HomeMy WebLinkAboutPermit Building 2018-10-01SPRINGTIEL'
0rtf G0il
web Addressr wwr/.spnn9fi€ld-or.qov
Building Permit
Commercial Structural
Permit Number: 81 1 -1 8-001 995-STR
IVR Number: 81 I 0834627 17
City of Springfield
Development and Public Works
225 Flfth Street
Springfield, OR 97477
54t-7 26-37 53
Permit lssued: October 01, 2018
Category of Construction: Commercial
Submitted Job Value: $275,000 00
Oescription of Work: 1Q23 MRI equipment replacement
Type of Work: New
Worksite address
3333 RiverBend DR
Springfield, OR 97477
Parcel
1703220004102
Owner:
Address:
PEACEHEALTH
1,115 SE 164TH AVE
VANCOUVER, WA 98683
Business name
GBC CONSTRUCTION LLC - Primary
License
CCB
License number Phone
541 -7 52-0381
lnspection
1999 Final Building
8999 Final Fire
1260 Framing
1460 lnsulation
'l g0 Gypsum Board/Lath/Drywall
1600 Ceiling Grid
lnspection group
Struct Com
Fire
Struct Com
Struct Com
Struct Com
Struct Com
lnspection status
Pending
Pending
Pending
Pending
Pending
Pending
Various inspections are minimally required on each project and often dependent on the scope of work. Contact the issuing
jurisdiction indicated on the permit to determine required inspections for this project.
Schedule or track inspections at www.buildingpemits.oregon.gov
Schedule by phone call 1-884-299-2821 use IVR number: 8110A3/62717
Schedule using the Oregon ePermitting lnspeclion App, search 'epermitting" in the app store
Permib must be posted in clear view on the worksite. Permits expire if work is not staned within i80 Days of issuance or if work is
suspended for 180 Days or longer depending on the issuing agency's policy.
All provisions of laws and ordinances goveming this type ot work will be complied with whethor specifi€d herein or not. Granting of
a permit does not presume to give authodty to violate or cancel the provisions oI any other state or local law regulating construction
or the pedormance of construction.
ATTENT1ON - CALL BEFORE YOU DIG: Oregon law requi.€s you to follow rules adopted by the Oregon Utility Notification Center.
Thoso rules are aet forth in OAR 952-001-00'10 through OAR 952-001{090. You may obtain copies of the rules by calling the Center at
(877) 668.1001 o.dial 811.
All persons or entities performing work under this permit aro required to be licensed unless exempted by ORS 701.010
(StructuGuMechanical), ORS /t79.5,0 (Elecrrical), and ORS 693.010-020 (Plumbing).
Print€d on: 10/1/18 Page 1 of 2 std_EuitdingPermit-pr
Email Address: permitcenter@springfleld-or.9ov
TYPE OF WORX
JOB SITE INFORMATION
PEHDING INSPECTIONS
SCHEDULING INSPECTIONS
Permit Number: 81 1 -1 8-001 995-STR Page 2 ol 2
Fee Description
Technology Fee
Structural building permit fee
Structural plan review fee
State of Oregon Surcharge - Bldg (12olo of applicable fees)
Quantity
Total Fees:
Fee Amount
$154.73
$1,875.56
it,2L9.tt
$225.O7
93,474.47
PnnEd on: 10/1i18 Page 2 af 2 std_BuildingPem(_pr
PERt,IIT FEES
SPRII.IGFITLD
{&
OR€GON
www.sprinqf ield-or. gov
worksite addressi 3333 RiverBend DR, Springfield, OR 97477
Parcel: 1703220004102
Transaction Receipt City of Springfield
Fees Paid
Transaction date
8t20118
Description
Slructural plan review fee
Account code
224 -00000 - 425602 - 1 030
Fee amount
$'1 ,219.1 1
Paid amount
$1,219.1 1
Payment Method Credit card authorization
006952
Payer: Daniel Klute Payment Amount:$1,219.'11
Cashier: Toste Muniz Rgcaipt Total:$1,219.1 I
Printed:8/20/18 127pm FlN,TransaclionReceipl-lrr
811-18-00199s-STR
Receipt Number: 467757
Receipt Date: 8/20/18
Development and Public Works
225 Fifth Street
Springfield, OR 97477
541-726-3753
permitcenter@springfield-or.gov
Unlts
1 .00 Ea
Page 1 of 1
Crrv or Spnrxcrret-n, onecoN
Structural Permit Application
225 Fif$ Srreer . Springfield, OR 97477 r PH(541)726-1753 . FAX(54t )726-3689
DEPARTMENT USE ONLY
Permit no rB .-lqqI
oate:9.1>O lLtr
This permit is issued under OAR 918-460-0030. Permits expire if work is not started within 180 days ofissuance or if work is
suspended for 180 days.
FEE SCHEDULE
l. Valualion inform;rtion
(a) Job description: lQ23 MRI equipnlent replacement
Occupancy: I-2 (Hospital)
Construction type: lU - Full) Sprinkled
Cost per square foot
Other inlormation
T) pe of Heat:
Energy Path:
E new Elalteration E addition
(b) Foundation-only permit'l I Yes E No
$ 275.000
2. Building fees
(a) Permit fee (use valuation table)$
(b) Investigative fbe (equal to [2a])5
(c) Reinspection ($ per hour)
(number ofhours x fee per hour)S
(d) Enter 12% surcharge (.12 x [2a+2b+2c])S
(e) Subtotal of fees above (2a through 2d):s
3. PIan review f€es
(a) Plan review (65% x permit fee [2a])$ l,)q.t
(b) Fire and life safety (65% x permit fee [2a])'i,
(c) Subtotal offees above (3a and 3b):S
,1. Miscellaneous fecs
(a) Seismic l'ee, I o/o (.01 x pcrmit lee [2a])$
(b) Tech fee, 5% (.05 x permit fee[2a]+PR fee [3c])5
(c) Continuing Education Fee $2.50
IOTAL fees and surcharges (2e+3ct4s+b+c+d)S
Bldg C hns c
PW - slev<
Prrvo - O(L,nv
LOCAL GOVERNMENT APPROVAL
This proiect has final land-use approval
Signature:I)atc
This project has DEQ approval
Signature:Date
Property is within flood plain: !Yes El No
CATEGORY OF CONSTRUCTION
! Covemment E Commercial
JOB SITE INFORMATION AND LOCATION
Job site address:3333 Riverbend Dri!e
City: Springficld State: oR ZIP:9141'7
Subdivision Lot no
Rel'ercncc Taxlot: 17032200 - 4102
PROPERTY OWNER
Ntune: Pcacchealth
Addrcss: I I I5 SE l64th Ave
Citv: Vancouver State: wA ZIP: 98683
Phonc: (541) 344-9157 Fa\
lhBuilding O\rncr
Sign here
nl is application
0r.010
lhi dential or farm propcrty o\med by
requirements under O
ofmv i family, and is exempt from licensing
coN/RAcToR INSTALLATION
Bl)sincss namc: GBC Construction
Citv: Corvallis State: OR 7.lP:91330
Phone: 541-752-0381 Fa\
E-mail
CCB liccnse no.: 166612
Print name: Kellv Willis
Signalure
\ ame CCB 1-iccnse #l)honc \umbcr
203 ( 5.11) 7.17-081I
Olectricxl
OEG
'7',7 (5.11) 746- l62l
Plumbing
Harvcy + Price Co
Mechenicel
Hane), + Pricc Co (5411746-1621
Lasl edilcd 5-5-2017 BJones
Square feet: 1,018 Sl:
Totalvaluationi
lsr..o
Zoning approval verified: ! Yes n No
E Residential
E-mail:jholloway@p"u""yt/Sh.org I
tr
Address: 2273 NW Professional Dr.
SUB.CONTRACTOR INFORMATION
COMcheck Software Version 4.0.7.1
lnterior Lighting Compliance
Gertificate
Section 1: Project lnformation
Energy Code: 2014 Oregon Energy Efficiency Specialty Codo
Project Title:
Project Type: New Construction
Construction Site: Owner/Agent:
Section 2: lnterior Lighting and Power Calculation
Designer/Contractor:
AB
Area Category Floor Area
(ft2)
c
Allowod
Watts / ft2
o
Allowed Watts
(Bxc)
MRI Computer Equipment Room (Hospital:Active Storage) (Ceiling Height 8 ff.)
Reading Rooms (Hospital:Medical Supply) (Ceiling Height 8 ft.)
300
358
0.79
1.23
237
440
Total Allowed Watts =
Section 3: lnterior Lighting Fixture Schedule
A
Fixture lD : Description / Lamp / Wattage Per Lamp / Ballast
B
Lampsi
Flxture
c#ol
Fixtures
o
Fixture
Watt.
E(cxD)
MR! Computer Equipment Room ( HospitaliActive Storage 300 sq.ft.)
LED 4r C: Other:
Reading Rooms ( Hospital:Medical Supply 358 sq.ft.)
LED 3: B: Other:
LED 2r 42: Other:
LED 1i 41i Other:
42 168
6
1
2
24
19.2
19.2
144
19.2
38.4
Totial Proposed Watts = 370
Section 4: Requirements Checklist
ln the tollowing requircments, blank checkboxes identify rcquiremenls lhal the applicant has not acknowledged as being rnet. Checkmarks
identity rcquirenents that the applicant acknowledges are met ot excepted lrom compliance. 'Plans relerence page/section' identifies where in
the plans/s@cs the requircment can be veified as being satisfied.
Lighting Wattage:
/ 1. Total proposed wans must be less than or equal to totial allowed watts.' Allowed Wattage:677 Proposed Wattage: 370
Complies: YES
Mandatory Requirements:
y'/ 2. Exit signs. lnternally illuminated exit signs shall not exceed 5 watts per side.
Plans reference page/section: Nk
3. Daylight zone control. All daylight zones are provided with individual controls that control the lights independent of general area lighting
in the non-daylight zone. ln all individual daylight zones larger than 350 sq.ft., automatic daylight controls ls provided. Automatic
daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent, and provide an automatic OFF control,
while maintaining a uniform level of illumination. Contiguous daylight zones adjacent to vertical fenestration may be controlled by a
single controlting device provided that they do not include zones facing more than two adiacent cardinal orientations (i.e., north, east,
south, west). Daylight zones under skylights shall be controlled separately from daylight zones adiacent to vertical fenestration.
v/ Exception applies; Spaces required to have occupancy sensors.
Plans reference page/section E-111
Report date: 08/17l'18
Page I of 3
1
1
1
1
Project Title:
Data filename: Untitled-cck
lnterior lighting controls. At least one local shutoff lighting control has been p.ovided for every 2,000 square feet of lit lloor area and -
each area enclosed by walls or floor-to-ceiling partitions. The required controls are located within the area served by the controls or are
a remote switch that identifies the lights served and indicates their status.
Plans reference page/section
V/ 5. Sleeping unit controls. Master switch at entry to hotel/motel guest room.
Plans reference page/section
6. Egress lighting. Egress illumination is controlled by a combination of listed emergency relay and occupancy sensors to shut otf during
periods that the building space served by the means of egress is unoccupied.
Plans reference page/section E-111
7- Additional controls. Each area that is required to have a manual control shall have additional controls that meet the requirements of
Sections 505.2.2.1 and 505.2.2.2.
Plans refeaence paqelsediont E-111
8. Light reduction controls. Each space required to have a manual control also allows for reducing the connected lighting load by at least
50 percent by either 1) controlling (dimming or multi-level switching) all luminaires; or 2) dual switching of altemate rows of luminaires,
altemate luminaires, or alternate lamps; or 3) switching the middle lamp luminaires independently of other lamps; or 4) switching each
luminaire or each lamp.
v/ Exception applies: An occupant-sensing device conkols the area.
E-111
L Buildings larger than 2,000 square feet are equipped with an automatic control device to shut off lighting in those areas. This automatic
control device shall function on either: 1) a scheduled basis. using time-of-day, with an independent program schedule that controls the
interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor; or 2) an occupant sensor that shall tum
lighting off within 30 minutes of an occupant leaving a space; or 3) a signal from another control or alarm system that indicates the area
is unoccupied.
Plans reference page/section: AZ4_E-111
y/ 'l0.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation
Plans reference page/section: N/A
V/ 'l 1 An occupant sensor control device is installed that automatically tums lighting off within 30 minutes of all occupants leaving a space
Plans reference page/section: E-1? 7
/ 'l2Addrlional controls. An occupant sensor control device that automatically tums lighting oIf within 30 minutes of all occupants leaving a' space or a locally activated switch that automatically tums lighting ofi within 30 minutes of being activated is installed in all storage and
supply rooms up to 1000 square feet.
Plans reference page/section
l3.Occupant override. Automatic lighting shutoff operating on a time-of-day scheduled basis incorporates an override switching device
that: 1) is readily accessible, 2) is located so that a person using the device can see the lights or the area controlled by that switch, or
so that the area being lit is annunciated, 3) is manually operated, 4) allows the lighting to remain on for no more than 2 hours when an
ovenide is initiated, and 5) conkols an area not exceeding 2,000 square feet.
Plans reference page/section: E-7r7
l4.Holiday scheduling. Automatic lighting shutoff operating on a time-of-day scheduled basis has an automatic holiday scheduling feature
that turns off all loads for at least 24 hours, then resumes the normally scheduled operation.
Plans reference page/section
l5.Exterior lighting controls. Lighting not designated for dusk-to-dawn operation shall be controUed by either a combination of a
photosensor and a time switch, or an astronomical time switch. Lighting designated for dusk{o-dawn opeaation shall be controlled by
an astronomical time switch or photosensor.
Plans reference page/section
'16.Tandem wiring. The following luminaires located within the same area shall be tandem wired: 1- Fluorescent luminaires equipped with
one, three or odd-numbered lamp confgurations, that are recess-mounted within 10 feet center{o-center of each other. 2. Fluorescent
luminaires equipped with one, three or any odd-numbered lamp configuration, that are pendant- or surface-mounted within 1 foot edge-
to-edge of each other.
y/ Exception applies: Luminaires on emergency circuits.
'l7.Medical task lighting or aruhistory display lighting claimed to be exempt from compliance has a control device independent of the control
of the nonexempt lighting.
Project Title:
Data filename: Untitled.cck
Report date:08/17l18
Page 2 of 3
Plans reference page/section:
Plans reference page/section:
Plans reference page/section
V/ 18.Each dwelling unit an a building is metered separately
Plans reference page/section: N/A
lnterior Lighting PASSESi Oesign 45% better than code
Section 5: Compliance Statement
Compliance Statementr The proposed lighting design represented in this document is consistent with the building plans, specilications and
other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 2014 Oregon Energy
Efficiency Specialty Code requirements in COMcheck Version 4.0.7.1 and to comply with the mandatory requirements in the Requirements
Checklist.
Name - Title
Project Title:
Data lilename: Untitled.cck
Report dater 08/17l18
Page 3 of 3
GOMcheck Software Version 4.0.7.'l
lnterior Lighting Compliance
Certificate
Section 1: Project lnformation
Energy Code: 2014 Oregon Energy Efficiency Specialty Code
Project Title:
Project Type: New Construction
Construction Site: Owner/Agent:
Section 2: lnterior Lighting and Power Calculation
Area Catsgory
Designer/Contractor
B
Floor Area
(ft2)
c
Allowed
Watts / ft2
D
Allowed Watts
(Bxc)
MRI Computer Equipment Room (Hospital:Active Storage) (Ceiling Height I ft.)
Reading Rooms (Hospital:lvledical Supply) (Ceiling Height I ft.)
300
358
0.79
1.23
237
440
Total Allowed Wans =677
Section 3: lnterior Lighting Fixture Schedule
A
Fixture lD : Oescrlption / Lamp / Wattage Per Lamp / Ballast
BCLamps/ # ofFixture Fixtures
D
Fixture
Watt.
E(cxD)
4 42 168
6
1
2
24
19.2
19.2
't44
19.2
38.4
Total Proposed Watts = 370
Section 4: Requirements Checklist
ln the following requirements, blank checkboxes identify requitements that the applicant has not acknowledged as beihg meL Checkmarks
identity requirements lhat the applicant acknowledges are met or excepted lrom complianco. 'Plans reference page/section' identilies where in
the plans/specs tho requirement can be veifiod as being satisfied.
Lighting Wattage:
1 . Total proposed wans must be less than or equal to total allowed watts.
Allowed Wattage:677 Proposed Wattage: 370
Complies: YES
Mandatory Requirements:
2. Exit signs. lnternally illuminated exit signs shall not exceed 5 watts per side
Plans reference paae/section' N/a
r/ 3. Daylight zone control. All daylight zones are provided with individual controls that controlthe lights independent ofgeneralarea lighting' in the non-daylighl zone. ln all individual daylight zones larger than 350 sq.ft., automatic daylight controls is provided. Automatic
daylight sensing controls reduce the light output of the controlled luminaires at least 50 percent, and provide an automatjc OFF control,
while maintaining a uniform level of illumination. Contiguous daylight zones adjacent to vertical fenestration may be controlled by a
single controlling device provlded that they do not include zones facing more than two adjacent cardinal orientations (i.e., north, east.
south, west). Daylight zones under skylights shall be controlled separately from daylight zones adjacent to vertical fenestration.
v/ Exception applies: Spaces required to have occupancy sensors.
Plans reference page/section
Project Title:
Data filename: Untitled-cck
E 111
Report date: 08i 17118
Page 1 of 3
MRI Computer Equipment Room ( Hospital:Active Storage 300 sq.ft.)
LED 4: C: Other:
Reading Rooms ( Hospital:Medical Supply 358 sq.fi.)
LED 3: B: Other:
LED 2: A2: Other:
LED '1: A1: Other:
1
1
1
1
r// 4. lnterior lrghting controls At least one localshutoff lighting controlhas been provided tor every 2,000 square teelol lit fioot atea and -- each area enclosed by walls or floor-to-ceiling partitions. The required controls are located within the area served by the controls or are
a remote switch that identilies the lights seNed and indicates their status.
Plans reference page/section
y' 5. Sleeping unit controls. Master switch at entry to hotel/motel guest room
Plans reference page/section: N/A
6. Egress lighting. Egress illumination is controlled by a combination of listed emergency .elay and occupancy sensors to shut off during
periods that the building space served by the means of egress is unoccupied.
Plans reference page/section
7. Additional controls. Each area that is required to have a manual control shall have additional controls that meet the requirements ol
Sections 505.2.2.'1 and 505.2.2.2.
Plans reference page/section: E111
8. Light reduction controls. Each space required to have a manual control also allows for reducing the @nnected lighting load by at least
50 percent by either 1) controlling (dimming or multi-level switching) all luminaires; or 2) dual switching of alternate rows of luminaires,
altemate luminaires, or altemate lamps; or 3) switching the middle lamp luminaires independently of other lamps; or 4) switching each
luminaire or each lamp.
v/ Exception applies: An occupant-sensing device controls the area.
Plans reference page/section E-111
Plans reference page/section: Ei111
Plans reference page/sectio n.. E-111
'14.Holiday scheduling. Automatic lighting shutotf operating on a time-of-day scheduled basis has an automatic holiday scheduling feature
that turns off all loads for at least 24 hours, then resumes the normally scheduled operation.
Plans reference page/section
ls.Exterior lighting controls. Lighting not designated for dusk-to-dawn operation shall be controlled by either a combination of a
photosensor and a time switch, or an astronomical time switch. Lighting designated for dusk{o-dawn operation shall be controlled by
an astronomical time switch or photosensor.
Plans reference page/section: N/A
16.Tandem wi.ing. The following luminaires located within the same area shall be tandem wired: 1. Fluorescent luminaires equipped with
one, three or odd-numbered lamp configurations, that are recess-mounted within 10 feet center-lo-center of each other. 2. Fluorescent
luminaires equipped with one, three or any odd-numbered lamp configuration, that are pendant- or surface-mount6d within 1 Ioot edge-
to-edge of each other.
v/ Exception applies: Luminaires on emergency circuits.
Plans reference page/section
/ '17.[y'edical task lighting or aruhislory display lighting claimed to be exempt from compliance has a control device independent of the control' oflhe nonexempl lightinq.
Project Title:
Data lilenamer Untitled.cck
Repod date: 08/17118
Page 2 of 3
J/ 9. Buildings larger than 2,000 square feet are equipped with an automatic control device to shut olf lighting in those areas. This automatic' @ntroldevice shall tunction on either: 't) a scheduled basis, using time-of-day, with an independent program schedule that controls the
interior lighting in areas that do not exceed 10,000 square feet and are not more than one floor; or 2) an occupant sensor that shall tum
lighting off within 30 minutes of an occupant leaving a space; or 3) a signal from another control or alarm system that indicates the area
is unoccupied.
Plans reference page/section: N/A E-111
V/ l0.Occupancy sensors in rooms that include daylight zones are required to have Manual ON activation.
Plans reference pa_qe/section:
V/ 1 1 An occupant sensor control device is installed that automatically tums lighting off within 30 minutes of all occupants leaving a space.
J/ l2Additional controls. An occupant sensor control device that automatically turns lighting off within 30 minutes of all occupants leaving a' space or a locally activated swrtch that automatically tums lighting off within 30 minutes of being activated is installed in all storage and
supply rooms up to 1000 square feet.
Plans reference page/seclion: E. 1 1 1
r/ l3.Occupanl overide. Aulomatic lighting shutoff operating on a time-ol-day scheduled basis incorporates an override switching device' thal: 1) is readrly accessible, 2) is located so that a person using the device can see the lights or the area controlled by that switch, or
so that the area being lit is annunciated, 3) is manually operated. 4) allows the lighting to remain on for no more than 2 hours when an
override is initiated, and 5) controls an area not exceeding 2,000 square feet.
Plahs reference page/section:E-111
V/ 18.Each dwelling unit in a building is metered separately
Plans relerence page/section N/A
lnterior Llghting PASSES: Design 45% better than code
Section 5: Compliance Statement
Compliance Statementr The proposed lighting design represented an this document is consistent with the building plans, specifications and
other calculations submitted with this permit application. The proposed lighting system has been designed to meet the 20't4 Oregon Energy
Efllciency Specialty Code requirements in CoN4check Version 4.0.7.1 and to comply with the mandatory requirements in the Requirements
Checklist.
Name - Title
Project Title:
Data fr lename: Untitled.cck
Report date: 08/17l'18
Page 3 of 3