Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2018-12-07rsrfi0 t llsPtilt01,rr Golr[ik.l a ao.rlrx,id s.rYia Geotecfrhal & Cor$udim Servi:es Page 1 of I Report of lnspection Services Weldinq/Hiqh-Strenqth Boltins FEI Client MLM:St Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Orcgon 97 477 Project: Heartfelt Guest House 1 16 Saint Joseph Dr. Springfield, Oregon Date: Project No.: Rsport No.: lnspector: lD No.: Shop: EI Weather: BP No.: 't2-07 -18 2187067 E-47278 K Ewalt 09010061 CWI Field: tr lnside 81 1-18-000350-sTR lnspection of: Welding Fabricator or Erector: Kiwi Fab Contractor: Chambers Construction Co Reviewed By Performed continuous visual inspection on flare bevel groove welds for bucket to HSS connections and final visual inspection for columns 39A & 398. lnspected fit-up and monitored amps, volts and travel speed of one ('l ) certified welder using the FCAW welding process E71T-1 filler metal. Compleled welds were checked for size, length, profile and location. R€marks: Structural drawings do not contain weld details for column connections. Columns were fabricated per attached shop detail. To the best ot our knowledge, the work checked is in conformance with applicable AWS Dl.1 code, except if noted above. /h,-r. Michael L. M Technical Manager PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Lawlence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) City of Springfield - Robert Castile (email) Attachment: structural detail This report and/or enclosed tesl data is the confidential property ol the clrcnt to whom il is addressed and pertains to the sp€cific prccess and/or malerial evaluated. As such, informalaon contained herein shall not be reproduc€d in part or full and/or any pa( lhereol be disclosed lvithout FEI Testing A lnspection, lnc. s wrillen aulhorization 750 l.Iw ComellA\Enue Corvallis, oiegpn 97330 phone (541) 7574698 29540 B Airport Road EugEne, oregm 97.102 phono (sal ) 686849 945 Columbia Steet NE, Suite 'lA Salem, Oregon 97301 phone (971) 2730672 FEI Page 1 of 1 Daily Field Reportftsnilie iltsPtilt0il.n;;i:;;';;;";-.:;., C€tsdnicd & CorswtiT Servi:es Client Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Oregon 97477 Project: Heartfelt Guest House 1 '16 Saint Joseph Dr. Springfield, Oregon Oale: 12-18-18 Project No.: 2187067 Report No.: E-47227lnspector: K. Ewalt lD No.: 8117613 rcc Continuous lnspection: tr Periodic lnspection: M lnspEction of: Screw Anchors Contractor: ChambersConstruction Weather: BP No.: lnside 81 1-18-000350-STR Reviewed By lh.* Michael L Technical Manager c: PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Conslruction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) City of Springfietd - Robert Castile (email) MLM:st Performed periodic inspections during the installation of approximately five hundred and two (502) 5/8" x 8' Simpson Titen HD screw anchors into concrete slab for Type 'l & 3 shear walls and load bearing wall sill connections from line A to E, between lines '1 & 7 in the easl, west and south wings. The holes were cleaned during drilling using a Hilti drill/vacuum system. Anchors were installed with 2" x 2" plate washers using a Milwaukee '110V electric impact wrench to snug{ight condition. Site visits were made on December 07, 11 & 18. Tim Jacobs (CCC) was asked to notify our otfice when additional services are needed To the best of our knowledge, the work inspected was in accordance with structural drawings dated 02-06-'18, RFI 70 and applicable workmanship provisions of the l.B.C., except if noted above. This reporl and/or enclos€d tesi dala is lhe confidenlial property of the client lo lstlom it is address€d 6nd perteins to the specific process and/or malerial evaluated As such, informalion contained herein shall not be reproducod in parl or full andlor any parl thereof be dasclosed \Nithout FEI Testing 6 hsp€ction. lnc.'s wi[en aulhorizalion 750 t{w CornellAvenue Coffallis, Oegon 97330 . phme (541) 757-4698 29540 B Airporl Road . Eugene, Oregon 97402 . phone (54l ) 684-3849 945 Columbia Sreet NE, Suite 1A Salem, Oregon 97301 . phone (9711273{672 It|ililte IISPtillqil,rt G-r*h.i!r r.sr!di6 er;.. G€o€ctr|ical& constudh sqvi-s Page 1 of 1 Report of lnspection Services Weldins/Hish-Strensth Bolting FEI Client Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Otegon 97477 Project: Heartfelt Guest House 1'10 Saint Joseph Dr. Springfield, Oregon Date: Project No Report No. lnspector: lD No.: Shop: tr Weather: BP No.: 12-12-18 2187067 E-47261 K. Ewalt 09010061 cwr Field: El Clear 81 '1-18-000350-STR Performed continuous visual inspection on complete joint penetration groove welds for HSS to HSS splice connections on in-progress trusses at line 5.5D.2, lounge. lnspected fit-up, root pass and monitored amps, volts and travel speed by two (2) certified welders using the FCAW welding process E71T-1 flller metal. Completed welds were checked for size, length, profile and location. Roger (Kiwi Fab) was asked to notify our otfice when additional services are needed To the best of our knowledge, the work checked is in conformance with structural drawings dated 03- 08-18 and applicable AWS Dl .1 code, except if noted above. Reviewed By /1.*. Michael L. Meyer Technical Manager c: PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) Foundation Engineering - David Running (email) City of Springfield - Robert Castile (email) MLM:st This report and/or enclosed lest data rs the confidential property ol the clent to $tDm at is addressed and pertaans lo lhe spec lc process and/or materiel evaluated. As such, information conlained herein shall nol be reproduced in part or full and/or any parl lhereol be drsclosed wilhout FEI Testing & lnspeclion, lnc's written aulhorizalion 750 I'fw Cornell Avenue Coryallis, oregon 97330 phone (541 ) 7574698 29540 B Airport Road Eugene, oregpn 97402 phone (541)6843849 945 Cdumbia Sreet NE, Suite 14 Salem, Oegpn 97301 phone (971) 2710672 lnspection of: Welding Fabricator or Erector: Kiwi FabConlractor: Chambers Construction Co. It|lilti i fisPtUl1il,,t cser,.i.!r r (dnxll.. s.el.- Geobdri:al& cornfudi:n selices Page '1 of 1 Report of lnspection Services Weldins/Hiqh-Strenqth Boltinq FEI Client:Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Oregon 97 47 7 Project: Heartfelt Guest House 116 Saint Joseph Dr. Springfield, Oregon Date: Project No.: Report No.: lnspector: lD No.: Shop: EI Weather: BP No.: 11-O7 -18 2187067 E-47108 K. Ewalt 09010061 cwr Fiold: D lnside 811-18-000350-5TR lnspection of: Welding Fabricator or Erector: Kiwi Fab Contractor: Chambers Construction Co Reviewed By /).r Michael L. M Technical Manager MLM:SC Performed continuous visual inspection on complete joint penetration groove welds for HSS to HSS splice connections for trusses 364 (6 pcs.). lnspected fit-up and monitored amps, volts and lravel speed by two (2) certified welders using the FCAW welding process E71T-'l filler metal. Completed welds were checked for size, length, profale and location. Roger (Kiwi Fab) was asked to notify our oflice when additional services are needed. To the best of our knowledge, the work checked is in conformance with shop drawings dated 08{1-18 and applicable AWS D1.1 code, except if noled above. This report and/or enclos€d lest dale is lhe confdentaal property of the client lo whom d is addressed and pertains to lhe specific process and/or maleial evaluated As such, antormation contained herein shall nol be reproduced in parl or full and/or any pert thereof b€ disclosed reithout FEI Testing & lnspection. lnc. s wrilten authorizatrcn. 75o IfW ComellAvenue ' Corvallis, Oegon 97330 phone (541) 757-4698 29540 B Airpo{t Road Ewene, Oegon 97a02 phone (541) 6843849 945 Cdumbia Sreet NE, Suite 1A Salern. Oregon 97301 ptrone (971) 2734672 c: PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) Foundation Engineerang - David Running (email) City of Springfield - Robert Castile (email) nslfie t lilsqtcil0fl,r.c*l,iJ I c6*v.ri, 9rvid G€obdri:d & CorEtwtDn Servbes Page 'l of 1 Report of lnspection Services Weldinq/Hiqh-Strenqth Boltinq FEI Project: Heartfelt Guest House '116 Saint Joseph Dr. Springfield, Oregon 09-25-18 2147067 E-46841 A. Wilson 09020961 AWS CWI Fisld: tr lnside 81 1-18-000350-STR Date: Project No.: Report No.: lnspector: lD No.: Shop: E Woather: BP No.: lnspGction of: Welding Fabricator or Erector: Kiwi FabContractor: Chambers Construction Co Reviewed By Performed continuous inspection of partial .ioint penetration welds during the fabrication of structural steel hanger lube MK-21A. lnspected fit-up and monitored amps, volts and travel speed of one (1) cedified welder using the FCAW welding process E71T-1 filler metal. Completed welds were checked for size, length, profile and location. Gary (Kiwi) was asked to notify our office when additional services are needed To lhe best of our knowledge, the work checked is in conformance with shop drawings dated 08-01-18 and applicable AWS D1.1 code, except if noted above. LLL Michael L Technical Manager c: PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) Foundation Engineering - David Running (email) City of Springfield - Robert Castile (email) MLM:st fi z./) This repod and/or enclosed lest data is the confidenlial property of lhe clienl lo whom it is addressed and penains to the specmc process and/or maloial evahraled. As such, informalion conlaaned herein shall nol be rep@duced in parl or full and/or any pan thereol be disclosed wilhoul FEI Tesling & lnspection, lnc '5 written suthorrzation 750 l.iw Corndl Avenue Corvallis, Oegpo 97330 ptEne (541) 75/4698 29540 B Airpod Road Eugene, Oegon 97402 phone (541 ) 684-3849 945 Columbia Sfeet NE, Suite 1 A Salern, Oegon 97301 phme (971 ) 2734672 Client: Ms. Janet Holloway PeaceHealth 3333 Riverbend Or. Springfield, Orcgon 97 477 ttsilil6 e iltsPfilt0il.,,1 C.oi.l$aol a C.didin s.rYt.'C,€otecfnbal & Cor$udi:n Servires Page 1 of 1 Report of lnspection Services Welding/Hi gh-Strength Bolting FEI Client:Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Qrcgon 97 47 7 Project: Heartfelt Guest House 1 16 Saint Joseph Dr. Springlield, Oregon Date: Project No.: Report No.: lnspector: lD No.: Shop: O Weather: BP No.: '1 1-09-18 2187067 E-47124 K. Ewalt 09010061 cwt Field: EI Clear 81 1-18-000350-5TR lnspection of: Welding Fabricator or Erector: Kiwi Fab Contractor: Chambers Construction Co Reviewed By: Performed continuous visual inspection on complete joint penetration groove welds for HSS to HSS splice conneclions on in-progress trusses at line 3, 109 west lounge. lnspected filup, root pass and monitored amps, volts and travel speed by two (2) cerlified welders using the SMAW welding process E7018 filler metal. Completed welds were checked for size, length, profile and location. Roger (Kiwi Fab)was asked to notify our office when additional services are needed. To the best of our knowledge, the work checked is in conformance with structural drawings dated 03- 08-18 and applicable AWS D1.1 code, except if noted above. fir Michael L. Meyer Technical Manager PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) Foundation Engineering - David Running (email) City of Springfield - Robert Castile (email) MLM:Sc This report and/or enclosed lest dala is the confidenlial property ol the clienl lo ry+|om il is addressed ari penains lo the specific process and/or material evaluated. As such, informalion contained herein shall not be rcproduced in part ot full end/or any part thereofbe disclosed withoul FElTesling & lnspoclion. lnc.'s wrillen authorizalion. 750l'{W Corndl A\€nue Corvallis, Oregon 97330 pipne (541) 7574698 29540 B Airpo{t Road Eugene, Oegon 97402 pitooe (541) 6844849 945 Columbia Sfeet NE, Suite 1A Salem, Oregpn 97301 plsE(571\273&72 Ifsilili e IilgPtcltqil,,t c.d-hiill a Cdturi' 9rvk.Cieobdri:d & CorBtudiTl Servi:es Page 1 of 1 Report of lnspection Services Weldins/Hish-Strensth Boltinq FEI Client:Ms. Janet Holloway PeaceHealth 3333 Riverbend Or. Springfield, Oregon 97 477 Project: Heartfelt Guest House 'l'16 Saint Joseph Dr. Springfield, Oregon Date: Project No.: Report No.: lnspector: lD No.: Shop: D Weather: BP No.: 1 't -08-18 2187067 E47118 A. Wilson 09020961 AWS CWt Field: EI Cloudy 81 1-18-O00350-STR lnspection of: Welding Fabricator or Erector: Kiwi Fab Contractor: Chambers Construction Co Reviewed By /1./. Michael L Technical Manager c: PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associales - Pieter Smeenk (email) Kpff - Matt Keenan (email) Foundation Engineering - David Running (email) City of Springfield - Robert Castile (email) MLM:sc Performed continuous inspection of in-progress complete joint penefation welds for rigid frame beam to column connections along line 3 at line A.5. lnspecled fit-up and monitored amps, volts and travel speed by two (2) certified welders using the SMAW welding process E70'18 filler metal. Welds compleled at the time of inspeclion were checked for size, length, profile and location. To the best of our knowledge, the work in-progress is in conformance with structural drawings dated 03-08-18 and applicable AWS D1.1 code, except if noted above. This rcport and/or enclosed lesl dala is lhe confidential property oflhe client to whom it is addressed and pertains to the specific process and/or malerial evaluated As such, infonnation contained herein shall not be reproduced in part or full 6nd/or any part thereof be disclosed withoul FEI Tesling & lnspeclion, lnc 's wrillen aulhorizalion 750 NIW Comell Avenue . Corvallis, Oregon 97330 . phone (541) 7574698 29540 B Airport Road Eugene, oregon 97402 phone (541) 68+3849 945 Columbia Sreet NE. Suite 14 Salem, Oreqoo 97301 phone (971)2734672 tts liltt t iltsPfiltoil,,,l G-e[.i!l l aetuiqr ldi..,Geotedrical & Corsttdi]rl Servires Page 'l of 1 Report of lnspection Services Welding/Hi gh-Strensth Bolting FEI Client Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Orcgon 97477 Project: Heartfelt Guest House 1'16 Saint Joseph Dr. Springfield, Oregon Date: Project No.: Report No.: lnspector: lO No.: Shop: tr Wealher: BP No.: 1147-18 2187067 E-47'117 A. Wilson 0902096't AWS CWI Field: El Cloudy 81 1-18-000350-5TR lnspection of: Welding Fabricator or Erector: Kiwi Fab Contractor: Chambers Construction Co Reviewed By: Performed continuous inspection of in-progress complete ioint penetration welds for rigid frame beam to column connections along line 3 at line A.5. lnspected fit-up and monitored amps, volts and travel speed by two (2) certified welders using the SMAW welding process E70'18 filler metal. Welds completed at the time of inspection were checked for size, length, profile and location. To the best of our knowledge, the work in-progress is in conformance wilh structural drawings dated 03-08-18 and applicable AWS D1 .1 code, except if noted above. /1.1 Michael L. M Technical Manager PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kptf - Malt Keenan (email) Foundation Engineering - David Running (email) City of Springfield - Robert Castile (email) MLM:sc This report and/or enclosed lest data is the confidentaal property of the clcnl lo whom it is addressed and pertains to lhe specafic process and/or malerial evaluated As such, informat,on contained herean shall not be reproduced in part or full and/or any parl thereof be disclosed wilhout FEI Tesling 6 lnspection, lnc.'s \0ralten authorization 750 NW @ndl Avenue Corvallis, Oegon 97330 ' phone (541) 7574698 29540 B Airport Road Eugene. oregon 97492 ' pf'ooe (541 ) 6843849 945 Columbia Steet NE, Suite 1A Salem, Oegon 97301 phone (971)2734672 tf sil il 0 t lll sPfil] 0 il.,, t cno'..hni.r ..M.tuk !nr" c€tecfniral & corstrJctbn s€rvi:es Page '1 of 1 Report of !nspection Services Weldins/Hiqh-Strenqth Bolting FEI Client:Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Orcgon 97 47 7 lnspection ot; Welding Fabricator or Erector: Kiwi FabContractor: Chambers Construction Co Reviewed By Project: Heartfelt Guest House 116 Saint Joseph Dr. Springfield, Oregon Dato: Project No.: Report No.: lnspector: lD No.: Shop: D Weather: BP No.: 11-06-18 2187067 E-47',t 16 A. Wilson 09020961 AWS CWI Field: El Cloudy 81 1-18-000350-5TR Performed continuous inspection of complete joint penetration welds for rigid frame beam lo column conneclions along line 3 at line A.5. lnspected fit-up and monitored amps, volts and travel speed by two (2) cerlified welders using the SMAW welding process E7018 filler metal. Welds completed at the time of inspection were checked for size, length, profile and location. To the best of our knowledge, the work in-progress is in conformance with struclural drawings dated 03{8-18 and applicable AWS Dl.1 code, except if noted above. /)/./ Michael L. M Technical Manager c: PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construclion - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) Foundation Engineering - David Running (email) City of Springfield - Robert Castile (email) MLM:sc This report and/or enclosed lest dala is lhe confidenlial property ollhe claenl lo whom it is addressed and pe.teins to the specificprocess and/or material evalueled. As such, information contained herein shall nol be reproduced in part or full and/or any parl thereol be disclosed without FElTesting 8 lnsp€ction. lnc's wrilten aulhoization 750 NIW Comell Avenue . Co{vallis, Oregon 97a30 phooe (54'l ) 7574698 29540 B Airporl Road Eugpne, Oregon 97402 . phone (541 ) 684-3849 945 Columbia Sfeet NE, Suite 1A Salem, Oregon 97301 . phme (971) 273{672 tfsillF t iltsPtcnoil,,r G.*hin lI(dtuln 9rYi.6 Geotedri:d & Corstudim Servbes Page 1 of 'l Report of lnspection Services Welding/High-Strensth Boltins FEI Client:Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr Springfield, Orcgon 97 477 Projecl: Heartfelt Guest House 116 Saint Joseph Dr. Springfield, Oregon Date: Project No.: Report No.: lnspector: lD No.: Shop: tr Weather: BP No.: 1l-13-18 2187067 E47145 A. Wilson 09020961 AWS CWI Field: E! Cloudy 81 1-18-000350-5TR lnspection of: Welding Fabricator or Erector: Kiwi Fab / Tall PinesContractor: Chambers Construction Co Reviewed By: Technical Manager c: PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) Foundation Engineering - David Running (email) City of Springfield - Robert Castile (email) MLM:St Performed continuous inspection of complele joint penetration groove welds for HSS to HSS connections for rigid frame at lines 6C.5 and at horizontal HSS framing to column connection on lines 5.5D.9. lnspected filup and monilored amps, volls and travel speed of two (2) certified welders using the SMAW welding process E7018 and FCAW welding process E7'lT-8 filler metal. Welds completed at lime of inspection were checked for size, length, profile and location. To the best of our knowledge, the work in-progress is in conformance with structural drawings dated 03-08-18 and applicable AWS D1 .1 code, except if noted above. This report and/or enclosed lest dala is the confidential property ol lhe client to whom it is addressed and p€rlains to th€ specilic process and/or material evalualed As such, inlormalion contained he.ein shall not be reproduced in part or ,ull and/or any pan lhereof be dasclosed without FEI Testing E lnspecton, lnc.'s written aulhodzation. 750 t.{W ComdlAvenue . Co Ellis, ofegpn 97330 phone (541) 757-4698 29540 B Airport Road Eugeoe, Oegon 97,102 phone (541) 684{449 945 Cdumiia Sfeet NE, Suite 1A Salern, Oregm 97301 phone (971) 2730672 /h.f lLn -- Michael L. Meyef Itsil il 0 r lllsqfc It ofi , D !G-th.id I (oiru.rie $ri(.!Geotecfntal & CorBfudrrr Se.vi:es Page 1 of 1 Report of lnspection Services Welding/High-Strength Boltin g FEI Client:Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Oregon 97477 Project: Heartfelt Guest House 116 Saint Joseph Dr. Springfield, Oregon Date: Project No.: Report No.: lnspoctor: lD No.: Shop: tr Weather: BP No.: 11-14-18 2187067 E47146 A. Wilson 09020961 AWS CWI Fi€ld: A Overcast 81 1-18-000350-STR Reviewed By: Technical Manager c: PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess E Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) Foundalion Engineering - David Running (email) City of Springfield - Robert Castile (email) MLM ST Performed continuous inspection of complete ioint penetration groove welds on HSS rigid frame connections at lines 6C.5 and HSS beam to HSS column connections along line O.5, between lines 5 & 6. lnspected fit-up and monitored amps, volts and travel speed of two (2) cerlified welders using the SMAW welding process E7018 and FCAW welding process E71T-8 filler metal. Completed welds were checked for size, length, profile and location. To the best of our knowledge, the work in-progress is in conformance with structural drawings dated 03{8-18 and applicable AWS D1.1 code, except if noted above. This rcporl end/or enclosed test data is lhe conlldentEl prop€rly ol lhe clienl to whom it is addressed and pertains to lhe specificprocess and/or malehal ovalualed As such. informalion contained herein shall not be .epoduced in pan or full and/or any pert thereof be disclosed wilhoul FEI Testing A lnspeclion. lnc s vtrilten authodzation. 750 NW Comell Av€nue . Corvallis, oregon 97330 . phone (541) 757-4698 29540 B Airpo{t Road . Eugene, Oregon 97402 . phone (541) 6&1-3849 945 Cdumbia Street NE, Suite 14 Salem, Oregon 97301 . phone (971) 273{672 lnspection of: Welding Fabricator or Erector: Kiwi Fab / Tall PinesContractor: Chambers Construction Co fh.t [1,q"__ Michael L. Mey# It|ilili t lilsPfilt1tt.,e C-i.i.i.l I C-rt€ih !.nin G€obclraal & Cordudrln Serviies Page 1 of 1 Report of lnspection Services Welding/High-Strength Bolting FEI Client:Ms. Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Orcgon 97 477 Project: Heartfelt Guest House 116 Saint Joseph Dr. Springrfield, Oregon Date: Project No.: R€port No.: lnspector: lD No.: Shop:0 Weather: BP No.: 11-20-18 2187067 E-47168 A. Wilson 09020961 AWS CWr Field: EI Overcast 81 1-18-000350-5TR Reviewed By Performed continuous inspection of in-progress complete joint penetration groove welds for HSS rigid frame conneclions at lines 6C.5. lnspected filup and monitored amps, volts and travel speed by two (2) certified welders using the SMAW welding process E7018 filler metal. Completed welds were checked for size, length, profile and location. To the best of our knowledge, the work in-progress is in conformance with structural drawings dated 03-08-18and applicable AWS D1.1 code, except if noted above. c: PeaceHealth - Scott Tang (email) Chambers Construclion - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) City of Springfield - Robert Castile (email) MLM:SC This reporl and/or errclosed test data is the confidential properly ol lhe clienl to \Nhom it is eddress€d and perlains lo lhe spec{fic p.ocess and/or material evaluated As such, inlormation contained herein shall not be .eproduced in pan or full and/or any parl thercof be disclosed withoul FEI Testing & lnspection, lnc.'s w.itten aulhod:ation. 750 l.lw Cornell Avenue . Corvallis, oregm 97330 phone (541) 757-4698 29540 B Airpod Road Eugene, olegpn 97402 phor€ (541) 6843849 945 Columbia Sfeet NE, Suite 1 A Salem, oregpn 97301 phone (971 ) 273{672 lnspection or: Welding Fabricator or Erector: Kiwi FabContractor: Chambers Construction Co. lh.q.{4>-- Michael L. Mey# Technical Manager Its ItI| 6 lll sFf$t0il,*tG**h.i..l I Calhdn' !-vk.!Geolecfyrcal & Constoudi:n Services Page 1 of 1 Report of lnspection Services Weldinq/Hish-Strensth Boltins FEI Client Ms. Janet Holloway PeaceHealth 3333 Riverbend Or. Springfield, Otegon 97 477 Project: Heartfelt Guest House 116 Saint Joseph Dr. Springfield, Oregon Date: Project No.: Report No.: lnspector: lD No.: Shop: D Weather: BP No.: 12-O4-18 2'187067 e-47225 A. Wilson 09020961 AWS CWI Field: El Sunny 81 1-18-000350-STR lnspection of: Welding Fabricator or Erector: Kiwi Fab Contractor: Chambers Construction Co /1. Michael L Technical Manager c PeaceHealth - Scott Tang (email) Chambers Conskuction - Tim Jacobs (email) Chambers Construction - Erin Lawrence (email) 2-Form Architeclure - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) City of Springfield - Robert Castile (email) MLM:st Performed continuous inspection of complete joint penetration welds on in-progress erection of HSS rigid frame corner connections along line 7, between lines D.5 & E. lnspected fil-up and monitored amps, volts and travel speed of one (1) cedified welder using the SMAW welding process E7018 filler metal. To the best of our knowledge, the work in-progress is in conformance with structural drawings dated 03{8-18 and applicable AWS D1 .1 code, except if noted above. This report snd/or enclosed test dsla rs the confidential propeny of lhe client lo whom it as eddr€ssed and pertains to the specific process and]or material evaluated. As such, information contained heroin shall nol be reproduced in parl or full and/or any pt.l thereol be disclosed wthout FEI Tesling E lnspection, lnc 's rdtitlen aulhorization. 750 i'JW CornellAveoue Corvallis, Orcgon 97330 phone (5a1) 757-4698 29540 B Airport Road Euger€, oregpn 97402 phone (541) 684-3849 945 ourntia Sfeet NE, Suite 1A Sakm, Oregpn 97301 phor€ (971) 273{672 Reviewed By: FEI Page 1 of 1 Report of Inspection ServicesItsItil0t tilsPtfitofl,,NG-dl'.i.|I G.du.t o S.ni.l Geoteclmical & Corsfudim Servi:es Client:Ms- Janet Holloway PeaceHealth 3333 Riverbend Dr. Springfield, Otegon 97 477 Weldin /Hi h-Stren th Boltin Date: Project No Report No. lnspector: lD No.: Shop: tr Weather: BP No.: 12-06-18 2187047 E-47226 K Ewalt 09010061 cwt Field: EI CIear 811-18-000350-sTR lnspection of: Welding Fabricator or Erector: Kiwi Fab Contractor: Chambers Construction Co Reviewed By Technical Manager c: PeaceHealth - Scott Tang (email) Chambers Construction - Tim Jacobs (email) Chambers Construction - Erin Laffence (email) 2-Form Architecture - Kira Malone (email) Marquess & Associates - Pieter Smeenk (email) Kpff - Matt Keenan (email) City of Springfield - Robert Castile (email) Performed continuous visual inspection on parlial joint penetration groove welds for HSS beam to HSS beam connections on sun shade at lines 5.5E. lnspected fit-up and monilored amps, volts and travel speed ot one (1) certified welder using the FCAW welding process E71T-8 and SMAW E7018 filler metal. While on-site, performed visual weld inspection on continuous corner angle to HSS connections for ,rames at west lounge 109 at 3A.5 and east lounge at 6C.5. Completed welds were checked for size, length, profile and location. Note: Continuous angle to HSS connections were welded per conversalion between Tim Jacobs (Chambers Construction) and EOR in lieu of all around weld due to joinl configuration. Items requlring completion: Continuous angle to HSS connections do not mo€t accaptance criteria for AWS D1.1 code due to ercessiye porosity, slag inclusions and lack of fuslon for €ast lounge t 09. Mr. Jacobs was asked to nolify our office when additional services are needed. To lhe best of our knowledge, the work checked is in conformance with structural drawings dated 02- 06-18, Kiwi Fab drawings approval date 08-06-18 and applicable AWS D1.1 code, excepl if noted above. This report and/or enclosed tesl data is the contiderltial properly of th€ client lo whom it is gddressed and pertains to lhe specific paocess and/or material evaluated. As such, information contained herein shrll not be reproduced in part or tull andlor any part thereof be disdosed without FEI Testing & lnspeclrcn, lnc's w'ilten authorization 750 NW corrdl Avenue Corvallis, Oegon 97330 . phone (541) 7574698 29540 B Airport Road Eugene, Oregon 97402 . phone (5al )68a.3&19 945 Columbia Sreet NE, Suite 'l A Salem, Oegon 97301 . phone (971 ) 2734672 N.4 L N.4 rst Project: Heartfelt Guest House '116 Saint Joseph Dr. Springfield, Oregon ,4.zrb--Michael L. Me(sf