HomeMy WebLinkAbout2010 07 12 Downtown Plan Memo AGENDA ITEM SUMMARY Meeting Date: 7/12/2010
Meeting Type: Work Session
Staff Contact/Dept.: Linda Pauly/DSD Staff Phone No: (541) 726-4608
Estimated Time: 90 minutes
S P R I N G F I E L D C I T Y C O U N C I L Council Goals: Community and
Economic Development
and Revitalization
ITEM TITLE: DOWNTOWN DISTRICT URBAN DESIGN PLAN AND IMPLEMENTATION STRATEGY: PRESENTATION OF DOWNTOWN ADVISORY COMMITTEE’S
RECOMMENDATIONS
ACTION REQUESTED:
The Council is asked to conduct a joint work session with the Planning Commission to receive the Downtown Citizen Advisory Committee’s recommended strategic action plan to
guide the revitalization of Springfield’s Downtown District. Staff requests direction from the Council to indicate their support/non-support for the plan concepts and proposed
implementation actions. Options for Council action: Option 1: Endorse the Downtown District Urban Design Plan and Implementation Strategy
as presented and direct staff to: 1) schedule a City Council regular session to adopt the plans by resolution and to initiate the plan amendment process; and 2) identify and prepare
amendments to the Downtown Refinement Plan, Springfield Development Code and/or Springfield Municipal Code to implement the plans.
Option 2: Request additional work session(s) with staff to review revisions and refinements
to the proposals in response to the Council’s comments and concerns.
ISSUE
STATEMENT:
George Crandall, Don Arambula and Jason Graf (Crandall Arambula) − the City’s
downtown revitalization consultants − will present the proposed Springfield Downtown
District Urban Design Plan and Implementation Strategy for the Council’s consideration and discussion. The recommendations are the work product of a 13-month Downtown planning
process conducted by Development Services staff. The Crandall Arambula team worked from June 2009 - June 2010 with the Downtown Citizen Advisory Committee, a Technical
Advisory Committee and an Oversight Team consisting of City department managers to prepare a renewed vision and strategy for revitalizing Downtown Springfield. The plan and
strategy has been coordinated with the concurrent Downtown Parking study and work performed Rick Williams Consulting. Committee members have been invited to attend the
work session.
ATTACHMENTS: 1. Transmittal letter – Advisory Committee recommendation
2. Draft Downtown District Urban Design Plan Executive Summary and Implementation Strategy
DISCUSSION/
FINANCIAL IMPACT:
The Downtown District Plan project was initiated by the City Council on July 7, 2008.
Downtown redevelopment is a key strategy for accommodating future growth. Adoption and implementation of the plan would:
Establish the City’s expectations and support for Downtown’s further development as an attractive and economically viable city center.
Assist the Council in setting Downtown funding and policy priorities that have the greatest potential to improve the Downtown investment environment and catalyze
a change in Downtown dynamics and perceptions of Springfield.
Revitalize Downtown by addressing fundamental components of successful
downtowns that are currently lacking in Springfield: a pedestrian-friendly shopping street, a significant retail presence, and a civic gathering place at the
heart of the community.
Demonstrate the City’s commitment to a set of phased strategic public actions that
are designed to stimulate private sector development.
Identify specific development opportunity sites and public infrastructure that will
play a critical role in successful revitalization.
Downtown District Urban Design Plan
Executive Summary and Implementation Strategy
Citizen A
d
vi
s
or
y
C
o
m
mitt
e
e
Recomm
e
n
d
ati
o
n
s
DRAFT
June 10,
2
0
1
0
Downtown Citizen Advisory Committee • City of Springfield, Oregon
Table of Contents
Executive Summary
Project Overview .........................................................2
Mobility Oriented Downtown ....................................3
Fundamental Concept ..............................................4
Downtown Springfield/Glenwood Vision .................6
Downtown Build Out ...................................................8
Land Use .......................................................................9
Circulation ..................................................................10
Land Use
To Be Developed ..........................................................
Circulation
To Be Developed ..........................................................
Implementation Strategy
Overview ....................................................................12
Funding .......................................................................13
Catalyst Project .........................................................14
Key Projects ...............................................................16
Other Actions .............................................................18
Public Projects Schedule ..........................................20
Responsibilities ...........................................................21
Executive Summary
The Springfield Downtown District Urban Design Plan
provides an innovative yet realistic vision and strategy for
strengthening downtown Springfield’s role as the economic
and cultural heart of the community.
Study Area
The project study area is identified to the right. The plan
includes consideration of both downtown Springfield and
the Glenwood North Riverfront Corridor.
Stakeholder Meetings
A citizen advisory committee comprised of local
neighborhood representatives, citizens, property owners
and business representatives provided input and direction
for the development of all plan concepts and implementing
actions. A technical advisory committee (TAC), consisting
of representatives from transportation, planning, public
works, and economic development reviewed all plan
materials and provided input.
Project Objectives
The following stakeholder-created objectives served as
touchstones for the development and evaluation of the
plan.
Land Use
Provide for a community plaza or gathering space
Identify opportunities for retail and entertainment uses
Provide for safe and convenient parking
Preserve and expand downtown employment
Revitalize underutilized sites
Increase density and mix of uses
Circulation
Identify safe, direct connections to neighborhoods
Promote pedestrian-friendly streets
Improve access to the river, parks and open space
Reduce the impact of truck traffic downtown
Project Overview
Downtown–Glenwood District Study Area
Implementation
Encourage investment in public infrastructure
Create standards and guidelines for development
Identify incentives for new and existing businesses
Other
Maintain and enhance historic character
Create a family-friendly downtown
Improve downtown image and increase safety
DOwnTOwnGLEnwOODnORTh RIvERFROnT CORRIDOR SOUTh A ST
MAIn ST
A ST
FRAnkLIn BLvD PIOnEER Pkwy w.PIOnEER Pkwy E.U n IO n PACIFIC
R
A
I
L
R
O
A
D
W ILL A M E T T E R I V E R
TC
DRAFT June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy2
Executive Summary
Mobility Oriented Downtown
Downtown Springfield is envisioned as a destination
rather than a thoroughfare. Within a five-minute walk or
a five-minute bike ride, residents will be able to access a
concentration of retail, employment, and services.
What is a Mobility Oriented Downtown
(MOD)?
A MOD’s one-mile radius includes:
A Hot Spot. The center or ‘Hot Spot’ contains a
concentration of the community’s residential, retail,
employment, business, and service uses and a civic plaza
Pedestrian-Friendly Sidewalks. The sidewalks leading
to the Hot Spot are comfortable, safe and vibrant
Protected Bikeways. Bicyclists are separated from auto
traffic
Transit Supportive. Bus rapid transit will connect to
neighborhoods and other centers in the region. High-
speed rail will provide premium transit access between
Springfield, Portland, Seattle and Vancouver, B.C.
What are the benefits of a Springfield MOD?
Auto Travel Distances are Reduced. Most residents do
not have to travel outside of the MOD to shop, work or
conduct business. Most auto travel is to the commercial
core, reducing typical auto travel distances
Auto trips are Reduced. Protected bike lanes allow
residents—young and old alike—to substitute safe
bicycle travel for auto travel within the downtown
Homeowners’ Fuel Costs are Reduced. The
average U.S. household drives 22,000 miles per year.
Households within the MOD could drive 50 percent
fewer miles for an annual savings of approximately
$2,500
Fuel Savings Provide a Local Economic Stimulus. If
MOD households spend their energy savings locally—
instead of sending the money overseas to multi-national
companies—the annual local economic stimulus would
likely be $152 million annually in Springfield*
* $84 million for every 27,600 population
Springfield Mobility Oriented Downtown
Willamalane ParkSpringfield Middle SchoolSpringfield HighSchool
Hamlin Middle School
Moffitt Elem.School
10TH AVE5TH AVEPIONEER
PKWY
(E)
MAIN ST
S. A ST
FRANKLI
N
B
L
V
D KE
LL
Y
B
LVD
Meadow ParkKelly ButtePark
2ND STMCVEY BLVD
A STPROTECTED BIkEwAy hOT SPOT BUS RAPID TRAnSIT
h IG h S PEED RA ILDorris RanchLiving HistoryMuseum
Eastgate Woodlands
Willamalane Park
Mill PondWillame
t
te
R
ive
r
TC
Fundamental Concept
Revitalization of downtown Springfield is dependent on
the implementation of a few essential actions.
A focused and coordinated effort will be required. Once
these projects are implemented, other projects may be
considered.
Mill Plaza–the city’s ‘living room’ hosts the community’s
day-to-day gatherings. This paved multi-use space is
intended to be active 18 hours a day
Retail Hot Spot–oriented around and near the plaza,
a variety of local shops and anchor national tenants are
envisioned as the main shopping destination and the
heart of downtown. A critical mass of at least 150,000
square feet of ground-floor retail is necessary
Neighborhood Retail–Glenwood will have a
neighborhood retail hub. To preclude development of
a center that competes with the Hot Spot, ground-floor
retail should be limited to 50,000 square feet
Two-Way Main Street–one-way street is converted to
two-way, providing pedestrian-friendly direct access to
downtown retail and providing visibility for Main Street
businesses
Mobility Corridors–provide more efficient auto access
through downtown and support Bus Rapid Transit (BRT)
to the metro area
Protected Bikeways–separate bicycles from auto traffic,
providing a safe and direct five-minute or less bike ride
from neighborhoods to all downtown destinations
Glenwood North Riverfront Housing District–2,000
new residences surrounded by parks and oriented to the
riverfront are located within a short walk or bike ride to
downtown retail, employment and services
Retail hot Spot
Mobility Corridor
Plaza
Protected Bikeway
DRAFT June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy
Executive Summary
Downtown Springfield Fundamental Concept Diagram
GLEnwOOD RIvERFROnThOUSInG DISTRICT
MOBILIT y CORRID
O
R
PROTECTED BIkEwAyS
nEIGhBORhOODRETAIL
50,000 SF
PLAZA PIOnEER Pkwy wESTPIOnEER Pkwy EASTA ST
TwO-wAy MAIn STREET
SOUTh A ST
TC
BRT Transit Center
High Speed
Rail StationRETAIL h OT S
P
OT5
Downtown Springfield/Glenwood Vision
Collectively Downtown Springfield and the Glenwood
District have the collective capacity to absorb significant
amounts of growth over the next 30 years. The build-
out plan illustrates the character, location and intensity
of new development that may be achieved through
implementation of the Downtown Urban Design Plan and
the Glenwood North Riverfront Corridor Plan.
The Glenwood North Riverfront Corridor Plan and the
Downtown Urban Design Plan were separate parallel
planning efforts that provide specific recommendations
within their respective study areas; but they, collectively
addressed the relationship of managing growth and
development between downtown and the Glenwood
riverfront. The purpose of the Springfield/Glenwood
Vision is to illustrate the context and relationship of future
development between downtown and the Glenwood
Riverfront Corridor instead of as isolated planning efforts.
Existing Buildings
Proposed Buildings
Parks and Open Space
Legend
Public Parking
high Speed Rail Station
PR Park and Ride
TC Transit Center
Franklin Multi-way Boulevard wILLAMETTE
RI
vERTo Eugene
Protected Bikeways
P
To Glenwood Riverfront
DRAFT June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy
Executive Summary
Booth Kelly
Millrace Educational and Recreational EnhancementswILLAMETTE
RI
vERIsland Park To Springfield High SchoolTo Willamalane ParkTo GatewayTo Willamette Heights and Dorris RanchTo Ke
l
ly
Butte and
Meadow Pa
rk
D St.
B St.
A St.
Main St.
South A St.
C St.Pioneer Pkwy (West)Pioneer Pkwy (West)TC
PR5th St7th St10th StMi
l
l St
Mill Plaza Two-way Main Street
Protected Bikeways
P
P
City Hall
Justice Center
Transit Street and high Speed Rail Station
Post Office Park
Island ParkEnhancements
To Glenwood Riverfront
To Fran
kli
n
Bl
v
d
Transit Street &
Rail Platfrom
Mill Plaza
Post Office Park
Island Park Enhancements Two-way Main StreetJustice Center
Emerald Arts Center
Booth Kelly
TC
Wildish Theater Academy of Arts
Gateways learning Center
New Library
Island Park
Willamett
e
River
Downtown Build-Out
The build-out diagram provides a summary of the potential
amount and type of new downtown development and
public infrastructure projects. Most new development is
located on vacant or underutilized sites.PR
Existing Buildings Public Parking
TC Transit Center
PR Park and Ride
high Speed Rail Station
new Buildings
Parks and Open Space
Legend South A StreetA Street10th Street
7th Street
Pioneer Pkwy (East)
Pioneer Pkwy (West)
5th Street
P P
P
City Hall
Millrace Educational and Recreational Enhancements
Downtown Build-Out
nEw DEvELOPMEnT POTEnTIAL
Retail 195,000 sf
Commercial 105,000 sf
Employment (Office) 885,000 sf
Cultural/Education 26,250 sf
Housing 1,080 units
Parking 3,150 sp
New LIbrary 60,000 sf
PUBLIC InFRASTRUCTURE PROJECTS
Two-Way Main Street 3200 lin. ft
Mill Plaza Streets 1265 lin. ft
Mill Plaza .75 ac
Post Office Park/Island Park 2.3 ac
Protected Pedestrian/Bikeway Loop 9125 lin. ft
Public Parking Structures 1,145 sp
Park and Ride Lot 255 sp
Transit Street & Rail Platform 1,585 lin.ft
DRAFT June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy
Executive Summary
Land Use
Primary Land Use DiagramUnion Pacifi c Rail Ro
a
dWillamet
t
eR
i
v
er
Mill Pond
WashburneDistrict
WillametteHeights
Glenwood
Booth Kelly
IslandPark
C ST.
D ST.
E ST.
F ST.
G ST.
A ST.
MAIN ST.
SOUTH A ST.
B ST.6TH ST.7TH ST.5TH ST.8TH ST.9TH ST.4TH ST.4THST.3RD ST.2ND ST.WATER ST.MILL ST.PIONEER PARKWAY EASTPIONEER PARKWAY WESTMC
V
A
Y
H
W
Y
C ST.
B ST.10THST.12THST.RANKLINBLVD
¼
Mile
Ra
dius
KellyButte
PLAZA
TC
PR
The land use framework identifies a mix of essential uses
in locations deliberately selected to maximize development
potential and ensure long-term viability. Based upon
fundamental real estate siting requirements, the land use
framework has the capacity to attract a significant portion
of anticipated future region-wide development to the
downtown.
The land use framework:
Identifies primary land uses; a vertical mix of uses along
with the identified primary uses is encouraged
Identifies areas most likely to be developed or
redeveloped over time
Builds upon and strengthens existing retail and
commercial districts
Builds upon existing employment districts and creates
new employment opportunities
Existing private property shown as a public use would
operate as is until acquired by a public entity.
Public Parking
Exisiting Parks & Open Space
new Parks
housing
Cultural/Education
Civic/Government
Employment
Commercial
Ground Floor Retail
TC
PR
high Speed Rail Station
high Speed Rail Tracks
Park and Ride
Transit
Legend
P
P
P
P
BRT/Bus Transit Center
Circulation
Circulation Diagram
The circulation framework supports regional and local
access, providing for a wide range of current and future
circulation needs. While efficient access to and mobility
through the downtown is maintained, there is an increased
emphasis on the design of streets to serve pedestrians and
bicycles.
The circulation framework includes two types of streets.
Mobility Framework
Primary auto and transit routes serving the metro region:
Pioneer Parkway
South A Street
Transit Street and Transit Center
Livability Framework
Primary pedestrian and bicycle routes to key downtown
destinations:
Main Street
Main and Mill (Plaza Streets)
Downtown Protected Bikeway Loop (A Street, 10th
Street, South A Street and the Waterfront Trail)
Neighborhood Connections (Mill Street, 2nd Street, 7th
Street, 10th Street, Main Street Bridge and Island Park
Bridge)
Legend
TC
PR
high Speed Rail Station
high Speed Rail Tracks
BRT/Bus Transit Center
Park and Ride
LEGENDMobility FrameworkLivability Framework
Union Pacifi c Rail Ro
a
dWill
a
me
t
t
e
Ri
v
er
Mill Pond
WashburneDistrict
WillametteHeights
Glenwood
Booth Kelly
IslandPark
C ST.
D ST.
E ST.
F ST.
G ST.
A ST.
MAIN ST.
SOUTH A ST.
B ST.6TH ST.7TH ST.5TH ST.8TH ST.9TH ST.4TH ST.4THST.3RD ST.2ND ST.WATER ST.MILL ST.PIONEER PARKWAY EASTPIONEER PARKWAY WESTMC
V
A
Y
H
W
Y
C ST.
B ST.10THST.12THST.RANKLINBLVD
¼
Mile
R
a
dius
KellyButte
PLAZA
TC
PR
Livability Connections
Mobility Connections
DRAFT June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy10
Implementation Strategy
The implementation strategy prescribes a program for
creating positive change and stimulating development
momentum in downtown Springfield.
The implementation strategy is founded on the principle
that public dollars must be spent on projects that stimulate
significant private investment in the downtown. The
strategy includes:
Catalyst and Key Projects–Essential projects and
actions that stimulate downtown investment and support
revitalization efforts over time
Other Actions–Actions that demonstrate momentum
and establish the regulatory framework needed to
implement the plan
Schedule–A schedule for implementing the downtown
plan’s projects and actions
Responsibilities–Identifies a comprehensive, consistent
and coordinated effort
Overview
10th StImplementation Projects
Catalyst Project
Key Project
Downtown Urban Renewal District Boundary
DRAFt June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy12
PlAzA
twO-wAy mAIn StReet
PARKIngPIOneeR PARKwAy (weSt)PIOneeR PARKwAy (eASt)
ImplementationImplementation Strategytwo-way main StreetJustice Center
Emerald Arts Center
Wildish Theater
Academy of Arts
Gateways learning Center
Funding
Public investment in infrastructure and open space will be
necessary to improve the private investment environment
within the Downtown Springfield study area. The area
currently lacks fundamental components of a vibrant
downtown such as a public plaza, a significant retail
presence and a pedestrian-friendly shopping street.
Therefore, the Implementation Strategy suggests focusing
on the catalyst and key public projects as the initial step
required to stimulate adjacent private development.
Public Investment
With limited public funds available, it will take time to
build out all of the public actions identified in the plan.
To limit public costs, catalyst and key projects such as the
Mill Plaza and development of public parking facilities can
be phased to limit public financial exposure in the early
stages of implementation. The figure to the right illustrates
the location and relationship of catalyst and key public
infrastructure projects.
Public Investment Tools
It is important to keep in mind what Springfield “wants
to be when it grows up” and to devise an implementation
strategy around that notion rather than simply crafting a
strategy based upon limited available funds. For Downtown
Springfield to be revitalized and the community’s vision to
be realized, a concerted and disciplined adherence to the
strategies and elements of the plan will be required.
Funding of downtown public projects will likely come
from various sources. Some of these sources, such as
Tax Increment Financing (TIF) or the City’s Capital
Improvements Program (CIP), are currently in place.
Additional funding from local, state and national sources
should be explored.
Nationwide, tax increment financing of public projects
has proven the most effective tool for funding downtown
infrastructure. The Downtown Urban Renewal District
has produced a limited amount of increment; however,
over time, it will be an invaluable source of financing
implementation projects. South A StreetA Street10th Street
7th Street
Pioneer Pkwy (East)
Pioneer Pkwy (West)
5th Street
City Hall
Public Parking Site
mill Plaza
two-way main Street
Catalyst and Key Projects
13
Catalyst Project
Mill Plaza is a public catalyst project that is essential to
creating a positive downtown atmosphere and triggering
significant private development surrounding the plaza.
The project will serve as an amenity and focus for
downtown development. It will help to create a downtown
identity that will add value to surrounding parcels.
mill Plaza
Acquisition of the Mill Plaza site should occur immediately.
The Mill Plaza site is comprised of three parcels under
separate ownership. The diagram to the right identifies the
parcels that must be assembled.
Required land Assembly mill Plaza Project Concept
A StReet
mI
ll St
mAIn St PIOneeR PARKwAy (weSt)Alley
A StReet
mIll StmAIn St PIOneeR PARKwAy (weSt)1 2 3
DRAFt June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy14
ImplementationImplementation Strategy
mill Plaza (looking northwest)
Stimulated Private Investment
e
A
B
C
D
mIll PlAzA
total: $5.1 mil
Acquire Site (Estimated Value) $1.1 mil
Construct Plaza (88,800 sf @ $45.00 sf) $4.0 mil
Public Investment
A conceptual estimate of the public cost to acquire and
build the plaza is approximately $5 million.
Private Investment
The potential for private investment adjacent to the plaza is
approximately $81 million.
15
PRIVAte InVeStment
total: $80.8 mil
De
ABC
Mill Street Office and Retail $35.0 mil
A Street Parking Structure $6.7 mil
Plaza Office and Retail $11.6 mil
A Street Housing and Retail $16.0 mil
Main and Mill Office and Retail $11.5 mil
Key Projects
After the Mill Plaza site is secured, key projects must be
implemented to support retail revitalization.
The two key projects are:
Converting Main Street from one-way to two-way travel
Securing a significant public parking site
two-way main Street
Currently, Main Street’s one-way travel limits business
accessibility and visibility and reduces pedestrian safety.
Returning Main Street to its historic two-way travel pattern
will create an environment in which businesses can thrive.
The following actions should be implemented over time.
At a minimum, Main Street should include two-way
travel between Mill Street and 10th Street
Curbside on-street parking should be maintained
Traffic signals should be reconfigured along with roadway
striping
No changes are required to Main Street’s existing sidewalks,
curb extensions or crosswalks to implement two-way travel.
existing Conditions
two-way main Street limits
A StReet
mIll StSOUth A St 5th St6th St7th St8th St9th StA StReet
mIll StSOUth A St 5th St6th St7th St8th St9th St10th St10th StDRAFt June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy16
existing One-way main Street
two-way main StreetPIO
neeR PARKwAy (weSt)PIOneeR PARKwAy (weSt)
ImplementationImplementation Strategy
Public Parking Site
Public parking will be needed to serve customers who
frequent ground-floor retail uses surrounding Mill Plaza.
Parking can be built in phases as shown below.
Phase I
Acquire sites: 1) the north side of the block currently
under private ownership and occupied by County
services 2) the south side of the block currently occupied
by the Springfield Utility Board
Design and build a surface lot with approximately 135
parking stalls
Phase II
Design and build the parking structure to serve primarily
ground-floor ‘hot spot’ retail uses. At full retail build-out,
approximately 475 spaces would be required.
Public Parking Site–Phase II
existing Retail
new Retail
new Parking Structure
legend
17
Public Parking Site–Phase I
Phase I Parking lot
A StReet
mAIn StPIOneeR PARKwAy (weSt)PIOneeR PARKwAy (eASt)Public Parking Site–Required land Assembly
A StReet
mAIn StPIOneeR PARKwAy (weSt)PIOneeR PARKwAy (eASt)Phase II Parking Structure
1
2
Other Actions
Other actions are necessary to ensure that projects are
implemented as envisioned by the plan.
The other actions are:
Plan adoption
Updates to existing policy and regulatory documents
Additional planning efforts
A Main Street demonstration block project
Plan Adoption
The following plans should be adopted by city council.
Downtown Urban Design Plan and
Implementation Strategy Adoption
Plan adoption is the first step in providing a clear
commitment to Springfield’s future and a tool for decision
makers to use to prioritize public investment that will
generate significant and sustained private investment. The
plan should be reviewed by the Planning Commission with
recommendations presented to the City Council. The plan
should be adopted by City Council as a subarea plan or
other policy-guiding resolution as an amendment to the
Downtown Refinement Plan, the Eugene-Springfield Metro
Plan, and the Springfield 2030–Comprehensive Plan.
Parking Management Plan Adoption
Adoption of the Parking Management Plan will strategically
support development identified in the 30-year build-out
plan.
Policy and Regulatory Updates
Plan recommendations generally comply with existing
and updated plans, policies and regulations. Where
recommendations do not comply or additional regulations
are needed, updates to the existing policies and regulations
should be made to ensure that the intent of the Urban
Design Plan is realized.
Springfield Development Code Update
The current Mixed-Use Zoning Districts (3.2-600) and
Mixed-Use Development Standards (3.2-615) identified
in the Springfield Development Code are not consistent
with the plan. Staff and Council should consider the
modification of existing zones/standards and the addition
of mixed-use zones/standards as needed to support
development consistent with the Urban Design Plan.
Recommended code modifications are identified in the
appendix to this report.
Downtown Design Guidelines
The City should initiate a process for the creation of design
guidelines and a design review process as an essential tool
for review of downtown projects. Typically, more extensive
(major) projects could be reviewed by a review committee,
while less extensive (minor) projects could be reviewed by
planning staff.
Downtown Street Standards
Design standards and details that are consistent with
the circulation framework should be developed for the
downtown streets, sidewalks, intersections and public
spaces. These standards must address roadway safety
requirements and have an emphasis on pedestrians and
bicycles.
Additional Planning efforts
The following planning efforts are necessary to ensure
that the implementation strategy is executed in a timely
manner and is consistent with the Urban Design Plan’s
recommendations.
Develop a Retail Strategy and Implementation
Plan
The City needs to fund a retail strategy that identifies
retail development sites, recruitment, management and
financial incentives to ensure a critical mass of retail in the
downtown. The strategy should incorporate:
A comprehensive database as a leasing and information
tool
A recruitment brochure and information on downtown
sites and opportunities
Formation of a representative retail recruitment team
Development incentives for retailers and public/private
partnerships to encourage retail development
Initiate a Two-Way Main Street Transportation
Study
A two-way Main Street will ensure successful development
of future retail along Main Street. The study should include
a plan for:
Converting Main Street to two-way from Mill Street to
10th Avenue at a minimum.
Including the two-way conversion as a priority project in
the update to the Transportation System Plan
Funding improvements and a schedule for
implementation
To enable conversion of Main Street, the study should also
develop a design concept for converting South A Street
to a mobility corridor for autos, trucks and transit traffic
through downtown. The design should consider:
Two-way conversion of South A Street
Potential impacts of two-way streets (South A and Main)
accessing or exiting from a one-way bridge crossing on
the eastside of the Willamette River
The impacts and need for additional road widening and
new signalization
An east/west truck route along South A Street or other
streets
Protected bikeways on the south side of the street
Pedestrian-friendly and safe crossings at key intersections
Develop a High-Speed Rail Plan
The Urban Design Plan proposes a “multi-modal hub” that
maximizes current investment in transit by locating a High-
Speed Rail (HSR) station and a park-and-ride lot/structure
in close proximity to the current BRT station. Additionally,
the proposed station location is adjacent to properties
outside the downtown study area that are ideally located
and large enough to serve as maintenance facilities needed
for HSR system operations. Efforts should be made by the
City to include the proposed station and related transit
facilities as part of ODOT’s ongoing HSR environmental
analysis or any subsequent supplemental environmental
analysis, engineering and design studies.
DRAFt June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy18
ImplementationImplementation Strategy
main Street Demonstration Block (looking east)
main Street Demonstration Block
The demonstration block would showcase improvements
that would eventually be made to nine blocks of Main Street
between Mill Street and 10th Street. The approximate cost
for improvements to one block and two intersections would
range from $0.5 to $0.9 million.
Future Development Future Development
mill Plaza
19
Proposed Construction limits
Demonstration Block
SOUth A StReet
mAIn StReet
existing ConditionsPIOneeR PARKwAy (weSt)PIOneeR PARKwAy (eASt)SOUth A StReet
mAIn StReetPIOneeR PARKwAy (weSt)PIOneeR PARKwAy (eASt)Design and Construct Demonstration Block
First 120 Days
Public Projects Schedule
1. Adopt Downtown District Urban Design Plan & Implementation Strategy
2. Adopt Parking Management Plan
3. Establish an inter-departmental implementation team
4. Develop Financing Strategy to Secure Mill Plaza Site and Public Parking Site
5. Initiate Update to Development Code, Design Guidelines, and Street Standards
6. Initiate Two-Way Main Street Transportation Study
7. Initiate Retail Strategy and Implementation Plan
Six months
1. Secure Mill Plaza Site
2. Develop a High-Speed Rail Plan
One year
1. Complete Two-Way Main Street Transportation Study
2. Complete Update to Development Code and Design Guidelines
3. Design Mill Plaza
4. Secure Public Parking Site
two to three years
1. Construct Mill Plaza
2. Design and Construct Public Parking Surface Lot
3. Obtain Approvals for Two-Way Main Street Recommendations
4. Complete Update to Street Standards
2010 2011 2012
JuneMar Sept JuneMar Sept JuneMar Sept
2013
JuneMar Sept
three to Seven years
1. Construct Main Street Demonstration Project
2. Construct Improvements Identified in Two-Way Main Street Transportation Study
DRAFt June 10, 2010–Downtown District Urban Design Plan and Implementation Strategy20
ImplementationImplementation Strategy
Responsibilities
Implementation of this plan will require focused,
aggressive efforts by the public and private sectors
over the coming years. For this plan to be successful, a
comprehensive, consistent and coordinated effort will be
necessary.
Plan success depends upon establishing implementation
momentum.
Managing Implementation
The key entities below will be responsible for managing
aspects of plan implementation:
City of Springfield
Convene Downtown Citizen Advisory Committee
meetings every six months or as needed to review plan
implementation progress
Establish an inter-departmental implementation team to
coordinate public and private sector efforts
Create a Parking and Transportation Manager position
and Parking Advisory Committee to assist in the parking
program implementation
Coordinate design and construction of public
infrastructure and amenities such as the Main Street
Demonstration Project and Mill Plaza
Administer loan and grant programs contributing to
downtown revitalization and affordable housing
Encourage creation of a downtown business association
City of Springfield, Development Services Planning
Division
Coordinate a public process for amending code and
development standards and new downtown design
guidelines consistent with the recommendations
identified in the Downtown Urban Design Plan
Support adoption of the Downtown Urban Design Plan
as an amendment to the Downtown Refinement Plan
City of Springfield, City Manager’s Office
Develop and implement urban redevelopment activities,
such as attracting developers and assisting in site
assembly
City of Springfield, Public Works
Manage study of two-way conversion of Main Street and
additional South A traffic analysis
Coordinate a public process for amendments to
downtown street standards consistent with the
recommendations identified in the downtown plan
Coordinate a public process for design and construction
of the Main Street Demonstration Project
Downtown Citizen Advisory Committee
Meet on a regular basis to review and provide
recommendations to the City and Council on
implementation progress
Provide updates to constituent groups for downtown
revitalization and implementation progress
Willamalane Parks and Recreation District
Coordinate with the City on design, construction,
funding and management of park improvement projects,
such as Mill Plaza and the Island Park enhancements
Oregon Department of Transportation
Coordinate with the City for the study of two-way
conversion of Main Street and additional South A traffic
analysis
NEDCO
Coordinate with local businesses and owners on their
support of downtown revitalization projects and solicit
grants through the Oregon Main Street program
Springfield Chamber of Commerce
Promote tourism marketing
Identify planning strategies for attracting visitors,
meetings and events
Property Owners and Business Owners
Organize a downtown business association and
coordinate planning efforts and needs with the City
interdepartmental team responsible for the downtown
plan implementation
Focus on building renovations and tenant upgrades by
taking advantage of available loan and grant programs
Provide the information required to create an effective
leasing strategy and marketing materials for the
downtown
Participate in retail and office recruitment outreach and
marketing programs
Other Implementors
Local and national foundations
Other governmental entities
21
Revitalizing America’s Cities
www.ca-city.com
Crandall Arambula
Crandall Arambula