Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2018-12-06Page 1 of I FEI ttsililty!!!ru!*- ceoedrical&cqsudbn servi:es Daily Field RePort Client:Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Otegon 97 47 7 Proiect: PeaceHealth X-RaY 6 3333 Riverbend Dr. Springfield, Oregon Date: 12-06-18 Project No.: 2187145 Report No.: E-47213lnspector: M. Meyer lD No.: 0877905 tcc Continuouslnspection: D Periodic lnspection: glnspection of: Wedge Anchors Contractor; GBCConstruction Reviewed By: lnside 81'1-18{0141g-STR 750 tIW CornettA venue . Corvallis, o'egon 97330 phone (541) 757469829540 B Airport Road . Eugene, oregon 97402 plrone (541) 6843849 Weather: BP No.: Performed continuous inspection during the installation of six (6) 1/2" x 5 1/2" vertical Hilti KB-TZ CS wedge anchors (lCC - ESR 1917) securing patient table base and four (4) 3/8' x 3 3/4" vertical Hilti KB-TZ CS anchors securing generator cabinet to 'l si floor slab in room 'lQ21. Predrilled holes appeared relatively clean and free of excessive drilling dust. Verified minimum embedment depth ol 3114" tot 1/2" anchors a d2" fot 3/8" anchors. Afler installation, verifjed installation torque of 40 fvlbs. for 1/2" anchors and 25 fulbs. for 3/8" anchors with a calibrated torque wrench. To the best of our knowledge, the work inspected was in accordance with KPFF sketch SSK-1 dated 06-15-18 and applicable workmanship provisions of the l.B.C., except if noted above. fi.<.rln-- Michael L. Meyer Technical Manager MLM:st c: GBC Construction - Kelly WiIis (email) GMA Architects - Aaron McGarry (emait) City of Springfietd - Robert Castile (emait) This report a^d/or enclosed tesl dala is the conficlential prope(y of the clienl lo whom il is addressed aM pertains to the specificprocess and/or maleraal evaluated As such. rntorm"uo" "irnraln"Jtr"reln "tiliio] * rJproar""o in part or fu end/or ahy partlhereof be disctosed wthout FEt Testhg E tnspecl,on. ln".t*nt"l arnori."tion 945 Cdumbia Sfeel NE, Suite 1A Salern, Oegon 97&1 phcr.e (971)273&72 Page 1 of 1 FEI Daily Field RePortItsllll0t!!:!!ruk. cedeffi & casr.rdim services Client Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Orcgon 97 47 7 Proiect: PeaceHealth X-RaY 6 3333 Riverbend Dr. Springfield, Oregon Dale: 10-05-18 Proiect No.: 2187145 Report No.: E46899 lnspec-tor: M. Meyer lD No.: 0877905 tcc Continuous lnspsction: O Periodic lnspection: glnspoction of: Wedge Anchors Contractor: GBCConstruction Reviewed By: Weather: lnside BP No.: 811-18-00141g-STR 7fi Ml Cc,IE,l AvenLE Comallis,Oegon 97W.il:gl,e(541)7574M29540 B Airpon Road Etaene, Oegon 97N2.ptfrF-(541 ) 684,3849 Performed periodic inspection during the installataon of fony-two (42) 112" x 7' vedical Hilti KB-TZ wedge anchors securing Unistrut P1000 brackets and braces to underside of 2d floor slab in X-Ray #6 room '1Q21. Site visits were made on September 26, 28 & October 06. Predrilled holes were cleaned during drilling with a Hilti drill/vacuum system. Verified minimum embedment depth of 3 1/4". Anchors were installed with a Hilti impact driver and tightened to 40 fl.Ibs. Verified installation torque \ryith FEI'S calibrated torque wrench. Kelly Willis (GBC) was asked lo notify our office when additional services are needed. To the best of our knowledge, the work inspected was in accordance with NW CeilingLifts submittal dated 09-07-18 and applicable workmanship provisions of the l.B.C_ except if noted above. /1.* Michael L. Me Technical Manager MLM:Sc c: GB-C Conskuction - Kefly Wi[is (emait) GMA Architects - Aaron McGarry (email) City of Springfietd - Robert Castiie (emait) This rer'orl and/or enclosed lesl dela is lhe cbnfidenlrel property ol lhe cr,enr lo r,horh is address€d aM p€rurns ro rhe s9ecfrcprocess and/or matenat evatuated As such. hformrtion conia;ned h€rein sf,ifi*f #.i"p."o*"0, pan orful and/or any pathereot be ctrsctosed without FEt Testrng & tnspeclion.l* (#riJi"rrnon rrio" 945 Columbia Steet NE, Suite 14 Salern,Oegon 97301 dDte(9t1)273#72