HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2018-12-148\t-tr-ooatrlb Jt"lt--
woodchuck
1120 Arihur Street
E{ectre, Ore8otr 97402
o-fEcer 541'357'5532
chuck@WoodChuckEtrgtureerhgcom
Proiect 18'337ttlEERIIGEN6
ilH:::#i:::nck Engineering has comprered a soir invesrigarion ar rhe subiecr p.roperrv. our
understanding is *rat it is proposl"i i.'".**"i " .onventional wo6d-framed single- family residence on
this sit€. This-was a previously unoccupied loL
ThepurposeofourinvestiSationwastodeterminet}resuitabilityofthesoilsforconstruchonofthe
residence, and prorio" .".o.."rJtion.ior construction of the foundahon. The scope ofour services is
ii-il"a to'g"n"ia suitability with respect to bearing capacity and expansive soils'
INVESTIGATION AND FINDINGS
The investigation consisted ofexaminingthe site soils during, excavation for the foundation' The depth of
the foundaion excavatior! based on ouiobservations in the fiel4 varied from 12 to S2-inches'
The exposed soils on the lot consisted ofa layer ofa brown organic layer over a dense, gray to yellow silty
clay loim over silty clay, over weathered tredrock Croundwater springs were not encountered in the
foundation excavation.
December 14, 2018
Rock Builders Inc.
30364 MaPle Dt'ive
function CitY, O re Eon 97 4*8-94+0
Subiect Foundation soils
54L Oak SL
SPringfield, Oregon 97 47 7
RECOMMENDATIONS
Conventional cast-in-place concrete spread and stfip
footings may be used for foundations. Foundation
loads should bear on the brown to yellow dense
sandstone or bedrock or the dense silty clay a
minimum of l8-inches below final grade. This may
be accomplished by either placing the footings
directly on undisturbed native soils or on a select
granular fill that extends to tlre undisturbed native
soils a minimum of 1B-inches below final grade.
Select glanular' fill should consist of 7+-inch minus,
well graded crushed aggregate. Selectgranular fill
shall be placed in layers not to exceed 12-inches
(loose) and mechanically compacted.
Construction according to tlese recommendations is
adequate to assul€ stable moistul€ content of foundation soils, and adequate bearing capacity, for the
proposed foundation.
,?-.!j*.
Aproof roll was performed on December 10, 2 018' prior to placinq concrete forms Theroll was performed
wfth a sinsle axle au.p *.r. ririii;;d"d. ih"r;;s no visible plmpingof the imported fill and the
depressions left from the tire tracks was less than 1-inch deep'
we recommend acceptance of the imported granular fill, by the local building official.
WoodChuck Engineering
LIMITATIONS OF THIS REPORT
This report has been prepared for t}le exclusive use of Rock Builders lnc. and their design consultants for
tjre subiect proposed structure.
The soil investigation, analysis, and recommendations meet standards of care of competent design
engineers providing similar services at the time these services were provided. We do not warrant or
guarantee these recommendations, site surface, or subsurface conditions. Exploration test holes indicate
soil conditions only at specific locations (i.e. tle test hole locations) to t}te depth penetrat€d They do not
necessarily reflect soil/rock materials or groundwat€r conditions that exist between or beyond exploration
locations or limits.
Thankyou for the opportunity to be ofservice. please call ifyou have any
quesUons.
GIN
Respectfully,65476PE
&*t-l-zl
Chuck Du Fault, P.E.
WoodChuck Engineering OREGON
11
Expires 12-31-19
Project:7g.337
CIienE Rock Builders Inc.541 Oak SL
page 2 of2December 14, 201.g
The scope ofour services does not include construction safety precautions, techniques, sequences, or
procedures exceptas specifically recommended in t}is reporL Our services should notbe interpreted as an
environmental assessment of site conditions.
0-Lt\-z-/-
Earth
fngineers,
lnc.
4660 Main Street, Suite 100 o Springfield o OR 97478
Phone: 541-39$6340' Fax il1-3936385
www.eartFengineers c'm
DAILY FIELD TESTING REPORT
P e1ot2
As requested by Brandon Devers with Rock Builders, lnc., Earth Engineers' Inc' (EEl) representative Pete Furlong was on
site to perform moisture-density tests (nuclear method) on imported structural fill placed under the proposed single family
residential structure and garage.
compactive efforts were performed using a large vibrating roller before and during our time on site Moisturedensity tests
were performed at finished rock graoe- in accordance with ASTM ri2922 and D3017 using a Troxler 3430 nuclear
densometer. The test resutts are pre-sented in Table 1 below and the approximate locations are shown in Figure 1 below
The moisture-densit
San<l and cravelclensity curve was
Table 1: Moisture0ens Test Results
y tests aboye were peflormed on finished rccl<compnsed of 3/4"-0 crushed rock from Eugenegradeusing a maximum clry density of 133.4 pcf an(t an optimum moislure content of 7.lol. The noislurc-
oate: August 10, 2018
EEI Report No.: 1&154-2
Permit tlo : GitY of SPringfield 811-17-
nddress: 541 Oak Streel, Springfield,
0026'18-DWL
97 477o
ctiern: Rock Builders, lnc
Projed: \Mllamette Heights SuMivision -
Block 1 1 Lot 5 Weather. SunnYSLbcontractor: NAGeneral cor{rador Rock Builders, lnc
rted: 10:30 a.m.Detaibd Testin Notes DeArrived: 9:00 a,m.
Percent
Compaction
Required
Percent
compaction
Achieved
Dry
Density
(pcO
Percent
Moisture
Wet
Density
(pcr)
Test
Elevation
Test
Probe
Depth
(in.)
Approximate Location
of Test
Test
#
9594125.9 4.310131 .3FRGNortheast Comer of
Garage PadI
o<4.9 99138.6 132.210FRG2Southeast Comer of
Garage Pad
95130.7 4.8 9810136.9FRG3Southwest Comer of
Garaoe Pad
115.7 6.0 8710134.5FRG4Northwest Comer of
Garage Pad
97 95170.6 128.9FRG5Northeast Comer of
House Pad
95128.8 4.8 9710134.86Northwest Comer of
House Pad
9510132.9 126.8 3.9 957Southwest Comer of
House Pad FRG
OA 95133.7 127 .5 4.88Southeast Comer of
House Pad FRG
9510136.1 130.2 45 989South Strip Footing
Center FRG
FRG 10 '133.8 126.5 5.8 95 9510Middle Strip Footing
Cenler
10 4,E o<11 North Strip Footing
Center FRG
12
Retest of Location 4
Northwest Comer or
carage Pad FRG 10 137 .3 131 .8 99 95
Sand and performed in accotdance with AASHTO T 1BO Method D Stan(lard and was provkled lo us by Eugene
Items Teded: Moisture-Density Testing
95
10
FRG
10
137 .8 '13'l .5 99
4.2
EEI Report No. 18-1 54-2
August 10, 2018
2ot2
4&12
a
a
3a
5
87aa
a,|
a
2
a
6
118
108
,8
Figure 't: Approximate locations of moisture-density testing performed on Augusl 10,2018 on
the impoded 1-112'minus crushed rock placed under the proposed single family residential
structure and garage
Distribution (eleclronic distribution onlv):
Brandon Devers - Rock BuiHers, lnc. - brandon@rockbuildersinc.com
Field Staff Name (Print)i Pete Furlong Report Reviewed By. Ray Aliperti
lh7J2/'Field Copy of tbndlvritten Report Let on Site: NO
ted res..rlt"s do nol relie\r'e contractor ftom ih accordance with contract ard appao\red documents-
A
Earth
Engirrccrs,
1,t,,.
4660 Main Street, Suite 100 e Springfield o OR 97478
Phone: 54'l-391634O o Fax: 541-3916385
www. earth-engineers. com
DAILY FIELD OBSERVATION REPORT
1of 2
Date: August 8, 2018client: Rock Builders, lnc.Permit tlo.: City of Springfie6 811-17-
002618-DVVL
EEI Report No.: 18-154-1Project: Wllamette Heighls SuMivision -
Block 1 'l, Lot 5
Address: 541 Oak Street, Springfield,
Oregon 97477
GerEral contractor Rock BuiHers, lnc.Subcordractor; NA
Items observed: Subgrade under Proposed Single Family Residential Struclure r l.lew Observation
! Re.Observation
Typ€ of Observations
Detailed Observation Notes
As requested by Brandon Devers with Rock Builders, lnc., Earth Engineers, lnc. (EEl) representative Ray Aliperti was
at the project site fmm about 8:00 a.m. to 9:00 a.m. on this dale to observe subgrade soils under the proposed single
family residential structure and garage.
Upon anival, our client had already exposed the subgrade soils using a John Deere 135c Excavator with a 5'wide
smooth bladed bucket. The exposed subgrade soils visually appeared to be relatively undisturbed, nati\re, sittyclaylclayey silt wilh sand. To assist us in determining the stability of the in-place soils, we used a 112" diameter soilprobe. The soil probe penetrated the surface ofthe subgrade approximately 3" - 4" using heavy effort, indicating a firmsubgrade at the time of our observalion. ln addition, we also used a pocket penetrometer to perform unconfinedcompressi\€ strength testing on several locetions of the exposed subgrade surface. The unconlined compressivestrength test results were between 3 and 4 tons per square fool.
our representative was informed by Mr. Devers thal the eleosed subgrade surface will be covered with approxmately30'- 36" of imported crushed rock to bring the building pad up to finished rock grade. The crushed rock will be placedas follows: approximately 6" - 10'of 4' open-graded angular quarry rock will be placed over the subgrade and thenapproximately 12'- 24" of 1-1!2' minus crushed rock will be placed over the open{raded rock. Mr. De\ers alsoinformed us that he will contact us to perform in-place compaction testing on the imported crushed rock.
Weather Clear
U Continuous r Periodic
EEI Report No 18-1
August8'
54-1
2018
2 ol2
Photo 1: Looking southwest at
on this date (within the limits of
a portion of the elposed subgrade soils obsenred
the yellorv dashed line).
Photo 2: Looking south at a portion of the e),eosed subgrade soils observed on
this date (within lhe limits of the yellow dashed line).
Distribution (electronic distribution only):
Brandon Devers - Rock Builders,lnc. - brandonr@rockbuildersinc com
Fietd s,tafr Name (ptirt): Ray Aliperti Report Reviewed By; Ray Aliperti
R"1+ V-44"1
Field Name Cqy of l.tadwitten Report LeA m Si,tej No
OLr do rpi relieve the contractof fromperfomirg ,n accordance wilh tlrF-t coriract and approyed permtt
;,-
K
I
IE .fl
v
ffit
I
jE
I
1
t[*"
JFrt
r-G--i:2 --_
t'.
a