatograph with Laptop
13
FY 19-20 Equipment Replacement
Sludge Blanket Level System
Segmented Flow Analyzer
LEL Detection System
14
FY 19-20 Equipment Replacement
Cargo Van - Operations
Small Shop Vehicle/Box Van - Plant
15
FY 19-20 Equipment Replacement Program Budget
16
Collector Mechanism, Clarifier Rake Arms Recoating - Secondary
Roof Replacement – Gravity Belt Thickener Building
FY 19-20 Major Rehabilitation Program
17
FY 19-20 Major Rehabilitation Program
Dome Interior Coating Repair Digester #2
Roof Replacement – MWMC Modular Building, Plant
18
Dredge Rebuild - BMF
FY 19-20 Major Rehabilitation Program
19
FY 19-20 Major
Rehabilitation Program
20
FY 19-20 Regional Wastewater 5-Year Capital Programs
21
Questions / Comments
The MWMC and the regional partners are committed to
providing these services in a manner that will achieve, sustain,
and promote balance between community, environmental,
and economic needs while meeting customer service expectations
22