Daily Report of Proprietary Anchors
Client:KBBL LLC - DBA C & R DEVEIOPMENT
8Kj24063
A d d ress:2790 GATEWAY ST SPRJNGE]ELD OR Jurisdiction:SPRINGFIELD
CTI representative D. SMITH OBOA 442
CTI Job #:E1801541.A
was on site this date Sep.28,2018 to pcrlom Special Inspection for
pcrmit 811- 17 001020 STR
DFS #(s)
SCOPE OF INSPECTION
l. Checked in with superintendent or client represcntative
Company
2. Inspection was "lBC" I Continuous Periodic
PROPII.IETARY,{NCH ORS
YesNoN/A
1. Revies'ed previous inspection reports?
2. Reviewed evaluation report?x
Verified following items meet manufacturc/s
published installation instructions.
3. Verified minimum embedment depth of the
anchoIS.X
4.Verified inslallation of the anchors x
5. Verified anchor diameter.
6. Verified steel grade.x
7. Verified hole diamcter.;:
8. Verified type of drill bit used x
9. Verified hole cleaning method.x
10. Verified adhesive application x
11. Verified cdge distance l:
12. Verified spacing
13. Verilled installation torque x
Evaluation report number & date
ESR 250B DATED O?/201L
Location of proprietary anchors inspected [to include grid
lines, elevations (floors) and drawing detailsl:
EPOXY (4) #4'S WITH 6" EMBED AT EACH OE MENU
BOARD ANI-i OCB FOOT]NG ATTACiIMENT. REFERENCE
DETAT],S 2 AND 3/A5.4.
REPORT ST-]MMARY
1. Work inspected \\.as Completed ! In p.og.ess
2. Completed work inspected rvas in compliance with
Approved plans aod specifications ! Shop drawings
Rl-'1 ! Design change Submittal N/A
Document #(s) BURGER KING PLANS Dated'. A9/26/201A
3. Noncompliance item(s) were noted this date, details on
following page(s). I ver E No N/A
ENo INra4. Noncompliance item(s) were reinspected this date, details
on following page(s)Yes
Contbrm ! Remain in progress
Report(s) findings were discussed and left with
LEON
ol KBBL
Name of product being installed i: l ': _r:.1
Batch Number 199D4840
Expiration Da:f' a5/o6 /2019
Based on the Code. approval is required from the Building Official bcfore the SPECIAL INSPECTED items noted above can
be covered. Carlson Testing has no autho ty to direct work of contractors or subcontactors.
Page 1 of 2f] See additional report page(s)EDistribute attachments
Project:
PO Numberi BK24A6'l
Name:
KBBL
Dailv Report of Proprietary Anchors
cTI Job #: E180r541.A
Project: BK +24063
For: A9 /2A / 2A78
N otes:
In some cases more than one box may be checked for a given item on the ftont page.
Ourreports pertain to the material tested/inspected only. Information contained herein is notto be reproduced, except in full,
without priorauthorization liom this office. Under all circumstances, the information contained in this report is provided
subject to alltems and conditions ofCTI's General Conditions in effect at the time this report is prepared. No party other
than those to whom CTI has distributed this report shallbe entitled to use or rely upon the informationcontained in this
document.
Ifthere are any further questions regarding this matter, please do not hesitate to contact this office
Respectfu I ly submitted,
CARLSON TESTING,INC
David Smith
Project Manager
DS /GK
CC:
Reviewed By: Project Manager
Review Date: 10/01/2018
CTTY OE SPRTNGFIEI,D BUILDING DEPARTMENT
H T K STRUCTUBAL ENGINEERS _ HELMAND KUSI]KAK]
ADN ARCHITECTS _ .]OHN DODSON
KBBL LLC. DBA C & R DEVELOPMENT _ RODNEY BICKLE
PERMITCENTER@SPRINGFIELD OR. GOV
HK@HTKS E . ColN
DOOSONGAONARCH . CO't
RBlCKLE@S BCGIOBAL . N EI
Page 2 of 2
GBMO L],C - VICIOR LOZANO
89970 HWY 99N. EUGENF OR
vL@BKGsMO,Cdri
Bcnd Office
Ceotechnical officr
I:ugene Oflicc
Srlem Office
Tigard O{trce
(5Jl )(s03)
(sJl )(s0r)
(501)
330-9155
60!-8250
315-0289
58r-1252
68.1-3J60
Daily Report of Proprietary Anchors
Cli en t:
Project:BK *24A 63 CTI Job #:E1801541.A
A ddrcss:2790 GATEWAY ST SPRINGFIELD OR Jurisdiction S PRINGEIELD
CTI representative D. SMITH OBOA 442
$,as on site this date sep.28,2018 to pcrform Special Inspection for:
Permit 811 17-001020 STR
DFS #(s)PO \umber:
SCOPE OF INSPECTION
l. Checked in with superintendent or client representative
Compan;
Location of proprietary anchors inspected [to include grid
lines, elevations (floors) and drawing detailsl:
EPOXY (4) #4'S WITH 6" EMBED AT EACH OF MENU
DETAILS 2 AND 3/A6.4.
2. Inspection was "lBC"Continuous Periodicti:
YesNoN/A
l. Reviewed previous inspection reports?
2. Reviewed evaluation report?-i
REPORT SUMMARY
l. Work inspected was Completed I In p-gr"rt
2. Completed work inspected was in compliance with
[! approved plans and specifications ! Shop drawings
RFI ! Design change Submittal
Document #(s) BURGER KING PLANS 1161ec]. 09/26/2078
3. Noncompliance item(s) were noted this date, details on
following page(s)Ycs No
N/A
N/A
N/A
4. Noncompliance item(s) were reinspected this date, details
on following page(s)
Evaluation report number & date:
ESR 2508 DATED 0712018
Yes \o
Conform ! Remain in progress
Report(s) findings were discussed and left with
],EON
ol'KB BL
Name of product being installed
3. Verified minimum embedment depth of the
anchors.:
4.Verified installation of the anchors :
5. Verified anchor diameter.
6. Verjfied steel grade.:
7. Verified hole diameter.x
8. Verified tlpe of drill bit used I
9. Verificd hole cleaning method :!
I0. Verificd adhesive application.X
11. Verified edge distance.
12. Verified spacing ::
13. Verified installation torque x
Ilatch Numbcr
Expiration DaLe 0\ / 0 6 / 2a1 9
Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above canbe covered. Carlson 1'esting has no authoriB to direct rvork of contractors or subcontractors_
Pagc 1 of 2I See additional report page(s)l)istribute aftachments
Carlson Testing, [nc.
Name:LEON
KBBL
I'IiO PRII.]TAI{Y A NCI IORS
Verified following items meet manufacturer's
published installation instructions.
Daily Report of Proprietary Anchors
CTI Job #: Ei8 015 41. A
Project: BK #24063
For: 09/28/2A78
Notes:
Tn some cases more than one box may be checked for a given item on the front page.
Our reports pertain to the material tested/inspected only. Information contained herein is notto be reproduced, exceptin full,
without priorauthorization from this office. Under all circumstances, the information contained inthis report is provided
subject to all terms and conditions ofCTI's General Conditions in effect at the time this report is prepared. No party other
than thoseto whom CTI has distributedthis report shallbe entitledto use orrely upon the information contained inthis
document.
Ifthere are any further questions regarding this matter, please do not hesitate to contactthis office.
Respectfu lly submitted,
CARLSON'fESTING,INC.
David Smith Reviewed By: Project Manager
Project Manager Review Date: 10/01/2018
DS /GK
CC:
CITY OF SPRINGE]E],D BUILDING DEPARTMENT
H T K STRUCTURAL ENGINEERS - HEIMAND XUSHKAKI
ADN ARCIITTECTS JOHN DODSON
KBBL LLC _ DBA C ! R DEVELOPI'SNT. RODNEY BICKLE
PERMITCENTER@S PRI NGFI ELD-OR . GOV
HK@HTKS E . Col.I
DODSONOADNARCH . COIi
RBT'XI E@SBCGLOBAL.NET
Page 2 of 2
GBMO LLC VICTOB. LOZA,NO
89970 HWY 99N. EUCENE OR
vL@BK63MO,Cofi
a
77ta G,/+---
aa ru{)t)-
,744/4,
]Y E TID O R F E R E ]Y G I ]Y E E R,S IITC.
TEST REPORT TYPE:
BALANCE REPORT
Springfield Burger
King #24063
Project Completion Date:
Revision Date;
09t26t'18
Revision Number:
SEATTLE PORTLAND
ARETT MctNTyRE
CERIFICATION
3414
ExD,35r/!S
foZ ot
e
5516 1st Avenue South
Seattle, Washington 981 08
Phone (206) 621-181A
Fax (206) 343-9820
2501 SE Colunbia Way, Suite 230
Va ncouve r, Wa sh ingto n 9866 1
Phone (503) 23U8924
Fax (503) 23e8925
Page 1 of '15
,.f Con3uldng Englneeaa Sratlle. urashlnglon - Pordand, Oregon
erEngki
Springfield Burger
King #24063
Table of Contents
Title Sheet
Report Certification 4
Terms 5
lnstrument Calibration br
Summary 7
Roof Top Units 8
Exhaust Fans 12
Mechanical Prints 1E
Page 2 of 15
Neudorfer Engineers, Inc.
d Neudorfer Engineers, lnc.
Consuldog EnganeGE S€atlle, Vtlaihlnglo{t - Podand, Oregon
comrE ne iri
Report Title
CERTIFIED TEST: BALANCE REPORT
Project: Springfield Burger
King #24063
NEI Job#: 2018-1065
Mechanical Engineer: NCA
Architect: ADN
TAB Firm:
Test Engineer:
Neudorfer Engineers lnc
Cameron Morgan
55161srAveSourh
Seadle, Washington 98108
Phone (206) 621-1810
Fax (206) 343-9820
2501 SE Columbaa Way, Suite 230
Vancouvar, Washington 98661
Phone (503) 2358924
Fax (s03) 235-8925
ARE'T' r&NTYBECEHTIRCAToN
34.t 4Exp.3?tn9
e
Page 3 of 15
HVAC Contractor: Mount Hood Piping
,\t Neudorfer Engineers, lnc.
Consuldng Englneers S€€ttle, Wrthlngton - Portsrd, Oregon
www- NouttoilerEogid
CERTIFICATION
Springfield Burger
The data presented in this report is a record of system measurements and flnal adjustments that have
been obtained in accordance with the current edition of the NEBB Procedural Standards for Tesling,
Adjusting, and Balancing of Environmental Systems. Any variances from design quantities, which exceed
NEBB tolerances, are noted in the Test-Adjust-Balance Report Project Summary.
Significant / Noleworthy Remarks are noted on the General Remarks and General Field Notes pages
Other remarks are noted on individual test sheets.
Noted deficiencies are not the TAB firms responsibility to repair. Prior to issuance of this report, Deficiency
Reports are forwarded to our contracted agent.
Warranty is limited to one year from date of this report. Within that time, any discrepancies, ambiguities, or
omissions found in this report will be retested, adjusted, or balanced as needed. A written notification will
be required.
Submitted and Certified by:
NEBB TAB Firm: Neudorfer Engineers lnc
Certification No: 3414
Expiration Date: March 31,2019
Certification Date: March 31, 20'17
(Date compteted) Signed and Sealed by:
NEBB Supervisor: Brett Mclntyre, P.E.
APETT I'|dNTYREc€RTtFtc^Trc{.t
3414
Erp,3/31/19
t
Page 4 of 15
o,Neudorfer Eng ineens, lnc.
**".,.-_..m
Terms and Abbreviations
Project: SpringfieldBurger
King #24063
AC or ACU
AH or AHU
BHP
cBv
CD
Air Conditioner orAjr Conditioning Unit
Air Handler orAir Handling Unit
Average
Brake Horsepower
Constant Air Volume
Calbirated Ealancing Valve
(Circuit Setter)
Cooling Coil
Ceiling Diftuser
TOH Pressure Difference across the entering
and leaving side ota pump
HEPA High Efficiency Particulate Arrestance
HP HoEepower
HVAC Heatrng Ventrlelior and Ar Condrtronrng
HwS Heating Water Supply
HWR Heating Water Return
HX Heat Exchanger
HZ Hertz, cycle per second
in. inches
in.w.g. inches ot water galge
Kfactor Correction factor to the free area need to
calculate CF[,1
l(V\l Kilowatts
LAT Leaving Air Temperature
LWG Low Wal Grille
LWR Low Wall Register
LWT Leaving Water Temperature
MAU Make-up Ajr Hangling Unit
MBH 1.OOO BTUH
N/A Not Applicable
OSA Outside Air
OBD Opposed Blade Damper
AP Pressure Drop
PH Phase
PSI Pounds per Square lndl
RA Relum Air
RAT Return Air Temperature
RF Retum Fan
RH Relative Humidity
RHC Reheat Coil
RPM Revolutions per l\rinute
RTU Roof Top Unit
SA Supply Air
SAT Supply Ajr Temerature
S.F. Service Factor
SF Supply Fan
SFD Smoke/Fire Damper
SP Static Pressure
sq.ft. square feet
Suct. Suction
SWG SidewallGille
SWR Sidewal Register
TAB Test Adjust, and Balance
TSP Total Stetic Pressure Differen.€
between the entering and leaving
slatic pressure of a lbn
UH Unit Heater
VAV Variable Air Volume; box that
contains a motori2ed damper that
modulates airflow.
VD Volume Damper
VFD Variable Frequency Drive
Velgrid lnstrument that reads used to read
velocity in feet per minute.
WT Variable Volume Terminal
WC Water Column
w'G. Water cauge
WB Wel Bulb
CFM Cubic Feet per Minute
CH Chiller
CHWS Chilled Water Supply
CHWR Chilled Water Return
a-Pioneer Place
m exhaust fans Circulating Pump
CR Ceiling Register
20r6-993 Computer Room Arr Conditioner
CRU Computer Roorn Unit
CT Cooling Tower 912A12016
CU Condenser Unit
CUH Cabinet Unit Heater
CWS Condenser Water Supply
CWR Condenser Water Return
DAT Discharge Air Temperature
DB Dyr Bulb
DD Direct Drrve
DDC Direct Digital Controls EMS Control
Systern for the HVAC
Des. Design
Dia. Diameter
Disch. Discharge
EA Exhaust Air
EAT Entering Air Temperature
Economizer Controls and components that allow an
arr handler to logic€lly ut lze outdoor air
for cooling as opposed to the use of
mechanical cooling
EF Exhaust Fan
EG Exhaust Gnlle
EMCS Energy Management Control System
ERU Energy Recovery Unit
E.S.P. External Static Pressure
HRC Heat Recovery Coi
EWT Entenng Water Temperature
FCU Fan Coil unit
FO Fire Demper
FLA Full Load Amperage Maximum
amperage a molor c€n draw
Flow Hood lnstrumenl that captures air and
conveds the reading io CFM
FHT Fume Hood Test
FPB Fan Powered 8ox
FPM Feet per Minute
FR Field Report
FT Foot. Feet
FTIJ Fan Term na lJnit
GPM Gallons per Minute
HC Heating Coil
Page 5 of 15
coneru.g E.dns Sdirlc. uu.st ngno - Pdd-d, {ttad
fr Neudorfer Engineens, Inc.
tervw- N€udortofE r|9i
lnstrument Type Air Data N.4eter with Flowhood lnstrument Serial #M07269
Instrument Manufacturer Shortridge Calibration Date 121',t1t2017
lnstrument Model Number ADM 870
lnstrument Type Differential Pressure Water Meter lnstrument Serial #w09't31
lnstrument Manufacturer S hortridge Calibration Date 8t22t2017
lnstrument Model Number H DM-250
lnstrument Type Psychrometer lnstrument Serial #8084305
lnstrument Manufacturer Extech Calibration Date 11t30t2017
lnstrument Model Number RH39O
lnstrument Type Tachomeler lnstrument Serial #156489
lnstrument Manufacturer Hasler Bern Calibration Date 11t29t2017
lnstrument Model Number TYPE-B
lnstrument Type Amp Probe lnstrument Serial #78212531
lnstrument Manufacturer Fluke Calibration Date 11t2912017
lnstrument Model Number 36 Clamp Meter
lnstrument Type Digital Thermometer lnstrument Serial #7190028
lnstrument Manufacturer Fluke Calibration Date 11t29t2017
lnstrumenl Model Number 52
lnstrument Type Manometer lnstrument Serial #M07269
lnstrument Manufacturer Shortridge Calibration Date 121',t1t2017
lnstrument Model Number ADM 870
lnstrument Type Thermal Anemometer Instrument Serial #AVM4407 42003
lnstrument Manufacturer Alnor lnstruments Calibration Date 11t29t2017
lnstrument Model Number AVM 440
lnstrument Type Ultrasonic Flow Meter lnstrument Serial #N7G19927
lnstrument Manufacturer Fuji Calibration Date 9t1812017
lnstrument Model Number Portaflow-C
Page 6 of 15
Con.uldng EnganecrB SGattle, Wathlnglon - Po.dsld, Oregofl
Springfield Burger
King #24063
INSTRUMENT CALIBRATIONS
rl.l Neudorfer Enoineers.
{
'I co*rrtng EngirEers sernp- mrurnd
lnc.
wwlv. Naudorf8€ ngirl
2018-1 065 SprinqJield Burger Kinq #24063PROJECT
LOCATION Springfield. OR
BALANCE REPORT SUIVMARY
This project has been balanced per plans and specifications using the National Environmental
Balancing Bureau (NEBB) standards and procedures.
The scope of this work is to perform the test and balance on the newly installed Roof Top Units
and Exhaust Fans that serve the restaurant.
Roof Top Units
RTU-2
This Roof Top Unit serves the North side of the Kitchen area and the Offlces. This unit has a belt
drive motor and is operating at '101% of design air flow. Outside Air is set to 1030 CFNL
Exhaust Fans
EF-1
This Exhaust Fan serves the Broiler Grease Hood. This unit has a belt drive motor and is
operating at 105% of design air flow.
EF -?
This Exhaust Fan serves the Fryers Grease Hood. This unit has a belt drive molor and is
operating at '106% of design air flow.
EF-1
This Exhaust Fan serves the Restroom. This unit has a direct drive motor and is operating at
'1 10% of design air flow.
Please see the data sheets for the detailed performance ofthe equipment
Neudoier Engineers lnc.
Page 7 of 15
RTU-1
This Roof Top Units serves the Lobby, the South side of the Kitchen area, and the Storage room.
The unit has a belt drive motor and is operating at 100% of design air flow. Outside Air is set to
1 120 CFt\4.
fJ Ue!lg.t",i*l E#ngg". rnc'
mnr, l{oudo,rtaaE ED
Roof Top Unit
Springfi eld BurgerKing #24063
Springfield. OR
20't8-1065
DATE
CONTACT
912612018
Eric Stotts
SYSTEM/UNIT: RTU-01 Tested By
Date
Cameron [,4organ
9t26t2018
LJnit Data
lJnit Manufacturer
Unit Model Number
Unit Serial Number
RTI,J-01/Filt€r Bank
Filter Manufacturer
Filter Type
Filter Quantity - Size 1
Filter Dimensions - Size 'l
Canier
48HCFEOgA2A5AOAOAO
2418P96731
lntertek
Fiberglass
4
20x2ox2
Motor Data
RTU-Ol/Suoolv Fan
Drive Type
I\,{otor I\ranufacturer
l\y'otor RPLd
l,{otor Rated Volts
N,4otor Phase
i\rotor Hertz
[,lotor FL Amps
l\,,lotor Service Factor
Belt Drive
[rarathon
1725 RPt\.{
208-230 Volts
3
60 Hz
6.9/6.7 Amps
1.15
Test Oata
Total Design Flow
Total Actual Flow
OA Design Flow
OA Actual FIow
RA Design Flow
RA Actual Flow
RTt {1/Supplv Fan
Fan RPIV Actual
l\rotor RPM Actual
Molor Volts T1-T2
[.lolor Volts T2-T3
l\.,!otor Volts T1-T3
lvotor Amps Tl
l,totor Amps T2
l,,!otor Amps T3
924 RPt\,!
1726 RPM
207 Volts
209 Volts
209 Volts
6.0 Amps
5.9 Amps
6.1 Amps
3400 cFM
3415 CF|V
10s0 cFtV
1 120 CFt\,t
23s0 cFM
2295 CFt
Sheave Data
RTll.01/Suoolv Fan
I\,{otor Sheave MFG
Motor Sheave Model
Ivlotor Sheave Bore
l\rotor Sheave Type
Adl Nrtr Sheave Pos
Fan Sheave MFG
Fan Sheave Model
Fan Sheave Bore
Number of Bells
Belt Size
Sheave Cent€r Line
l\rotor to Extend
[rotor to Retract
5i8 in.
Adjustable
0.5TO
Fenner Drive
AFD74
1in.
1
A48
16.5 in.
2in.
2in.
Tesl Pressures
SF Suct on SP
SF Discharge SP
ActualTotal SP
Coil DP
OA Damper Pos
RA Damper Pos
-1.00 in. wc
1.11 in. wc
2.11 in. wc
(1) 0.31 in. wc
35%
65%
Log RTU-01 9t271201A Jason Coutu (1)ter and ng pressuae rop are
combined due to
Neudoier Engineers, lnc.
Page 8 of 15
PROJECT:
LOCATION:
PROJECT #:
iJ tteuoorfer Enoineers. lnc.
{ I cn-,ttt rs Englno€rE Ssrt!!- fbl8od
r .L.l,rCqlrEr!9
Roof Top Unit
PROJECT: SpringfieldBurgerKing#24063
LOCATION: Sprinqfield,OR
PROJECT#: 2018-1065
RTU-o1 Supply Outlet Summary
System/Unit Type of
Readino
Outlet
TvDe
Size
LxW/D
AK Design Design Prelim
Readinq
Final
Readinq
Final Remarks
Outlet-o1 12 1 600 325 575 96
Outlet02 Flowhood 12 1 600 485 630 T05
Outlet-03 12 1 600 275 624 103
Outlet04 6 1 50 B5 50 100
Out et-05 Flowhood D 12 1 600 455 605 101
Outlel-06'12 1 600 455 565 (1)
Outlet-07 12 1 350 340 370 106
Totals:3400 2420 3415 100
DATE:
CONTACT:
9t26t2018
Eric Stotts
Log R 9t2712014 Jason Coutu (1) The amper rs open
Neudoie r Engineers, lnc
Page I of 15
f,l rueuOorfer Enoineers. lnc.
{ I u*att"g Er{rirt€rs s"anh- hrdand
*rr. tasudo.tsEno
Roof Top Unit
Springfi eld BurgerKing #24063
Springfield, OR
2018-1065
DATE:
CONTACT:
9126t2018
Eric Stotts
SYSTEM/UNIT: RTU-02 Tested By
Date
Jason Coutu
9t26t2018
Unit Data
Unil l\,lanufacturer
lJnit Model Number
Unit Serial Number
RTu42/Filter Bank
Filter I\ranufacturer
Filler Type
Filter Quantity - Size 1
Filter Dimensions - Size 1
Caarier
48HCFEO9A2A5AOAOAO
2414P96731
lntertek
Fiberglass
4
2lv20x2
Motor Data
RTU-02/Suoolv Fan
Drive Type
I\rotor I\,{anufact!rer
L4otor RPN,
lvotor Rated Volts
I\rotor Phase
Motor Hertz
Motor FL Amps
^rotor
Service Factor
Belt Drive
Marathon
1725 RPM
208-230 Volts
3
60 Hz
6.9/6.7 Amps
1 .15
Tesl Data
Total Design Flow
Total Actual Flow
OA Design Flow
OA Actual Flow
RA Design Flow
RA Actual Flow
RTtl{2rSupolv Fan
Fan RPM Actual
Motor RPM Actual
tlrotor Volts Tl -T2
[.,lotor Volls T2-T3
Motor Volts T1-T3
Motor Amps T1
MotorAmps T2
MotorAmps T3
3400
3435
1050
1030
2350
2405
cFt\4
CFM
CFM
CFM
CFM
CFM
914 RPt\.{
1712 RPM
208 Volts
209 Volts
207 Volts
6.0 Amps
5.9 Amps
6.1 Amps
Sheave Data
RTU-02/Supolv Fan
Motor Sheave N.4FG
l\,,lotor Sheave Model
l\,,lotor Sheave Bore
l,lotor Sheave Type
Adj Mtr Sheave Pos
Fan Sheave MFG
Fan Sheave irodel
Fan Sheave Bore
Number of Belts
Belt Size
Sheave Center Line
Motor to Extend
Motor to Retract
vL44
5/8 in.
Adjustable
1TO
Fenner Drive
AFD74
1in.
1
A48
16.5 in.
2in.
2in.
SF Suction SP
SF Discharge SP
ActualTotal SP
Coil DP
OA Damper Pos
RA Darnper Pos
-0.98 in. wc
0.96 in. wc
1.94 in- wc
(1) 0.33 in. wc
65 9o
Lo9:RTU 2 9l27t2UA Cameron organ (1) Filter and Cooling Coil pressure drop are
combined due to
Neudoier Engineers, lnc
Page 10 of 15
PROJECT:
LOCATION:
PROJECT #:
Test Paessures
t"t neuUorler Enoineers. lnc.
{'A c*"t,llWenrynsr s8ltd.-tbrflsd
hrrrr. tkudod.rEng
Roof Top Unit
PROJECT; SpringfieldBurgerKing#24063LOCATION: Springfield,OR
PROJECT #: 2018-1065
RTU-02 Supply Outlet Summary
Sysrem/Unit Type of
Readinq
Outlet
Tvpe
Size
LxW/D
AK Design Design Prelim
Readinq
Final
Readinq
Final Remarks
Oullet-01 B 12 1 600 430 590 98
OLrtlet-02 Flowhood B 12 1 600 505 655 109
Outlet-03 B 12 600 s65 550 92
Outle!04 Flowhood B 12 1 600 415 570 95
Outlet-o5'Flowhood C 12 1 500 350 520 '104 (1)
Outlet-o6 Flowhood 12 1 400 285 444 110
Outlet-07 Flowhood 8 1 100 100 110 110
Totals:3400 2650 3435 101
DATE:
CONTACT:
912612018
Eric Stotts
Log:RTI.J-02lOutlet.05 9l2t t201a Jason Coutu (1) The volume damper is fullopen
l-
t__
Neudoier Engineers, lnc.
Page 1'1 of 15
7d u**r9.'#J *sHFs"' t nc'
-*r*,.*mFan Unit
PROJECT:
LOCATION:
PROJECT #:
Springfi eld BurgerKing #24063
SpringJield, OR
2018-1065
DATE
CONTACT
9t26t2018
Eric Stotts
SYSTEM/UNIT: EF-01 Tested By
Date
Cameron Morgan
9t2612018
unit Data
Fan Manufacturer
Fan Model Number
Fan Serial Number
Fan Rotation
Fan Discharge
Drive Type
Cook
120 CPBK
007sH57501
Conect
Upblast
Bett Drive
Motor Oata
irotor Manufacturer
l\,,lotor Frame
I\rotor HP
t\.,lotor RPM
Motor Rated Volts
I\,4otor Phase
l\,{otor HerE
I\,{otor Full Load Amps
[,,lotor Service Factor
Century
K56
1HP
1725 RPM
115-208/230 Volts
I
60 Hz
12.&6.2i6.3 Amps
1.15
Test Data
Total Design Flow
TotalActual Flow
Fan RPM Actual
Motor RPi,4 Actual
Motor Volts T1-T2
Motor Amps T'1
1000 cFl\,t
1045 CFM
2272 RPM
1 736 RP|V
207 Volts
5.60 Amps
Sheave Oata
Motor Sheave MFG
N,4otor Sheave Model
Motor Sheave Bore
Motor Sheave Type
Adj [rlr Sheave Pos
Fan Sheave I\rFG
Fan Sheave Model
Fan Sheave Bore
Number of Belts
Belt Size
Sheave Center Line
lrotor to Extend
Motor to Retract
Not Listed
VL44B
5/8 in.
Adjustable
2.5rO
Dodge
AK28
1in.
1
AX33
11 114 in.
1.00 in.
1 314 in.
Test Pressures
-'1.65 in. wc
0.18 in. wc
1.83 in. wc
EF-01 Exhaust lnlet Summary
System/Lrnit Type of
Readino
Outlet
Tvpe
Size
LxW/D
AK Design
Velocitv
Design
Value
Prelim
Readino
Final
Readinq
Final Yo Remarks
Baoiler Hood Airfo I Grease
Filter
2.75x46.5 O.8BB 1000 '1045 1045 105
Totals:1000 1045 1045 105
Neudoier Engineers, lnc Page 12 of 15
Fan Suclion SP
Fan Discharge SP
ActualTolal SP
fii rueuoorter Enoineers. lnc.
{ I co*tn^c Engaruers soa@- rorurr
*?r, t{c0doalor€^g
Fan Unit
PROJECT:
LOCATION:
PROJECT #:
Springfield BurgerKing #24063
Springfleld, OR
2018-1065
DATE
CONTACT
9126t2018
Eric Stotts
Tested By
Date
Cameron Morgan
9t26t2018
Test Pressures
Design Total SP 1.55 in. wc
unit Data
Fan l\ranufacturer
Fan [,4odel Number
Fan Serial Number
Fan Rotation
Fan Discharge
Drve Type
Cook
165 VCRH
007sH57501
Correct
Upblast
Belt Drive
Mot6r Data
I\rdtor Manufaclurer
[\,iotor Frame
lrotor HP
Motor Rated volts
irotor Phase
Motor Hertz
l,,lotor Full Load Amps
I\rotor Service Factor
Century
K56
1HP
1725 RPM
115-208i230 Volts
1
60 Hz
12.6-6.2/6.3 Amps
1.25
Test Oata
Total Design Flow
TotalActual Flow
Fan RPI\,4 Actual
lvlotor RPN,,l Actual
Motor Volts T1-T2
Motor Amps T1
900 cF[,4
950 cF[.l|
1054 RPM
1764 RPM
209 Volts
4.40 Amps
Sheave Data
Not Listed
VL34B
5/B in.
Adjustable
4.5TO
Not Listed
AK39
314 in.
1
A26
6 114 in.
114 in.
1 114 in.
EF-02 Exhaust lnlet Summary
System/Unit Type of
Readino
Outlet
Tvpe
Size
LxWiD
AK Oesign
Velocity
Design
Value
Prelim
Readinq
Final
Readinq
Final %Remarks
Fryers Hood Rotating Grease
Filter
11x64 3 900 1125 950 106
Totals 900 1125 950 '106
Neudorfer Engineers, lnc Page 13 of 15
SYSTEMiUNIT: EF-02
Motor Sheave MFG
[,,lotor Sheave lvodel
Motor Sheave Bore
[,4otor Sheave Type
Adj Mtr Sheave Pos
Fan Sheave MFG
Fan Sheave l\,,todel
Fan Sheave Bore
Number of Belts
Belt Size
Sheave Center Line
I\,1otor to Extend
I\,lotor to Retract
flU**-omEgguEg* lnc'
wwi.fieudo srEn!
Fan Unit
PROJECT:
LOCATION:
PROJECT #:
Springfi eld BurgerKing #24063
Springfield, OR
2018-1065
Unit Data
Fan Manufacturer
Fan l\,,lodel Number
Fan Serial Number
Drive Type
Fan Speed
Cook
100 AcEH 100c1oDH
001sH58871
Direct Drive
HiSh
l\Iotor Data
l\rotor Manulacturer
Motor HP
I\,4otor RPM
Motor Rated Volts
l\,4otor Phase
[,!otor HerE
lrotor Full Load Amps
Fasco
1t25 AP
1050 RPru
115 Volts
1
60 Hz
1.40 Amps
SYSTEM/UNIT: EF-03 Tested By: Jason Coutu
Oale: 912612018
Test Data
Total Design Flow
Total Actual Flow
Motor Volts T1-T2
Motor Amps T1
100 cFM
110 CF|V
120 Volts
1.30 Amps
EF-03 Exhaust lnlet Summary
System/Unit Type of
Readinq
Outlet
Type
Size
LxW/O
AK Design Design
value
Prelim
Readinq
Final
Readinq
Final ok Remarks
lnle!01 Flowhood F 12x12 1 100 110 110 110
Totals '100 110 110
Neudoier Engineers, lnc
Page 14 of 15
DATE: 9/26/20'18
CONTACT: Eric Stotts
110
NoCoA
CONTRACTORS NOTIS
FLOOR PLAN _ HVAC
''' ' ::r"
PACKAGE ROOFTOP IJNT SCI]EDULE 1,2
:$--^,*,_r!.EI+]!_1lI!l-]r+] ]++ {:r4-rr
A,,c
tr va 1=
2
1
3
6
1 t:.{}.ll'.
1
&,,
_;imE-
drtrt/4t]gfr a'51n1,,
@
-L!aLLL
M1
Page 15 of 15