HomeMy WebLinkAboutPlan, Tentative APPLICANT 7/18/201900
T-
c:)
CN
I—
L�
d
0
U
80' - 0ls
PUBLIC UTILITY EASEMENT (P.U.E.)
551 -
1/16" = 1'-0"
RIP W/IN RIGHT
AIN - TYPICAL.
D REMAIN - TYPICAL.
IDSCAPE AREA.
0111- 18 2019
' SUMMARY:
II PLAN - SP1.3 FOR ALL COMPLETED WORK PER SUMMARY)
LOT SIZE:
LOT COVERAGE:
OWNER:
3188 GATEWAY LOOP
17-03-22-20
03300
C2
CONVERTING SKATE FACILITY INTO CHURCH
FACILITY IN (3) PHASES. PHASE I and 11: INTERIOR
REMODEL ONLY. PHASE III: 2,885 S.F. COVERED
ENTRY ADDITION TO EXTERIOR BLDG SHELL.
PHASE I COMPLETE: WINTER 2019
PHASE 11 COMPLETE: FALL 2020
PHASE III COMPLETE: FALL 2021
105,450 SQ. FT.
BUILDING COVERAGE: 25%
LANDSCAPE COVERAGE: 24%
IMPERVIOUS SURFACE: 51%
JOY CHURCH
CONTACT: MARK HARPHAM
2940 - B CHAD DRIVE
EUGENE, OR 97408
L
RICHARD BARBIS
ARCHITECT, LLC
13270 SW KINGSTON PLACE, PORTLAND, OREGON 97223
PHONE (503) 970-0910
JULY 18, 2019
Author
•
JULY 18, 2019
Author
00
V-
C:)
C\I
l'—
r
0
0
801-011
PUBLIC UTILITY EASEMENT (P.U.E.)
I N 890 49 20" E 373.3T
I
(E) STREET LIGHT TO REMAIN.
I
5f-
1/16" = V-0"
RIP WIN RIGHT
AIN - TYPICAL.
:) REMAIN - TYPICAL.
�i � c�
fts MOW
Date Received
MMMARY:
original Submittal—�&—'
LAN - SPI.3 FOR ALL COMPLETED WORK PER SUMMARY)
3188 GATEWAY LOOP
17-03-22-20
03300
C2
CONVERTING SKATE FACILITY INTO CHURCH
FACILITY T IN (;J) t-Pl/A,)=i. PHASE I and II: INTERIOR
ERIOR
REMODEL ONLY. PHASE 111: 2,885 S.F. COVERED
ENTRY ADDITION TO EXTERIOR BLDG SHELL.
PHASE I COMPLETE: WINTER 2019
PHASE 11 COMPLETE: FALL 2020
PHASE III COMPLETE: FALL 2021
LOT SIZE: 105,450 SQ. FT.
LOT COVERAGE: BUILDING COVERAGE: 25%
LANDSCAPE COVERAGE: 24%
IMPERVIOUS SURFACE: 51%
OWNER: JOY CHURCH
CONTACT: MARK HARPHAM
2940 - B, CHAD DRIVE
EUGENE, OR 97408
13270SWKINGSTON PLACE, PORTLAND, OREGON 97223
PHONE (503) 970 - 0910
IJULY 18, 2019
rl.
IAuthor
801-011
PUBLIC UTILITY EASEMENT (P.U.E.)
T'TO REMAIN.
5' -
I
1
I
I
00
T
0
N
}
a
O
U
1 /16" = 1'-0"
RIP WAN RIGHT
AIN - TYPICAL.
3 REMAIN - TYPICAL.
N3ot 3
Date Received
Oddi gal Submiital wy-
PARKING - PARKING SPACE REQ:
IT: SPRINGFIELD DEVELOPMENT CODE 4.6-125
;H 100 SQUARE FEET OF FLOOR AREA IN THE PRIMARY
'AREA AND 1 FOR EACH 200 SQUARE FEET OF GROSS
EA FOR THE REMAINDER OF THE BUILDING.
REQUIRED AUTOMOBILE STALLS:
tY = 6,478 SQ. FT. ! 100 SQ. FT. = 65 STALLS
R = 19,842 SQ. FT. / 200 SQ. FT. = 99.1 STALLS
)UIRED STALLS FOR JOY CHURCH = 165 AUTO. STALLS
PARKING - NUMBER OF SPACES REQ'®:
IT: SPRINGFIELD DEVELOPMENT CODE 4.6-155
STALL PER EVERY 200 SQUARE FEET WHERE NO PERM -
%TS OR BENCHES ARE MAINTAINED IN MAIN AUDITORIUM
RY OR PLACE OF WORSHIP)..
REQUIRED BICYCLE STALLS:
tY = 6,478 SQ. FT. / 200 SQ. FT. = 32 BIKE STALLS
. REQUIRED STALLS ARE'SHORT TERM'.
' SUMMARY:
3188 GATEWAY LOOP
17-03-22-20
03300
C2
CONVERTING SKATE FACILITY INTO CHURCH
FACILITY IN (3) PHASES. PHASE I and 11: INTERIOR
REMODEL ONLY. PHASE 111: 2,885 S.F. COVERED
ENTRY ADDITION TO EXTERIOR BLDG SHELL.
PHASE 1 COMPLETE: WINTER 2019
PHASE II COMPLETE: FALL 2020
PHASE 111 COMPLETE: FALL 2021
LOT SIZE: 105,450 SQ. FT.
LOT COVERAGE: BUILDING COVERAGE: 25%
LANDSCAPE COVERAGE: 24%
IMPERVIOUS SURFACE: 51%
OWNER: JOY CHURCH
CONTACT: MARK HARPHAM
2940 - B CHAD DRIVE
EUGENE, OR 97408
IN
RICHARD BARBIS
ARCHITECT, LLC
13270 SW KINGSTON PLACE, PORTLAND, OREGON 97223
PHONE (503) 970 - 0910
JULY 18, 2019
Author
Uc:
0
0
M
U�
O
�L
'Q^
VJ
JULY 18, 2019
Author