HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2018-12-10FEI Page 1 of 1 Daily Construction ReportIt$ilt|iiltsPtcfl0il.,,t G*iiiJ I (e.i-ri' s.'i'r Client Mr. Mark lngram Project: Oregon lndustrial Lumber Products PO Box 1442 Springfield, Orcgon 97 477 OILP Storage Building 3950 Marcola Rd. Springrfield, Oregon Date: 12-10-18 Project o.: 2187004 Roport No.: E-47240 lnspector: M. Meyer lD No.: Continuous lnspection: tr Periodic lnspection: E lnspectionof: Sitework Contractor: O&SContractors Wsather: Cloudy/30-40" BP No.: 18-002435 Met on-site with Mark lngram (OILP), Clay O'Connor (O&S), and/or Tom Heer (Blade Works) to observe completed excavations for new column footings on line C. Site visits were made on December 06, 07 & 10. Excavations are founded in the weathered bedrock slrata referenced in the project soils report dated March 06, 2018, at depths below existing pavement grade of 11.0' at lines 1C to 14.0' at 6C. Dewatering pumps are being used as crushed rock backfill is placed to raise areas back to proposed botlom of footing elevations. Field density lesting was performed on December 10 and results will be reported under separate cover. The tests indicate in-place values exceed the minimum reguirement of 95% referenced in the soils report. Mr. O'Connor and Mr. Heer were asked to notify our office when additional services are needed. /]. Michael L yer Technical Manager MLM:st This report and/or eoclosed tesl daia is the confidentral property ol lhe clienl lo *iom it is addressed and pertsrns to th€ specirlc process and/or material evaluated As such, informalion conteined herein shall not be reproduced in part or full aod/or any pan lhereofbe disclosed without FEI Tesling e lnspection, lnc.'s written authorization 750 I'JW CordlAvenue . Coryallis, Oregon 97330 phone (541) 757-4698 29540 B Airport Road . Eugene, oregon 97402 . pf'one (541) 6843849 945 Cdurrt a Steet NE, Suite 1A Salern, Oregm 97301 . phor€ (971) 2734672 Reviewed by: c: O&S Contractors - Clay O'Connor (email) Peterson Engineering - (email) City of Springfreld - Robert Castile (email) Page 1 of 1 ftsnffirlllsPtnloll.ilt G6Erii(.rr (arrb i.ry,. Geotednical & CorEfiJcltJn ServiE Field Density Test Results - ASTM D 6938 FEI Client: Mr. Mark lngram Project: Oregon Induslrial Lumber Products PO Box 1442 Springrf ield, Ot egon 97 47 7 OILP Storage Building 3950 Marcola Rd. Springfield, Oregon Date: Project No.: Report No.: B.P. No.: 12-10-18 2187004 E47241 18-002435 MOISTURE/DENSITY DATA: AASHTO T99 - Maximum Dry Density of 124.1 pct, at 13.2% moisture, is from our sample no. 7404-A dated 01 -'19-18 for 3/4'-0 crushed gravel (OSG). Tests performed at or below finished grade of crushed rock fill under tootings Remarks: Tom Heer (Blade Works) was advised of test results. Reviewed By: /) Mrchaei L Technical Manager O&S Contractors - Clay O'Connor (email) Peterson Engineering - (email) City of Springfield - Robert Castile (email) MLM:St conuiEd h.Ein shallllor b. Eprodu.cd ir n n of tull ..d or an!-- pan lh.r.of b. d,*loed wilhqn tEl T.em8 & lnsp.clm, lm s f,nno.uhdirrid 750 tlw ComellAvenue Conallis, Oregon 97330 phone (541) 7574698 29540 B Airpon Road Eugene, oregorl 97/tO2 phooe (541) 6&8849 945 Cdumbia Sreet NE, Suite 1A Salem. Oregon 97301 pttooe (971) 2734672 Test No. Approximate Location Approx Elev. Wst Density (pc0 Percent Moisture Ory Oensity (pcfl Percent Compaction Compaction Requirement 1 2 3 4 5 6 At lines 4C At lines 4C Al lines 5C At lines 5C At lines 6C At lines 6C *,I' BFG FG !1'BFG FG T'I' BFG FG 137 .6 139.8 142.1 '129.6 140.3 133.4 8.1 7.7 9.9 6.9 7.9 9.1 129.3 129.4 129.3 '121 .2 130.0 122.2 100+ 100+ 'r 00+ 98 100+ 99 95 95 95 95 95 95 FEI ftsfllt0tiltsPtffl0il,,tG-rhit.r. (''h,<t6 s.rti.' Ger:tedriel & cssfiLrdiyr Sgvi-s Compressive Strength of Concrete (ASTM C 39) CLIENT Reviewed By: Mr. Mark lngram PROJECT Oregon lndustrial Lumber Products PO Box 1442 Springfeld, Oregon 97477 BP NO. OATE PROJECT NO REPORT NO. 12-24-18 2187004 2672 OILP Storage Building 3950 Marcola Rd. Springfield, Oregon 23.0 12-18-18 4'x8' Knife River 3t4" 5 112" 1:15 PM ASTM C 31 DATE CAST STRENGTH REOUIRED STRENGTH PLACEO PRODUCT CODE ADDITIVES LOAD NO. CONCRETE TEMP AIR TEMP POUR LOCATION DATE RECEIVEO SPECIMEN SIZE SUPPLIER MAX SIZE AGG, AIR CONTENT SLUMP TIME SPECIMEN STORAGE 18-002435 12-17-18 CAST BY M. Meyer 4000 psi 4000 psi SACKS 6RN17OO9 CEMENT WRDA tr; AEA 1 TtcxET NO. 80031146 60" F YAROAGE 8,0 OF 52'F WEATHER Cloudy Column footings at lines 1C, 2C, 3C, 4C, 5C & 6C REMARKS: Howard (O&S Contractors) was advised of on-sate test resulls. LOAD ,I SAMPLED At lines 2C TEST DATE AGE {DAYS) AREA (tN.,) WEIGHT (LBS) TOTAl- LOAD (LBS) COMPRESSIVE STRENGTH IPSI) AVERAGE STRENGTH (PSr) TIME OF TEST TYPE OF FRACTURE' 12-24-18 7 '12.31 8.25 63475 5160 8:20 AM 2 01-14-19 01-'14- 19 28 01-14-19 28 _1.EidCsB 2, CdE/Spl,r 3-Cdum.r .-O.gM.r 5 - Srd. (too s bonm) 6 - $d! (ponr.d rop d bot@) "J t& {r,.- Michael L. Meyer Technical Manager O&S Contractors - Clay O'Connor (email) Petersoo Engineering (email) City ot Springfield - Robert Castile (email) This reporl and/or enclosed lest data is the confidenlial properly of the cl€nt to rr/hom il is addressed and pertains lo lhe specific process and/or maledal evalualed. As such, information conlained herein shall nol be reproduced in part or full and/or any part lhereol be disclosed wilhoul FEI Testing & lnspection. lnc's urilten authorization. 750 t.Iw ComdlAvenue Corvallis, Oregon 97330 ptrcne (541)7574698 29540 B Ajrport Road Eugen€, oregpo 97402 phone (541)6843849 945 Columbia Slreet NE, Suite 14 Salem, O€gon 97301 phme (971) 2734672 [4LM:st FEI Page 1 of 1 Daily Field Report Client:Mr. Mark lngram Project: Oregon lndustrial Lumber Products PO Box 1442 Springfield, Orcgon 97477 OILP Storage Building 3950 Marcola Rd. Springfield, Oregon Date: 01{8-19 Projeci No.: 21E7OO4 Report No.: E-47356lnspector: M. Meyer lD No.: 0877905 tcc Continuous lnspection: B Periodiclnspection: EI lnspection of: Reinforced ConcreteContractor: O&SContractors Performed inspection on the reinforcing steel for column piers at lanes 1C,2C,3C,4C, 5C & 6C and column footings al1A,2A,3A, 4A, 48,58 & 68. Rebar was checked for size, grade, lap, quantity, ties, supports and clearances, where applicable. Anchor bolts were checked for size & embedment, and were secured in templates. Observed the placement of 31.0 yards of Knife River 4000 psi concrete (mix 6RN17009). Concrele was placed directly from trucks and was mechanically consolidated. Cast one (l) set of four (4) 4" x 8" compressive strength test cylinders from load 2. Slump-4'l/2"; concrete temperature - 64F; air temperature - 42F. Howard (O&S Contractors) was advised of on-site test results and was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected was in accordance with plans dated 03-21-18 and applicable workmanship provisions of the l.B.C., except if noted above. Reviewed By: /1.r Michael L Technical Manager c: MLM:sc This repoi and/or enclosed test data is the con,ldential property of lhe clienl lo whom it is addressed and pertains to the spocific p.ocess andlor malerial evaluated As such, information conlained herein shall not be reproduced in pan or full andlor any parl lherool be disclosed wilhoul FEI Testing & lnsp€ction, lnc 's written authorizalion 75O tIW Corndl Avenue Coryallis, orwon 97330 phme (541) 7574698 29540 B AiDort Road EW€ne, Oregon 9zto2 phone (541) 68ffi49 94.5 Columtia Steet NE, Suite 1A Salem, oregon 97301 phone (971)2734672 Sm!!*Wk" c€edyicd & corsudbn servi:es Weather: Cloudy BP No.: 18-002435 O&S Contractors - Clay O'Connor (email) Peterson Engineering (email) City of Springfield - Robert Castile (email) tfsilil0t iltsPtfft1il,ut'6e6.i,iol a cd,nldir t di.r Geciechni, & Cor$uctcn Services Page 1 of 1 Field Density Test Results - ASTM D 6938 FEI Client: Mr. Mark Ingram Project; Oregon lndustrial Lumber Products PO Box 1442 Sprjngfi eld, Oregon 97 477 OILP Storage Buildin9 3950 Marcola Rd. Springfield, Oregon Date: Project No.: Report No.: B.P. No.: 12-'.t9-18 ?187004 E47290 18-002435 Tests performed at or below finished grade of crushed rock fill under footing Remarks: Tom Herra (Bladeworks) was advised of test results. Reviewed By: fi,* Michael L. M Technical Manager O&S Contractors - Clay O'Connor (email) Peterson Engineering - (email) City of Sprhgfield - Robert Castile (email) MLMrsc @raiEd [6cr. sltallnor b. rcFoduc.d !n pan of fulle*Lo. t p.n rhdcotb. dis.loscd $id$!r FEI T.ging & lrc!.ctidr.I]l. s *rina al,hcianpn 750 t[W ComellAr€nue Corvallis, Oegon 97330 firorE (541) 757-4698 29540 I Airport Road . E€ene, Oregm 97402 . dlone (541) 6E43&19 945 Columbia Sfeet NE, Suite 14 Salem, Oegon 97301 phone (971) 2730672 Test No. Approximate Location Approx Elev. Wet Oensity (pcO Percent Moisture Dry Density (pcf) Percent Compaction Compaction Requirement 1 2 4 o 7 8 9 10 At lines 1A At lines 1,q At lines 2A At lines 3A At lines 4A near north end At lines 4A near south end At lines 58 At lines 58 At lines 68 At lines 68 .1' BFG FG FG FG FG FG -1' BFG FG -,I' BFG FG '1 33.0 127 .9 140.3 '135.2 134.3 127 .1 128.2 134.9 4.9 6.0 7.1 6.9 6.2 5.5 6.3 6.5 6.2 126.8 120.6 123.2 131.r 126.4 126.4 120.5 120.6 126.7 124.5 100+ 97 99 100+ 100+ 100+ 97 97 100+ 100+ o6 95 95 95 95 oq 95 95 95 95 MOISTURE/DENSITY DATA: AASHTO T99 - Maximum Dry Density ol 124.1 pcf, at 13.2% moisture, is from our sample no. 7404-A dated 01-19-18 for 3/4'-0 crushed gravel (DSG). FEI Page 1 of '1 Dailv Construction ReportItsflilgtfisPtcilnil.,,t c-!]li.d I a'rh.ii- 3.,*- Client:Mr. Mark lngram Project: Oregon lndustrial Lumber Products PO Box 1442 Springfield, Orcgon 97 477 OILP Storage Building 3950 Marcola Rd. Springfield, Oregon Date: 12-19-18 Project No.: 2187004 Report No.: E-47286 lnspector: M. Meyer lD No.: Continuous lnspection: O Periodiclnspection: EI Reviewed by: Weather: Cloudy/55' BP No.: 18-002435 Met on-site with Tom Heer (Blade Works) to observe completed excavations for new column lootings on lines A & B. Excavations are founded in the weathered bedrock slrata referenced in the pro.iect soils report dated March 06, 2018, at depths below existing pavement grade of i2.5'at lines 14 to t5.0'at 68. Dewatering pumps are being used as crushed rock backfill is placed to raise areas back to proposed bottom of footing elevations. Field density testing was performed and results will be reported under separate cover. The tests indicate in-place values exceed the minimum requirement of 95% referenced in the soils report. Mr. Heer was asked to notify our office when additional services are needed /h4a-= Michael L. Meyer Technical Manager c: O&S Contractors - Clay O'Connor (email) Peterson Engineering - (email) City of Springfield - Robert Castile (email) MLM:st This r€porl and/or enclosed test dela as the confidenlial prop€rly of the cllent lo wllom il is address€d and perlains to lhe specific process and/or malerial evalualed. As such, information contained herein shall nol be reproduced in pan or lull and/or any pad thereol be dasclosed wilhout FEI T€sljng E lnspcction. lnc.'s written authori2etion. 750 t'IW Cordl A\Enue . CorvaIis, Oregpn 97330 . p|rone (541) 757-4698 29310 B Airporl Road . EWene, oregon 97402 pt'one (541) 684384S 945 Cdurtia Sreel NE, Suite 14 Salem, oregpn 97301 phone (971) 2734672 lnspection of: Sitework Contractor: O&SContractors FEI Page 'l of 'l Daily Field Report#m!!ruk- Ge*cfnid & corsrLdim savices Mr. Mark lngram Project Oregon lndustrial Lumber Products PO Box 1442 Springfield, Orcgon 97 47 7 OILP Storage Building 3950 Marcola Rd. Springfield, Oregon Date: 12-'17-'18 Project No.: 2187004 Raport No,: E47269 lnspector: M. Meyer lD No.: 0877905 tcc Continuous lnspection: tr Periodic lnspection: M lnsp€ction of: Reinforced Concrele Contractor: O&SContractors Reviewed By: Weather BP No.: Cloudy 18-002435 Performed inspection on the reinforcing steel for column footings at lines 1C, 2C, 3C, 4C, 5C & 6C. Rebar was checked for size, grade, lap, quantity, ties, supports and clearances, where applicable. Observed the placement of 23.0 yards of Knife River 4000 psi concrete (mix 6RN17009). Concrele was placed directly from trucks and was mechanically consolidated. Cast one (1) set of four (4) 4" x 8" compressive strength test cylinders from load 1 and performed field tests as follows: Slump - 5 1/2"; concrete temperature - 60F; air temperature - 52F. Howard (O&S Contractors) was advised of on-site test results and was asked to notify our office when additional services are needed. To the best of our knowledge, the work inspected was in accordance wlth plans dated 03-2'1-18 and applicable workmanship provisions of the LB.C., except if noted above. Technical Manager c: O&S Contractors - Clay O'Connor (email) Peterson Engineering (email) City of Springfield - Robert Castile (email) MLM:st This report and/or enclosed tesl data is lhe conUdential prope(y of the clienl lo whom it is addressed and perlarns lo the specific process and/or malerial evalualed As such, informallon conlained herein shall nol be reproduced in part or lull and/or any pan the.eot be dasclosed withoul FEI Testrng & lnspeclion, lnc 's writlen aulhorization 750 t.Iw ComellA\enue . Coflrallis, Oregon 97330 phor€ (541) 757-4698 29310 B Airpofl Road Eugene, Oregon 97a02 phorE (541) 684-3849 945 Cdurntia Steet NE, Suite 1A Salern, oregon 97301 phooe (971) 2734672 Clienl: /l r.ilw,-- Michael L. Me# 5lO 30th Street Springrield, OR 97478 Maio Office: (S1) 741-1775 Direct Une; (541) 744-3555 Cell: (541) 501-1784 www.omlidandswinnev.com www.wSfo.com .{/d% FIRE PROIECIION & SECUNIY oR ccB No. 104570 September 4d. 2018 Oregon Industrial Lumber Products Ann: Mark Ingram 3950 Marcola Rd Springfield, OR 97477 Total Pages: 2 AUDGET PflOPOSAL - INSTAI.UTTION Fire Sprinkler Syslem inslallation for the new lumber storage building at Oregon Industrial Lumber Products in Springfield, Oregon. We are pleased to confirm our budget quote to provide all material and labor for a new automatic fire sprinkler system throughout the above mentioned as desribed below. Thiswill be in strict accordance with local and State Fire Maffhal and National Fire Protection Association, pamphlets #13 and #24 requirements. Our budget price for this dcsign is $72,000.00 (seventylwo lhousand dollars) INCLUSIONS:l. 10" DCDA backflow preventer adjacent to the concrete SUB meter enclosure.2, 10" firc line 8om backflow to the NW comer ofnew building. with plugged tee for future extension.3, One new private hydranl, with required Storz outlet, to be installed in coordinated location.4. Provide 6" dry pipe valve and associated riser components in coordinated location.5. Sprinkler system, with standard weight galvanized steel pipe, throughout the building.6. Lift rental as needed.7. Subminalofplans for permit. TXCLUSIONS:l. Any alarm or clectrical system work. 2. Sprinkler monitoring. *Please budBet $3,800.00 for radio monitoring system.3. Painting or prep for paint ofpipe.4. Night or weekend working hours.5. Any excavation or backfill offire line trcnch.6. Approvcd backflow enclosure or sprinkler system yalve house.7- Permit fees to City ofSpringfield. *Feesshouldbe assessed with building permit. Thank you for thc opportunity to quote this project. We look fonvard to hearing iiom you soon. Sincerely, e%odDtuil In signing th is document, I am acknowledging thal I undersland.am authorird to accepr, and accept this Proposal/Conlracl \rrrh arl.ached Terms & Condilioos in rl5 cnlrreq PURC}IASE ORDE fl-L-.**',lo Email: mark@oilpinc.com Offic€: (541) 746-2531 ACCEPTED BY Narne & Title: Billing Address: Ciry, Srsre & Zip: Federal Tar tD#: n/c/,x o m I),rle dr-l-