Report of lnspection Services
Weldinq/Hiqh-Strenqth Boltins
FEI
Client
MLM:St
Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Orcgon 97 477
Project: Heartfelt Guest House
1 16 Saint Joseph Dr.
Springfield, Oregon
Date:
Project No.:
Rsport No.:
lnspector:
lD No.:
Shop: EI
Weather:
BP No.:
't2-07 -18
2187067
E-47278
K Ewalt
09010061
CWI
Field: tr
lnside
81 1-18-000350-sTR
lnspection of: Welding
Fabricator or Erector: Kiwi Fab
Contractor: Chambers Construction Co
Reviewed By
Performed continuous visual inspection on flare bevel groove welds for bucket to HSS connections
and final visual inspection for columns 39A & 398. lnspected fit-up and monitored amps, volts and
travel speed of one ('l ) certified welder using the FCAW welding process E71T-1 filler metal.
Compleled welds were checked for size, length, profile and location.
R€marks: Structural drawings do not contain weld details for column connections. Columns were
fabricated per attached shop detail.
To the best ot our knowledge, the work checked is in conformance with applicable AWS Dl.1 code,
except if noted above.
/h,-r.
Michael L. M
Technical Manager
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Lawlence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
City of Springfield - Robert Castile (email)
Attachment: structural detail
This report and/or enclosed tesl data is the confidential property ol the clrcnt to whom il is addressed and pertains to the sp€cific
prccess and/or malerial evaluated. As such, informalaon contained herein shall not be reproduc€d in part or full and/or any pa(
lhereol be disclosed lvithout FEI Testing A lnspection, lnc. s wrillen aulhorization
750 l.Iw ComellA\Enue Corvallis, oiegpn 97330 phone (541) 7574698
29540 B Airport Road EugEne, oregm 97.102 phono (sal ) 686849
945 Columbia Steet NE, Suite 'lA Salem, Oregon 97301 phone (971) 2730672
FEI Page 1 of 1
Daily Field Reportftsnilie iltsPtilt0il.n;;i:;;';;;";-.:;., C€tsdnicd & CorswtiT Servi:es
Client Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Oregon 97477
Project: Heartfelt Guest House
1 '16 Saint Joseph Dr.
Springfield, Oregon
Oale: 12-18-18
Project No.: 2187067
Report No.: E-47227lnspector: K. Ewalt
lD No.: 8117613
rcc
Continuous lnspection: tr
Periodic lnspection: M
lnspEction of: Screw Anchors
Contractor: ChambersConstruction
Weather:
BP No.:
lnside
81 1-18-000350-STR
Reviewed By
lh.*
Michael L
Technical Manager
c:
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Conslruction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
City of Springfietd - Robert Castile (email)
MLM:st
Performed periodic inspections during the installation of approximately five hundred
and two (502) 5/8" x 8' Simpson Titen HD screw anchors into concrete slab for Type 'l
& 3 shear walls and load bearing wall sill connections from line A to E, between lines '1
& 7 in the easl, west and south wings. The holes were cleaned during drilling using a
Hilti drill/vacuum system. Anchors were installed with 2" x 2" plate washers using a
Milwaukee '110V electric impact wrench to snug{ight condition. Site visits were made
on December 07, 11 & 18.
Tim Jacobs (CCC) was asked to notify our otfice when additional services are needed
To the best of our knowledge, the work inspected was in accordance with structural
drawings dated 02-06-'18, RFI 70 and applicable workmanship provisions of the l.B.C.,
except if noted above.
This reporl and/or enclos€d tesi dala is lhe confidenlial property of the client lo lstlom it is address€d 6nd perteins to the specific
process and/or malerial evaluated As such, informalion contained herein shall not be reproducod in parl or full andlor any parl
thereof be dasclosed \Nithout FEI Testing 6 hsp€ction. lnc.'s wi[en aulhorizalion
750 t{w CornellAvenue Coffallis, Oegon 97330 . phme (541) 757-4698
29540 B Airporl Road . Eugene, Oregon 97402 . phone (54l ) 684-3849
945 Columbia Sreet NE, Suite 1A Salem, Oregon 97301 . phone (9711273{672
It|ililte IISPtillqil,rt
G-r*h.i!r r.sr!di6 er;.. G€o€ctr|ical& constudh sqvi-s
Page 1 of 1
Report of lnspection Services
Weldins/Hish-Strensth Bolting
FEI
Client Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Otegon 97477
Project: Heartfelt Guest House
1'10 Saint Joseph Dr.
Springfield, Oregon
Date:
Project No
Report No.
lnspector:
lD No.:
Shop: tr
Weather:
BP No.:
12-12-18
2187067
E-47261
K. Ewalt
09010061
cwr
Field: El
Clear
81 '1-18-000350-STR
Performed continuous visual inspection on complete joint penetration groove welds for HSS to HSS
splice connections on in-progress trusses at line 5.5D.2, lounge. lnspected fit-up, root pass and
monitored amps, volts and travel speed by two (2) certified welders using the FCAW welding process
E71T-1 flller metal. Completed welds were checked for size, length, profile and location.
Roger (Kiwi Fab) was asked to notify our otfice when additional services are needed
To the best of our knowledge, the work checked is in conformance with structural drawings dated 03-
08-18 and applicable AWS Dl .1 code, except if noted above.
Reviewed By
/1.*.
Michael L. Meyer
Technical Manager
c:
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
Foundation Engineering - David Running (email)
City of Springfield - Robert Castile (email)
MLM:st
This report and/or enclosed lest data rs the confidential property ol the clent to $tDm at is addressed and pertaans lo lhe spec lc
process and/or materiel evaluated. As such, information conlained herein shall nol be reproduced in part or full and/or any parl
lhereol be drsclosed wilhout FEI Testing & lnspeclion, lnc's written aulhorizalion
750 I'fw Cornell Avenue Coryallis, oregon 97330 phone (541 ) 7574698
29540 B Airport Road Eugene, oregpn 97402 phone (541)6843849
945 Cdumbia Sreet NE, Suite 14 Salem, Oegpn 97301 phone (971) 2710672
lnspection of: Welding
Fabricator or Erector: Kiwi FabConlractor: Chambers Construction Co.
It|lilti i fisPtUl1il,,t
cser,.i.!r r (dnxll.. s.el.- Geobdri:al& cornfudi:n selices
Page '1 of 1
Report of lnspection Services
Weldins/Hiqh-Strenqth Boltinq
FEI
Client:Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Oregon 97 47 7
Project: Heartfelt Guest House
116 Saint Joseph Dr.
Springfield, Oregon
Date:
Project No.:
Report No.:
lnspector:
lD No.:
Shop: EI
Weather:
BP No.:
11-O7 -18
2187067
E-47108
K. Ewalt
09010061
cwr
Fiold: D
lnside
811-18-000350-5TR
lnspection of: Welding
Fabricator or Erector: Kiwi Fab
Contractor: Chambers Construction Co
Reviewed By
/).r
Michael L. M
Technical Manager
MLM:SC
Performed continuous visual inspection on complete joint penetration groove welds for HSS to HSS
splice connections for trusses 364 (6 pcs.). lnspected fit-up and monitored amps, volts and lravel
speed by two (2) certified welders using the FCAW welding process E71T-'l filler metal. Completed
welds were checked for size, length, profale and location.
Roger (Kiwi Fab) was asked to notify our oflice when additional services are needed.
To the best of our knowledge, the work checked is in conformance with shop drawings dated 08{1-18
and applicable AWS D1.1 code, except if noled above.
This report and/or enclos€d lest dale is lhe confdentaal property of the client lo whom d is addressed and pertains to lhe specific
process and/or maleial evaluated As such, antormation contained herein shall nol be reproduced in parl or full and/or any pert
thereof b€ disclosed reithout FEI Testing & lnspection. lnc. s wrilten authorizatrcn.
75o IfW ComellAvenue ' Corvallis, Oegon 97330 phone (541) 757-4698
29540 B Airpo{t Road Ewene, Oegon 97a02 phone (541) 6843849
945 Cdumbia Sreet NE, Suite 1A Salern. Oregon 97301 ptrone (971) 2734672
c:
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
Foundation Engineerang - David Running (email)
City of Springfield - Robert Castile (email)
nslfie t lilsqtcil0fl,r.c*l,iJ I c6*v.ri, 9rvid G€obdri:d & CorEtwtDn Servbes
Page 'l of 1
Report of lnspection Services
Weldinq/Hiqh-Strenqth Boltinq
FEI
Project: Heartfelt Guest House
'116 Saint Joseph Dr.
Springfield, Oregon
09-25-18
2147067
E-46841
A. Wilson
09020961
AWS CWI
Fisld: tr
lnside
81 1-18-000350-STR
Date:
Project No.:
Report No.:
lnspector:
lD No.:
Shop: E
Woather:
BP No.:
lnspGction of: Welding
Fabricator or Erector: Kiwi FabContractor: Chambers Construction Co
Reviewed By
Performed continuous inspection of partial .ioint penetration welds during the fabrication of structural
steel hanger lube MK-21A. lnspected fit-up and monitored amps, volts and travel speed of one (1)
cedified welder using the FCAW welding process E71T-1 filler metal. Completed welds were checked
for size, length, profile and location.
Gary (Kiwi) was asked to notify our office when additional services are needed
To lhe best of our knowledge, the work checked is in conformance with shop drawings dated 08-01-18
and applicable AWS D1.1 code, except if noted above.
LLL
Michael L
Technical Manager
c:
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
Foundation Engineering - David Running (email)
City of Springfield - Robert Castile (email)
MLM:st
fi z./)
This repod and/or enclosed lest data is the confidenlial property of lhe clienl lo whom it is addressed and penains to the specmc
process and/or maloial evahraled. As such, informalion conlaaned herein shall nol be rep@duced in parl or full and/or any pan
thereol be disclosed wilhoul FEI Tesling & lnspection, lnc '5 written suthorrzation
750 l.iw Corndl Avenue Corvallis, Oegpo 97330 ptEne (541) 75/4698
29540 B Airpod Road Eugene, Oegon 97402 phone (541 ) 684-3849
945 Columbia Sfeet NE, Suite 1 A Salern, Oegon 97301 phme (971 ) 2734672
Client: Ms. Janet Holloway
PeaceHealth
3333 Riverbend Or.
Springfield, Orcgon 97 477
ttsilil6 e iltsPfilt0il.,,1
C.oi.l$aol a C.didin s.rYt.'C,€otecfnbal & Cor$udi:n Servires
Page 1 of 1
Report of lnspection Services
Welding/Hi gh-Strength Bolting
FEI
Client:Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Qrcgon 97 47 7
Project: Heartfelt Guest House
1 16 Saint Joseph Dr.
Springlield, Oregon
Date:
Project No.:
Report No.:
lnspector:
lD No.:
Shop: O
Weather:
BP No.:
'1 1-09-18
2187067
E-47124
K. Ewalt
09010061
cwt
Field: EI
Clear
81 1-18-000350-5TR
lnspection of: Welding
Fabricator or Erector: Kiwi Fab
Contractor: Chambers Construction Co
Reviewed By:
Performed continuous visual inspection on complete joint penetration groove welds for HSS to HSS
splice conneclions on in-progress trusses at line 3, 109 west lounge. lnspected filup, root pass and
monitored amps, volts and travel speed by two (2) cerlified welders using the SMAW welding process
E7018 filler metal. Completed welds were checked for size, length, profile and location.
Roger (Kiwi Fab)was asked to notify our office when additional services are needed.
To the best of our knowledge, the work checked is in conformance with structural drawings dated 03-
08-18 and applicable AWS D1.1 code, except if noted above.
fir
Michael L. Meyer
Technical Manager
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
Foundation Engineering - David Running (email)
City of Springfield - Robert Castile (email)
MLM:Sc
This report and/or enclosed lest dala is the confidenlial property ol the clienl lo ry+|om il is addressed ari penains lo the specific
process and/or material evaluated. As such, informalion contained herein shall not be rcproduced in part ot full end/or any part
thereofbe disclosed withoul FElTesling & lnspoclion. lnc.'s wrillen authorizalion.
750l'{W Corndl A\€nue Corvallis, Oregon 97330 pipne (541) 7574698
29540 B Airpo{t Road Eugene, Oegon 97402 pitooe (541) 6844849
945 Columbia Sfeet NE, Suite 1A Salem, Oregpn 97301 plsE(571\273&72
Ifsilili e IilgPtcltqil,,t
c.d-hiill a Cdturi' 9rvk.Cieobdri:d & CorBtudiTl Servi:es
Page 1 of 1
Report of lnspection Services
Weldins/Hish-Strensth Boltinq
FEI
Client:Ms. Janet Holloway
PeaceHealth
3333 Riverbend Or.
Springfield, Oregon 97 477
Project: Heartfelt Guest House
'l'16 Saint Joseph Dr.
Springfield, Oregon
Date:
Project No.:
Report No.:
lnspector:
lD No.:
Shop: D
Weather:
BP No.:
1 't -08-18
2187067
E47118
A. Wilson
09020961
AWS CWt
Field: EI
Cloudy
81 1-18-O00350-STR
lnspection of: Welding
Fabricator or Erector: Kiwi Fab
Contractor: Chambers Construction Co
Reviewed By
/1./.
Michael L
Technical Manager
c:
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associales - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
Foundation Engineering - David Running (email)
City of Springfield - Robert Castile (email)
MLM:sc
Performed continuous inspection of in-progress complete joint penefation welds for rigid frame beam
to column connections along line 3 at line A.5. lnspecled fit-up and monitored amps, volts and travel
speed by two (2) certified welders using the SMAW welding process E70'18 filler metal. Welds
compleled at the time of inspeclion were checked for size, length, profile and location.
To the best of our knowledge, the work in-progress is in conformance with structural drawings dated
03-08-18 and applicable AWS D1.1 code, except if noted above.
This rcport and/or enclosed lesl dala is lhe confidential property oflhe client to whom it is addressed and pertains to the specific
process and/or malerial evaluated As such, infonnation contained herein shall not be reproduced in part or full 6nd/or any part
thereof be disclosed withoul FEI Tesling & lnspeclion, lnc 's wrillen aulhorizalion
750 NIW Comell Avenue . Corvallis, Oregon 97330 . phone (541) 7574698
29540 B Airport Road Eugene, oregon 97402 phone (541) 68+3849
945 Columbia Sreet NE. Suite 14 Salem, Oreqoo 97301 phone (971)2734672
tts liltt t iltsPfiltoil,,,l
G-e[.i!l l aetuiqr ldi..,Geotedrical & Corsttdi]rl Servires
Page 'l of 1
Report of lnspection Services
Welding/Hi gh-Strensth Bolting
FEI
Client Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Orcgon 97477
Project: Heartfelt Guest House
1'16 Saint Joseph Dr.
Springfield, Oregon
Date:
Project No.:
Report No.:
lnspector:
lO No.:
Shop: tr
Wealher:
BP No.:
1147-18
2187067
E-47'117
A. Wilson
0902096't
AWS CWI
Field: El
Cloudy
81 1-18-000350-5TR
lnspection of: Welding
Fabricator or Erector: Kiwi Fab
Contractor: Chambers Construction Co
Reviewed By:
Performed continuous inspection of in-progress complete ioint penetration welds for rigid frame beam
to column connections along line 3 at line A.5. lnspected fit-up and monitored amps, volts and travel
speed by two (2) certified welders using the SMAW welding process E70'18 filler metal. Welds
completed at the time of inspection were checked for size, length, profile and location.
To the best of our knowledge, the work in-progress is in conformance wilh structural drawings dated
03-08-18 and applicable AWS D1 .1 code, except if noted above.
/1.1
Michael L. M
Technical Manager
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kptf - Malt Keenan (email)
Foundation Engineering - David Running (email)
City of Springfield - Robert Castile (email)
MLM:sc
This report and/or enclosed lest data is the confidentaal property of the clcnl lo whom it is addressed and pertains to lhe specafic
process and/or malerial evaluated As such, informat,on contained herean shall not be reproduced in part or full and/or any parl
thereof be disclosed wilhout FEI Tesling 6 lnspection, lnc.'s \0ralten authorization
750 NW @ndl Avenue Corvallis, Oegon 97330 ' phone (541) 7574698
29540 B Airport Road Eugene. oregon 97492 ' pf'ooe (541 ) 6843849
945 Columbia Steet NE, Suite 1A Salem, Oegon 97301 phone (971)2734672
tf sil il 0 t lll sPfil] 0 il.,, t
cno'..hni.r ..M.tuk !nr" c€tecfniral & corstrJctbn s€rvi:es
Page '1 of 1
Report of !nspection Services
Weldins/Hiqh-Strenqth Bolting
FEI
Client:Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Orcgon 97 47 7
lnspection ot; Welding
Fabricator or Erector: Kiwi FabContractor: Chambers Construction Co
Reviewed By
Project: Heartfelt Guest House
116 Saint Joseph Dr.
Springfield, Oregon
Dato:
Project No.:
Report No.:
lnspector:
lD No.:
Shop: D
Weather:
BP No.:
11-06-18
2187067
E-47',t 16
A. Wilson
09020961
AWS CWI
Field: El
Cloudy
81 1-18-000350-5TR
Performed continuous inspection of complete joint penetration welds for rigid frame beam lo column
conneclions along line 3 at line A.5. lnspected fit-up and monitored amps, volts and travel speed by
two (2) cerlified welders using the SMAW welding process E7018 filler metal. Welds completed at the
time of inspection were checked for size, length, profile and location.
To the best of our knowledge, the work in-progress is in conformance with struclural drawings dated
03{8-18 and applicable AWS Dl.1 code, except if noted above.
/)/./
Michael L. M
Technical Manager
c:
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construclion - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
Foundation Engineering - David Running (email)
City of Springfield - Robert Castile (email)
MLM:sc
This report and/or enclosed lest dala is lhe confidenlial property ollhe claenl lo whom it is addressed and pe.teins to the specificprocess and/or material evalueled. As such, information contained herein shall nol be reproduced in part or full and/or any parl
thereol be disclosed without FElTesting 8 lnsp€ction. lnc's wrilten aulhoization
750 NIW Comell Avenue . Co{vallis, Oregon 97a30 phooe (54'l ) 7574698
29540 B Airporl Road Eugpne, Oregon 97402 . phone (541 ) 684-3849
945 Columbia Sfeet NE, Suite 1A Salem, Oregon 97301 . phme (971) 273{672
tfsillF t iltsPtcnoil,,r
G.*hin lI(dtuln 9rYi.6 Geotedri:d & Corstudim Servbes
Page 1 of 'l
Report of lnspection Services
Welding/High-Strensth Boltins
FEI
Client:Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr
Springfield, Orcgon 97 477
Projecl: Heartfelt Guest House
116 Saint Joseph Dr.
Springfield, Oregon
Date:
Project No.:
Report No.:
lnspector:
lD No.:
Shop: tr
Weather:
BP No.:
1l-13-18
2187067
E47145
A. Wilson
09020961
AWS CWI
Field: E!
Cloudy
81 1-18-000350-5TR
lnspection of: Welding
Fabricator or Erector: Kiwi Fab / Tall PinesContractor: Chambers Construction Co
Reviewed By:
Technical Manager
c:
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
Foundation Engineering - David Running (email)
City of Springfield - Robert Castile (email)
MLM:St
Performed continuous inspection of complele joint penetration groove welds for HSS to HSS
connections for rigid frame at lines 6C.5 and at horizontal HSS framing to column connection on lines
5.5D.9. lnspected filup and monilored amps, volls and travel speed of two (2) certified welders using
the SMAW welding process E7018 and FCAW welding process E7'lT-8 filler metal. Welds completed
at lime of inspection were checked for size, length, profile and location.
To the best of our knowledge, the work in-progress is in conformance with structural drawings dated
03-08-18 and applicable AWS D1 .1 code, except if noted above.
This report and/or enclosed lest dala is the confidential property ol lhe client to whom it is addressed and p€rlains to th€ specilic
process and/or material evalualed As such, inlormalion contained he.ein shall not be reproduced in part or ,ull and/or any pan
lhereof be dasclosed without FEI Testing E lnspecton, lnc.'s written aulhodzation.
750 t.{W ComdlAvenue . Co Ellis, ofegpn 97330 phone (541) 757-4698
29540 B Airport Road Eugeoe, Oegon 97,102 phone (541) 684{449
945 Cdumiia Sfeet NE, Suite 1A Salern, Oregm 97301 phone (971) 2730672
/h.f lLn --
Michael L. Meyef
Itsil il 0 r lllsqfc It ofi , D !G-th.id I (oiru.rie $ri(.!Geotecfntal & CorBfudrrr Se.vi:es
Page 1 of 1
Report of lnspection Services
Welding/High-Strength Boltin g
FEI
Client:Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Oregon 97477
Project: Heartfelt Guest House
116 Saint Joseph Dr.
Springfield, Oregon
Date:
Project No.:
Report No.:
lnspoctor:
lD No.:
Shop: tr
Weather:
BP No.:
11-14-18
2187067
E47146
A. Wilson
09020961
AWS CWI
Fi€ld: A
Overcast
81 1-18-000350-STR
Reviewed By:
Technical Manager
c:
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess E Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
Foundalion Engineering - David Running (email)
City of Springfield - Robert Castile (email)
MLM ST
Performed continuous inspection of complete ioint penetration groove welds on HSS rigid frame
connections at lines 6C.5 and HSS beam to HSS column connections along line O.5, between lines 5
& 6. lnspected fit-up and monitored amps, volts and travel speed of two (2) cerlified welders using the
SMAW welding process E7018 and FCAW welding process E71T-8 filler metal. Completed welds
were checked for size, length, profile and location.
To the best of our knowledge, the work in-progress is in conformance with structural drawings dated
03{8-18 and applicable AWS D1.1 code, except if noted above.
This rcporl end/or enclosed test data is lhe conlldentEl prop€rly ol lhe clienl to whom it is addressed and pertains to lhe specificprocess and/or malehal ovalualed As such. informalion contained herein shall not be .epoduced in pan or full and/or any pert
thereof be disclosed wilhoul FEI Testing A lnspeclion. lnc s vtrilten authodzation.
750 NW Comell Av€nue . Corvallis, oregon 97330 . phone (541) 757-4698
29540 B Airpo{t Road . Eugene, Oregon 97402 . phone (541) 6&1-3849
945 Cdumbia Street NE, Suite 14 Salem, Oregon 97301 . phone (971) 273{672
lnspection of: Welding
Fabricator or Erector: Kiwi Fab / Tall PinesContractor: Chambers Construction Co
fh.t [1,q"__
Michael L. Mey#
It|ilili t lilsPfilt1tt.,e
C-i.i.i.l I C-rt€ih !.nin G€obclraal & Cordudrln Serviies
Page 1 of 1
Report of lnspection Services
Welding/High-Strength Bolting
FEI
Client:Ms. Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Orcgon 97 477
Project: Heartfelt Guest House
116 Saint Joseph Dr.
Springrfield, Oregon
Date:
Project No.:
R€port No.:
lnspector:
lD No.:
Shop:0
Weather:
BP No.:
11-20-18
2187067
E-47168
A. Wilson
09020961
AWS CWr
Field: EI
Overcast
81 1-18-000350-5TR
Reviewed By
Performed continuous inspection of in-progress complete joint penetration groove welds for HSS rigid
frame conneclions at lines 6C.5. lnspected filup and monitored amps, volts and travel speed by two
(2) certified welders using the SMAW welding process E7018 filler metal. Completed welds were
checked for size, length, profile and location.
To the best of our knowledge, the work in-progress is in conformance with structural drawings dated
03-08-18and applicable AWS D1.1 code, except if noted above.
c:
PeaceHealth - Scott Tang (email)
Chambers Construclion - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
City of Springfield - Robert Castile (email)
MLM:SC
This reporl and/or errclosed test data is the confidential properly ol lhe clienl to \Nhom it is eddress€d and perlains lo lhe spec{fic
p.ocess and/or material evaluated As such, inlormation contained herein shall not be .eproduced in pan or full and/or any parl
thercof be disclosed withoul FEI Testing & lnspection, lnc.'s w.itten aulhod:ation.
750 l.lw Cornell Avenue . Corvallis, oregm 97330 phone (541) 757-4698
29540 B Airpod Road Eugene, olegpn 97402 phor€ (541) 6843849
945 Columbia Sfeet NE, Suite 1 A Salem, oregpn 97301 phone (971 ) 273{672
lnspection or: Welding
Fabricator or Erector: Kiwi FabContractor: Chambers Construction Co.
lh.q.{4>--
Michael L. Mey#
Technical Manager
Its ItI| 6 lll sFf$t0il,*tG**h.i..l I Calhdn' !-vk.!Geolecfyrcal & Constoudi:n Services
Page 1 of 1
Report of lnspection Services
Weldinq/Hish-Strensth Boltins
FEI
Client Ms. Janet Holloway
PeaceHealth
3333 Riverbend Or.
Springfield, Otegon 97 477
Project: Heartfelt Guest House
116 Saint Joseph Dr.
Springfield, Oregon
Date:
Project No.:
Report No.:
lnspector:
lD No.:
Shop: D
Weather:
BP No.:
12-O4-18
2'187067
e-47225
A. Wilson
09020961
AWS CWI
Field: El
Sunny
81 1-18-000350-STR
lnspection of: Welding
Fabricator or Erector: Kiwi Fab
Contractor: Chambers Construction Co
/1.
Michael L
Technical Manager
c
PeaceHealth - Scott Tang (email)
Chambers Conskuction - Tim Jacobs (email)
Chambers Construction - Erin Lawrence (email)
2-Form Architeclure - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
City of Springfield - Robert Castile (email)
MLM:st
Performed continuous inspection of complete joint penetration welds on in-progress erection of HSS
rigid frame corner connections along line 7, between lines D.5 & E. lnspected fil-up and monitored
amps, volts and travel speed of one (1) cedified welder using the SMAW welding process E7018 filler
metal.
To the best of our knowledge, the work in-progress is in conformance with structural drawings dated
03{8-18 and applicable AWS D1 .1 code, except if noted above.
This report snd/or enclosed test dsla rs the confidential propeny of lhe client lo whom it as eddr€ssed and pertains to the specific
process and]or material evaluated. As such, information contained heroin shall nol be reproduced in parl or full and/or any pt.l
thereol be disclosed wthout FEI Tesling E lnspection, lnc 's rdtitlen aulhorization.
750 i'JW CornellAveoue Corvallis, Orcgon 97330 phone (5a1) 757-4698
29540 B Airport Road Euger€, oregpn 97402 phone (541) 684-3849
945 ourntia Sfeet NE, Suite 1A Sakm, Oregpn 97301 phor€ (971) 273{672
Reviewed By:
FEI Page 1 of 1
Report of Inspection ServicesItsItil0t tilsPtfitofl,,NG-dl'.i.|I G.du.t o S.ni.l Geoteclmical & Corsfudim Servi:es
Client:Ms- Janet Holloway
PeaceHealth
3333 Riverbend Dr.
Springfield, Otegon 97 477
Weldin /Hi h-Stren th Boltin
Date:
Project No
Report No.
lnspector:
lD No.:
Shop: tr
Weather:
BP No.:
12-06-18
2187047
E-47226
K Ewalt
09010061
cwt
Field: EI
CIear
811-18-000350-sTR
lnspection of: Welding
Fabricator or Erector: Kiwi Fab
Contractor: Chambers Construction Co
Reviewed By
Technical Manager
c:
PeaceHealth - Scott Tang (email)
Chambers Construction - Tim Jacobs (email)
Chambers Construction - Erin Laffence (email)
2-Form Architecture - Kira Malone (email)
Marquess & Associates - Pieter Smeenk (email)
Kpff - Matt Keenan (email)
City of Springfield - Robert Castile (email)
Performed continuous visual inspection on parlial joint penetration groove welds for HSS beam to
HSS beam connections on sun shade at lines 5.5E. lnspected fit-up and monilored amps, volts and
travel speed ot one (1) certified welder using the FCAW welding process E71T-8 and SMAW E7018
filler metal.
While on-site, performed visual weld inspection on continuous corner angle to HSS connections for
,rames at west lounge 109 at 3A.5 and east lounge at 6C.5. Completed welds were checked for size,
length, profile and location.
Note: Continuous angle to HSS connections were welded per conversalion between Tim Jacobs
(Chambers Construction) and EOR in lieu of all around weld due to joinl configuration.
Items requlring completion: Continuous angle to HSS connections do not mo€t accaptance
criteria for AWS D1.1 code due to ercessiye porosity, slag inclusions and lack of fuslon for
€ast lounge t 09.
Mr. Jacobs was asked to nolify our office when additional services are needed.
To lhe best of our knowledge, the work checked is in conformance with structural drawings dated 02-
06-18, Kiwi Fab drawings approval date 08-06-18 and applicable AWS D1.1 code, excepl if noted
above.
This report and/or enclosed tesl data is the contiderltial properly of th€ client lo whom it is gddressed and pertains to lhe specific
paocess and/or material evaluated. As such, information contained herein shrll not be reproduced in part or tull andlor any part
thereof be disdosed without FEI Testing & lnspeclrcn, lnc's w'ilten authorization
750 NW corrdl Avenue Corvallis, Oegon 97330 . phone (541) 7574698
29540 B Airport Road Eugene, Oregon 97402 . phone (5al )68a.3&19
945 Columbia Sreet NE, Suite 'l A Salem, Oegon 97301 . phone (971 ) 2734672
N.4 L N.4 rst
Project: Heartfelt Guest House
'116 Saint Joseph Dr.
Springfield, Oregon
,4.zrb--Michael L. Me(sf