DAILY FIELD INSPECTION REPORT
e1of1
C ient: Hyland Business Park, LLC Permit No.: City of Springfield 81 1-17-
002798-STR Date: December 17, 2018
Project: High Banks Business Park - Phase 3
- (Building 5)
Projeci Address: 5250 High Banks Rd.,
Springfield, Oreqon 97478 Report No: 18-013-101
cenerat contlactor: John Hyland Construction Subcontraclor:Weather: lnside
lrems lnspecred: Simpson Strong-Tie Titen HO Screw Anchors I New lnspection
I Re-lnspection
Type of lnspections
I At Complelion tr ln Progress tr Conlinuous I Penodic
Detailed lnspection Notes Departed: 9:00 a.m
As requested by John Hyland Construction, Earth Engineers, lnc. representative Pete Furlong was at the above
referenced project site on this date to perform periodic inspection on Simpson Strong-Tie Titen HD Screw Anchors
installed at Building 5 in sill plate to concrete slab on grade in suites 830, 840 and 850.
The seventy-five (75) 5/8" x 6" Simpson Strong-Tie Titen HD Screw Anchors were installed in accordance with the
Typical Sill Plate Attachment Detail 1/S4.3 in the City of Springfield approved project plans. Note: the screw anchors
had already been installed and tightened by the contractor prior to our arrival on site. ln accordance with Table #1 in
the ICC ESR-2713, the maximum installation torque of 1ooft-lb was verified on 100% ofthe 5/8" anchors. The torque
was verified using our Craftsman Microtork Torque Wrench (Model No. 34576) with a calibration date of May 30,
2018
To the best of our knowledge, the work inspected on this date by EEI and noted above was in conformance wilh the
City of Springfield approved jobsite plans, manufacturer's installation instructions for the Simpson Strong-Tie Titen HD
Screw Anchors, ICC ESR 2713 and applicable provisions of the lBC.
David Shaw - John Hyland Construction - dshaw@ihconst.com
Kevin Wilger - Structural Source - kevinw@structural-source.com
Matt Matthews - TBG Architects and Planners - mmatthew bq-arch.com
Robert Castile - Citv of Sprinqfield - rcastile@sprinqfiekLercey
Report Reviewed By: RayAliperti ICC#1017075Field staff Name (Print): Pete Furlong
Copy of Handwritten Report Lefl on Site: NoField Staff Name (Signalure)le7,^z*/
Our inspection does not relieve the contractor ftom performing in accordance with their conlract and approved permil documenls
4660 frilain Street, Suite 100-1A o Springfield r OR 97478
Phone: 541-393-6340 o Fax: 541-393-6385
www.earth-eng ineers.com
Report Distribution (via email):
Arrived: 8:00 a.m.
4660 Main Street, Suite 100 . Springfield o OR 97478
Phone: 541-393-6340 o Fax: 541-393-6385
www.ea rth-engineers. com
DAILY FIELD INSPECTION REPORT
elofl
Permit No.: City of Springfield 81 1-17-
002798-STR Date: November 29, 2018client: Hyland Business Park, LLC
S on 97478rinfieldOre
Project Address: 5250 High Banks Rd.,Reporr No.: 18-01 3-1 00Buildin4
Project: High Banks Business Park - Phase 3
General Cont.actor: John Hyland Construction Subconlractor:Weather: lnside
Items tnspected: Simpson Strong-Tie Titen HD Screw Anchors I New lnspection
L]RCI 0n
of lns ections
I Periodicf Continuousf ln ressI Al Com let on
Arrived: 1:00 .m,Detailed lns ction Notes De rted: 1:45 m.
As requested by John Hyland Construction, Earth Engineers, lnc. representative Pete Furlong was at the above
referenced project site on this date to perform periodic inspection on Simpson Skong-Tie Titen HD Screw Anchors
installed at Building 4 sill plate to concrete slab on grade in Suite 600.
The 5i8' diameter x 6' long Simpson Strong-Tie Titen HD Screw Anchors were installed in accordance with the
Typical Sill Plate Attachment Detail 1/S4.3 in the City of Springfield approved project plans. Note: the screw anchors
had already been installed and tightened by the contractor prior to our arrival on site. ln accordance with Table #1 in
the ICC ESR-2713, the maximum installation torque of 1ooft-lb was verified on 95% of the 5/8" diameter anchors. The
torque was verified using our Craftsman Microtork Torque Wrench (Model No. 37425) with a calibration date of May
2018.
To the best of our knowledge, the work inspected on this date by EEI and noted above was in conformance with the
City of Springfield approved jobsite plans, manufaclurer's installation instructions for the Simpson Strong-Tie Titen HD
Screw Anchors, ICC ESR 2713 and applicable provisions of the lBC.
ReDort Distribution (via email)
David Shaw - John Hyland Construction - dshaw@ihconst.com
Kevin Wilger - Structural Source - kevinw@structural-source.com
Matt Matthews - TBG Architects and Planners - mmatthews@tbq-a h.com
Robert Castile - C of fln !etd-I tn OV
Report Reviewed By: Ray Aliperti ICC#1017075Fietd staff Name (Print): Pete Furlong
Copy of Handwitten Repo( Lefr on Site: NoField Staff Name (Signature)/,h/,,-1/
Our inspection does not relieve the contractor from performing in accordance with their contract and approved permit documents
Earth
fngineers,
lnc.
Earth
Engineers,
ln..
4660 Main Street, Suite 100-14 o Springfield . OR 97478
Phone: 541-393-6340 o Fax: 541-393-6385
www.earth-engineers.com
DAILY FIELD INSPECTION REPORT
Pa el of 1
Client: Hyland Business Park, LLC Permit No.: City of Springfield 81 1-17-
002798-STR Date: June 12, 2018
Project: High Banks Business Park - Phase
3 - (Buildinq 4)
Project Address: 5250 High Banks Rd.,
Springfield, Oregon 97478 Report No.: 18-013-81
General Contractor: John Hyland Construction SubconlractoT Weather: Sunny
Items lnspected: High Skength Bolts I New lnspection ! Re lnspection
Type of lnspections
! At Completion I In Proqress I Continuous ! Periodic
Arrived:11:00 a.m. Detailed lnspection Notes Departed: 1:00 p.m.
As requested by John Hyland Construction, Earth Engineers, lnc. representative Pete Furlong was at the above
referenced project site this date to perform continuous inspection on 4325 high strength bolts (HSB) located in
Building #4:
On this date we inspected lhe 112" x2-112" A325 HSB and 314" x2" A325 HSB that were installed between gridlines A
and N from 1 to 2. Using the conlractor's Williams HTW 4CP7 torque wrench (S/N 433602), that was calibrated on
May 31 , 201 8 (see EEI report 18-013-79), at least 80% of the HSB were inspected and found to be torqued to 1 50 ft.-
lbs. for the 1/2" HSB and 300 ft.-lbs. for the 3/4" HSB.
To the best of our knowledge, the work inspected by EEI on this date and described herein was in accordance with the
City of Springfield approved project plans, the City of Springfield Varco Pruden drawings, and the applicable provisions
of the IBC and AISC.
Robert castile - City of Springfield - rcastile@sp rinofield-or.qov
Field Statf Name (Print): Pete Furlong ACI #00083536 Report Revievted By: RaY AliPerti
Field Slaff Signature:(h7,"-1/Copy of Handwitten Report Lefl on Site: No
Our inspections do not relieve the conlractor from performing in acco.dance with their conlract and approved permit documents
I
I
I
I
Distribution (electronic distribution onlv):
David Shaw - John Hyland Construction - dshaw@ihconst.com
Kevin Wilger - Structural Source - kevinw@structural-source.com
Matt Matthews - TBG Architects and Planners - mmatthews@tbo-arch.com
I
Earth
Engineerq
lnc.
Buildin 4
General conkactor: John Hyland Construction
4660 Main Street, Suite 100-1A o Springfield r OR 97478
Phone: 541-393-6340 r Fax: 541-393-6385
www.earth-en gineers.com
Pa e 1 of 3
Items tnspected: All-Thread Epoxy Anchors and Welds
rAt Com ietion lds r nP ress
I New lnspection
D Re-lnspection
T e of lns ections
r Periodic (Welds)
Arrived: 10:30 a.m.Detailed lnspection Notes DeparteqJ 2
As requested by John Hyland Construction, Earth Engineers, lnc. representative Pete Furlong was at the above
referenced project site this date to perform inspection on the following items at Building rr4:
All-Thread Epoxied Anchor Bolts: continuous inspection was performed during the installation of one hundred thirty
two (132) 3/4" all-thread epoxied anchor bolts in the following column base plate locations: B at 2, B at 3, B at 4, C at
2,Cat3,Cal4,Dal2,Dat3,Dat4,Eat2,Eat3,Eat4,Fat2,Fat3,Fat4,Gal2,Gat3,Gat4,Hat2,Hat3,
H at4, J at 2, J at 3, J at4,Kat2, K at 3, K at 4, L at 2, L at 3, L at4, M at 2, M at 3 and M at 4. Priorto installation,
the pre-drilled holes were cleaned with compressed air and a nylon "bottle" brush. The above listed anchors were
installed using Hilti Hit-RE-5000 V3 epoxy with an expiration date of 9-2-2019 and an ICC ESR-3814. The holes were
verified to be the proper embedment depth of 1 l'. Prior to installation, the contractor discarded several pumps of the
initial epoxy to ensure both parts were adequately mixed. Contractor stated the nuts would be tightened after the
epoxy has cured. Contractor was asked to notify our office when additional services are needed.
IrI
!I 18358
Photo 1: Equipment used to install the 3/4" diameter all{hread epoxy
anchor bolts including epoxy, epoxy tubes, and epoxy dispenser.
I Continuous (Epo
Permit No.: City of Springfield 81 1-17-
002798-STR
Subcontractor: Rock Hill Welding and
tegon 97478oefd
Fabrication welds
Report t'to.:'l 8-01 3-76
Weather: Overcast
DAILY FIELD INSPECTION REPORT
C ient: Hyland Business Park, LLC Date: May 17, 201 8
Project: High Banks Business Park - Phase 3
I
Projecl Address: 5250 High Banks Rd.,
,
EEI Report No. 1B-013-76
May 17 ,2018e2ot3
Photo 2: Four 3/4" diameter all{hread epoxy anchor bolts installed into
the existing concrete for one of the column base plates using Hilti Hit
RE-5000
Welds: periodic inspection was performed on welds at the embed plates to tilt up panel connections in the following
localions: Tilt-up panel to footing connection in accordance detail 1/S4.2 (Typical to Foundation Connection); tilt-up
panel to tilt up panel connection in accordance with detail 2154.2 (lypical Panel Alignment Clip Detail); and tilt-up
panel to tilt up panel connection in accordance with detail 5/54.2 (Typical lnside Corner Connection). All welds were
inspected for size, length, profile, and visual discontinuities including porosity, cracking, and incomplete fusion. The
welds were not painted at the time of our inspection. All welding was performed by Nicholas Cunningham with Rock
Hill Welding and Fabrication. A copy of Mr. Cunningham's welding certificate was provided to us and will be kept in the
project file.
Photo 3: Tilt-up panel to footing connections with a minimum 1/4" flllet
weld in accordance with detail 1/S4.2.
6/l7ml0 l13A
)
t
I
I
I
I
re I
EEI Report No. 18-013-76
May 17, 2018
Pa e3of3
Photo 3: Tiltup panel to tilt-up panel connection
with a minimum 3/16" fillet weld in accordance
with detail 3/S4.2.
To the best of our knowledge, the work inspected on this date by EEI and noted above was in conformance with the
City of Springfield approved jobsite plans, the installation instructions for the epoxy used, tCC ESR-3814, applicabte
provisions of the IBC and AWS D1.1 for welding.
Report Distribution (via email):
David Shaw - John Hyland Construction - dshaw@ihconst.com
Kevin Wilger - Structural Source - kevinw@structural-source.com
Matt Matthews - TBG Architects and Planners - mmatthews@tbo-arch.com
Robert Castile - Ci ofs IN field - rcastile S nn field-or OV
Field Slaff Name (Print): Pete Furlong ACI #00083536 Report Reviewed By: Ray Aliperti ICC#1017075
Copy of Handwitten Reporl Left on Site: NOField Slafi Name (Signalure)^. -, //,htury
Ou. inspection does not relieve the contraclor from performing in accordance with their conlract and approved permit documents
_l
I
I
i
i,.|
-"
i8 l0;*
dl
I
r
Iarth
f ngineers,
lnc
4660 lt/ain Sheet, Suite 100-1A o Springfield o OR 97478
Phone: 541-393-6340 o Fax: 541-393-6385
www.earth-en gineers.com
DAILY FIELD INSPECTION REPORT
Pa 1of 3
crient: Hyland Business Park, LLC Pennit No.: City of Springfield 81 1-17-
002798-STR oate: May 23, 2018
Buildin 4&5
Project: High Banks Business Park - Phase 3
S on 97478flletd, o
Projecl Address: 5250 High Banks Rd.,Report No.: '18-013-77
ceneral conkactor: John Hyland Construction Subconhaclor:Weather: Sunny
Items tnspected: Simpson Strong-Tie Titen HD Screw Anchors & All-Thread Epoxy
Anchors
I New lnspection
El Re-lnspection
e of lns ctio n s
I Al Com on (Screw Anchors lln Iess I Continuous E r Periodic Screw Anchors
Arrived: 7:45 a.m.Detailed lns ection Notes D arted: 9:00 a.m.
As requested by John Hyland Construction, Earth Engineers, lnc. representative Pete Furlong was at the above
referenced project site this date to perform inspections at Building #4 and Building #5.
(Building ,r4) Simpson Strong-Tie Titen HD Screw Anchors: periodic inspection was performed on 314" x 4"
Simpson Strong-Tie Titen HD Screw Anchors, model no. THD75400H, installed along gridline N between 1 and 5 in
accordance with detail 1'1lS4.2. Note that the screw anchors had already been installed and tightened by the
contractor prior to our arrival on site. ln accordance with Table #1 in the ICC ESR-2713, the maximum installation
torque of 15oft-lb was verifled using the contractors Armstrong Torque Wrench #'16052930.
Photo l: Plates 'l t2" x4" x O'-8" along gridline N from 1 to 5 that were
attached to the tilt.up panels using 3/4" x 4" Simpson Titen HD screw
anchors in accordance with detail 11/S4.2.
I
_r...-l
N
\t
tt u,ur
I
G/A/ml8 07e5!
EEI Report No '18-013-76
May 17, 2018
Page 2 of 3
(Building #5) All-Thread Epoxied Anchor Bolts: continuous inspection was performed during the installation of
forty (40) 3/4" all-thread epoxied anchor bolts in the following column base plate locations: B at 2, C al2, D at 2, E at
2, F at 2, H al2, J at 2, K at 2, L at 2 and I\il at 2. Prior to installation, pre-drilled holes were cleaned with com pressed
air and a nylon "bottle" brush. The above listed anchors were installed using Hilti Hit-RE-5000 V3 epoxy with an
expiration date of 1-10-2019 and an ICC ESR-38'14. The holes were verified to be the proper embedment depth of
11". Prior to installation, the contractor discarded several pumps of the initial epoxy to ensure both parts were
adequately mixed. Contractor stated the nuts would be tightened after the epoxy has cured. Contractor was asked to
notify our office when additional services are needed.
Photo 3: lnstalling %" diameter all{hread epoxy anchor bolts within
Building #5 using Hilti Hit-RE-5000 V3 epoxy.
ttr123l2018 08i31t
T
Photo 2: A closer view of the plates attached to the tilt-up panels along
gridline N from 1 to 5.
I
".!
!
I
o
o
\rii
,t{
l
,-/
a
t
EEI Report No. j8-Oj 3-76
May 17 , 2O1Be3of3
To the best of our knowledge the work inspected on this date by EEr and noted above was in conformance wth thecrty of springfierd approved iousite ptans. 'manur;ir;;;;#ffi"n
inshuctions for the screw anchors, rcc ESR2713, manufacturer's instaIation instructions forthe "r"rr, ,c"lIi-r814, and appricabre provisions ofthe lBc.
Robert Castile - C ot fl td-
Report Reviewed By: Ray Aliperti ICC#1017075Field Staff Name (Prinl): Pete Furlong ACI #00083536
Field Slafi Name (Signature)lh7,'-1/Copy of Handwitten Report Lefl on Site: No
Our inspection does not relieve the contraclor from peforming in accordance with lheir conlract and approved permit documents
I
Report Distribution (via email):
David Shaw - John Hyland Construction - dshaw@ihconst.com
Kevin Wilger - Structural Source - kevinw@structural-source.com
Matt Matthews - TBG Architects and Planners - mmatthews@tbq-arch.com
Earth
fngineers,
lnc.
4660 Main Street, Suite 100-'1A r Springfield o OR 97478
Phone: 541-393-6340 r Fax: 541-393-6385
www.earth-engineers. com
DAILY FIELD INSPECTION REPORT
Pa 1ot1
Client: Hyland Business Park, LLC Permit No.: City of Springfield 81 1-17-
002798-STR Daler August 28, 2018
Report No.: 18-013-92Project: High Banks Business Park - Phase
3 - (Building 5 Loading Oock)
ProjectAddress: 5250 High Banks Rd.,
Springfield, Oregon 97478
ceneral Contractor: John Hyland Construction Subcontractor:Weather: Overcast
Items lnspecled: Reinforced Concrete I New lnspection fi Re Inspection
Type of lnspections
r Conlinuous tr Periodictl At Completion t ln Progress
Arrived: 5:45 a.m.Detailed lnspection Notes Departed: 7:00 a.m.
As requested by John Hyland Construction, Earth Engineers, lnc. (EEl) representative Pete Furlong responded to the
site on this date to perform continuous visual inspection during the placement of concrete at Building 5 loading dock
walls.
Note: reinforcing steel for the above referenced area was inspected on August 23, 2018 (reference our report 18-01 3-
e1).
Our representative performed continuous inspection during the placement of concrete in the above referenced
locations. Approximately 21.50 yds3 of Knife Rivers approved mix design no. 24V0N55C00 (4,000 psi, 3/4" aggregate,
no air) was deposited by boom pump and mechanically consolidated throughout its placement depth. Concrete trucks
were inspected for mix design, batch time, slump, and temperature. For more detailed information on concrete placed
on this date please reference our concrete strength test report 1 8-013-93.
Our representative also cast one set of four (4" x 8') concrete test cylinders from a sample obtained from the 1"t
concrete truck load. Our sample had a measured slump of 7". The test cylinders were stored on site in a cooler with
temperature-conditioned water for initial curing in accordance with ASTM C31. The test cylinders will be transported to
our facility on August 29, 20'18 and placed in a concrete curing tank (lime and water solution) for final curing. The
cylinders are scheduled to be tested for compressive strength in accordance with ASTM C39 at (1) 7-day and (3) 28-
days. For more detailed information on concrete placed on this date please reference our concrete strength report 18-
013-93.
To the best of our knowledge, the work inspected by EEI on this date and described herein was in accordance with the
city of Springfield approved project plans, approved mix design, and the applicable provisions of the lBc.
Robert Castile - City of Springfield - rcastile@sDrinq field-or.qov
Repolt Reviewed By: RaY AliPertiField Stafl Name (Print): Pete Furlong ACI #00083536
Copy of Handvritten Report Left on Site: No-,--/ r'/,hturyField Staff Signaturel
Our inspections do not relieve the contractorfrom performing in accordance with their conkacl and approved permit documents
Distribution (electronic diskibution onlv) :
David Shaw - John Hyland Conslruction - dshaw@ihconst.com
Kevin Wilger - Structural Source - kevinw@structural-source.com
Matt Matthews - TBG Architects and Planners - mmatthews@tbq-arch.com
COMPRESSIVE STRENGTH REPORT OF
ST SPECIMENSCONCRETE CYLINDRICAL TE
(') 1 - Cone (both ends),2-Cone (oneend) and vertical cracks (other end ), 3 - Columnar vertical cracks,4- Diagonal fracture no
cracks through ends, 5 - Side fractures at top or bottom, 6 - Top fractures (Rel: Schenatic ol Typical Fracture Pattems , F ig. 2 in ASTM C39)
I Test results comply with project specifications. E Test results do not comply with project specifications.
Report Reviewed By (print name): Raymond V. Aliperti
4660 Main Street, Suite 100_14 o Springfietd c OR 97478phone: 541.393.6340 o Fax: 541.393.6385
www.earth_engineers.com
zud\M
David Shaw - John Hyland Construction - dshaw@jhconst.com
Kevin Wilger - Structural Source - kevinw@structural-source.com
Matt Matthews - TBG Architects and Planners - mmatthews@tbg-arch.com
Robert Castile - City of Springfield - rcastile@springfield-or.gov
Dan Simmons - Knife River - dan.simmons@kniferiver.com
crient: Hyland Business park, LLC Permit No: City of S
STR
pringfield 81 1-1 7-002798-
Report Dare: September 25, 2O.l g
rrolect: High Banli ness Park - Phase 3s Busi
Dock)(Buildin g 5 Loadin Address: 5250 High Bank
Oregon 97478
s Rd., Springfietd,
Report No.: '18-013-93
Genera 0Cntraclor:oJ nh H nd nCo rUst toctnyla Subconkactor:Weather: Overcast
Field Data ASTM C1721C31
ualding S loading dock wallsPlacement Locationi B ang dock wall on the westsideSampling Location: Load
Date Placedr 08/28/18 Cast by: Pete Furlons Supptieri Knife River Delivery Ticket No.: 80028483 TrrJck No.: 38.1Load No. (00: 1 of 2 Cubic Yards (o0: 10.75 of 21.50 lvix No.: 24V0N55C00
aatch Time: 5:34 a.m Sample Timer 6:27 a.m Batched Cement (lbs.)5,234 + slag '1,332
N4easured Slump (in.) ASTM C143: 7
Slump Cone t.D. No.: 005 Tamping Rod l.D. No : 006 Balched Hot Water (gat ): 214 Added al jobsite (gal): 5
Measured Air Content (o/o) ASTM Ct73/ASTMC231 Batched Fine Aggregate (tbs ) 15,200
LD. No.: 002l\4aterial Temperature at Samptin g (oF) ASTM C1064: 72 Batched Course Aggregate (tbs.): 1 8,640
Air Temperature at Sampting (oF) ASTM Ct064 52 t.o. No.: 002 Admirrures: VMAR3 (1 95o2.), WRDA64 (332 oz.)
Mallet l.D. No.: 004 Test Cylinder Tamping Rod t.D. No.: 009
r - Standard Curing (ini
initial curing. The next d
No. and then stored in a
tial/final methods): Test cylinders were s
ay the cylinders were transported to our
concrete curing tank (water/lime solutio
tored on-site in a cooler with temperature-conditioned water for
facility, stripped from their plastic molds, labeted with their tD
n) for final curing.
Descri piion of Curinq lVethod AST[.4 C31
Date and Time Removed From N4otds: 08/29118 at 9:05 a.m Curing Temperature (.F) ASTM C3t: High-79 row_61 t.D.No.: 002
Comments: Sample Size 4"x8"
Laboratory Data ASTM C39lC51'l lo'123'l
EEI Lab
No.
Tesl Age
(days)Test Date Maximum
Load (lbs.)
Average
Diameter (in.)
Compressive
Skength, fc
(10 psi)
Fracture Type (')
Test
By
(initials)
4072 7 44,762 4.00
4073 ZO 6,120 bU
09t25118 78,253 4.00 12.56 6,2 30 3 PF
4075 28 09t25t18 4.01
Ave e f'c at 28 da 6,080
Mix Design Strength (psi): 4,000 Specified Structural Strength (psi): 4,000Set # (o0: 1 of 1
Earth
Engineerg
lnc.
Report Reviewed By (signature):
Reoort Distribution (email onlv):
Unbonded
Cap Type
(durometer)
09i 04/18
60
| 12.62 ls,eooI60 l3lPF28
I- or/rsru
4074
77,n6 | 4.0'r I o.az
T cr*"
I Sectronat AreaI t"o,nt
frl.s6-t 3"560 fficr T 3 IPF
74,462
Earth
Engineers,
lnc.
4660 Main Street, Suite 100-1A o Springfield r OR 97478
Phone: 541-393-6340 o Fax: 541-393-6385
www.earth-engineers. com
DAILY FIELD REPORT el of 1
crienr: Hyland Business Park, LLC Date; August 29, 2018
Project: High Banks Business Park - Phase
3 (Building 5 Loading Dock)
ProjectAddress: 5250 High Banks Rd.,
Springfield, Oregon 97478 Report No.: '18-013-94
cenerat contractor: John Hyland Construction Subcontractor:---Weather: SUnny
Task Performed: Sample Pick-Up, Building #5 Loading Dock
Arrived: 8:45 a.m Detailed Field Notes Departed: 9:00 a.m.
Earth Engineers, lnc. (EEl) representative Pete Furlong was on site this date to pick up 1 set of 4 (4" x 8") concrete
test samples that were cast on August 28, 20'18 (reference our report 1 8-013-92). The samples were transported to
our facility for final storage in accordance with ASTM C31 procedures and compression testing in accordance with
ASTM C39 procedures. The results of the tests will be presented in our report 1 8-013-93.
Distribution (electro nic distribution onlV)
David Shaw - John Hyl and Construction - dsha hconst
Kevin Wilger - Structural Source - kevinw@struct ral-source.com
Matt Matthews - TBG Architects and Planners - mmatthews@tbo-arch.com
Robert Castile - City of Springfield - rcastile@sorinofaeld-or.qov
Report Reviewed By: RaY AliPertiFietd stafi Name (Print): Pete Furlong ACI #00083536
Copy of Handv/ritten Report LeIt on Site: NOle4Jry/Field Staff Signalure
Permit No.: City of Springfield 81 I -17-
002798-STR
Earth
fngineerg
ln..
4660 Main Street, Suite 100-1A o Springfield o OR 97478
Phone: 541-393-6340 o Fax 541-393-6385
www.earth-engineers. com
DAILY FIELD INSPEGTION REPORT
e1o'f 2
Client: Hyland Business Park, LLC Permit No.: City of Springfield 81 'l- 17-
002798-STR Date: August 23, 2018
3 Docu ild in 5 Load in
Project: High Banks Business Park - Phase
d o on 97478
ProjectAddress: 5250 High Banks Rd.,
I neport tlo.:'l8-013-91
General contractor: John Hyland Construction subconkactor: Santiam Steel Wealher Clear
Items lnspected: ReinfOrci Steel and Concrete Formwork I New lns D RC.I
of lns ns
rAl n lttn ! Continuous I Periodic
Arrived: 12:30 .m.Detailed lns n Notes De rted: 1:30 m
As requested by John Hyland Construction, Earth Engineers, lnc. (EEl) representative Ray Aliperti was on site this
date to perform periodic visual inspection of reinforcing steel for the Building 5 loading dock walls.
The reinforcing steel was inspected for grade, size, Iap, placement and clearances where applicable. The rebar was
secured against displacement using annealed tie wire. The reinforcing steel was placed in accordance with the revised
plan sheet and details on S4.5 for the proposed Building 5 loading dock.
To the best of our knowledge, the work inspected by EEI on this date and described herein was in accordance with the
City of Springfield approved project plans, revised plan sheet S4.5, and the applicable provisions of the lBC.
Photo 1: Reinforcing steel for the wall along the e
toading dock (view is looking southeast)
astside of the Building 5
A
"dra
EEI Report No. 18-01 1 3-91
August 23, 2018
Pa e2ol2
:-.-_
Photo 2: Reinforcing steel for the wall along the eastside of the Building 5
loading dock (view is looking northeast).
Photo 3: Reinforcing steel for the wall along the westside of the Building 5
loading dock (view is looking west).
Djstribut on (e eclron c distr bution only)
David Shaw - John Hyland Construction - dshaw@ihconst com. Kevin Wilger - Structural Source - kevinw@structural-source.com
Matt Matthews - TBG Architects and Planners - mmatthews@tbq-arch com
Robert Castile - City of Springfield - rcastile@sprinofleld-or.oov
Field Staff Name (Prinl): Ray Aliperti ICC #1017075
npvuField Staff Signalure Copy of Handwritten Report Lefl on Site: NO
Our inspections do not relieve the contraclor from performing in accordance with thelr conlracl and approved permit documents
I
r*,i
ftr.fl
i
I I
08/43/20!6
(Df_
ir
*-
4
Report Revie\red By: Ray Aliperti
Earth
Engineers,
lnc.
4660 Main Street, Suite 100-14 o Springfield o OR 9747g
Phone: 54'l-393-6340 o Fax: 541-393_6385
www. earth_engineers. com
DAILY FIELD INSPECTION REPORT
Pa e1of1
client: Hyland Business Park, LLC Permit No.: City of Springtield 811-17-
002798-STR Date: July 5, 2018
J_Buildin 5
Project: High Banks Business Park - Phase
S n 97478rineldo
Project Addressr 5250 High Banks Rd ,Report No.: 18-013-84
Items lnspected: Hi h Strength Bolts I Re'lI New Lns ection
T e of lns ctions
rAt sson CInP tl Continuous I Periodic
Arrived: 10:00 a.m.Detailed lns tion Notes Oe arted:2:30 .m.
As requested by Stephen Klemmer with John Hyland Construction, Earth Engineers, lnc. representative Pete Furlong
was at the above referenced project site on this date to perform inspection on 4325 high strength bolts (HSB) in the
beam to beam and beam to column connections located in Building #5.
On this date we inspected all the 4325 HSB that were installed in the beam to beam and beam to column connections
from gridtine A to N between 1 and 3. Using the contractor's Williams HTW 4CP7 torque wrench (S/N A33602), that
was calibrated on May 31, 2018 (see EEI report 18-013-79) we inspected at least 80% of the HSB. The 1/2" HSB were
verified to be torqued to 150 ft.lbs. and the 3/4" HSB were verilled to be torqued to 300 ft -lbs'
The A32S HSB located at the Lateral Frame Column along gridline G from 1 to 3 were tensioned using Turn-of-the-Nut
method. The 4325 HSB were initially verified to be snug{ight then the bolts were match marked and then the
additionat 1/3 turn applied as required in the AISC manual.
To the best of our knowledge, the work inspected by EEI on this date and described herein was in accordance with the
city of springfield approved project plans, lcc ESR-3814 and the appticable provisions of the lBc and Alsc manual
Distribution (el ronic distribution on lv)
David Shaw - John Hyland Construction - dshaw@l hconst.com
Kevin Wilger - Structural Source - kevinw(Ostructural-source'com
Matt Matthews - TBG Architects and Planners - mmatthews@tbo-arch.com
Robert Castile - City of Springfield -rcastile S fl ld-or
Report Revie\^€d BY: RaY Aliperti
Field Stafi Name (Print): Pete ACI #00083536Furlong
Copy of Handwritten Report Lefl on Site No
/,h7,.-2,2/Field Staff Signalure
Our inspections do nol relieve the contraclor from performing in accord ance with their contract and approved permit documents
General Conkactor: John Hyland Construction weather: ClearSubcontractor:
Earth
Engineers,
lnc
4660 Main Street, Suite 100-14 o Springfietd o OR 92478
Phone: 541.393.6340 o Fax: S4'1.393.638s
www. earth-engineers. com
DAILY FIELD OBSERVATION REPORT
e1ol2
client: Hyland Business Park, LLC Permit No.: City of Springield 8'l 1-17-
002798-STR Date: August 1, 2018
Project: High Banks Business Park - Phase
3 (Building #5 Loading Dock)
Project Address: 5250 High Banks Rd.,
Springfield, Oregon 97478 Reporl No.: 18-013-85
cenera Conlractor John Hyland Construction Subcontractor:---Weather: Clear
r New Observation nRe-ObservalionItems obsetued: Proofroll at Building 5 Loading Dock
e of Observations
r Continuous D Periodico Al Completion r ln Progress
Arrived: '11:'15 a.m.Detailed Observation Notes De rted: l1 :45 a.m
As requested by John Hyland Construction, Earth Engineers, lnc. (EEl) representative Ray Aliperti was on site today
to observe a proofroll at finished subgrade elevation under the proposed Building 5 loading dock.
The proofroll was performed to assist us in determining the stability of the exposed soils which appeared to be a
mixture of 3/4"-minus, 1-1l2"-minus, and well-graded gravel with silt and sand (tocally referred to as "bar-run" gravel).
Prior to performing the proofroll, the surface of the area was compacted using a large vibratory Smooth drum roller'
The proofroll was conducted using a loaded tandem axle water truck weighing approximately 40,000 pounds No
deflections (pumping) were observed under the wheel loads of the dump truck and no wheel tracking (rutting)
occurred, indicating a well-compacted and stable surface at this time'
To the best of our knowledge, the work observed on this date by EEI and noted above was in accordance the city of
Springtield approved plans and applicable provisions of the IBC'
i*
EEI Report No. 18-0'13-85
August 1 , 2018
e2o'f2
Photo 1: The proposed loading dock area on the eastside of Building 5 that
was proofrolled on August 1 , 2018
Field Staff Nam;(Pr'nt): Ray Atipetli tcc #1 017075 Report Reviewed gy: ftay AtipeftiStaftS,s
Copy ofHandwrifte;Report Lefi on Site: NoOurervat,ona