Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2018-11-20Carlson Testing, Inc. Bend Omce Gcotechnl€I Office Eugene Oflice Srlem Omce Tigrrd Omce (541) 330-9r5s (s03) 601-82s0 (s41) 3ds-8289 (s03) sE9-r2s2 (s03) 684-3.i60 Date:al120/ 20ta Report of In-Place Asphaltic Concrete Density Tests Job Number:81.5 010 7 8 Permit #:811-LDp2015-00069 i EXCAVATIoN) , 811-SPR20 15-41229 Client: Project:MCKENZIE WILI,AMETTE I4EDICAI CENTER Address:1460 G ST - SPRINGFIEI,D OREGON Description:LEIiEI 2, 1/2N DENSE ACP RI\ER BEND SAND & GRAVEL Rice Value:154.8 MAtr{D: - Marshall Valuet l\{ethod of Test:A.STM D2950 /ASTM 041 Source of Value Dated 1Ul9i20l8 is project specific. 7o Required: -92--9- Dcnsity: 2270 Calibration D*e: ]2JlLStandard Count for Gauge Serial #:Trox.39525 I)ste of Test Test No.Test Location Mode Density Count Lift No. Thick- ness In Place Density Comp. 11- 19 1 SEE ATTACHED SITE M.AP FOR LOCATION BS 783 1 L44.8 93.5 11- 19 2 SEE ATTACHED SITE MAP FOR ],OCATION BS 'i 15 1 2 11- 19 3 SEE ATTACHED SITE MAP FOR LOCATION BS 7'12 1 2r 94 .2 11- 19 4 SEE ATTACHED SITE MAP FOR LOCATION '7 89 1 144.3 11- 19 5 SEE ATTACHED STTE MAP FOR LOC-ATION BS 7'7 9 f 93.8 11- 19 6 SEE ATIACHED SITE MAP FOR LOCATION BS s03 1 2l 143.0 Please see reverse side for additional information, 145 .4 145.8 E Distribute attachmetrts. Job Numtlerl E1501078 Our services were iateoded to proyide coEpactiotr test results oEly Remarks: AIL TEST TOCATIO}'S ARE APPROXIMATE. I,AYTON CONSTRUCI'ION CO - ROBERT MITCHEI,L DROP BOX TestBy: T, DUNAIIAY Reviewed BY: ProjectMrnager: christian McDonald Tesl results were discussed and left with SI{ANIION Ast€ri*ed (*) p€rc€6t mmpaction test results did not m€et listed acceptarc€ criteria. up'l oad. rnspect. p9 DsteofTest: Lt/7e/20L8 CCr OHCCS ILc CITY OF SPRINGFIEID DEVBLOPIIENT SERVICES'ROBERT CAST]LE LTTN,EJOIIN iS & ME COMPATSY) . CI{RIS AKERS LII'IIEJOHN (S & ME COMPANY) - TODD WILSON INVOICES ONLY RCASTILEGCI. SPRINCFiELD. OR. US CAXERSGSMEINC. COI' t{TwI L SOr{0SMEINC . COr{ Date of Test Test No.Test Location Mode Density Count Lift No, Thick- ness In Place Detrsity Comp. Of IAYTON CONSTRUCTION Crur rcDorts Dertain to the material tested/iospected only. tnformation cootained herein is nol to be tEproduced, except.io fitll. *i*lrii.i.i "rtl"rl*tion t"m tttir omce. i-lnder all iircumstances. the in-forrnation contained in this repon is provided ;#;6;ji ;-r;t";"dtiions of CTI's General Corditiors itr effect at the time this reportis prepared. No p-arty-othsr than i;;;;ilbTl 635 Jistributed rhis repon shall be entitl€d to use or rely upon the information cootained in this document. E9970 HWY 99N, zuCENE OR r I I L-I f- ffiI I I I t Itt[T-I--T-- I I I i - Im I tl (r) lr)!f . - ' .PFOPOSEO. .' . . HqSFITAL EOPIPEITf" _i1trli?D sF. -,'ifr-8"-:=-L'nl,l la'(:, Fa t4$ - --;- . erl) (,l -n') t t I "l I f: I\lr) F' FiIF] I PROPQSED PARKING LOT III41,2'n I - rr----+--r-!.!! -D -Fr - - - -- -- - - \'1 lra t2.t 'i,I aa. .ft I ,1, I I !-. {- t / 1 Beod OIIic€ G.ot chnLal Ofiice EuSene Ofice Snl.o Olllce Tigard Omce (541) 330-9lss (503) 60r-8250 (s41) 3454289 (503) stqr2s2 (s03) 684-3460 Report Of In-Place Density Tests ao / 24 /20L8 811-IrDP2015 0163f 815 010 ? 8Date:Job Number: l'ermit #: Client:OHCCS I,LC Project: Address: MCKENZIE WIIJLAMETTE MEDICA! CENTER 3/4"-O CRUSHED RoCI( (Gw) WII,DISI{ STANDARD PAVING CO Material Description: Maximum Dry D"rrity, t32'' lbs./cu. ft. optimum Moistu r"; "'n o/o Required Compaction: tu yo Standard Count for Gauge Serial #Troxler 39525 Method of Test:ASTM D5938/ASTM D1557 C 1460 G ST - SPRINGFIBLD OREGON Source of Value Dated 11/18/2015 is project specific. Standsrd Counts - Densify: 2277 Moisture:722 Date Of Test Test No.Code Test Location Dctrsity Count Moist. Coutrt Mode Depth Elev Ft. o/o Field Moist. In-Place De$ity obs/cu. ft.) Comp.lVet Drv !0 -23 I PS 9'7 70-23 2 PS ROADWAY BASE ROCK SEE ATTACHED SITE MAP FOR LOCATION 95 LA-23 3 PS ROADWAY BASE ROCN SEE ATTACHED SITE MAP FOR I,OCATION to -23 4 ps ROADWAY BASE ROCK SEE ATTACHED SITE MAP FOR LOCATION 99 I I I I I I II Please see reyerse side for additional information. Carlson Testing, Inc. calibration Date I t2 / 2017 ROADWAY BASE ROCK SEE ATTACHED SITE MAP FOR LOCATION I I I I | 8n I I I I I r.062 | 113 | D1', I 8n I FRG I s.6l I I tt tt n Distribute attacbmetrts. JobNunber: E1s010?8 Date 0f Test 10 /23 / 2ota Date Of Test Test No. Code Test Loc&tiotr Detrsity Coutrt tr{oist. Count )lode Depth Elev tr't. Ficld Moist Ir-Pl8ce Densio 0bsicu. fL) Comp.Wet Dry I I I I I I I I I I tlr I I Asterisked (*) perc€nt compactio, test rEsults did not meet listed acceptanca criteda" Our services were intended 1o proyide compaction test results only. Remarks: FRG = FINISHED ROCK GRADE, TEST *1 THROUGI{ TEST #4 AII, SHOT LOCATIONS ARE APPROXTMATE. CCr onCCS LIC CITY OT SPRINGFIEI,D DEYEIPPIIENI SERVICES-ROBERT CNSTII,E I,ITT[iE.'O[IN (S & MB COI.IP}NY) - CERIS AKERS LrTrLErOllN (s & uE co[tP]Nv) - mDD wrlsoN INVOICES ONLY RCASTI L EOCI . SPRIIlG FIELO , OR . IIS CA(ER56SMEIxc. Cq'! mMrLS0N@SMETNC. COU I,AYIf,'N CONSTRUCTION CO - ROBERT MITCHEIIJ DROP EOX up]oad. rnspect. p97wghrsabou. box. coll Test By: D' sMrrH Project Manager: chrj-stian McDonald TEst results were discussed ard left r ith DouG of PACTFIC EXCAVATION Reviewed By: NC - No code (serle-al fill atcas and backfill/original groundhot fill) SF - Struclulal'Ell (Buildings Non-Re'sidential) LF - Re,sidqrtial lot eogine€red fill RF - Roadway engiDe€rad fill (Soil Only) PS - Pav€rnent subgtade BC - Base course (Rock Only) RW - Retaining wall backfill WI - Water line trench ST - Sanitary sewer t€nch DT - Storm drain trench ET - Ele!trical treoch GT- Gass line Erirch CT - Cablg ptone t€nches Our rEDorts Dqtain !o the marerial tested/hspocied only. Informalion mntained herein is not to be repr*uced, exc€pt in fuIl' wifiout prior ;. oii;. ;ffi rhir-;tr; Li;d- Ji"ir"ir;sknces; fie information contained in this n?ort is Fovided subjed ro al.terms and ;ftiifi;;i An'. G€".rl Conditions in effect at theiime this rcport is pr€pared. No p-attyothet than those to whorn CT( has aiiGU.rt.A rti,"p.rt.t all be eatitled to use or rcly upon the information contained in this documeot, 89970 }I!\ry 99N, EIJCENE OR tt I I I tt I I tt Code Descriptions E Hl!E l"tl tn}EI II8 tt 'li,dL rotue3 tsc!Pon aBaulelllM-€lzuexslI ol .uollB^oueu , suoluppv ! 4i Ii! I -; It: EI iI,t $t iii { tI! i '. i I !g al. ET j IL {.1 II .!-+t (Jtrsg.t 'U{1f.j t{rrJos \, *V) \-s o! L d !!lIi 1, I ,u o a, iiare ! iiI: urol!+a >ooo ?&*^ i--_--ll,tfrE l, i,i ili???!ilii iillffli t dr:,,.rar!qi!r ; -r'r r_ii--, E !'! r'l ril 6 i I i I iliii, ilt!i: I I I I Er3ri!.r:::.:,-rr. ;: Carlson Testing, [nc. Bend OIfice Ceot€chnical Office Eugene Office Salem 0lficel igard OIficc (s]1) (s03)(sll) (503) (s03) 330-9155 601-8250 34s-0289 589-1252 681-3,160 Report Of In-Place Density Tests la/1a/2018 811-LDP2015-00069 (EXCAVATTON) E15 0107 8 -Date:Job Numbcr: Permit #: QHCCS LLCClient: Project:MCKENZIE IiILLAMETTE MEDICAL CENTER 1460 G ST _ SPRINGEIELD OREGON 3/4"-O CRUSHED ROCK (GW) I{ILDISH STANDARD PAVING CO. Troxler 39526 Address: Material Description: Maximum DryDensig: l12 a lbr./cu. fi. Optimum Moisture: 9'4 o/o Required Compaction: 95 o/o Standard Count for Gauge Serial # Ilethod of Test: Source of Value Dated lll18/2015 is project specific. Standard Counts - Densig: I ti Moisture: Date Of Test Test No.Code Density Co unt !loist. Count \'lode Depth ElevFt Field Moist. ln-Place Density (lbs/cu. ft.) Comp.\l et Dr\ 10-09 1 40, t2' NORTH OE SOUTH ENTRY TO EMERGENCY ROOM DRIVEWAY FROM WEST CURB 91 10-09 FS B8I NORTH OE SOUTH ENTRY TO EMERGENCY ROOM DRIVEWAY 9' FROM WEST CURB 96 10-09 3 ?S 142I NORTI] OE SOUTH ENTRY TO EMERGENCY ROOM DRIVEWAY 7' EROM WEST CURB 10-09 167' NORTH OF SOUTH ENTRY TO EMERGENCY ROOM DRIVEWAY 28' EROM WEST CURB 95 10-09 PS 192' NORTH OF SOUTH ENTRY ?O EMERGENCY ROOM DRIVEWAY 10' FROM IiEST CURB 101 I ASTM D6938/ASTM D1557 C 610 CalibrationDate: 5 / aB / 78 Please see reverse side for additional information- e6 | Test Location 721 D1 FRG 137.0 128.1 I 1041 1066 124 DT FRG 9 I 1051 129 FRG FRG DT FRG 140-133.9 I ! oist.ibute attachments. Job Number: Elscr0rB Date Of Test: |a/a9/2c7a Date Of Test 'I_est \o.Code Test LocatioIl Densitv Count )loist. ( lo unl ]l ode I)epth Elev FL Field Moist. In-Place Density (lbs/cu. ft.) Comp.Wet Dry Asterisked (*) percent compaction test results did not meet listed acceptzmce criteda. Our services werc intended to provide compaction test results only. Remarks: FRG = FINISHED ROCK GRADE, TEST +1 THROUGH TEST +5 ALL SHOT LOCATIONS ARE APPROX]MATE. I,AYTON CONSTRUCTION CO ROBERT M]TCHELL DROP BOX CC: QHCCS I-LC CITY OE SPRINGFIEID DEVE],OPMENT SERVICES-ROBERT CASTILE ],ITTLE.]OT1N (S & ME COMPANY) CHRIS AKERS ],ITTIEiTOHN (S & ME COMPANY) TODD WILSON INVOICES ONLY RCASTILEGCI. SPRINGFIELD.OR. US cIKERS@SMETNC. CO&1 wTwI LS0NGSM EI NC . col'j Reviewed By upload. rnspect. p97h/9hwsab@u. box. con : Project Manager oo 10/12/zOLaTest BY: L. KrNG Project Manager: Christian McDonafd Test results were discussed and left with NOI]C CART SO of pact nt EXCAVATION Code Descriptions BC - Base course (Rock Only) RW - Retainhgllall backfill W'l - Water line trench ST - Sanitary sewertrench DT - Storm drain trench ET- Elcctrical trench GT - Cass line trench CT - Cablc, phone trenchcs NC - No code (generalfillareas and backflll oriS inal grou nd/nol fill) SF - Structural fi ll (Buildings Non-Rcsidential) LF- Residential lotengineeredfi ll RF- Roadway engineered fill (SoilOnly) PS - Pavement subgrade Our reports pertain to the material tcsted/inspecte d onl) . I n formation contained herein is not to be reproduted, €xcept in ful I, without prior auii,o#uiio'n f,om rl,i. oIIce. I nderallcircimsrancesllhcinformarionconlaincdinlhisreponispro\idedsubFtrloalltermsandconditionsoitiiG C.n".rf bonaitions in ellect at the time this report is prepared. No party other thtn those to whom CTI has di5tribuled this report shall be enlitledto use orrcly upon the information contained in this dooument. 89970 HWY 99N- ETJCENE OR I I tl I I I Carlson Testing, Inc. Berd OIfice Gcotechdcrl Ofrice Eugene OIfice SaleB Oflice Tigrrd Office (541) 330-9rss (503) 601-82s0 (541) 34!0289 (503) 589-1252 (503) 68+3460 Octobcr 9, 2018 E1s01078.CTr PermitNo: 811-I-DP2015-00069 FIELD INSPECTION REPORT DATES CO\aERED: October 8, 2018 PROJECT: ADDRESS: INSPECTO& McKenzie rd/illamette Medical Centet i460 G St - Spring6eld Oregon Chris McDonald As requested by PaciEc Ercavation, Carlson Testing, inc. (CTT) reptesentative, Chris McDooald was on site to obseree deflecdon testiog on proposed subgrade elevatioo for ddvevzy ofnew emergency depaltrnent €xpansion, Upon arrival I obsersed that Pacific Excavation had excavated to proposed subgrade elcvation- Exposed material appeats to be a mixture of 32"-0 crushed tock and medium btown silty sandy clay with cobblc and gravel. PaciEc Excavation used a fully loaded tandem arle dump truck *'eighing apptoximatel,v 55,000 lbs. to perforrn the ptoofroll from approximatelv 21 feet to 140 feet north of the south entrv on Mohawk Boulevatd. No pumping, no deflecdon, and no tire tracking/mtting werc observed iadicating a firm subgrade at this time. Results of deflection testing wete discussed with Doug with Paci8c Excavation ptior to my departu.re ftoflt ploiect site. 0 08 18: PROOFROI -t October 10, 2018 E1501078.CTI Pctmit No: 811-l-DP2015{0069 Page 2 of 2 Our.reports pertain to the material testcd/iaspccted only. Informadon contained herein is not to be reproduced, except in ftrll, wiGout prifi authorization fiom this ofEce. Under all circumstaaces, the iofotmation contained in this teport is protided subiect to all terms and conditions of Cll's Genetal Conditions in effect at &e time this report is prepared. No pattr other dran those to vrhom CfJ has distdbuted dis report shall be entided to use ot rcly upon the infornation contained in this document. If there ate any further questions regardirtg tlis maner, please do not hesitate to contact this of6ce. Respectfu lly subm.itted, C.ARISON TESTING, INC, Ckis McDonald Eugene Branch Managet CM/gk CITY OF SPRII{GITIELD SERVICES. ROBERT CASTILE CARTSON GEOTECH}iICAL - BRq]] wIrcOX F.SA - TOV LEF}iVR.E I-\YION CONSIRUCI]ON _ CHRIS STRUCK}L{N LAYTON CONSTRUCTION - N.ATE IIELLER I^YTON CONSTRUCfiON _ ROBERT M1TCIIELL I,AYTON CONSTRUCTION - ROAERT MT(:H!IL DROP BOX LAYION CONSIRUClION SHANNO\ STF,INER LUILITJOHN (S & NIE COLIPA\|4 Ct.lRls AKERS LI ITLFJOHN tS & VE COMITTNY) - TODt'r VILSON STRUCTUR.AL DESIGN GROUP _ MIKE ruRRAY STRUCTLTRII DESIG].] GROUP - ?AUL tr{URRAY E\ltAI1- El\!AIL EivAII- BMA1L EMAIL EM,AI! EMAIL EMAII, F.I{AII, EM IL EMAIL EM.{I]- cc: Carlson Testing, Inc. Bend OIfice GeotechEical Of{ice Eugene Offrce Salem Oflicc Tigard Office (54r) 330-9r5s (503) 601-82s0 (s4r) 34s4289 (s03) s89-12s2 (s03) 684-3460 October 10 2018 E1501078.CII ?ermit Ne: 811-LDP2015-00069 FIELD INSPECTION REPORT DA'IES COYF,RED: October 9, 2018 PROJECT: ADDRESS: INSPECTORJ McKenzie Willamette Medical Center 1460 G St - Sprhgfield Oregon Barry King 10/09/18: PROOFROLL As requested by Pacific Ercar-atioo, Catlsoo Testing, Inc. (Cl'l) representative, Bar:ry Kt€ was oo site to obsewe deflection testing of proposed subgrade elevation fot ddveway of new Emergeocy Room expansion. Upon arriva! I obsenred that PaciEc Ercavation had excavated to proPoscd subgnde elevation. Exposed material appeas to be a mixnrre of 7.r"-0 cushed tock and medium btown silty sandy clay with cobble and gtavel. Pacific Excavation uscd a fully loaded tuadem axle dump truck weigbing approximately 55,000 lbs. to perforrn the ptoo&oll from approrimately 0 feet to 21 fcet north of south enry on MohawL Boulevard and 140 feet to 2,lO feet north of the south entry on lv{ohawk Boulevatd. No pumping, no deflection, and no rutting wete obscrved, indicating a 6rm subgnde at this tfune- Subgtade is approximately 12 inches belovi finish gade. Rcsults of dcflecti<.ro testing rvere discussed with Doug Carlson vrith Pacihc excavation prior to my depatture from project site October 11, 20111 81501078.CTI Permit No: 811-LD?2015-00069 Pa.ge 2 of 2 Our reports pertain to th€ mate{ial tested/inspccted on}y, Infotmation containcd huein is not to be rcproduced, except in ftrll, u'irhout prior authorizatior from this ofEce. Undcr all citcumstances, dtc ioformation contained in this repott is ptovide'd subjcct to all terms and conditions of CTI's Geaeral Conditioas in effect at the tirne this teport is prepated. Ncr party other than those to whom CTI has distributed this report sha.ll be enritled to use or tely upoo the information contained in dri$ document. If there ate any {luther questions regarding this mattet, please do Dot hesitate to contact t}is office Respcctfu 1l,v submittcd, CARISON TESTING, IAIC, Cbris McDonald Eugene Branch Manager BK/gk cc:CITY OF S?RINGFIELD SER\4CES - ROBERT Ci{SrILE CARLSON GEOTECI TNICAI - BR.T\D WILCOX laSA - TOM IEFEVRI llYToN CONSIRUCTION - CHRIS STRUCKIV{-AN LA.YTON CONS'IRUCTION hrAlE HELI-EI I-AYTON CONSTRUCflON ROBERT MITCI{ELL I-AYTON COh\STRUCION - ROBERT NIITG{ELL DROP BOX LAYION CONSTRUCTION - SII-4Nr-ON STEINIIR LTnLEJOHN (S & ME COMPA\I0 -CHNS AKFIS LrrrLFJoFII.i (s & ME coMPA\r' - TODD MI^SON STRUC-1'URAI, DF]SIGN GROUP_ MIKE VURRAY SItrUCTUR{, DF,SIGN GROUP - PAUL MUR.RAY EIlllIL En/LAll. EMA]I, EM,{L EMAI'- r][IATL FMAII, EMAIL EMAlL f!Vr{lL EMAIL EMAlL \: t Cn Contractors P.O. Box 225789 Dsllas, Texrs 75222 Phone: (214) 761-1940 Fax: (214) 761-t936 PROJECT: SECTION: MANUFACTURER: PRODUCT: suBM|TTED 1-4-16 078100-01 (DAIE} (SUBMTNAI NUM.} THIS REVIEW IS FOR GENERAT CONTRACT COMPTIANCE ANO DOES NOT RELEASE THE 5UECONTRACTOR ANDIOR SUPPTIER FROM COMPLYING TO THE PLANS AND SPECIFICATIONS AND SUBCONTRACI AND/oR PURCHASE ORDER AGREEMENTS: NOR DOES THIS RETEASE TH€ ARCHITECI OR McKenzie-Wi llamene Medical Center Additions Spray Applied Fireproofing / Specification 078100 Isolatek lntemational Cafco 300 al Concealed Locations Cafco 4O0 at Exposed Mechanical Room I'LOOR ASSBI\{BLY / }-uture Fkmrs tRestrained Floor Ratinpst: PRIMARY BEAMS: SECONDARY BEAMS:UL# N759 2hr ll(X)F' ASSEMBLI' t 1\uical l,iuhtr,vrirlht lnsulatinI Concrele Rrlof Svstenr r: EXTERIOR PRIMARY ROOF BEAMS: UL# P922 3 hr PRIMARY ROOF BEAMS uL#P92? 2 hr SECONDARY ROOF- BEAMS:llL# P922 1.5 hr 9/16" I I t/16" It/16" 3t4" lio Er.qrll,nrTEi- (4 c"r" Ot^ffit riotu 5&kioE5 t I ev. JWL nevita t B€.!bl.t { } THEIR CONIRACTUAL RESPONSIBI CONTRACTORS SIGNATURE LAYTON CONSIRUCT1ON C NC UITANTS FROM &i Erl gxmr.m l.,6ci.r6., hc,rlchr.d l. milk . -dtt.ct 2l0o lt d Efi,lyir.rt. ni. Ptbf&aliE T-ri.s.s 9,20asrs 3€c0{6 r iiirr..irch crm .. SUBMITTAL.. UL# N759 3 hr COLI]MNS: COLUMNS SUPNORTING A FLOOR: COLI,JMNS SUTPiORTING A ROOF: UL Deslgn #X790 UL Deslgn #X790 3 hour rating 2 hour rating WFColumns ULXTM 3 hr.2 hr. WDRatio Column Size 2.55 w 14X233 7tE"5/8" 1.96 wr4xl76 r ul6"lut6" r.56 I U4"13/r6" 1.23 w 14x82 I u2"I 2.M I l1116" r.65 wl2xr20 l :l/16"13/16" I 3/8"t.34 w12X96 t5/r6" 1 lD*r.22 w 12x87 I 9//l6t'I r/16"l.ll wt2x79 1 5t8"I 1/t"w12x65o.92 I 1E',I 5/8"w 12x580.92 I U4tlt 13/15"wr2x400.73 I s/16"I 7n"wl0x330.66 3 hr.2 hr,ul.x790mnsWF Tube Steel Sizew/D Ratio | 3t4"I l/t"'ts4x4x5/16 I 3/t"2"TS5X5X I /40.24 - wt4xl32 w12Xl52 1" tJ.29 FI REPRO O FI NG THICKNESS TESTS Pro,lectNam€ Pmf Addresi Oale lnsoectur: BtdS- #/'StEc rE Nam€:IFERIlTfrlT M EASUREMENT PROCEOURES {For rn6asrn!.rrnt loaatioos sar o{rr. sirc) UETAEA I esru esc z r.t3 o(! O.ct ag i l/Yrlt r 3rr ol l0 UJ a No EI tl)r HOTEr ENTER ALL RE oINGS ltl b oF AN |HCH I'l.rinu]n Ft cordrbl. Thlckn6s: SFcdlied lhiain s! plus lr4 indr tiinlmum Acc.pbblc Thlckn6s: For SFfirI EpGdfi.d to bG l' or lers. 75% ol lp.dfic. tion 297olrtt Fo, SFRlr apar,ifi.d lllalcr thrn l', rlo Lss lhan l/4'b.lo{ splarficrtion at2 kidtyc€h k Lttt t't ,?', ,** + lttsrt {lrclrrlr: i/lrererncil lEtion I I755a,IIIIII I Sp.i I xFF/tot.gGlu*r,n 4 II l/6 2 ,t,/,ry LI a c ,5'/bt M 2&,rv '7-,9.I t",r^) l013>zls zls 2h e2t ?La 2h ?2Yr tlg 9roI il's xFF lnt.g ihtDtrl,tPrt t4L ltlb Ltfu )*,It tZt % u)thxSll it.I fi"h,I $a 'tt4LI n t?^llt tfrtl: \x7{r 1ftt.g tZr r2rr,t*t rfi,th,tZo tZrt lVro t7?rl*or,t{4n DhxkL P,o tho tilt t/tb tlth Prt t2i )3t t4k t I xFF I rct.9'l i1aSe,,-)u'br,I I I I I I I I I I I {I I tunLittJII t, il !t rt lt to t tr it w,E4IrInI IIT r ITrrr r IIITII I I IIII ITIrIIIII rr rII rIr I I IT ITw, IIIITTII II rI rrII IIITrI I rI II r IIIIrrIrIrr IIIII III II rII II II III Ir IrIr I Ir rrrITITrIrII IrIIIIIIrrIII r.+ 0.. . I I f/h IIII Carlson Testing, fnc. Bend 0fEce Geotechtricd Omce Eugene OIIice salem Offfce (s4r) 330-91ss (503) 601-8250 (s41) 34s-0289 (503) s89-1252 (s03) 684-3.160TigardOffice August 24, 2018 E1501078.CTr Permit No: 811-IDP2015-00069 FIELD INSPECTION REPORT DATIS COYERED: August 23, 2018 PROJECT: ADDRESS: INSPEC-TOR: McKenzie Willamette Medical Center 1460 G St - Spring6eld Oregon Robett Otchard 08/23l18: THICKNESS OF SFXII APPLIC-I\TION As requested by Shannon wittr Layton Consttuction, Cadson Testing, Inc. (CfI) tepresentative, Robert Orchard arrived onsite to perfom thickness testing of SFRM (Cafco 300) for columns and beams at Sectot F 1" floor nith tests being petformed at general area of XFF/101.8, with extedor primary beam, pdmary beam, column, and secondarv beam having met and/or exceeded thickness requirements. Out repotts pertain to the material tested/inspected only. Infornation contained herein is not to be reproduced, ercept in fi:Il, vrithout ptior authotization ftom this ofEce. Undet all &cumstarces, tlle ioformatioo coutained in this leport is provided subiea to all terms and conditions of CTI's Genetal Conditions in effect at the time this report is prepared. No party other than those to r*'hom CTI has distributed this repott shall be entided to use o! lely upon the infotmation contained in this documenL If thete are ar:y futhet questions rcgarding this matter, please do not hesitate to contact this of6ce. Respectfrrlly submittcd, CAR-ISON TESTING INC. Chris McDonald Eugene Branch Marrager RO/mw cc:CITY OF SPRINGFIEI,D SER\4CES ROBERT C,{SI.T.E CARISON GEOTECHN'CAI, BLAD W1I,COX ESA. TOM I-I]FEVRE LAYTOh- CONSTRUCT1ON - CHRIS STRUCI''\'r\N I-AYTON CONSTRUCTON . NATE HELLER LAYTON CONS TRUCTION _ ROBERT MI'(CHELI, LAYTON- CONSTRTICI'ION . ROIIERT lllITCHF,r-l,DROI' BOX LAYTON CONSTRUCTON - STI\NNON STENER LITIIE JOH.\ (S & ME COMPA].T4 _ CHRIS AKERS LTTTLEJOITN (S & ME COMPANTI) - TODD \I4LSON STRUCTI]E-{I, DIiSIGN GROUP _ MIKE MURRAY STRUCTURAL DESIGN (;ROLIP IAUL i\,{lJRR,{Y EMAIL IJMAII- EMAIL EIq,{L EMAIL EM.{IL EMAIL FN,LUL EMAIL EMAIL E\t{IL E]VIAIL Carlson Testing, fnc. BeDd Ofnce c€otechnicsl Office Eugetre Office Salem Oflice Ticard Office (s41) 330-9155 (s03) 601-E2s0 (s41) 34+02E9 (503) s891252 (so3) 684-3460 August 31, 2018 81501078.CTI Perrnit Na: 8 1 1 -LDP20 1 5-00069 FIELD INSPECTION REPORT DATES COLERED: August 30,2018 PROJIiCT: ADDRESS: INSPECTOR McKenzie Willamette Medical Center 1460 G St - Springfield Oregon Chris McDonald 08/30/18: PROOFROLI. As requested by Lapon Construction, Carlson Testing, Inc. (CTI) tepresentative, Chtis McDonald was on site to observe deflecrion testing on proposed subgrade elevation for parking stalls referenced on attached site map. Upon arrival I obsen ed that Pacific Ercavation has pteparcd subgtade at locations refereoced on site map. The subgrade matedal appears to be medium btown silty clay with cobble and gravd. Pacific Ercavation used a 6r1ly loaded tandem axle dump truck weighing approximately 55,000 lbs. to petforrn the prooftoll. No pumping, oo deflectioo, aod no tire tracking/ruttiog were observe{ indicating a frrm subgrade at this time, Resuls of deflection testing were dtcussed urith Shannon with l-ayton Construction pdor to m,v departute ftom ptoiect site. August 31, 2018 E1501078.CTI PemitNo: 811-LDI,2015-00069 Page 2 of 2 Our reports pertain to the matedal tested/inspected only. Information contained hetein is not to be teproduced, exccpt in fu[ without ptior authorization from this of6ce. Under all circumstances, the information containcd in this report is ptovided subject to all terms and conditions of CTII Genetal Conditions in effect at the time this leport is prepared- No party other than those to whom CTI has disttib,-rted this report shall be entidcd to usc ot rcly upoo the inforrnation contained in this document. If there are any further questions tegarding this matter, please do not hesitate to contact this of6ce. Respectfr.rlly submined, CARISON TESTING, INC. Chris McDonald Eugene Bralch Manager CM/gk EMAII. EM IL EXIL{IL EMAIL LMAII EMAII EMAII, EMAIL EILTIL EMAII- EMAII- FN,GIL cc:C]TY OF SPRINGFIELD SF,R!'ICES _ ROBERT CASflIT C\RISON GEOTECHNICAL - BL{D tr1IIOX ESA _ TOM I-EFLVRE L{YTON CONSTRUCTION _ CHRIS ST'RUC}NT{N LAYTON CONSTRUCTTON - NA'I! HF:I,i,ER I.AYTON CONSTRUCTION ROBERT TATCHEII- LAYTON CONSTRUCTIO:": - ROBERT iINTCHELL DROP BOX I"{YION CONSTRUCfION - SUANNON 5-TElh\ER rrrlr-E JoHN (s & ir{E coMPiNY) - CHPJS AKERS Lt I'TLEJOIIN (S & ME COMPAN' TODD W]I-SON SIRUCTT]RAI, DESIGN (;ROUP - MIKE MURR,\Y STRUCTUL{I DF.SIGN GROUP , PALII, MURRNY t (?v\ ,II\ Ix{(D I I I I IT\ t +,t,tr Bm.A n J1' o a st + + + t H fll ft fa a ;l ',7aiit {r.a ;tfilK,,l.1 .uj r::fr<ill it;a.:!,ad;' ffiffiffiffimt I It T ffiHl t a i f a tris Is t !re s J- r--..:\ I \\ \ I I I A I i I I ) ,? FIr.t:- F\ ;1 ) )'1 l IIIaa3 I Carlson Testing, Inc. Bend Omce (S4I) 33o-9lss Geole.hnical Orlice (S03) 501-t250 Eugene Omce (541) 345.02E9 Srl.m Offic€ (503) 5E9-1252 TiEard Office (503) 6t4-3460 Odober 25, 2018 E1501078,CTt Lab Los #18-6795 QHCCS tLC PO Box 5009 Brentwood, TN 37027 RE: MCKINZIT WITLAM.T'E MEDICAI- CENTER LEvEr 2, 1/2"DE sEACPFRoMEucE ESaxD&GRAVEL MAxrMuM SprcrFrc GRAv[y (RICE] TESnNG As requested, Carlson Testing lnc. has completed a maximum specific gravity (rice) test conducted on a sample of level 2, l/2" Dense Asphaltic Concrete Pavement (ACP) produ€ed by Eugene Sand & Gravel. The sample was collected by our representative on Oclober 24, 2018 from the grade afler placement and prior to compaction at approximately 11:15 a.m. representing approximateV 32 tons. The asphalt concrete temperature was 2900F at the time ol sampling. Following are the results: MAXTMUM THEORETTCAT SPECTHC GRAVTTY (R|CE) - ASTM D2041: Sample ldentification Test Resultr Number of Samples Tested Sample Mass, Srams 1 1590.8 grams Container Type Tesl lMethod Vacuum Bowl WeiBhing in air Maximum Specific Gravity, Gmm 2.469 rs3.z lb/ft'Maximum Density, lb/ft! Supplemental Procedure (0ry-Back)No Our repons penain to the material tested/inspected only. lnformation contained herein is not to be reproduced, except in full, without prior authorization from this office. It there are any further questions ,egarding thls matter, please do not hesilate to contact this office. Respectf ully submitted, CAR6ON TESTING, INC. Steve pton Salem Laboratory Manager mk cc:QHCCs Ll-C CITY OF SPRINGFIELD DEVELOPMENT SERVICES - ROSERT CASTILT LITTLEJOHN {5 & ME COMPANY) - CHRIS AKERS LITTLEJOHN (S & ME COMPANY) - TODD WILSON TAYTON CONSTRUCTION CO _ ROBERT MITCHELI DROP BOX 4060 Hudson Avc NE Salon, OR 97301 E-Mailed E-Mailed E-Mailed E-Mailed 1 Carlson Testing, Inc. Bend Omce (541) 33G9155 Geoteth nlcsl Office (503) 601-8250 Eugen€ Omc? (54I) -l{54289 Selem OIfice (503) 589-1252 Tlgrrd Office (503) 6E+3,160 November 20, 2018 E1501078.Cn Lab Log Sl8-8551 QHCCS LLC PO Box 5009 Brentwood, TN 37027 R€:McKENzII WIILAMETTE Mf DICAI CTT{Tt R LEvcr 2, l/2" DErisE ACP FRoM RTVERBTND SANo & GRAVEL MAXMUM spEonc GRAvny (RlCEl TEsnNG As regu€sted, Carlson Testing lnc. has completed a maximum specific travity (rice) test conducted on a sample of Level ?, 1/2" Dense Asphahic Concrete Pavement (ACP) produced by Riverbend Sand & Gravel. The sample was collected by our representative from the jobsite on November 19, 2018 and delivered to our Eugene laboratory on November 19, 2018. The sample was collected from the trade 30 feet east of liBht pole next to the brick masonry building after placement and prior to compaction from load #2 at approximately 2:20 p.m. representing approximately 32.95 tons. The asphalt concrete temperature was 295"F at the time of sampling. Following are the results: MAXTMUM THEORETICAT SPECIHC GRAVTTY (R|CE) - ASrM D2041: sample ldentlflcation Number of samples Tested I Sample Mass, grams 1571.0 grams Containe. Type Vacuum Bowl Test Method WeighinB in air Maximum Specific Gravity, Gmm 2.487 Maximum Density, lb/ft3 154.8 tb/ft3 supplemental Procedure (Dry-Back)No Our reports pertain to the material tested/inspected only. lnformation contained herein is not to be reproduced, except in full, without prior authorization from this office. lf there are any further questions regarding this matter, please do not hesitate to contact this office. Respectf u lly su bmitted, cARl"soN TESTTNG, rNC. U*rffirryJason 8ryant Senior Laboratory Mana8er gk 89970 HWY 99n- Eugene, OR 97402 cc: DISTRIBUTION LIST Test Results