Loading...
HomeMy WebLinkAboutPermit Electrical 2018-09-27CITY OF SPRINGFIELD, OREGON Electrical Permit lication 225 Fifth Streett Springfield, OR 97477 t PH(54r)726-3753i FAX(541)726-3689 DEPARTMENT USE ONLY Permit no.: l0 -n 27O I tfrrlrqDate: SPI]XGFIELD *."+: t-i L+.@'-*#&e ffi&ffi' ft'rc, This permit is issued under OAR 918-309-0000. Permits are nontransferable. Permits expire if work is not started within 180 days ofissuance or ifwork is suspended for 180 days. LOCAL GOVERNMENT APPROVAL Zoningapproval verified? E Yes E No CATEGORY OF CONSTRUCTION D Residential D Govemment E Commercial JOB SITE INFORMATION AND LOCATION Job site address: l0CA L J t City: \/nvq h'r,1,{State: olh nPt q?\r+ Reference:Taxlot. DESCRIPTION OF WORK 111; Aittt\ 7z H 1ks f ,,,,t 7 / ( qrv/ t ;t Ctaccl PROPERTY OWNER Name:\ Address: W7fo City:State: o 1?.zrP: 7 7127 Phone Fax: E-mail This installation is being made on residential or farm prope(v owned by me or a member of my immediate family. This properf,v is not intended for sale, exchange, lease, or rent. OAR 479.540(1) and 479.560( I ). Signature: CONTRAGTOR INSTALLATION Business name:LC Address: Cit1,:State: (){L nPqlLUJ;) Phonegs/[ Zt&{*4{t+l Fax: E-maii 4t0dce(\,56 CCB license rro.:/fi-n 1 BCD license no.: 6! Udq isor's license no. Signature of signing supervi Print name of sigrring supervisor:,,v\ FEE SCHEDULE Number of inspections per item ( )Qty Cost ea- Total cost Residential, per unit, service included: 1,000 sq. ft. or less (4)$181.00 $ Each additional 500 sq. ft. or portion thereof s 35.00 $ Limited energy (2)$ 43.00 $ Each manufactured home or modular dwelling service or feeder (2)$ 86.00 $ Services or feeders: installation. alteration. relocat ion 200 amps or less (2)t $ 109.00 $ lo'1 201 to 400 amps (2)s127.00 $ 401 to 600 amps (2)$21s.00 $ 601 to 1,000 amps (2)s277.00 $ Over 1.000 amps or volts (2)$635.00 $ Reconnect only (2)$ 86.00 $ Temporary services or feeders: installation. aheration. relocation 200 amps or less (2)$ 86.00 $ $ 118.00 $201 to 400 amps (2) $172.00 $401 to 600 amps (2) Over 600 amps or 1,000 volts, see services or feeders section above Branch circuits: nan. alteration, extension per panel a. Fee for branch circuits with purchase of a service or feeder fee: Each branch circuit S 7.42 $ b. Fee for branch circuits without purchase ofa service or feeder fee First branch circuit (2)$ 86.00 $ Each additional branch circuit s 7.42 $ Miscellaneous fees: service or feeder not included Each pump or irrigation circle (2)$ 86.00 $ Each sign or outline lighting (2)$ 99.00 $ $ 99.00 $Signal circuit or a limited-energ.v panel, alteration, or extension (2) Each additional inspection: (l )s99.00 $ DEPARTMENT USE $ (A) Enter subtotal ofabove fees (Minimum Permit Fee $99.00) (B) Enter 120% surcharge (.12 x [A])$ (C) Technology Fee (5% of [A])$ TOTAL fees and surcharges (A through D):$ 0a.b Last edited 7/1/2018 BJones I slgA )5