Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2018-09-28Carlson Testing, Inc. Bend Office Geotechnical Office Eugcne OIfice Salem Omcc Tigard OIfice (s{l) (s03) (s,lr) (s03) (s03) 3J0-9155 60t-8250 3{5-0289 589-1252 68{-1d60 Daily Report of Proprietary Anchors Client:KBBL LLC - DBA C & R DEVEIOPMENT 8Kj24063 A d d ress:2790 GATEWAY ST SPRJNGE]ELD OR Jurisdiction:SPRINGFIELD CTI representative D. SMITH OBOA 442 CTI Job #:E1801541.A was on site this date Sep.28,2018 to pcrlom Special Inspection for pcrmit 811- 17 001020 STR DFS #(s) SCOPE OF INSPECTION l. Checked in with superintendent or client represcntative Company 2. Inspection was "lBC" I Continuous Periodic PROPII.IETARY,{NCH ORS YesNoN/A 1. Revies'ed previous inspection reports? 2. Reviewed evaluation report?x Verified following items meet manufacturc/s published installation instructions. 3. Verified minimum embedment depth of the anchoIS.X 4.Verified inslallation of the anchors x 5. Verified anchor diameter. 6. Verified steel grade.x 7. Verified hole diamcter.;: 8. Verified type of drill bit used x 9. Verified hole cleaning method.x 10. Verified adhesive application x 11. Verified cdge distance l: 12. Verified spacing 13. Verilled installation torque x Evaluation report number & date ESR 250B DATED O?/201L Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing detailsl: EPOXY (4) #4'S WITH 6" EMBED AT EACH OE MENU BOARD ANI-i OCB FOOT]NG ATTACiIMENT. REFERENCE DETAT],S 2 AND 3/A5.4. REPORT ST-]MMARY 1. Work inspected \\.as Completed ! In p.og.ess 2. Completed work inspected rvas in compliance with Approved plans aod specifications ! Shop drawings Rl-'1 ! Design change Submittal N/A Document #(s) BURGER KING PLANS Dated'. A9/26/201A 3. Noncompliance item(s) were noted this date, details on following page(s). I ver E No N/A ENo INra4. Noncompliance item(s) were reinspected this date, details on following page(s)Yes Contbrm ! Remain in progress Report(s) findings were discussed and left with LEON ol KBBL Name of product being installed i: l ': _r:.1 Batch Number 199D4840 Expiration Da:f' a5/o6 /2019 Based on the Code. approval is required from the Building Official bcfore the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no autho ty to direct work of contractors or subcontactors. Page 1 of 2f] See additional report page(s)EDistribute attachments Project: PO Numberi BK24A6'l Name: KBBL Dailv Report of Proprietary Anchors cTI Job #: E180r541.A Project: BK +24063 For: A9 /2A / 2A78 N otes: In some cases more than one box may be checked for a given item on the ftont page. Ourreports pertain to the material tested/inspected only. Information contained herein is notto be reproduced, except in full, without priorauthorization liom this office. Under all circumstances, the information contained in this report is provided subject to alltems and conditions ofCTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shallbe entitled to use or rely upon the informationcontained in this document. Ifthere are any further questions regarding this matter, please do not hesitate to contact this office Respectfu I ly submitted, CARLSON TESTING,INC David Smith Project Manager DS /GK CC: Reviewed By: Project Manager Review Date: 10/01/2018 CTTY OE SPRTNGFIEI,D BUILDING DEPARTMENT H T K STRUCTUBAL ENGINEERS _ HELMAND KUSI]KAK] ADN ARCHITECTS _ .]OHN DODSON KBBL LLC. DBA C & R DEVELOPMENT _ RODNEY BICKLE PERMITCENTER@SPRINGFIELD OR. GOV HK@HTKS E . ColN DOOSONGAONARCH . CO't RBlCKLE@S BCGIOBAL . N EI Page 2 of 2 GBMO L],C - VICIOR LOZANO 89970 HWY 99N. EUGENF OR vL@BKGsMO,Cdri Bcnd Office Ceotechnical officr I:ugene Oflicc Srlem Office Tigard O{trce (5Jl )(s03) (sJl )(s0r) (501) 330-9155 60!-8250 315-0289 58r-1252 68.1-3J60 Daily Report of Proprietary Anchors Cli en t: Project:BK *24A 63 CTI Job #:E1801541.A A ddrcss:2790 GATEWAY ST SPRINGFIELD OR Jurisdiction S PRINGEIELD CTI representative D. SMITH OBOA 442 $,as on site this date sep.28,2018 to pcrform Special Inspection for: Permit 811 17-001020 STR DFS #(s)PO \umber: SCOPE OF INSPECTION l. Checked in with superintendent or client representative Compan; Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing detailsl: EPOXY (4) #4'S WITH 6" EMBED AT EACH OF MENU DETAILS 2 AND 3/A6.4. 2. Inspection was "lBC"Continuous Periodicti: YesNoN/A l. Reviewed previous inspection reports? 2. Reviewed evaluation report?-i REPORT SUMMARY l. Work inspected was Completed I In p-gr"rt 2. Completed work inspected was in compliance with [! approved plans and specifications ! Shop drawings RFI ! Design change Submittal Document #(s) BURGER KING PLANS 1161ec]. 09/26/2078 3. Noncompliance item(s) were noted this date, details on following page(s)Ycs No N/A N/A N/A 4. Noncompliance item(s) were reinspected this date, details on following page(s) Evaluation report number & date: ESR 2508 DATED 0712018 Yes \o Conform ! Remain in progress Report(s) findings were discussed and left with ],EON ol'KB BL Name of product being installed 3. Verified minimum embedment depth of the anchors.: 4.Verified installation of the anchors : 5. Verified anchor diameter. 6. Verjfied steel grade.: 7. Verified hole diameter.x 8. Verified tlpe of drill bit used I 9. Verificd hole cleaning method :! I0. Verificd adhesive application.X 11. Verified edge distance. 12. Verified spacing :: 13. Verified installation torque x Ilatch Numbcr Expiration DaLe 0\ / 0 6 / 2a1 9 Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above canbe covered. Carlson 1'esting has no authoriB to direct rvork of contractors or subcontractors_ Pagc 1 of 2I See additional report page(s)l)istribute aftachments Carlson Testing, [nc. Name:LEON KBBL I'IiO PRII.]TAI{Y A NCI IORS Verified following items meet manufacturer's published installation instructions. Daily Report of Proprietary Anchors CTI Job #: Ei8 015 41. A Project: BK #24063 For: 09/28/2A78 Notes: Tn some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is notto be reproduced, exceptin full, without priorauthorization from this office. Under all circumstances, the information contained inthis report is provided subject to all terms and conditions ofCTI's General Conditions in effect at the time this report is prepared. No party other than thoseto whom CTI has distributedthis report shallbe entitledto use orrely upon the information contained inthis document. Ifthere are any further questions regarding this matter, please do not hesitate to contactthis office. Respectfu lly submitted, CARLSON'fESTING,INC. David Smith Reviewed By: Project Manager Project Manager Review Date: 10/01/2018 DS /GK CC: CITY OF SPRINGE]E],D BUILDING DEPARTMENT H T K STRUCTURAL ENGINEERS - HEIMAND XUSHKAKI ADN ARCIITTECTS JOHN DODSON KBBL LLC _ DBA C ! R DEVELOPI'SNT. RODNEY BICKLE PERMITCENTER@S PRI NGFI ELD-OR . GOV HK@HTKS E . Col.I DODSONOADNARCH . COIi RBT'XI E@SBCGLOBAL.NET Page 2 of 2 GBMO LLC VICTOB. LOZA,NO 89970 HWY 99N. EUCENE OR vL@BK63MO,Cofi a 77ta G,/+--- aa ru{)t)- ,744/4, ]Y E TID O R F E R E ]Y G I ]Y E E R,S IITC. TEST REPORT TYPE: BALANCE REPORT Springfield Burger King #24063 Project Completion Date: Revision Date; 09t26t'18 Revision Number: SEATTLE PORTLAND ARETT MctNTyRE CERIFICATION 3414 ExD,35r/!S foZ ot e 5516 1st Avenue South Seattle, Washington 981 08 Phone (206) 621-181A Fax (206) 343-9820 2501 SE Colunbia Way, Suite 230 Va ncouve r, Wa sh ingto n 9866 1 Phone (503) 23U8924 Fax (503) 23e8925 Page 1 of '15 ,.f Con3uldng Englneeaa Sratlle. urashlnglon - Pordand, Oregon erEngki Springfield Burger King #24063 Table of Contents Title Sheet Report Certification 4 Terms 5 lnstrument Calibration br Summary 7 Roof Top Units 8 Exhaust Fans 12 Mechanical Prints 1E Page 2 of 15 Neudorfer Engineers, Inc. d Neudorfer Engineers, lnc. Consuldog EnganeGE S€atlle, Vtlaihlnglo{t - Podand, Oregon comrE ne iri Report Title CERTIFIED TEST: BALANCE REPORT Project: Springfield Burger King #24063 NEI Job#: 2018-1065 Mechanical Engineer: NCA Architect: ADN TAB Firm: Test Engineer: Neudorfer Engineers lnc Cameron Morgan 55161srAveSourh Seadle, Washington 98108 Phone (206) 621-1810 Fax (206) 343-9820 2501 SE Columbaa Way, Suite 230 Vancouvar, Washington 98661 Phone (503) 2358924 Fax (s03) 235-8925 ARE'T' r&NTYBECEHTIRCAToN 34.t 4Exp.3?tn9 e Page 3 of 15 HVAC Contractor: Mount Hood Piping ,\t Neudorfer Engineers, lnc. Consuldng Englneers S€€ttle, Wrthlngton - Portsrd, Oregon www- NouttoilerEogid CERTIFICATION Springfield Burger The data presented in this report is a record of system measurements and flnal adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for Tesling, Adjusting, and Balancing of Environmental Systems. Any variances from design quantities, which exceed NEBB tolerances, are noted in the Test-Adjust-Balance Report Project Summary. Significant / Noleworthy Remarks are noted on the General Remarks and General Field Notes pages Other remarks are noted on individual test sheets. Noted deficiencies are not the TAB firms responsibility to repair. Prior to issuance of this report, Deficiency Reports are forwarded to our contracted agent. Warranty is limited to one year from date of this report. Within that time, any discrepancies, ambiguities, or omissions found in this report will be retested, adjusted, or balanced as needed. A written notification will be required. Submitted and Certified by: NEBB TAB Firm: Neudorfer Engineers lnc Certification No: 3414 Expiration Date: March 31,2019 Certification Date: March 31, 20'17 (Date compteted) Signed and Sealed by: NEBB Supervisor: Brett Mclntyre, P.E. APETT I'|dNTYREc€RTtFtc^Trc{.t 3414 Erp,3/31/19 t Page 4 of 15 o,Neudorfer Eng ineens, lnc. **".,.-_..m Terms and Abbreviations Project: SpringfieldBurger King #24063 AC or ACU AH or AHU BHP cBv CD Air Conditioner orAjr Conditioning Unit Air Handler orAir Handling Unit Average Brake Horsepower Constant Air Volume Calbirated Ealancing Valve (Circuit Setter) Cooling Coil Ceiling Diftuser TOH Pressure Difference across the entering and leaving side ota pump HEPA High Efficiency Particulate Arrestance HP HoEepower HVAC Heatrng Ventrlelior and Ar Condrtronrng HwS Heating Water Supply HWR Heating Water Return HX Heat Exchanger HZ Hertz, cycle per second in. inches in.w.g. inches ot water galge Kfactor Correction factor to the free area need to calculate CF[,1 l(V\l Kilowatts LAT Leaving Air Temperature LWG Low Wal Grille LWR Low Wall Register LWT Leaving Water Temperature MAU Make-up Ajr Hangling Unit MBH 1.OOO BTUH N/A Not Applicable OSA Outside Air OBD Opposed Blade Damper AP Pressure Drop PH Phase PSI Pounds per Square lndl RA Relum Air RAT Return Air Temperature RF Retum Fan RH Relative Humidity RHC Reheat Coil RPM Revolutions per l\rinute RTU Roof Top Unit SA Supply Air SAT Supply Ajr Temerature S.F. Service Factor SF Supply Fan SFD Smoke/Fire Damper SP Static Pressure sq.ft. square feet Suct. Suction SWG SidewallGille SWR Sidewal Register TAB Test Adjust, and Balance TSP Total Stetic Pressure Differen.€ between the entering and leaving slatic pressure of a lbn UH Unit Heater VAV Variable Air Volume; box that contains a motori2ed damper that modulates airflow. VD Volume Damper VFD Variable Frequency Drive Velgrid lnstrument that reads used to read velocity in feet per minute. WT Variable Volume Terminal WC Water Column w'G. Water cauge WB Wel Bulb CFM Cubic Feet per Minute CH Chiller CHWS Chilled Water Supply CHWR Chilled Water Return a-Pioneer Place m exhaust fans Circulating Pump CR Ceiling Register 20r6-993 Computer Room Arr Conditioner CRU Computer Roorn Unit CT Cooling Tower 912A12016 CU Condenser Unit CUH Cabinet Unit Heater CWS Condenser Water Supply CWR Condenser Water Return DAT Discharge Air Temperature DB Dyr Bulb DD Direct Drrve DDC Direct Digital Controls EMS Control Systern for the HVAC Des. Design Dia. Diameter Disch. Discharge EA Exhaust Air EAT Entering Air Temperature Economizer Controls and components that allow an arr handler to logic€lly ut lze outdoor air for cooling as opposed to the use of mechanical cooling EF Exhaust Fan EG Exhaust Gnlle EMCS Energy Management Control System ERU Energy Recovery Unit E.S.P. External Static Pressure HRC Heat Recovery Coi EWT Entenng Water Temperature FCU Fan Coil unit FO Fire Demper FLA Full Load Amperage Maximum amperage a molor c€n draw Flow Hood lnstrumenl that captures air and conveds the reading io CFM FHT Fume Hood Test FPB Fan Powered 8ox FPM Feet per Minute FR Field Report FT Foot. Feet FTIJ Fan Term na lJnit GPM Gallons per Minute HC Heating Coil Page 5 of 15 coneru.g E.dns Sdirlc. uu.st ngno - Pdd-d, {ttad fr Neudorfer Engineens, Inc. tervw- N€udortofE r|9i lnstrument Type Air Data N.4eter with Flowhood lnstrument Serial #M07269 Instrument Manufacturer Shortridge Calibration Date 121',t1t2017 lnstrument Model Number ADM 870 lnstrument Type Differential Pressure Water Meter lnstrument Serial #w09't31 lnstrument Manufacturer S hortridge Calibration Date 8t22t2017 lnstrument Model Number H DM-250 lnstrument Type Psychrometer lnstrument Serial #8084305 lnstrument Manufacturer Extech Calibration Date 11t30t2017 lnstrument Model Number RH39O lnstrument Type Tachomeler lnstrument Serial #156489 lnstrument Manufacturer Hasler Bern Calibration Date 11t29t2017 lnstrument Model Number TYPE-B lnstrument Type Amp Probe lnstrument Serial #78212531 lnstrument Manufacturer Fluke Calibration Date 11t2912017 lnstrument Model Number 36 Clamp Meter lnstrument Type Digital Thermometer lnstrument Serial #7190028 lnstrument Manufacturer Fluke Calibration Date 11t29t2017 lnstrumenl Model Number 52 lnstrument Type Manometer lnstrument Serial #M07269 lnstrument Manufacturer Shortridge Calibration Date 121',t1t2017 lnstrument Model Number ADM 870 lnstrument Type Thermal Anemometer Instrument Serial #AVM4407 42003 lnstrument Manufacturer Alnor lnstruments Calibration Date 11t29t2017 lnstrument Model Number AVM 440 lnstrument Type Ultrasonic Flow Meter lnstrument Serial #N7G19927 lnstrument Manufacturer Fuji Calibration Date 9t1812017 lnstrument Model Number Portaflow-C Page 6 of 15 Con.uldng EnganecrB SGattle, Wathlnglon - Po.dsld, Oregofl Springfield Burger King #24063 INSTRUMENT CALIBRATIONS rl.l Neudorfer Enoineers. { 'I co*rrtng EngirEers sernp- mrurnd lnc. wwlv. Naudorf8€ ngirl 2018-1 065 SprinqJield Burger Kinq #24063PROJECT LOCATION Springfield. OR BALANCE REPORT SUIVMARY This project has been balanced per plans and specifications using the National Environmental Balancing Bureau (NEBB) standards and procedures. The scope of this work is to perform the test and balance on the newly installed Roof Top Units and Exhaust Fans that serve the restaurant. Roof Top Units RTU-2 This Roof Top Unit serves the North side of the Kitchen area and the Offlces. This unit has a belt drive motor and is operating at '101% of design air flow. Outside Air is set to 1030 CFNL Exhaust Fans EF-1 This Exhaust Fan serves the Broiler Grease Hood. This unit has a belt drive motor and is operating at 105% of design air flow. EF -? This Exhaust Fan serves the Fryers Grease Hood. This unit has a belt drive molor and is operating at '106% of design air flow. EF-1 This Exhaust Fan serves the Restroom. This unit has a direct drive motor and is operating at '1 10% of design air flow. Please see the data sheets for the detailed performance ofthe equipment Neudoier Engineers lnc. Page 7 of 15 RTU-1 This Roof Top Units serves the Lobby, the South side of the Kitchen area, and the Storage room. The unit has a belt drive motor and is operating at 100% of design air flow. Outside Air is set to 1 120 CFt\4. fJ Ue!lg.t",i*l E#ngg". rnc' mnr, l{oudo,rtaaE ED Roof Top Unit Springfi eld BurgerKing #24063 Springfield. OR 20't8-1065 DATE CONTACT 912612018 Eric Stotts SYSTEM/UNIT: RTU-01 Tested By Date Cameron [,4organ 9t26t2018 LJnit Data lJnit Manufacturer Unit Model Number Unit Serial Number RTI,J-01/Filt€r Bank Filter Manufacturer Filter Type Filter Quantity - Size 1 Filter Dimensions - Size 'l Canier 48HCFEOgA2A5AOAOAO 2418P96731 lntertek Fiberglass 4 20x2ox2 Motor Data RTU-Ol/Suoolv Fan Drive Type I\,{otor I\ranufacturer l\y'otor RPLd l,{otor Rated Volts N,4otor Phase i\rotor Hertz [,lotor FL Amps l\,,lotor Service Factor Belt Drive [rarathon 1725 RPt\.{ 208-230 Volts 3 60 Hz 6.9/6.7 Amps 1.15 Test Oata Total Design Flow Total Actual Flow OA Design Flow OA Actual FIow RA Design Flow RA Actual Flow RTt {1/Supplv Fan Fan RPIV Actual l\rotor RPM Actual Molor Volts T1-T2 [.lolor Volts T2-T3 l\.,!otor Volts T1-T3 lvotor Amps Tl l,totor Amps T2 l,,!otor Amps T3 924 RPt\,! 1726 RPM 207 Volts 209 Volts 209 Volts 6.0 Amps 5.9 Amps 6.1 Amps 3400 cFM 3415 CF|V 10s0 cFtV 1 120 CFt\,t 23s0 cFM 2295 CFt Sheave Data RTll.01/Suoolv Fan I\,{otor Sheave MFG Motor Sheave Model Ivlotor Sheave Bore l\rotor Sheave Type Adl Nrtr Sheave Pos Fan Sheave MFG Fan Sheave Model Fan Sheave Bore Number of Bells Belt Size Sheave Cent€r Line l\rotor to Extend [rotor to Retract 5i8 in. Adjustable 0.5TO Fenner Drive AFD74 1in. 1 A48 16.5 in. 2in. 2in. Tesl Pressures SF Suct on SP SF Discharge SP ActualTotal SP Coil DP OA Damper Pos RA Damper Pos -1.00 in. wc 1.11 in. wc 2.11 in. wc (1) 0.31 in. wc 35% 65% Log RTU-01 9t271201A Jason Coutu (1)ter and ng pressuae rop are combined due to Neudoier Engineers, lnc. Page 8 of 15 PROJECT: LOCATION: PROJECT #: iJ tteuoorfer Enoineers. lnc. { I cn-,ttt rs Englno€rE Ssrt!!- fbl8od r .L.l,rCqlrEr!9 Roof Top Unit PROJECT: SpringfieldBurgerKing#24063 LOCATION: Sprinqfield,OR PROJECT#: 2018-1065 RTU-o1 Supply Outlet Summary System/Unit Type of Readino Outlet TvDe Size LxW/D AK Design Design Prelim Readinq Final Readinq Final Remarks Outlet-o1 12 1 600 325 575 96 Outlet02 Flowhood 12 1 600 485 630 T05 Outlet-03 12 1 600 275 624 103 Outlet04 6 1 50 B5 50 100 Out et-05 Flowhood D 12 1 600 455 605 101 Outlel-06'12 1 600 455 565 (1) Outlet-07 12 1 350 340 370 106 Totals:3400 2420 3415 100 DATE: CONTACT: 9t26t2018 Eric Stotts Log R 9t2712014 Jason Coutu (1) The amper rs open Neudoie r Engineers, lnc Page I of 15 f,l rueuOorfer Enoineers. lnc. { I u*att"g Er{rirt€rs s"anh- hrdand *rr. tasudo.tsEno Roof Top Unit Springfi eld BurgerKing #24063 Springfield, OR 2018-1065 DATE: CONTACT: 9126t2018 Eric Stotts SYSTEM/UNIT: RTU-02 Tested By Date Jason Coutu 9t26t2018 Unit Data Unil l\,lanufacturer lJnit Model Number Unit Serial Number RTu42/Filter Bank Filter I\ranufacturer Filler Type Filter Quantity - Size 1 Filter Dimensions - Size 1 Caarier 48HCFEO9A2A5AOAOAO 2414P96731 lntertek Fiberglass 4 2lv20x2 Motor Data RTU-02/Suoolv Fan Drive Type I\rotor I\,{anufact!rer L4otor RPN, lvotor Rated Volts I\rotor Phase Motor Hertz Motor FL Amps ^rotor Service Factor Belt Drive Marathon 1725 RPM 208-230 Volts 3 60 Hz 6.9/6.7 Amps 1 .15 Tesl Data Total Design Flow Total Actual Flow OA Design Flow OA Actual Flow RA Design Flow RA Actual Flow RTtl{2rSupolv Fan Fan RPM Actual Motor RPM Actual tlrotor Volts Tl -T2 [.,lotor Volls T2-T3 Motor Volts T1-T3 Motor Amps T1 MotorAmps T2 MotorAmps T3 3400 3435 1050 1030 2350 2405 cFt\4 CFM CFM CFM CFM CFM 914 RPt\.{ 1712 RPM 208 Volts 209 Volts 207 Volts 6.0 Amps 5.9 Amps 6.1 Amps Sheave Data RTU-02/Supolv Fan Motor Sheave N.4FG l\,,lotor Sheave Model l\,,lotor Sheave Bore l,lotor Sheave Type Adj Mtr Sheave Pos Fan Sheave MFG Fan Sheave irodel Fan Sheave Bore Number of Belts Belt Size Sheave Center Line Motor to Extend Motor to Retract vL44 5/8 in. Adjustable 1TO Fenner Drive AFD74 1in. 1 A48 16.5 in. 2in. 2in. SF Suction SP SF Discharge SP ActualTotal SP Coil DP OA Damper Pos RA Darnper Pos -0.98 in. wc 0.96 in. wc 1.94 in- wc (1) 0.33 in. wc 65 9o Lo9:RTU 2 9l27t2UA Cameron organ (1) Filter and Cooling Coil pressure drop are combined due to Neudoier Engineers, lnc Page 10 of 15 PROJECT: LOCATION: PROJECT #: Test Paessures t"t neuUorler Enoineers. lnc. {'A c*"t,llWenrynsr s8ltd.-tbrflsd hrrrr. tkudod.rEng Roof Top Unit PROJECT; SpringfieldBurgerKing#24063LOCATION: Springfield,OR PROJECT #: 2018-1065 RTU-02 Supply Outlet Summary Sysrem/Unit Type of Readinq Outlet Tvpe Size LxW/D AK Design Design Prelim Readinq Final Readinq Final Remarks Oullet-01 B 12 1 600 430 590 98 OLrtlet-02 Flowhood B 12 1 600 505 655 109 Outlet-03 B 12 600 s65 550 92 Outle!04 Flowhood B 12 1 600 415 570 95 Outlet-o5'Flowhood C 12 1 500 350 520 '104 (1) Outlet-o6 Flowhood 12 1 400 285 444 110 Outlet-07 Flowhood 8 1 100 100 110 110 Totals:3400 2650 3435 101 DATE: CONTACT: 912612018 Eric Stotts Log:RTI.J-02lOutlet.05 9l2t t201a Jason Coutu (1) The volume damper is fullopen l- t__ Neudoier Engineers, lnc. Page 1'1 of 15 7d u**r9.'#J *sHFs"' t nc' -*r*,.*mFan Unit PROJECT: LOCATION: PROJECT #: Springfi eld BurgerKing #24063 SpringJield, OR 2018-1065 DATE CONTACT 9t26t2018 Eric Stotts SYSTEM/UNIT: EF-01 Tested By Date Cameron Morgan 9t2612018 unit Data Fan Manufacturer Fan Model Number Fan Serial Number Fan Rotation Fan Discharge Drive Type Cook 120 CPBK 007sH57501 Conect Upblast Bett Drive Motor Oata irotor Manufacturer l\,,lotor Frame I\rotor HP t\.,lotor RPM Motor Rated Volts I\,4otor Phase l\,{otor HerE I\,{otor Full Load Amps [,,lotor Service Factor Century K56 1HP 1725 RPM 115-208/230 Volts I 60 Hz 12.&6.2i6.3 Amps 1.15 Test Data Total Design Flow TotalActual Flow Fan RPM Actual Motor RPi,4 Actual Motor Volts T1-T2 Motor Amps T'1 1000 cFl\,t 1045 CFM 2272 RPM 1 736 RP|V 207 Volts 5.60 Amps Sheave Oata Motor Sheave MFG N,4otor Sheave Model Motor Sheave Bore Motor Sheave Type Adj [rlr Sheave Pos Fan Sheave I\rFG Fan Sheave Model Fan Sheave Bore Number of Belts Belt Size Sheave Center Line lrotor to Extend Motor to Retract Not Listed VL44B 5/8 in. Adjustable 2.5rO Dodge AK28 1in. 1 AX33 11 114 in. 1.00 in. 1 314 in. Test Pressures -'1.65 in. wc 0.18 in. wc 1.83 in. wc EF-01 Exhaust lnlet Summary System/Lrnit Type of Readino Outlet Tvpe Size LxW/D AK Design Velocitv Design Value Prelim Readino Final Readinq Final Yo Remarks Baoiler Hood Airfo I Grease Filter 2.75x46.5 O.8BB 1000 '1045 1045 105 Totals:1000 1045 1045 105 Neudoier Engineers, lnc Page 12 of 15 Fan Suclion SP Fan Discharge SP ActualTolal SP fii rueuoorter Enoineers. lnc. { I co*tn^c Engaruers soa@- rorurr *?r, t{c0doalor€^g Fan Unit PROJECT: LOCATION: PROJECT #: Springfield BurgerKing #24063 Springfleld, OR 2018-1065 DATE CONTACT 9126t2018 Eric Stotts Tested By Date Cameron Morgan 9t26t2018 Test Pressures Design Total SP 1.55 in. wc unit Data Fan l\ranufacturer Fan [,4odel Number Fan Serial Number Fan Rotation Fan Discharge Drve Type Cook 165 VCRH 007sH57501 Correct Upblast Belt Drive Mot6r Data I\rdtor Manufaclurer [\,iotor Frame lrotor HP Motor Rated volts irotor Phase Motor Hertz l,,lotor Full Load Amps I\rotor Service Factor Century K56 1HP 1725 RPM 115-208i230 Volts 1 60 Hz 12.6-6.2/6.3 Amps 1.25 Test Oata Total Design Flow TotalActual Flow Fan RPI\,4 Actual lvlotor RPN,,l Actual Motor Volts T1-T2 Motor Amps T1 900 cF[,4 950 cF[.l| 1054 RPM 1764 RPM 209 Volts 4.40 Amps Sheave Data Not Listed VL34B 5/B in. Adjustable 4.5TO Not Listed AK39 314 in. 1 A26 6 114 in. 114 in. 1 114 in. EF-02 Exhaust lnlet Summary System/Unit Type of Readino Outlet Tvpe Size LxWiD AK Oesign Velocity Design Value Prelim Readinq Final Readinq Final %Remarks Fryers Hood Rotating Grease Filter 11x64 3 900 1125 950 106 Totals 900 1125 950 '106 Neudorfer Engineers, lnc Page 13 of 15 SYSTEMiUNIT: EF-02 Motor Sheave MFG [,,lotor Sheave lvodel Motor Sheave Bore [,4otor Sheave Type Adj Mtr Sheave Pos Fan Sheave MFG Fan Sheave l\,,todel Fan Sheave Bore Number of Belts Belt Size Sheave Center Line I\,1otor to Extend I\,lotor to Retract flU**-omEgguEg* lnc' wwi.fieudo srEn! Fan Unit PROJECT: LOCATION: PROJECT #: Springfi eld BurgerKing #24063 Springfield, OR 2018-1065 Unit Data Fan Manufacturer Fan l\,,lodel Number Fan Serial Number Drive Type Fan Speed Cook 100 AcEH 100c1oDH 001sH58871 Direct Drive HiSh l\Iotor Data l\rotor Manulacturer Motor HP I\,4otor RPM Motor Rated Volts l\,4otor Phase [,!otor HerE lrotor Full Load Amps Fasco 1t25 AP 1050 RPru 115 Volts 1 60 Hz 1.40 Amps SYSTEM/UNIT: EF-03 Tested By: Jason Coutu Oale: 912612018 Test Data Total Design Flow Total Actual Flow Motor Volts T1-T2 Motor Amps T1 100 cFM 110 CF|V 120 Volts 1.30 Amps EF-03 Exhaust lnlet Summary System/Unit Type of Readinq Outlet Type Size LxW/O AK Design Design value Prelim Readinq Final Readinq Final ok Remarks lnle!01 Flowhood F 12x12 1 100 110 110 110 Totals '100 110 110 Neudoier Engineers, lnc Page 14 of 15 DATE: 9/26/20'18 CONTACT: Eric Stotts 110 NoCoA CONTRACTORS NOTIS FLOOR PLAN _ HVAC ''' ' ::r" PACKAGE ROOFTOP IJNT SCI]EDULE 1,2 :$--^,*,_r!.EI+]!_1lI!l-]r+] ]++ {:r4-rr A,,c tr va 1= 2 1 3 6 1 t:.{}.ll'. 1 &,, _;imE- drtrt/4t]gfr a'51n1,, @ -L!aLLL M1 Page 15 of 15 -. --_ l4g€s I L-