Loading...
HomeMy WebLinkAbout2016 09 07 AIS CPM DPW Virginia-Daisy Bikeway Draft Final Design ConceptCOMMUNICATION MEMORANDUM Date: 9/7/2016 Staff Contact/Dept.: Emma Newman/DPW Staff Phone No: 541-726-4585 S P R I N G F I E L D PLANNING COMMISSION INFORMATION SHARE: The Virginia-Daisy Bikeway Final Design Concept is the culmination of a highly coordinated design and development process that provided the local community and staff with the opportunity, tools and resources to complete this jointly planned, jointly envisioned multi-purpose bikeway project. In addition to the close participation of the neighborhood, the project benefited from the constructive feedback provided by the Bicycle and Pedestrian Advisory Committee, and the guidance from the Planning Commission and City Council. Staff is scheduled to discuss the draft final design concept with City Council during the September 6 Work Session in preparation for approval of the final concept during the October 3 Regular Session. Once the final design concept is approved, staff will proceed with detailed engineering design and construction. The goal is to construct the project in summer 2017. The Virginia-Daisy Bikeway Project is primarily funded through a $710,000 grant from the ODOT Bicycle and Pedestrian Advisory Committee Transportation Enhancement Program, which provides funding to improve biking and walking transportation facilities. Staff has worked to efficiently use these funds to accomplish a variety of inter-related City goals within the auspices of this single project by integrating bikeway treatments, key safety improvements for all road users, street maintenance, storm water treatment, and ADA upgrades. The Bikeway will integrate and complete Springfield Transportation System Plan projects PB-36: Virginia-Daisy Bikeway and R-38: South 42nd Street/Daisy Street Intersection Improvements for much less cost than the cost of planning and building the two projects separately. The project also helps fulfill the requirements of the municipal separate storm sewer system (MS4) permit and supports the City of Springfield’s 7 Key Stormwater Goals. The Draft Final Report (Attachment 1) provides additional information about the draft final design concept, including a project overview, the design concept, public involvement information, more cost estimate information, and next steps. Please contact Emma Newman, Transportation Planner (541-726-4585) if you would like more information about this project. Attachment 1: Virginia-Daisy Bikeway Concept Study – Draft Final Report VIRGINIA - DAISY BIKEWAY CONCEPT STUDY Draft Final Report Fall 2016Attachment 1, Page 1 of 146 Project Management Team Emma Newman, City of Springfield Transportation Planner Michael Liebler, City of Springfield Traffic Engineer Loralyn Spiro, City of Springfield Communications Coordinator Project Contributors Jeff Paschall, City of Springfield City Engineer Tom Boyatt, City of Springfield Community Development Manager Brian Barnett, City of Springfield Traffic Engineer Tom Speldrich, City of Springfield Police Officer Gilbert Gordon, City of Springfield Fire Marshal David Reesor, City of Springfield Senior Planner (former) Andrew Martin, City of Springfield Planning Intern Caitlin Drost, City of Springfield Engineering Intern Springfield Bicycle and Pedestrian Advisory Committee Springfield Planning Commission Springfield City Council Springfield Community Members Consultant Team Alta Planning+Design Joe Gilpin, Principal Mary Stewart, Project Manager Nick Falbo, Senior Designer Sacha Barkhuff, Engineer Prescott Morrill, Designer Derek Abe, Designer Bryan Jones, Senior Engineer CenturyWest Engineering Jim Pex, Engineer This project is partially funded by a grant from the ODOT Transportation Enhancement Oregon Bicycle Pedestrian Advisory Committee grant program. The contents of the document do not necessarily reflect views or policies of the State of Oregon. Acknowledgments Attachment 1, Page 2 of 146 Table of Contents Project Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 Network Context . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5 Project Goals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7 Draft Final Design Concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 Virginia Avenue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 Daisy Street . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 Outreach and Community Involvement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .33 Next Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37 The Path Forward . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .37 Cost Estimate for Refined Design Concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39 Project Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .39 Appendices 1 . Preliminary Design Concepts Mapbook 2 . Refined Design Concept Mapbook 3 . 32nd St and Virginia Ave Gap Analysis Memo 4 . 42nd St and Daisy St Safety Technical Analysis Memo 5 . Communications Plan 6 . Written Comment Log 7 . Open House 1 Comments 8 . Open House 2 Comments 9 . Outreach Materials (postcards, media, flyers, FAQ sheet) 10 . Cost EstimateAttachment 1, Page 3 of 146 MEMBERS OF THE BICYCLE PEDESTRIAN ADVISORY COMMITTEE ON VIRGINIA AVENUEAttachment 1, Page 4 of 146 VIRGINIA-DAISY BIKEWAY ~ 5 CHAPTER ONE Project Overview Network Context The current roadway network in mid-Springfield offers few safe and convenient options for bicyclists and pedestrians travelling east-west through the city . Main Street is the primary east-west corridor but functions as a principal arterial with high vehicle volumes and speeds that presents many challenges for people walking and bicycling . The nearby Virginia Ave-Daisy Street corridor is designated as a local road and major collector from 32nd Street to Bob Straub Parkway, and features much lower vehicle speeds and volumes . As such, it represents a more ideal candidate for bicycle and pedestrian travel, but requires significant improvements at key intersections and other locations along the corridor . The City of Springfield was awarded funding through the statewide Oregon Transportation Enhancement grant program to design, develop and construct the Virginia-Daisy Bikeway Project . Combined with federal funding for a roadway overlay project, the Virginia-Daisy Bikeway Project will allow the City of Springfield to provide comfortable, convenient, and safe transportation options for people of all ages and abilities along the Virginia Ave and Daisy Street corridor . Figure 1 on the next page provides an overview of the Virginia-Daisy Bikeway Project corridor . Designing for Safety and Access This multimodal corridor will provide a much needed connection for residents and the broader community travelling by foot or bicycle to local services and amenities, and complement the commercial Main St . thoroughfare to the north . Safety Design elements such as striped bicycle lanes, shared lane markings, traffic calming measures, intersection crossing improvements, wayfinding and additional regulatory signage, and improved lighting are planned to improve traffic safety and comfort . Notably, the project will also feature a significant reconstruction of the intersection of 42nd Street, into a low-stress single-lane roundabout . Equity The Virginia-Daisy Bikeway Project responds to the access and connectivity needs identified in the Springfield Bicycle Plan by closing gaps in the corridor that have otherwise presented challenges for people bicycling . This carries important social equity implications for residents with limited or no access to vehicles . Currently, 16 percent of area residents are below poverty level, while 20 to 40 percent of area children are below the poverty level . 24 percent of working residents already use non-drive alone transportation options (carpool, bus, bike, walk, etc .) to commute to and from work .1 Transit service in this area is also limited as Lane Transit District does not currently provide transit service south of Main Street . Health Creating a safer, more comfortable walking and biking environment helps to encourage more daily physical activity, which translates to lower stress levels, reduced risk of obesity, diabetes, and heart disease, and overall improved community health .2 1 Springfield, Oregon Profile . http://City-Data .com/city/Springfield-Oregon .html 2 Equity and Opportunity Assessment: Safety, Health, and Wellness - Body Mass Index . Livability Lane . 2013 . Amenities The Bikeway provides a vital connection to nine nearby schools, local shopping and recreation destinations, and the regional Willamalane Center that serves local area children with after school activities and families with a wide range of recreational opportunities and programs . The project further strengthens the walking and bicycling network by complementing current and future off-street path projects, including Willamalane Mill Race Path, Booth Kelly Road, Weyerhauser Haul Road, the growing Middle Fork Path, and other local accessways . Environment In addition to promoting active transportation and healthy lifestyles for local residents, the project will contribute to neighborhood livability by enhancing the overall attractiveness of the corridor by incorporating environmentally focused infrastructure, such as street tree plantings and stormwater management facilities . Tourism Cycling tourism is growing regionally . In 2012 bicycle-traveler trip expenditures in the Willamette Valley totaled over $70 million . Statewide cycling tourism generated $10 .3 billion in direct travel spending .3 Projects like the Virginia-Daisy Bikeway could expect to become part of larger regional or trans-American bike touring rides . The Virginia-Daisy Bikeway will also provide access to the future Thurston Hills single-track mountain bike trails, a potential key bike tourism destination . Policy The Bikeway project is closely aligned with the goals and policies set forth in the Springfield Transportation System Plan, Lane County Transportation System Plan, and the Central Lane Metropolitan Planning Organization Regional Transportation Plan related to regional sustainability, economic vitality, and social equity . City of Springfield City Council and Project specific goals are presented in the following section . 3 Oregon Travel Impacts: 1991-2014, Dean Runyan AssociatesAttachment 1, Page 5 of 146 6 ~ VIRGINIA-DAISY BIKEWAY 5 5 5 5 5 5 5 5 5 G ST 28TH ST42ND66TH ST57TH ST52ND STDAISYVIRGINIA 69TH STMAIN STMAIN ST THURSTON HIGH BANKS G ST 42ND STMT VERNON JASPER 58TH STAINDUSTRIAL JAS P E R COMMERCIAL 32NDE ST 48TH STCENTENNIAL 54THOLYMPIC 35THBOB STRAUB30TH STTH U R S T O N CLEARWATER LN51ST STMARCOLA DouglasGardensPark Rob AdamsParkBluebellePark PridePark Tyson Park Park Services Center Jesse MaineMemorialPark Wallace M.Ruff Jr.Memorial Park ThurstonPark Splash! ClearwaterPark WilliamS. FortMemorial Park JasperMeadowsPark VolunteerPark WillamalaneCenter for Sportsand Recreation QuartzPark ThurstonHillsNatural Area Geogia-Pacific MapleElementary RidgeviewElementary ThurstonHigh ThurstonMiddle Mt VernonElementary RiverbendElementary AgnesStewartMiddle DouglasGardensElementary There are no warranties that accompany this product. Usersassume all responsibility for any loss or damage arising from any error, omission, or positional inaccuracy of this product. Virginia-Daisy Bikeway Project 126 Proposed Virginia Daisy Improvements Area of Interest Future Shared Use Path Shared Use Path (Fall 2016) Existing Bike Facilities Bike Lane Popular Bike Route Shared Use Path Trailhead to Shared Use Path 5 Springfield Schools S City Limit 0 0.25 0.5Miles This project provides additional east-west bicycle network connectivity and a facility that is safe and comfortable for all users. This map also shows connectivity to communityfeatures that enhance Springfield’s overall livability and can be accessed from along the corridor. 8/22/2016 !D !D D Data Source: City of Springfield, LCOG Virginia - Daisy Bikeway Project Springfield, OR NORTH Downtown Springeld 2.5 miles Future Thurston Hills Bike Trails Future Weyerhaeuser Haul Rd shared use path Future Booth Kelly Rd shared u s e p a t h Wey e rh aeu s e r Hau l R d Mil l R a c e P a t h Co m p l e t e F a l l 2 0 1 6 Middle F o r k P a t hMc K e n z i e L e v e e P a t h Figure 1: Project Corridor Map Attachment 1, Page 6 of 146 VIRGINIA-DAISY BIKEWAY ~ 7 Project Goals 1. The project aligns with the City of Springfield’s commitment to providing safe transportation options. The project is an identified need in the Springfield Transportation System and aligns with regional bike network connectivity goals. 2. The Virginia-Daisy Bikeway Project provides a safe and comfortable bicycle corridor that can be used by people of all ages and abilities. 3. The design of the Virginia-Daisy Bikeway enhances the overall appearance of the corridor for all users, improves pedestrian safety and usage, and provides traffic calming for automobiles to emphasize active transportation along the street and enhance the neighborhood feel. City Council Goals 1. Financially Responsible and Stable Government Services A . Implementing street overlay, bikeway enhancement, and stormwater treatments through one project increases efficient use of public funds . 2. Community and Economic Development and Revitalization1 A . Investments in bicycling infrastructure are cost-effective and generate an array of direct and indirect health, transportation, environmental, and economic benefits for the City and region . B . Constructing bike facilities creates local jobs, increases local tax revenue, and stimulates local spending . C . Constructing bike facilities creates local jobs, increases employment tax revenue, and stimulates local spending . People making short local trips by bike tend to make more frequent trips to local stores, and bike tourism and events support the local food, lodging, and recreational industries . This spending on bicycle-related services and amenities generates demand for more bike facilities, creating a positive feedback loop of benefits . Research has also shown that the property values of homes in walkable, bikeable communities are typically higher than 1 Flusche, Darren . Bicycling Means Business: The Economic Benefits of Bicycle Infrastructure . Advocacy Advance . 2012 . similar homes in areas that do not have access to bike and pedestrian facilities . 3. Enhance Public Safety A . Safety will be greatly increased along the corridor with traffic calming and intersection safety improvements, such as the proposed roundabout at 42nd Street and Daisy Street . Roundabouts reduce overall collisions by 37 percent, injuries by 75 percent, fatalities by 90 percent, collisions with pedestrians by 40 percent, and collisions with people biking by 10 percent .2 4. Effectively Create a Positive Environment that Values Diversity and Encourages Inclusion A . Provide safe and comfortable transportation options for people walking and bicycling, in addition to people driving . 5. Maintain and Improve Infrastructure Facilities A . Perform an overlay treatment along the corridor to preserve the street infrastructure . B . Add bicycle facilities and sidewalk infill to improve Virginia Avenue and Daisy Street for all users . 6. Preserve our Hometown Feel, Livability, and Environmental Quality A . Install stormwater treatments along the corridor, including bioswales and additional tree canopy . B . Construct a design that encourages neighborhood appropriate speeds and enhances the overall appeal of the neighborhood . 2 Federal Highway Administration and Insurance Institute for Highway Safety Existing S 42nd Street Intersection (Facing North)Attachment 1, Page 7 of 146 S 32ND STREET INTERSECTION SIMULATION (FACING SOUTH)Attachment 1, Page 8 of 146 VIRGINIA-DAISY BIKEWAY ~ 9 This is a concept only . Detailed design leading up to construction has yet to be completed . Design elements that will be further developed include wayfinding to and from key locations including: Mill Race Path Middle Fork Path Main Street Future Booth Kelly Road Path Future Weyerhaeuser Haul Road Path McKenzie Levee Path Thurston Hills Natural Area Clearwater Park Willamalane Center for Sports and Recreation Virginia Avenue: S 32nd Street to S 41st Place The preferred bikeway type on Virginia Avenue to S 41st Place is a bicycle boulevard with shared lanes . Roadway markings throughout this section of the corridor would consist of frequent shared lane markings . These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors . No centerline would be provided to encourage people driving to give extra distance while passing people on bikes . S 32nd Street Intersection Design Rapid flashing beacons facing S 32nd Avenue would promote yielding to people crossing the street . People on bicycles on Virginia Avenue would take the ramp up to a shared-use path at the crossing and cross adjacent to pedestrians in the crosswalk . People on bicycles would also have the option to navigate the intersection as a vehicle in the travel lanes . Median safety islands would provide added safety and comfort for people walking and biking across the street . Mixing zones would be created on all four corners of the intersection . These are areas where people biking and walking would be able to navigate around the intersection separated from motor vehicle traffic . These areas are delineated with specialty pavement to indicate that these areas are for slow and safe travel . See Appendix 3 for the 32nd St and Virginia Ave Gap Analysis Memo. Additional Safety Features Other elements along the corridor designed to create a safer operating environment by slowing speeds, increasing the drivers’ field of vision and opportunity to yield, and shortening stopping distances include: Curb extensions (shorten the pedestrian crossing distance and visually narrow the roadway to slow traffic) On-street planters (capture and treat stormwater runoff and visually narrow the roadway to slow traffic) Mini-roundabouts (slow traffic) Raised crosswalk (improve driver visibility of pedestrians and slow traffic) Pedestrian refuge islands (provide physical protection form motorists and slow traffic) CHAPTER TWO Draft Final Design Concept Recommended Cross Section Conceptual On-Street PlanterAttachment 1, Page 9 of 146 10 ~ VIRGINIA-DAISY BIKEWAYNorth STOPSTOPSOUTH 37TH STREETVIRGINIA AVENUESOUTH 35TH STREETVIRGINIA AVENUEVIRGINIA AVENUEVIRGINIA AVENUE SOUTH 34TH STREETSOUTH 32ND STREETWillamalane Sports ComplexAt S 32nd Avenue: The crossing would be enhanced with high visibility markings and rapid flash beacons to create a low-stress crossing with a high rate of yielding . See next sheet for intersection design concept. Added Tree Canopy: Within the parking lane, tree planting areas would be added to increase canopy and define the edges of the street . Locations are schematic only, but based on existing parking needs and lack of existing tree canopy . Coordination and agreement from fronting property owner will be required prior to implementation . Locations shown are conceptual only . ADA Accessibility: All curb ramps along the corridor will be evaluated and upgraded for ADA accessibility . 50’25’0’100’200’Attachment 1, Page 10 of 146 VIRGINIA-DAISY BIKEWAY ~ 11 Dwg filename: C:\Users\prescottmorrill\Box Sync\Springfield, Virginia-Daisy Bikeway\CAD\2016-058_TS01-03.dwg Last saved by: prescottmorrill Plot date: 4/22/2016 11:10 AM Plotstyle table: CVLINK.ctbTS01 1 3 VIRGINIA AVE AND32ND AVE, DAISY STAND 42ND AVESTRIPING PLAN ---- 2016-058_TS01-03 - - - - 1. ___________________________________ 2. ___________________________________ 3. ___________________________________ VIRGINIA AVE & 32ND AVE (ONE-WAY CROSSINGS EACH SIDE) SCALE: 1" = 20' SCALE PLAN SCALE FEET 020 2010 40 GENERAL SHEET NOTES 1. TOPOGRAPHIC SURVEY 12/3/15-2/22/16. 2. ___________________________________ 3. ___________________________________ SHEET KEYNOTES PROJECT / CLIENT SHEET OF www.altaplanning.com p: 503.230.9862 f: 503.230.9862 MARK DATE DESCRIPTION PROJECT NO: CAD DWG FILE: DESIGNED BY: DRAWN BY: REVIEWED BY: DATE: SHEET TITLE CONSULTANTS ISSUELine measures 1 inch on full scale drawing, if not 1 inch scale accordingly.VIRGINIA - DAISYBIKEWAYDAISY ST & S 42ND AVE (OPTION 1A FULL SIGNAL & BIKE BOXES) SCALE: 1" = 20' S 32nd Street Intersection Concept EnlargementAttachment 1, Page 11 of 146 12 ~ VIRGINIA-DAISY BIKEWAY Pedestrian Refuge Island Pedestrian refuge islands provide a two-stage crossing for people walking and shorten crossing distances . Depending on the location, they may or may not include low profile landscaping . Mini Roundabout Mini-roundabouts provide traffic calming . Low profile mini-roundabouts would not include center landscaping and they would accommodate emergency vehicles and other typical neighborhood oversized vehicles .Attachment 1, Page 12 of 146 VIRGINIA-DAISY BIKEWAY ~ 13NorthSTOPSTOPSOUTH 37TH STREETVIRGINIA AVENUESOUTH 35TH STREETVIRGINIA AVENUEVIRGINIA AVENUEVIRGINIA AVENUESOUTH 34TH STREETSOUTH 32ND STREETWillamalane Sports ComplexAt S 37th Street: The stop sign would be flipped to favor Virginia Ave . At S 35th Street: A mini roundabout would be added as traffic calming to create bicycle- compatible travel speeds . Added Tree Canopy: Within the parking lane, tree planting areas would be added to increase canopy and define the edges of the street . Locations are schematic only, but based on existing parking needs and lack of existing tree canopy . Coordination and agreement from fronting property owner will be required prior to implementation . Locations shown are conceptual only . 50’25’0’100’200’Attachment 1, Page 13 of 146 14 ~ VIRGINIA-DAISY BIKEWAY Added Speed Cushion: Where additional tree plantings are less desired, traffic calming would include asphalt cushions to reduce traffic speeds . VIRGINIA AVENUE SOUTH 41ST PLACESOUTH 41ST STREETVIRGINIA AVE 4037-4053SOUTH 40TH STREETSOUTH 4OTH STREETVIRGINIA AVENUEVIRGINIA AVENUESOUTH 39TH PLACESOUTH 38TH STREETVIRGINIA AVENUE VIRGINIA AVENUE At S 38th Street: The stop sign would be flipped to favor Virginia Ave . A narrowed raised crossing with curb extensions would be added to promote yielding to crossing pedestrians and to help deter speeding through the neighborhood . Curb extensions may also function as stormwater planters to capture and treat water before entering channels on S 38th . At S 40th Street: Mini median islands would be added to slow traffic and provide refuge for pedestrians crossing the street . 50’25’0’100’200’Attachment 1, Page 14 of 146 VIRGINIA-DAISY BIKEWAY ~ 15 Sidewalk Infill: New concrete sidewalk added to fill in gaps along corridor . VIRGINIA AVENUE SOUTH 41ST PLACESOUTH 41ST STREETVIRGINIA AVE 4037-4053SOUTH 40TH STREETSOUTH 4OTH STREETVIRGINIA AVENUEVIRGINIA AVENUESOUTH 39TH PLACESOUTH 38TH STREETVIRGINIA AVENUEVIRGINIA AVENUE At S 41st Street: A mini roundabout would be added to create bicycle-compatible travel speeds . Average Daily Traffic = 1,075 Vehicles Added Tree Canopy: Within the parking lane, tree planting areas would be added to increase canopy and define the edges of the street . Locations are schematic only, but based on existing parking needs and lack of existing tree canopy . Coordination and agreement from fronting property owner will be required prior to implementation . Locations shown are conceptual only . 50’25’0’100’200’Attachment 1, Page 15 of 146 S 42ND STREET INTERSECTION SIMULATION (FACING NORTH)Attachment 1, Page 16 of 146 VIRGINIA-DAISY BIKEWAY ~ 17 Daisy Street: S 42nd Street to S Weyerhaeuser Haul Road The preferred bikeway type on Daisy Street to S Weyerhaeuser Haul Road is bicycle lanes . Due to higher traffic volumes, a separated bicycling facility is necessary . Roadway markings throughout this section of the corridor would consist of one consolidated parking lane, bike lane stripes, and bike lane markings to distinguish bike lanes from the general purpose travel lanes . No center line would be provided to encourage motor vehicles to give extra distance while passing people biking . Identification of consolidated parking lane is based on existing parking utilization levels combined with gaps in tree canopy . See the Parking Considerations in Relation to Bikeway Implementation section on pages 30-31 for additional information . S 42nd Street Intersection Design A single-lane roundabout would create slow circulation speeds through the intersection for all street approaches and greatly improve the safety of the intersection compared to existing conditions . People bicycling would be permitted to travel within the roundabout with motor vehicles, or to enter into a shared space with pedestrians and use the crosswalk . Mixing zones for people walking and biking would be created on all four corners of the roundabout . These are areas where people biking and walking would be able to navigate around the intersection separated from motor vehicle traffic . These areas are delineated with specialty pavement to indicate that these areas are for slow and safe travel . The roundabout could also incorporate stormwater treatment to aid in controlling flooding, treat stormwater, and recharging ground water . The roundabout proposed for implementation at S 42nd and Daisy St as a part of the Virginia-Daisy Bikeway Project is designed to be uniquely optimized for pedestrian and bicycle circulation, comfort and safety . This is achieved by designing for slow, 15 mph motor vehicle travel speed throughout the roundabout .1 This slow speed creates low speed differentials for cyclists choosing to travel in-lane, and a high degree of yielding to people walking and bicycling within the crosswalk and slower approach speeds through the reversing curve to the south . Additional Safety Features Other elements along the corridor designed to create a safer operating environment by slowing speeds, increasing the drivers’ field of vision and opportunity to yield, and shortening stopping distances include: Curb extensions (shorten the pedestrian crossing distance and visually narrow the roadway to slow traffic) On-street planters (capture and treat stormwater runoff and visually narrow the roadway to slow traffic) Raised crosswalk (improve driver visibility of pedestrians and slow traffic) Pedestrian refuge islands (provide physical protection form motorists and slow traffic) Mini-median islands (slow traffic) 1 FHWA, Roundabouts: An Informational Guide, 2000 . This guide has largely been superseded by NCHRP Report 672, but the compact urban roundabout type illustrated in the earlier guide is more appropriate for this use . Recommended Cross Section Attachment 1, Page 17 of 146 18 ~ VIRGINIA-DAISY BIKEWAY Accessway: Possible bike accessway improvement for people biking north on S 42nd heading east on Daisy . PARKINGSOUTH 46TH STREETSOUTH 44TH STREETDAISY STREET DAISY STREET SOUTH 44TH STREETSOUTH 43RD PLACESOUTH 43RD STREETSOUTH 42ND STREETSOUTH 42ND PLACEDAISY STREET At S 42nd Street: Intersection design options are proposed to improve safety, yielding and crossing comfort for users . See enlarged design concept of intersection on the following page . Street modification: Parking would be consolidated to the south side of the street . Bicycle lanes would be added for the safety and comfort of people bicycling . Street modification: Curb extension with stormwater treatment . See photo of potential treatment on next page . Average Daily Traffic = 3,357 Vehicles Property Line This is a concept only . Detailed design for the roundabout will be developed after final concept approval . 50’25’0’100’200’Attachment 1, Page 18 of 146 VIRGINIA-DAISY BIKEWAY ~ 19Dwg filename: C:\Users\prescottmorrill\Box Sync\Springfield, Virginia-Daisy Bikeway\CAD\2016-058_TS01-03.dwg Last saved by: prescottmorrill Plot date: 4/25/2016 10:31 AM Plotstyle table: CVLINK.ctbPROJECT / CLIENT SHEET OF www.altaplanning.com p: 503.230.9862 f: 503.230.9862 MARK DATE DESCRIPTION PROJECT NO: CAD DWG FILE: DESIGNED BY: DRAWN BY: REVIEWED BY: DATE: SHEET TITLE CONSULTANTS ISSUELine measures 1 inch on full scale drawing, if not 1 inch scale accordingly.SCALE PLAN SCALE FEET 020 2010 40DAISY ST & S 42ND AVE (OPTION 4 - ROUNDABOUT) SCALE: 1" = 20'TS03 3 3 DAISY ST ANDS 42ND AVEOPTION 3STRIPING PLAN ---- 2016-058_TS01-03 - - - - 1. ___________________________________ 2. ___________________________________ 3. ___________________________________ GENERAL SHEET NOTES SHEET KEYNOTES 1. TOPOGRAPHIC SURVEY 12/3/15-2/22/16. 2. ___________________________________ 3. ___________________________________VIRGINIA - DAISYBIKEWAY6'5'This is a concept only . Detailed design for the roundabout will be developed after final concept approval . S 42nd Street Intersection Enlargement Typical Stormwater TreatmentAttachment 1, Page 19 of 146 20 ~ VIRGINIA-DAISY BIKEWAY PARKINGSOUTH 46TH STREETSOUTH 44TH STREETDAISY STREET DAISY STREET SOUTH 44TH STREETSOUTH 43RD PLACESOUTH 43RD STREETSOUTH 42ND STREETSOUTH 42ND PLACEDAISY STREET Street modification: Parking would be consolidated to the higher-demand side of the street . Bicycle lanes would be added for the safety and comfort of people bicycling . Added Tree Canopy: Within the parking lane, tree planting areas would be added to increase canopy and define the edges of the street . Locations are schematic only, but based on existing parking needs and lack of existing tree canopy . Coordination and agreement from fronting property owner will be required prior to implementation . Locations shown are conceptual only . Street modification: A mini-median island would be added to slow traffic and keep cars in the proper lane through the bend in the roadway . 50’25’0’100’200’Attachment 1, Page 20 of 146 VIRGINIA-DAISY BIKEWAY ~ 21 SOUTH 49TH PLACESOUTH 49TH PLACESOUTH 48TH STREETW E Y E R H A E U S E R H A U L R DWEYERHAEUSER HAUL RDCAMELLIA STREETSOUTH 48TH STREETSOUTH 47TH STREETSOUTH 47TH STREETSOUTH 46TH STREETDAISY STREETDAISY STREET DAISY STREETDAISY STREET Street modification: Parking would be consolidated to the higher-demand side of the street . Bicycle lanes would be added for the safety and comfort of people bicycling . At S 46th Street: A narrowed raised crossing would be added to promote yielding to crossing pedestrians, as well as reduce speeding along the corridor . 50’25’0’100’200’ Street modification: A landscaped center median would be added to slow traffic . Landscaping would be low maintenance and drought tolerant .Attachment 1, Page 21 of 146 22 ~ VIRGINIA-DAISY BIKEWAY Daisy Street: S Weyerhaeuser Haul Road to S 54th Street Connector Path Roadway markings throughout this section of the corridor would consist of frequent shared lane markings . These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors . No centerline would be provided to encourage people driving to give extra distance while passing people on bikes . Additional Safety Features Other elements along the corridor designed to create a safer operating environment by slowing speeds, increasing the drivers’ field of vision and opportunity to yield, and shortening stopping distances include: Curb extensions (shorten the pedestrian crossing distance and visually narrow the roadway to slow traffic) On-street planters (capture and treat stormwater runoff and visually narrow the roadway to slow traffic) Mini-roundabouts (slow traffic) Raised crosswalk (improve driver visibility of pedestrians and slow traffic) Recommended Cross Section Attachment 1, Page 22 of 146 VIRGINIA-DAISY BIKEWAY ~ 23 SOUTH 49TH PLACESOUTH 49TH PLACESOUTH 48TH STREETW E Y E R H A E U S E R H A U L R DWEYERHAEUSER HAUL RDCAMELLIA STREETSOUTH 48TH STREETSOUTH 47TH STREETSOUTH 47TH STREETSOUTH 46TH STREETDAISY STREETDAISY STREET DAISY STREETDAISY STREET At S Weyerhaeuser Haul Rd: A narrowed raised crossing would be added to promote yielding to people on foot and people biking, as well as reduce speeding along the corridor . At S Weyerhaeuser Haul Rd: Additional coordination and area development required in relation to future 48th St extension to Main St and Willamalane path development . 50’25’0’100’200’ Added Speed Cushion: Where additional tree plantings are less desired, traffic calming would include asphalt cushions to reduce traffic speeds . Attachment 1, Page 23 of 146 24 ~ VIRGINIA-DAISY BIKEWAY SOUTH 53RD STREETDAISY STREET DAISY STREETSOUTH 52ND PLACESOUTH 53RD STREETSOUTH 52ND STREETSOUTH 51ST PLACESOUTH 51ST PLACESOUTH 49TH PLACESOUTH 49TH PLACE"5090-5136""4930-4954"CAMELLIA STREETDAISY STREETDAISY STREET Bluebelle ParkAverage Daily Traffic = 1,514 Vehicles At S 49th Place: A narrowed raised crossing would be added to promote yielding to crossing pedestrians and encourage neighborhood appropriate traffic speeds . Added Tree Canopy: Within the parking lane, tree planting areas would be added to increase canopy and define the edges of the street . Locations are schematic only, but based on existing parking needs and lack of existing tree canopy . Coordination and agreement from fronting property owner will be required prior to implementation . Locations shown are conceptual only . 50’25’0’100’200’Attachment 1, Page 24 of 146 VIRGINIA-DAISY BIKEWAY ~ 25SOUTH 53RD STREETDAISY STREET DAISY STREETSOUTH 52ND PLACESOUTH 53RD STREETSOUTH 52ND STREETSOUTH 51ST PLACESOUTH 51ST PLACESOUTH 49TH PLACESOUTH 49TH PLACE"5090-5136""4930-4954"CAMELLIA STREETDAISY STREETDAISY STREET Bluebelle Park At S 51st Place: A mini roundabout would be added to encourage drivers to travel at bicycle-compatible speeds . Curb ramps and concrete sidewalk added to the north east corner . At S 52nd Street: Signs would be provided to show existing no parking in narrow area of street . At S 53rd Street: A narrowed raised crossing would be added to promote yielding to crossing pedestrians . This replaces the existing crosswalk to the east . 50’25’0’100’200’ At S 52nd Street: Sidewalks would be added to the north side of Daisy St . Attachment 1, Page 25 of 146 S 53RD STREET RAISED CROSSING SIMULATION (FACING WEST)Attachment 1, Page 26 of 146 VIRGINIA-DAISY BIKEWAY ~ 27 Daisy Street: S 54th Street Connector Path to Bob Straub Pkwy Roadway markings throughout this section of the corridor would consist of buffered bike lane stripes, and bike lane markings to distinguish protected bike lanes from the general purpose travel lanes . No center lane would be provided to encourage people driving to give extra distance while passing people on bikes . Extremely low parking utilization in the block between the S 54th Street Connector Path and 5660 Daisy Street would allow conversion to buffered bike lanes . The block between the 5660 Daisy Street loop would be unbuffered bike lanes to allow on-street parking to remain on the north side of the street . Additional Safety Features Other elements along the corridor designed to create a safer operating environment by slowing speeds, increasing the drivers’ field of vision and opportunity to yield, and shortening stopping distances include: Curb extensions (shorten the pedestrian crossing distance and visually narrow the roadway to slow traffic) On-street planters (capture and treat stormwater runoff and visually narrow the roadway to slow traffic) Raised crosswalk (improve driver visibility of pedestrians and slow traffic) Recommended Cross Section Attachment 1, Page 27 of 146 28 ~ VIRGINIA-DAISY BIKEWAY BOB STRAUB PARKWAY DAISY STREET SOUTH 57TH PLACE COLONY RDGATEWAY STREETGATEWAY STREET DAISY STREET 5660 DA ISY STREET5660 DAISY STREETBOB STRAUB PARKWAY DAISY STREETFUTURE TRAIL CONNECTION TO 54THAt Future Trail Crossing: A raised crossing would be added to promote yielding to crossing pedestrians . Additionally, this treatment will enhance safety for all users by reducing speed along this section of the corridor . Street modification: Buffered bike lanes would be used to provide a gateway treatment and to slow traffic coming off of Bob Straub Parkway . 50’25’0’100’200’Attachment 1, Page 28 of 146 VIRGINIA-DAISY BIKEWAY ~ 29BOB STRAUB PARKWAY DAISY STREET SOUTH 57TH PLACE COLONY RDGATEWAY STREETGATEWAY STREET DAISY STREET 5660 DA ISY STREET5660 DAISY STREETBOB STRAUB PARKWAY DAISY STREETFUTURE TRAIL CONNECTION TO 54THAt 5660 Daisy Street: A raised crossing would be added to promote yielding to crossing pedestrians . Street modification: Buffered bike lanes would be used to provide a gateway treatment and to slow traffic coming off of Bob Straub Parkway . Bob Straub Pkwy: Design will be part of a future project . 50’25’0’100’200’Attachment 1, Page 29 of 146 30 ~ VIRGINIA-DAISY BIKEWAY Parking Considerations in Relation to Bikeway Implementation Establishing a new bikeway on the Virginia-Daisy corridor involves changes to the street that include traffic control changes, lane restriping and roadway reconfiguration . One strategy for creating space for dedicated bike lane facilities is to consolidate street parking on only one side of the street . Underutilized parking lanes can result in higher traffic speeds and unsafe driving behavior due to the appearance of a wide open travel space . Reallocating a portion of underutilized parking lanes as a bike lane can mitigate these issues while providing dedicated space for people biking and maintaining ample on-street parking spaces1 . Existing Conditions To support the bikeway design for Virginia-Daisy, the City of Springfield conducted on-street parking counts at ten different times to cover the variety of conditions encountered on the corridor2 . To supplement this data, the city also performed a count based on visual inspection of previously captured photography .3 Count Summary Observed usage of the on-street parking lane at any one time on the full Virginia-Daisy corridor ranges from a low of 74 vehicles to a high of 116 vehicles . Specific clusters of parking demand varies on the corridor in response to land uses, community destinations and availability of off-street parking . As shown in the table to the right, parking demand is generally consistent from weekday to weekend and morning to evening hours . Special event parking demand (such as a sports event at the Willamalane Center) may exceed the use seen on the average day . 1 FHWA . Incorporating On-Road Bicycle Networks into Resurfacing Projects . 2016 2 Counts were performed Tuesday 1/12/2016 and Tuesday 1/19 .2016 at 10am; Tuesday 1/19/2016 and Tuesday 1/26/2016 at 6:30 pm; Saturday 1/16/2016 and Saturday 1/23/2016 at 2:00pm; Saturday 4/02/2016 at 6:00pm; Sunday 4/03/2016 at 5:30pm; Saturday 7/16/2016 at 6:10pm; and Sunday 7/17/2016 at 6:00pm . 3 Google StreetView photography dated September 2011 and August 2008 . Average parking use for each block segment on the corridor based on day and time 0 2 4 6 8 10121416 # of Parked CarsWeekday Morning Weekday Evening Weekend Afternoon Weekend Evening Parking Lane Capacity Parking is allowed on the curbside on both sides of the street along the majority of the Virginia-Daisy corridor . Under some conditions, parking use may be prohibited, restricted or unavailable . These conditions include: Parking is prohibited for 30 ft advance of crosswalks . This applies at all crosswalks4, including all street corners . On the Virginia-Daisy corridor, currently yellow curbs are only painted on either side of the marked crosswalks by Colony Dr and Ridge Dr . Spot parking restrictions such as the residential loop at the far East end of the corridor which has no parking permitted on the street (off of Daisy St) . On-street parking is not allowed in front of driveways . Many residential units on the corridor provide their own off-street parking for one or two vehicles . Curb cuts provide access to these spaces but also prevent on-street parking in that location . On narrow segments without space for parking . Between S 51st and S 52nd St the street is so narrow that parking would block one travel lane . Parking is already prohibited on this segment . 4 See . ORS 811 .550 – Parking prohibition near crosswalks Design Considerations On most streets with parking on both sides, parking demand can be accommodated with parking provided on one side . Parking may be alternated from one side of the street to the other with proper transitioning . This pattern may cause motorists to reduce their speed .Attachment 1, Page 30 of 146 VIRGINIA-DAISY BIKEWAY ~ 31 Proposed Changes As part of the Virginia-Daisy Bikeway project, some segments of the corridor may feature consolidated parking lanes in order to visually narrow the roadway and provide space to establish a bike lane in higher traffic volume locations . At spot locations across the entire corridor, parking may be restricted in certain locations to allow for trees and crossing enhancements . These spot changes on their own are not expected to have significant impact to parking availability . There are four distinct segments in the project related to parking lane consolidation: S 32nd to S 42nd : In this segment, no parking consolidation is proposed, with no significant effect on parking availability . S 42nd to Weyerhauser Haul Rd: This segment proposes parking consolidation on one side of the street . After implementation, this segment will have an estimated 140 parking spaces . This is more than enough to serve the observed weekend peak of 15 parked cars . (10% post implementation utilization) . Weyerhauser Haul Rd to Ridge Dr: In this segment, no parking consolidation is proposed, with no significant effect on parking availability . Ridge Dr to Bob Straub Parkway: This segment proposes the removal of parking on both sides of the street (with the exception of one block on the north side near 5660 Daisy Street/Western Loop) . After implementation, this segment will have an estimated 15 parking spaces . This is more than enough to serve the observed weekend peak of 5 parked cars . (33% post implementation utilization) . This segment does not have driveways fronting the street since it is located between the backs of two mobile home parks . Community Benefits Reduces conflicts with bicyclists as drivers pull into and out of parking spaces and drivers and passengers open doors of parked vehicles . Provides additional roadway space for bicycle facilities . Improves sight distance for all roadway users . Provides clean water recharge and stormwater management via treatment and flood control .Attachment 1, Page 31 of 146 PLANNING COMMISSION AND BICYCLE & PEDESTRIAN ADVISORY COMMITTEE MEMBERS RIDE CORRIDOR AS PART OF SITE VISITAttachment 1, Page 32 of 146 VIRGINIA-DAISY BIKEWAY ~ 33 CHAPTER THREE Outreach and Community Involvement Involving the community in design concept development is critical to a successful project. The communications goals for the Virginia-Daisy Bikeway Project are as follows: Ensure the Springfield community has opportunities to be informed about the project Ensure the Springfield community has opportunities to provide input on the project; specifically residents within the project area Project communication is effective and efficient Included in this section are the following key highlights . Appendices referenced throughout provide additional detailed information about project communication efforts . Communications Summary Summary of Open Houses Committee Guidance Communications Summary A Communications Plan (Appendix 5) was developed to support the Virginia- Daisy Bikeway project by setting objectives, strategies, and tactics to increase awareness and understanding of the overall project and specifically inform Springfield residents that live within the project area about the overall goal of the project and opportunities to give input . The tactics used to date to communicate about the project and involve the community in project planning are summarized below . Additional communication will continue as the project moves from planning into design and construction . Copies of outreach materials are available in Appendix 9: Outreach Materials . Material Outreach Tactics Project Website: http://www .springfield-or .gov/dpw/Virginia-DaisyBikewayProject .htm E-updates: 5/23/2016, 6/23/2016, 7/7/2016 Newsletter articles: SmartTrips Springfield, SmartTrips Thurston, InMotion Postcards: 3 postcards, mailed to 4,400 addresses in the project area Interested parties email list: 85 subscribers as of August 19, 2016 TV interview: 6/13/2016 with local channel Flyers: distributed across community prior to each open house FAQs: available online and at open houses Newspaper: Open Houses promoted in Register Guard outdoor calendar Design Mapbooks: staff mailed or hand delivered three design concept packets to residents along corridor at their request Facebook posts promoting Open Houses by Safe Routes to School In-Person Outreach 2 Open Houses* Tabling at Neighborhood Community Events 1 . PeaceHealth Safety Fair at Willamalane Center on May 21, 2016 2 . Willamalane South Hills String Band at Douglas Gardens Park on July 20, 2016 Presentations: BPAC, Planning Commission, and City Council Hand-delivered letters and on-site conversations with residents on the corners of 42nd St and Daisy St Bicycle and Pedestrian Advisory Committee Site Visit Ride Analytics - E-update - Average open rate of 66%; 67% on Desktop and 33% on a moblie device; Website - 359 unique pageviews with an average viewing time of 4:29 minutes Feedback from Community** 10 emails 17 phone calls 1 letter *See Appendix 7 and 8 for summary of open houses . **See Appendix 6 for log of written comments .Attachment 1, Page 33 of 146 34 ~ VIRGINIA-DAISY BIKEWAY Summary of Open Houses To engage residents and property owners along the corridor and to receive their input on the bikeway design elements, staff held two open houses . The first was to show the design concepts and the second to show the refined design concepts that included their feedback from the first open house . Open House #1 Wednesday, May 25, 2016, 6:00 – 7:30PM Mt Vernon Elementary School Cafeteria 35 attendees “Support the shared travelway, beacons at 32nd and Virginia Ave, mini-roundabouts at 35th and 41st, bicycle lanes on Daisy all the way, and 42nd/Daisy traffic light, full signal preferred. Adding trees is not necessary, let people do it in front of their house if they want to. Safely crossing 42nd and Daisy on foot or bicycle is concerning currently, as well as 32nd and Bob Straub.” “No trees that the City has to maintain, staff and funds do not exist. Mini- roundabouts are okay if they don’t block the view so that neighbors can’t see across or down the street. Don’t mess with the parking.” “Like the roundabouts with single lanes for slowing traffic and it makes it safer for bikes. Bike boxes are great. Also buffered bike lanes in some places are great for safety. Not enough speed bumps [raised crosswalks and speed cushions]. Great job!” Open House #2 Tuesday, July 12, 2016 6:00 – 7:30PM Papa’s Pizza on Main St 45 attendees “I like basically everything, especially all the roundabouts and flipped stop sign. Also the protected bike lanes. Please, please push for the 54th St. connection to Safeway and remove the gate on the Weyerhaeuser trail. Thank you! Keep up the good work.” “I like these refined design concepts: yes, as far as I understand them. My concerns are what kind of trees will be added? And where?” “I don’t want to change the street.” “I like the roundabouts, especially at 42nd and Daisy, bike lanes, shared lane markings, and anything else you can do to inform others of cyclists on the road. Looks great. Remember to design the project like your kids will be using it. My concerns are that generally motorists far exceed the posted speed limit.” “I have nearly been hit on my bike a handful of times trying to cross at 42nd headed south while I’m on my bike. This is the route to Clearwater bike path that my family uses. My daughter is in middle school and I will not let her ride her bike to school (ASMS) due to this bike crossing problem. Not only would a round-a-bout be helpful for pedestrian and bicycle crossing, it would make traffic slow down for cars too. The corner south of daisy on 42nd street does not have good vision to predict turning times from daisy to 42nd in any direction. Often traffic is speeding around this corner.” – 44th and Daisy Resident, email “I love the idea of a yellow blinking light and cross- walk across 32nd at the end of Virginia to get to Willamalane Center from our neighborhood.” – Neighborhood Resident, emailAttachment 1, Page 34 of 146 VIRGINIA-DAISY BIKEWAY ~ 35 Committee Guidance Additional details in the following bullet point content. BPAC Site Visit (9/14/2015) BPAC Site Visit: Rode the length of the corridor Observed the varied characteristics (width, parking utilization, traffic volumes, intersection size, etc.) along the corridor Emphasized that crossing improvements at 42nd St and 32nd St were priorities for the project to address and a future crossing improvements at Bob Straub Parkway is needed Planning Commission (6/7/2016) and City Council (6/13/2016) Planning Commission: Supported 32nd intersection as proposed with refuge island crossings Preferred roundabout option at 42nd St and Daisy St Supported sharrows and bike lanes as proposed Discussed consistency of treatments along the corridor and throughout the community, including wayfinding signs and roundabouts City Council: Supported 32nd intersection as proposed with refuge island crossings Preferred roundabout option at 42nd St and Daisy St Supported sharrows and bike lanes as proposed Directed trees to be optional or at the property owner’s request and overall less frequent along the corridor Supported stormwater integration elements of project, but wanted predictable and smooth transitions along the corridor with stormwater and traffic calming Directed staff to collect additional evening weekend parking utilization counts to ensure treatments complement the current on-street parking patterns BPAC Meeting (6/14/2016) BPAC Meeting: Overall the committee was very supportive of the Preliminary Design Concepts Preferred buffered bike lane option for the corridor to the east of 54th on Daisy St Preferred roundabout treatment at 42nd and Daisy intersection Attachment 1, Page 35 of 146 Attachment 1, Page 36 of 146 VIRGINIA-DAISY BIKEWAY ~ 37 CHAPTER FOUR Next Steps The Path Forward The City of Springfield has engaged the Virginia-Daisy neighborhood and broader community in developing the design concepts for the Bikeway . The project will continue to communicate with the neighborhood and Springfield community as the project moves from planning into design and construction . The project website (http://www .springfield-or .gov/dpw/Virginia- DaisyBikewayProject .htm) will continue to be updated, email updates will be shared periodically with the interested parties list (sign-up available on the website), and postcards will be mailed to the project area to keep the community informed . Project Calendar September 2016 City Council Work Session October 2016 City Council Public Hearing October 2016 City Council Final Concept Approval October 2016 – Spring 2016 Engineering Design Summer 2017 Overlay Street and Construct Bikeway The timeline is subject to change . Please see project website for most updated information or contact Emma Newman, Transportation Planner, at 541-726-4585 or enewman@springfield-or .gov .Attachment 1, Page 37 of 146 Attachment 1, Page 38 of 146 VIRGINIA-DAISY BIKEWAY ~ 39 CHAPTER FIVE Cost Estimate for Refined Design Concept Project Elements Cost estimates have been developed for the different elements of the project (see below) . For the detailed cost estimate information, please see Appendix 10: Cost Estimate . As the project moves from high level planning concepts into design and construction, some design elements may need to be eliminated if construction costs end up being higher than expected . The intent of the project is to provide as many benefits with the funds available . Project Element Cost Funding Source Bikeway Treatments $806,000 Transportation Enhancement Oregon Bicycle and Pedestrian Advisory Committee Grant Springfield Development Charges Overlay $500,000 Federal Surface Transportation Planning Urban Funds ADA Ramps and Driveways $477,000 To be identified Stormwater Treatments $107,000 Springfield Stormwater funds Total $1,890,000Attachment 1, Page 39 of 146 Attachment 1, Page 40 of 146 VIRGINIA-DAISY BIKEWAY ~ 41 Appendices Attachment 1, Page 41 of 146 Attachment 1, Page 42 of 146 Appendix 1: Preliminary Design Concepts Mapbook Attachment 1, Page 43 of 146 STOPSTOPVIRGINIA AVENUESOUTH 34TH STREETSOUTH 32ND STREETWillamalane Sports ComplexVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS150’25’0’ 100’ 200’KEY FEATURES Virginia Avenue: 32nd Street to 34th StreetAt S 32nd Ave: The crossing would be enhanced with high visibility markings and rapid fl ash beacons to create a low-stress crossing with a high rate of yielding.See next sheet for intersection design.The preferred bikeway type on Virginia Avenue to 34th St is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Optional design elements could include colored pavement to diff erentiate the parking lanes from the travel lanes.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness. Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. On-Street Tree PlantersADA Accessibility:All curb ramps along the corridor will be evaluated for ADA accessibility and necessary upgrades.Attachment 1, Page 44 of 146 VIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS220’10’0’40’30’32ND STREET INTERSECTION SIMULATION (FACING SOUTH) Virginia Avenue: 32nd Street Intersection32ND STREET INTERSECTION DESIGNRapid fl ashing beacons facing S 32nd Ave would promote yielding to people crossing the street.People on bicycles on Virginia Ave would ramp up to a shared-use path at the crossing, and cross adjacent to pedestrians in the crosswalk. People on bicycles would also have the option to navigate the intersection as a vehicle in the travel lanes.Median safety islands would provide added safety and comfort for people walking and biking across the street.Mixing zones would be created on all four corners of the intersection. These are areas where people biking and walking would be able to navigate around the intersection separated from motor vehicle traffi c. These areas are delineated with specialty pavement to indicate that these areas are for slow and safe travel. Attachment 1, Page 45 of 146 SOUTH 37TH STREETVIRGINIA AVENUESOUTH 35TH STREETVIRGINIA AVENUEVIRGINIA AVENUEVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS350’25’0’ 100’ 200’KEY FEATURES Virginia Avenue: 35th Street to 37th StreetThe preferred bikeway type on Virginia Avenue to 37th St is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Optional design elements could include colored pavement to diff erentiate the parking lanes from the travel lanes.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness.At S 37th St: The stop sign would be fl ipped to favor Virginia Ave.At S 35th St : A mini roundabout would be added to create bicycle-compatible travel speeds.Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but on existing parking needs and lack of existing tree canopy.Attachment 1, Page 46 of 146 SOUTH 40TH STREETSOUTH 4OTH STREETVIRGINIA AVENUESOUTH 39TH PLACESOUTH 38TH STREETVIRGINIA AVENUEVIRGINIA AVENUEVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS450’25’0’ 100’ 200’KEY FEATURES Virginia Avenue: 38th Street to 40th StreetThe preferred bikeway type on Virginia Avenue to 40th St is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Optional design elements could include colored pavement to diff erentiate the parking lanes from the travel lanes.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness.At S 38th St: The stop sign would be fl ipped to favor Virginia Ave. A narrowed raised crossing with curb extensions would be added to promote yielding to crossing pedestrians and to help deter speeding through the neighborhood.Curb extensions could also function as stormwater planters to capture and treat water before entering channels on 38th.At S 40th St: Mini median islands would be added to slow traffi c and provide refuge for pedestrians crossing the street. Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. Attachment 1, Page 47 of 146 VIRGINIA AVENUESOUTH 41ST PLACESOUTH 41ST STREETVIRGINIA AVE 4037-4053VIRGINIA AVENUEVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS550’25’0’ 100’ 200’KEY FEATURES Virginia Avenue: 41st Street to 41st PlaceAt S 41St : A mini roundabout would be added to create bicycle-compatible travel speeds.Average Daily Traffi c = 1,075 VehiclesAdded Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. The preferred bikeway type on Virginia Avenue to 41st Pl is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Optional design elements could include colored pavement to diff erentiate the parking lanes from the travel lanes.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness.Sidewalk Infi ll:New concrete sidewalk added to fi ll in gaps along corridor. Attachment 1, Page 48 of 146 SOUTH 43RD PLACESOUTH 43RD STREETSOUTH 42ND STREETSOUTH 42ND PLACEDAISY STREETVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS650’25’0’ 100’ 200’KEY FEATURES Daisy Street: 42nd Street to 43rd PlaceAt S 42 St: Intersection design options are proposed to improve safety, yielding and crossing comfort for users.See detailed designs of intersection options on the following pages.The preferred bikeway type on Daisy Street to 43rd Pl is bicycle lanes.Due to higher traffi c volumes, a separated bicycling facility is necessary. Roadway markings throughout this section of the corridor would consist of one consolidated parking lane, bike lane stripes, and bike lane markings to distinguish bike lanes from the general purpose travel lanes. No center lane would be provided to encourage motor vehicles to give extra distance while passing people biking.Optional design elements could include colored pavement to diff erentiate the consolidated parking lane from the bicycle and travel lanes.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness.Identifi cation of consolidated parking lane is based on existing parking utilization levels combined with gaps in tree canopy. Street modifi cation:Parking would be consolidated to the higher-demand side of the street.Bicycle lanes would be added for the safety and comfort of people bicycling.Street modifi cation:Curb extension with possible stormwater treatment. See photo of potential treatment below.Average Daily Traffi c = 3,357 VehiclesAccessway:Possible bike accessway improvement for people biking north on 42nd heading east on Daisy. Property LineAttachment 1, Page 49 of 146 VIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS7 Daisy Street: 42nd Street Intersection Options20’10’0’40’30’42ND STREET INTERSECTION SIMULATION42ND STREET INTERSECTION DESIGN OPTION 1(ROUNDABOUT)A compact roundabout would create slow circulation speeds through the intersection for all street approaches and greatly improve the safety of the intersection compared to existing conditions.People bicycling would be permitted to travel within the roundabout with motor vehicles, or to enter onto a shared use path and cross adjacent to pedestrians.Mixing zones would be created on all four corners of the roundabout. These are areas where people biking and walking would be able to navigate around the intersection separated from motor vehicle traffi c. These areas are delineated with specialty pavement to indicate that these areas are for slow and safe travel. Attachment 1, Page 50 of 146 VIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS820’10’0’40’30’ Daisy Street: 42nd Street Intersection Options42ND STREET INTERSECTION DESIGN OPTION 2A(FULL SIGNAL & BIKE BOXES)42ND STREET INTERSECTION OPTION 2B(PEDESTRIAN HYBRID BEACON)A full traffi c signal would control traffi c on both streets. A red traffi c signal would stop traffi c on 42nd Ave, while a green signal would tell people on foot, on bike or in cars that they can safely and comfortably cross the street.Green bike boxes would provide a dedicated waiting space for people on bikes in advance of the intersection. This would create a prioritized space in front of motor vehicle traffi c, and would allow people on bikes to go fi rst on a green signal indication. Right turns on red from Daisy St would be prohibited in this option.People on bikes would activate the signal via loop detectors or video detection.Curb extensions on all four corners reduce crossing distances for pedestrians. A Pedestrian Hybrid Beacon (PHB) would control motor vehicle traffi c on S 42nd Ave and indicate to people biking and walking when it is safe to cross. A stop sign would control motor vehicle traffi c on Daisy St.Curb extensions on all four corners reduce crossing distances for pedestrians. 42ND STREET INTERSECTION SIMULATIONAttachment 1, Page 51 of 146 VIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS9 Daisy Street: 42nd Street Intersection Options20’10’0’40’30’42ND STREET INTERSECTION DESIGN OPTION 3(PEDESTRIAN AND BICYCLE SIGNAL)A full traffi c signal would control traffi c on S 42nd Ave. A red traffi c signal would stop traffi c on 42nd Ave, while a bicycle and pedestrian signal head would tell people on foot or on bike when to safely cross the street.A stop sign would control motor vehicle traffi c on Daisy St.Right-turn islands on Daisy St. would require that people driving turn right when entering S 42nd. Emergency vehicles would be capable of travelling straight through the intersection if necessary.Attachment 1, Page 52 of 146 SOUTH 4 6 T H S T R E E T SOUTH 44TH STREETDAISY STREETDAISY STREETSOUTH 44TH STREETVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS1050’25’0’ 100’ 200’KEY FEATURES Daisy Street: 44th Street to 46th StreetStreet modifi cation:Parking would be consolidated to the higher-demand side of the street.Bicycle lanes would be added for the safety and comfort of people bicycling.Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. Street modifi cation:A mini-median island would be added to slow traffi c and keep cars in the proper lane through the bend in the roadway. Street modifi cation:Curb extension with possible stormwater planter treatment. The preferred bikeway type on Daisy Street to 46th St is bicycle lanes.Due to higher traffi c volumes, a separated bicycling facility is necessary. Roadway markings throughout this section of the corridor would consist of one consolidated parking lane, bike lane stripes, and bike lane markings to distinguish bike lanes from the general purpose travel lanes. No center lane would be provided to encourage motor vehicles to give extra distance while passing people biking.Optional design elements could include colored pavement to diff erentiate the consolidated parking lane from the bicycle and travel lanes.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness.Identifi cation of consolidated parking lane is based on existing parking utilization levels combined with gaps in tree canopy. Attachment 1, Page 53 of 146 SOUTH 47TH STREETSOUTH 47TH STREETSOUTH 46TH STREETDAISY STREETDAISY STREETVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS1150’25’0’ 100’ 200’ Daisy Street: 46th Street to 47th StreetKEY FEATURESStreet modifi cation:Parking would be consolidated to the higher-demand side of the street.Bicycle lanes would be added for the safety and comfort of people bicycling.At 46th Street: A narrowed raised crossing would be added to promote yielding to crossing pedestrians, as well as reduce speeding along the corridor.The preferred bikeway type on Daisy Street to 47th St is bicycle lanes.Due to higher traffi c volumes, a separated bicycling facility is necessary. Roadway markings throughout this section of the corridor would consist of one consolidated parking lane, bike lane stripes, and bike lane markings to distinguish bike lanes from the general purpose travel lanes. No center lane would be provided to encourage motor vehicles to give extra distance while passing people biking.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness.A portion of this segment features light colored concrete paving. On this section, markings will use high-contrast black backing with all white colored markings to enhance visibility.Identifi cation of consolidated parking lane is based on existing parking utilization levels combined with gaps in tree canopy. RecommendationAttachment 1, Page 54 of 146 SOUTH 48TH STREETWEYER H A E U S E R H A U L R D WEYERH A E U S E R H A U L R D CAMELLIA STREETSOUTH 48TH STREETDAISY STREETDAISY STREETVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS1250’25’0’ 100’ 200’KEY FEATURES Daisy Street: Weyerhauser Haul Road to Camellia StAdded Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. At S Weyerhaeuser Rd: A narrowed raised crossing would be added to promote yielding to people on foot and people biking, as well as reduce speeding along the corridor.The preferred bikeway type on Daisy Street to Camellia St is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Optional design elements could include colored pavement to diff erentiate the parking lanes from the travel lanes.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness.A portion of this segment features light colored concrete paving. On this section, markings will use high-contrast black backing with all white colored markings to enhance visibility.Attachment 1, Page 55 of 146 SOUTH 49TH PLACESOUTH 49TH PLACE"5090-5136""4930-4954"CAMELLIA STREETDAISY STREETDAISY STREETBluebelle ParkAverage Daily Traffi c = 1,514 VehiclesVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS1350’25’0’ 100’ 200’KEY FEATURES Daisy Street: Camellia St to Daisy Street Cul-de-SacAt S 49th Pl: Mini roundabout would be added to provide placemaking and to encourage people to drive at bicycle-compatible speeds.Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. The preferred bikeway type on Daisy Street to Daisy St Cul-de-Sac is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Optional design elements could include colored pavement to diff erentiate the parking lanes from the travel lanes.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness.Attachment 1, Page 56 of 146 SOUTH 53RD STREETDAISY STREETDAISY STREETSOUTH 52ND PLACESOUTH 53RD STREETSOUTH 52ND STREETSOUTH 51ST PLACESOUTH 51ST PLACEVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS1450’25’0’ 100’ 200’KEY FEATURES Daisy Street: 51st Place to 53rd Street At S 51st Pl: A mini roundabout would be added to encourage drivers to travel at bicycle-compatible speeds.Curb ramps and concrete sidewalk added to the north east corner. At S 52nd St: Sidewalks would be added to the north side of Daisy and the planter strip would be removed from the south side. At S 53rd St: A narrowed raised crossing would be added to promote yielding to crossing pedestrians. This replaces the existing crosswalk to the east. The preferred bikeway type on Daisy Street to 53rd St is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Optional design elements could include colored pavement to diff erentiate the parking lanes from the travel lanes.Other elements could include curb extensions, raised crosswalks, and mini-roundabouts as needed to create a dynamic operating environment and increase safety by raising user awareness.Attachment 1, Page 57 of 146 VIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS1553RD STREET SIMULATION: RAISED CROSSWALK WITH RED ASPHALT PARKING AREAS53RD STREET SIMULATION: RAISED CROSSWALK WITH STANDARD ASPHALT PARKING AREAS Daisy Street: Raised Crosswalk at 53rd StreetAttachment 1, Page 58 of 146 DAISY STREETFUTURE TRAIL CONNECTION TO 54THVIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS1650’25’0’ 100’ 200’KEY FEATURES Daisy Street: 53rd St to Gateway Street The preferred bikeway type on Daisy Street to Gateway St is buff ered bike lanes.Roadway markings throughout this section of the corridor would consist of buff ered bike lane stripes, and bike lane markings to distinguish protected bike lanes from the general purpose travel lanes. No center lane would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements could include a raised crosswalk to create a dynamic operating environment and increase safety by raising user awareness.Optional design elements could include a planting strip on the south side of Daisy Street that would allow for additional tree plantings and/or stormwater treatment. Extremely low parking utilization in this block would allow conversion to buff ered bike lanes. At Future Trail Crossing: A raised crossing would be added to promote yielding to crossing pedestrians. Additionally, this treatment will enhance safety for all users by reducing speed along this section of the corridor.Street modifi cation:Buff ered bike lanes would be used to provide a gateway treatment and to slow traffi c coming off of Bob Straub Parkway.See cross-section views of design options to the right.Attachment 1, Page 59 of 146 BOB STRA U B P A R K W A Y DAISY STREETSOUTH 57TH PLACEGATEWAY STREETGATEWAY STR E E T 5660 DAIS Y S T R E E T 5660 DAISY STREETBOB STRA U B P A R K W A Y VIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS1750’25’0’ 100’ 200’KEY FEATURES Daisy Street: Future Trail/54th Street to Bob Straub ParkwayAt Gateway Street: A raised crossing would be added to promote yielding to crossing pedestrians.Street modifi cation:Buff ered bike lanes would be used to provide a gateway treatment and to slow traffi c coming off of Bob Straub Parkway.See option 1 cross-section view to the right.Bob Straub Pkwy: Design will be part of a future project.The preferred bikeway type on Daisy Street to Bob Straub Pkwy is buff ered bike lanes.Roadway markings throughout this section of the corridor would consist of buff ered bike lane stripes, and bike lane markings to distinguish protected bike lanes from the general purpose travel lanes. No center lane would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements could include a raised crosswalk to create a dynamic operating environment and increase safety by raising user awareness.Optional design elements could include a planting strip on the south side of Daisy Street that would allow for additional tree plantings and/or stormwater treatment. Attachment 1, Page 60 of 146 VIRGINIA-DAISY BIKEWAY: PRELIMINARY DESIGN CONCEPTS18 Parking Utilization AnalysisPARKING CONSOLIDATION TO SUPPORT BIKEWAY IMPLEMENTATIONEstablishing a new bikeway on the Virginia-Daisy corridor involves changes to the street that may include traffi c control changes, lane restriping and roadway reconfi guration. One strategy for creating space for dedicated bike lane facilities is to consolidate street parking on only one side of the street.Underutilized parking lanes can result in higher traffi c speeds and unsafe driving behavior due to the appearance of a wide open travel lane space. Reallocating a portion of underutilized parking or travel lanes as a bike lane can mitigate these issues while providing dedicated space for bicyclists1.EXISTING CONDITIONSTo support the bikeway design for Virginia-Daisy, the City of Springfi eld supplied on-street parking counts performed at six diff erent times to cover the variety of conditions encountered on the corridor2. To supplement this data, the city also performed a count based on visual inspection of previously captured photography3. PARKING LANE CAPACITYParking is allowed on the curbside on both sides of the street along the majority of the Virginia-Daisy corridor. Under some conditions, parking use may be prohibited, restricted or unavailable. These conditions include:• Parking is prohibited for 30 ft advance of crosswalks . This applies at all crosswalks4, including all street corners. On the Virginia-Daisy corridor, yellow curbs are only painted on either side of the marked crosswalks by Colony Dr and Ridge Dr.• Spot parking restrictions such as the residential loop at the far East end of the corridor which has no parking permitted on the street (off of Daisy St).• On-street parking is not allowed in front of driveways. Many residential units on the corridor provide their own off -street parking for 1 or 2 vehicles. Curb cuts provide access to these spaces but also prevent on-street parking in that location. • On narrow segments without space for parking. Between 51st and 52nd St the street is so narrow that parking would block one travel lane. Parking is prohibited on this segment.COUNT SUMMARYUsage of the on-street parking lane on the full Virginia-Daisy corridor ranges from a low of 74 vehicles to a high of 101 vehicles. Specifi c clusters of parking demand varies on the corridor in response to land uses, community destinations and availability of off -street parking.As shown in the table to the right, parking demand is generally consistent from weekday to weekend and morning to evening hours. Special event parking demand (such as a sports event at the Willamalane Center) may exceed the use seen on the average day.AVERAGE PARKING USE FOR EACH BLOCK SEGMENT ON THE CORRIDOR BASED ON DAY AND TIMEBENEFITS• Reduces confl icts with bicyclists as drivers pull into and out of parking spaces and drivers and passengers open doors of parked vehicles.• Provides additional roadway space for bicycle facilities.• Improves sight distance for all roadway users.DESIGN CONSIDERATIONS• On most streets with parking on both sides, parking demand can be accommodated with parking provided on one side. • Parking may be alternated from one side of the street to the other with proper transitioning. This pattern may cause motorists to reduce their speed.IMPLEMENTATION CONSIDERATIONSImperfections in the quality or installation of roadway pavement, gutter joints and drainage grates must be held to a higher standard when they are located within a bicycle lane than when located within a parking lane. Construction plans should call for repair of rough or uneven pavement surface, the use bicycle compatible drainage grates, and corrections to raise or lower existing grates and utility covers so they are fl ush with the pavement surface.1 FHWA. Incorporating On-Road Bicycle Networks into Resurfacing Projects. 20162 Counts were performed Tuesday 1/12/2016 and Tuesday 1/19.2016 at 10am; Tuesday 1/19/2016 and Tuesday 1/26/2016 at 6:30 pm; and Saturday 1/16/2016 and Saturday 1/23/2016 at 2:00pm.3 Google StreetView photography dated September 2011.4 See. ORS 811.550 – Parking prohibition near crosswalksPROPOSED CHANGESAs part of the Virginia-Daisy Bikeway project, some segments of the corridor may feature consolidated parking lanes in order to visually narrow the roadway and provide space to establish a bike lane. At spot locations across the entire corridor, parking may be restricted in certain locations to allow for trees and crossing enhancements. These spot changes on their own are not expected to have signifi cant impact to parking availability.There are four distinct segments in the project related to parking lane consolidation:32nd to 42nd: In this segment, no parking consolidation is proposed, with no signifi cant eff ect on parking availability.42nd to Weyerhauser Hall Rd:This segment proposes parking consolidation on one side of the street. The parking lane may be allocated on the north or south side of the street in response to measured parking demand.The observed weekend parking peak consisted of 15 cars. After implementation, this segment will have an estimated 140 parking spaces, which will more than serve the parking utilization needs.Weyerhauser Hall Rd to Ridge Dr:In this segment, no parking consolidation is proposed, with no signifi cant eff ect on parking availability.Ridge Dr to Bob Straub Parkway:Based on low existing parking utilization, this segment proposes the removal of parking on both sides of the street (with the exception of one block on the north side near 5660 Daisy Street (Western Loop). The observed weekend parking peak consisted of 5 cars. After implementation, this segment will have an estimated 15 park-ing spaces, which will more than serve the parking utilization needs.Attachment 1, Page 61 of 146 Attachment 1, Page 62 of 146 Appendix 2: Refined Design Concept Mapbook Attachment 1, Page 63 of 146 STOPSTOPVIRGINIA AVENUESOUTH 34TH STREETSOUTH 32ND STREETWillamalane Sports ComplexVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT150’25’0’ 100’ 200’KEY FEATURES Virginia Avenue: S 32nd Street to S 34th StreetAt S 32nd Ave: The crossing would be enhanced with high visibility markings and rapid fl ash beacons to create a low-stress crossing with a high rate of yielding.See next sheet for intersection design.The preferred bikeway type on Virginia Avenue to S 34th Street is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements include curb extensions and on-street planters to create a dynamic operating environment and increase safety by raising user awareness. Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. On-Street Tree PlantersADA Accessibility:All curb ramps along the corridor will be evaluated for ADA accessibility and necessary upgrades.RecommendationAttachment 1, Page 64 of 146 VIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT220’10’0’40’30’S 32ND STREET INTERSECTION SIMULATION (FACING SOUTH) Virginia Avenue: S 32nd Street IntersectionS 32ND STREET INTERSECTION DESIGNRapid fl ashing beacons facing S 32nd Ave would promote yielding to people crossing the street.People on bicycles on Virginia Ave would ramp up to a shared-use path at the crossing, and cross adjacent to pedestrians in the crosswalk. People on bicycles would also have the option to navigate the intersection as a vehicle in the travel lanes.Median safety islands would provide added safety and comfort for people walking and biking across the street.Mixing zones would be created on all four corners of the intersection. These are areas where people biking and walking would be able to navigate around the intersection separated from motor vehicle traffi c. These areas are delineated with specialty pavement to indicate that these areas are for slow and safe travel. Attachment 1, Page 65 of 146 SOUTH 37TH STREETVIRGINIA AVENUESOUTH 35TH STREETVIRGINIA AVENUEVIRGINIA AVENUEVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT350’25’0’ 100’ 200’KEY FEATURES Virginia Avenue: S 35th Street to S 37th StreetThe preferred bikeway type on Virginia Avenue to S 37th Street is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements include a mini-roundabout and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.At S 37th Street: The stop sign would be fl ipped to favor Virginia Ave.At S 35th Street: A mini roundabout would be added to create bicycle-compatible travel speeds.Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but on existing parking needs and lack of existing tree canopy.RecommendationAttachment 1, Page 66 of 146 SOUTH 40TH STREETSOUTH 4OTH STREETVIRGINIA AVENUESOUTH 39TH PLACESOUTH 38TH STREETVIRGINIA AVENUEVIRGINIA AVENUEVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT450’25’0’ 100’ 200’KEY FEATURES Virginia Avenue: S 38th Street to S 40th StreetThe preferred bikeway type on Virginia Avenue to S 40th Street is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements include curb extensions, a raised crosswalk, a pedestrian refuge island, and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.At S 38th Street: The stop sign would be fl ipped to favor Virginia Ave. A narrowed raised crossing with curb extensions would be added to promote yielding to crossing pedestrians and to help deter speeding through the neighborhood.Curb extensions also function as stormwater planters to capture and treat water before entering channels on S 38th.At S 40th Street: Mini median islands would be added to slow traffi c and provide refuge for pedestrians crossing the street. Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. RecommendationAttachment 1, Page 67 of 146 VIRGINIA AVENUESOUTH 41ST PLACESOUTH 41ST STREETVIRGINIA AVE 4037-4053VIRGINIA AVENUEVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT550’25’0’ 100’ 200’KEY FEATURES Virginia Avenue: S 41st Street to S 41st PlaceAt S 41Street: A mini roundabout would be added to create bicycle-compatible travel speeds.Average Daily Traffi c = 1,075 VehiclesAdded Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. The preferred bikeway type on Virginia Avenue to S 41st Place is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements include a mini-roundabout and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.Sidewalk Infi ll:New concrete sidewalk added to fi ll in gaps along corridor. RecommendationAttachment 1, Page 68 of 146 SOUTH 43RD PLACESOUTH 43RD STREETSOUTH 42ND STREETSOUTH 42ND PLACEDAISY STREETVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT650’25’0’ 100’ 200’KEY FEATURES Daisy Street: S 42nd Street to S 43rd PlaceAt S 42nd Street: Intersection design options are proposed to improve safety, yielding and crossing comfort for users.See detailed designs of intersection options on the following pages.The preferred bikeway type on Daisy Street to S 43rd Place is bicycle lanes.Due to higher traffi c volumes, a separated bicycling facility is necessary. Roadway markings throughout this section of the corridor would consist of one consolidated parking lane, bike lane stripes, and bike lane markings to distinguish bike lanes from the general purpose travel lanes. No center lane would be provided to encourage motor vehicles to give extra distance while passing people biking.Other elements include a stormwater treatment and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.Identifi cation of consolidated parking lane is based on existing parking utilization levels combined with gaps in tree canopy. Street modifi cation:Parking would be consolidated to the higher-demand side of the street.Bicycle lanes would be added for the safety and comfort of people bicycling.Street modifi cation:Curb extension with possible stormwater treatment. See photo of potential treatment below.Average Daily Traffi c = 3,357 VehiclesAccessway:Possible bike accessway improvement for people biking north on S 42nd heading east on Daisy. Property LineThis is a concept only. Detailed design for the roundabout will be developed after fi nal concept approval.RecommendationDaisy St, S 43rd St - S 44th StAttachment 1, Page 69 of 146 VIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT7 Daisy Street: S 42nd Street Intersection20’10’0’40’30’S 42ND STREET INTERSECTION DESIGN PREFERRED OPTION (ROUNDABOUT)A compact roundabout would create slow circulation speeds through the intersection for all street approaches and greatly improve the safety of the intersection compared to existing conditions.People bicycling would be permitted to travel within the roundabout with motor vehicles, or to enter onto a shared use path and cross adjacent to pedestrians.Mixing zones for people walking and biking would be created on all four corners of the roundabout. These are areas where people biking and walking would be able to navigate around the intersection separated from motor vehicle traffi c. These areas are delineated with specialty pavement to indicate that these areas are for slow and safe travel. The roundabout could also incorporate stormwater treatment to aid in controlling fl ooding, treat stormwater, and recharging ground water.The roundabout proposed for implementation at S 42nd & Daisy as a part of the Virginia-Daisy Bikeway Project is designed to be uniquely optimized for pedestrian and bicycle circulation, comfort and safety. This is achieved by designing for slow, 15 mph motor vehicle travel speed throughout the roundabout. This slow speed creates low speed diff erentials for cyclists choosing to travel in-lane, and a high degree of yielding to pedestrians and cyclists within the crosswalk. *Federal Highway Administration and Insurance Institute for Highway Safety (FHWA and IHS) and https://www.wsdot.wa.gov/Safety/roundabouts/benefi ts.htm* *FHWA, Roundabouts: An Informational Guide, 2000. This guide has largely been superseded by NCHRP Report 672, but the compact urban roundabout type illustrated in the earlier guide is more appropriate for this use.ROUNDABOUT SAFETY BENEFITS*• Crash reduction - 37 % reduction in overall collisions - 75 % reduction in injury collisions - 90 % reduction in fatality collisions - 40 % reduction in pedestrian collisions• Reduce delay, improve traffi c fl ow• Less expensive: Installations costs are comparable, however roundabouts eliminate hardware, maintenance and electrical costs associated with traffi c signalsThis is a concept only. Detailed design for the roundabout will be developed after fi nal concept approval.Attachment 1, Page 70 of 146 VIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT8 Daisy Street: S 42nd Street IntersectionS 42ND STREET INTERSECTION SIMULATIONAttachment 1, Page 71 of 146 SOUTH 4 6 T H S T R E E T SOUTH 44TH STREETDAISY STREETDAISY STREETSOUTH 44TH STREETVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT950’25’0’ 100’ 200’KEY FEATURES Daisy Street: S 44th Street to S 46th StreetStreet modifi cation:Parking would be consolidated to the higher-demand side of the street.Bicycle lanes would be added for the safety and comfort of people bicycling.Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. Street modifi cation:A mini-median island would be added to slow traffi c and keep cars in the proper lane through the bend in the roadway. The preferred bikeway type on Daisy Street to S 46th Street is bicycle lanes.Due to higher traffi c volumes, a separated bicycling facility is necessary. Roadway markings throughout this section of the corridor would consist of one consolidated parking lane, bike lane stripes, and bike lane markings to distinguish bike lanes from the general purpose travel lanes. No center lane would be provided to encourage motor vehicles to give extra distance while passing people biking.Other elements include a center median and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.Identifi cation of consolidated parking lane is based on existing parking utilization levels combined with gaps in tree canopy. RecommendationAttachment 1, Page 72 of 146 SOUTH 47TH STREETSOUTH 47TH STREETSOUTH 46TH STREETDAISY STREETDAISY STREETVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT1050’25’0’ 100’ 200’ Daisy Street: S 46th Street to S 47th StreetKEY FEATURESStreet modifi cation:Parking would be consolidated to the higher-demand side of the street.Bicycle lanes would be added for the safety and comfort of people bicycling.At S 46th Street: A narrowed raised crossing would be added to promote yielding to crossing pedestrians, as well as reduce speeding along the corridor.The preferred bikeway type on Daisy Street to S 47th Street is bicycle lanes.Due to higher traffi c volumes, a separated bicycling facility is necessary. Roadway markings throughout this section of the corridor would consist of one consolidated parking lane, bike lane stripes, and bike lane markings to distinguish bike lanes from the general purpose travel lanes. No center lane would be provided to encourage motor vehicles to give extra distance while passing people biking.Other elements include curb extensions, a raised crosswalk, a center median, and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.A portion of this segment features light colored concrete paving. On this section, markings will use high-contrast black backing with all white colored markings to enhance visibility.Identifi cation of consolidated parking lane is based on existing parking utilization levels combined with gaps in tree canopy. RecommendationAttachment 1, Page 73 of 146 SOUTH 48TH STREETWEYER H A E U S E R H A U L R D WEYERH A E U S E R H A U L R D CAMELLIA STREETSOUTH 48TH STREETDAISY STREETDAISY STREETVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT1150’25’0’ 100’ 200’KEY FEATURES Daisy Street: Weyerhauser Haul Road to Camellia StAdded Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. At S Weyerhaeuser Haul Rd: A narrowed raised crossing would be added to promote yielding to people on foot and people biking, as well as reduce speeding along the corridor.The preferred bikeway type on Daisy Street to Camellia Street is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements include curb extensions, a raised crosswalk, and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.A portion of this segment features light colored concrete paving. On this section, markings will use high-contrast black backing with all white colored markings to enhance visibility.RecommendationAttachment 1, Page 74 of 146 SOUTH 49TH PLACESOUTH 49TH PLACE"5090-5136""4930-4954"CAMELLIA STREETDAISY STREETDAISY STREETBluebelle ParkAverage Daily Traffi c = 1,514 VehiclesVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT1250’25’0’ 100’ 200’KEY FEATURES Daisy Street: Camellia Street to Daisy Street Cul-de-SacAt S 49th Place: A narrowed raised crossing would be added to promote yielding to crossing pedestrians. Added Tree Canopy:Within the parking lane, tree planting areas would be added to increase canopy and defi ne the edges of the street. Locations are schematic only, but based on existing parking needs and lack of existing tree canopy. The preferred bikeway type on Daisy Street to Daisy St Cul-de-Sac is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements include a raised crossing and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.RecommendationAttachment 1, Page 75 of 146 SOUTH 53RD STREETDAISY STREETDAISY STREETSOUTH 52ND PLACESOUTH 53RD STREETSOUTH 52ND STREETSOUTH 51ST PLACESOUTH 51ST PLACERecommendationVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT1350’25’0’ 100’ 200’KEY FEATURES Daisy Street: S 51st Place to S 53rd Street At S 51st Place: A mini roundabout would be added to encourage drivers to travel at bicycle-compatible speeds.Curb ramps and concrete sidewalk added to the north east corner. At S 52nd Street: Sidewalks would be added to the north side of Daisy. At S 53rd Street: A narrowed raised crossing would be added to promote yielding to crossing pedestrians. This replaces the existing crosswalk to the east. The preferred bikeway type on Daisy Street to S 53rd St is a bicycle boulevard with shared lanes.Roadway markings throughout this section of the corridor would consist of frequent shared lane markings. These markings indicate to all users to expect people on bikes in the roadway, and help instruct people bicycling to ride in the center of the roadway to increase visibility and avoid car doors. No centerline would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements include curb extensions, a raised crosswalk, a mini-roundabout, and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.Attachment 1, Page 76 of 146 VIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT14S 53RD STREET SIMULATION Daisy Street: Raised Crosswalk at S 53rd StreetAttachment 1, Page 77 of 146 DAISY STREETFUTURE TRAIL CONNECTION TO 54THVIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT1550’25’0’ 100’ 200’KEY FEATURES Daisy Street: S 53rd Street to Gateway Street The preferred bikeway type on Daisy Street to Gateway Street is buff ered bike lanes.Roadway markings throughout this section of the corridor would consist of buff ered bike lane stripes, and bike lane markings to distinguish protected bike lanes from the general purpose travel lanes. No center lane would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements include a raised crosswalk and on-street planters to create a dynamic operating environment and increase safety by raising user awareness.Extremely low parking utilization in this block would allow conversion to buff ered bike lanes. At Future Trail Crossing: A raised crossing would be added to promote yielding to crossing pedestrians. Additionally, this treatment will enhance safety for all users by reducing speed along this section of the corridor.Street modifi cation:Buff ered bike lanes would be used to provide a gateway treatment and to slow traffi c coming off of Bob Straub Parkway.See cross-section views of design options to the right.RecommendationAttachment 1, Page 78 of 146 BOB STRA U B P A R K W A Y DAISY STREETSOUTH 57TH PLACEGATEWAY STREETGATEWAY STR E E T 5660 DAIS Y S T R E E T 5660 DAISY STREETBOB STRA U B P A R K W A Y VIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT1650’25’0’ 100’ 200’KEY FEATURES Daisy Street: Future Trail/54th Street to Bob Straub ParkwayRecommendationAt 5660 Daisy Street: A raised crossing would be added to promote yielding to crossing pedestrians.Street modifi cation:Buff ered bike lanes would be used to provide a gateway treatment and to slow traffi c coming off of Bob Straub Parkway.See option 1 cross-section view to the right.Bob Straub Pkwy: Design will be part of a future project.The preferred bikeway type on Daisy Street to Bob Straub Pkwy is buff ered bike lanes.Roadway markings throughout this section of the corridor would consist of buff ered bike lane stripes, and bike lane markings to distinguish protected bike lanes from the general purpose travel lanes. No center lane would be provided to encourage people driving to give extra distance while passing people on bikes.Other elements include a raised crosswalk and on-street planters to create a dynamic operating environment and increase safety by raising user awareness. RecommendationAttachment 1, Page 79 of 146 VIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT17 Parking Utilization AnalysisPARKING CONSOLIDATION TO SUPPORT BIKEWAY IMPLEMENTATIONEstablishing a new bikeway on the Virginia-Daisy corridor involves changes to the street that may include traffi c control changes, lane restriping and roadway reconfi guration. One strategy for creating space for dedicated bike lane facilities is to consolidate street parking on only one side of the street.Underutilized parking lanes can result in higher traffi c speeds and unsafe driving behavior due to the appearance of a wide open travel lane space. Reallocating a portion of underutilized parking or travel lanes as a bike lane can mitigate these issues while providing dedicated space for people biking1.EXISTING CONDITIONSTo support the bikeway design for Virginia-Daisy, the City of Springfi eld supplied on-street parking counts performed at ten diff erent times to cover the variety of conditions encountered on the corridor2. To supplement this data, the city also performed a count based on visual inspection of previously captured photography3. PARKING LANE CAPACITYParking is allowed on the curbside on both sides of the street along the majority of the Virginia-Daisy corridor. Under some conditions, parking use may be prohibited, restricted or unavailable. These conditions include:• Parking is prohibited for 30 ft advance of crosswalks . This applies at all crosswalks4, including all street corners. On the Virginia-Daisy corridor, yellow curbs are only painted on either side of the marked crosswalks by Colony Dr and Ridge Dr.• Spot parking restrictions such as the residential loop at the far East end of the corridor which has no parking permitted on the street (off of Daisy St).• On-street parking is not allowed in front of driveways. Many residential units on the corridor provide their own off -street parking for 1 or 2 vehicles. Curb cuts provide access to these spaces but also prevent on-street parking in that location. • On narrow segments without space for parking. Between S 51st and S 52nd St the street is so narrow that parking would block one travel lane. Parking is prohibited on this segment.COUNT SUMMARYObserved usage of the on-street parking lane at any one time on the full Virginia-Daisy corridor ranges from a low of 74 vehicles to a high of 116 vehicles. Specifi c clusters of parking demand varies on the corridor in response to land uses, community destinations and availability of off -street parking.As shown in the table to the right, parking demand is generally consistent from weekday to weekend and morning to evening hours. Special event parking demand (such as a sports event at the Willamalane Center) may exceed the use seen on the average day.AVERAGE PARKING USE FOR EACH BLOCK SEGMENT ON THE CORRIDOR BASED ON DAY AND TIME 1 FHWA. Incorporating On-Road Bicycle Networks into Resurfacing Projects. 2016 2 Counts were performed Tuesday 1/12/2016 and Tuesday 1/19.2016 at 10am; Tuesday 1/19/2016 and Tuesday 1/26/2016 at 6:30 pm; Saturday 1/16/2016 and Saturday 1/23/2016 at 2:00pm; Saturday 4/02/2016 at 6:00pm; Sunday 4/03/2016 at 5:30pm; Saturday 7/16/2016 at 6:10pm; and Sunday 7/17/2016 at 6:00pm. 3 Google StreetView photography dated September 2011. 4 See. ORS 811.550 – Parking prohibition near crosswalks0246810121416# of Parked CarsWeekday MorningWeekday EveningWeekend AfternoonWeekend EveningAttachment 1, Page 80 of 146 VIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT18 Parking Utilization AnalysisBENEFITS• Reduces confl icts with bicyclists as drivers pull into and out of parking spaces and drivers and passengers open doors of parked vehicles.• Provides additional roadway space for bicycle facilities.• Improves sight distance for all roadway users.• Provides clean water recharge and stormwater management via treatment and fl ood control.DESIGN CONSIDERATIONS• On most streets with parking on both sides, parking demand can be accommodated with parking provided on one side. • Parking may be alternated from one side of the street to the other with proper transitioning. This pattern may cause motorists to reduce their speed.IMPLEMENTATION CONSIDERATIONSImperfections in the quality or installation of roadway pavement, gutter joints and drainage grates must be held to a higher standard when they are located within a bicycle lane than when located within a parking lane. Construction plans should call for repair of rough or uneven pavement surface, the use bicycle compatible drainage grates, and corrections to raise or lower existing grates and utility covers so they are fl ush with the pavement surface.PROPOSED CHANGESAs part of the Virginia-Daisy Bikeway project, some segments of the corridor may feature consolidated parking lanes in order to visually narrow the roadway and provide space to establish a bike lane. At spot locations across the entire corridor, parking may be restricted in certain locations to allow for trees and crossing enhancements. These spot changes on their own are not expected to have signifi cant impact to parking availability.There are four distinct segments in the project related to parking lane consolidation:S 32nd to S 42nd : In this segment, no parking consolidation is proposed, with no signifi cant eff ect on parking availability.S 42nd to Weyerhauser Hall Rd:This segment proposes parking consolidation on one side of the street. The parking lane may be allocated on the north or south side of the street in response to measured parking demand.The observed weekend parking peak consisted of 15 cars. After implementation, this segment will have an estimated 140 parking spaces, which will more than serve the parking utilization needs.Weyerhauser Hall Rd to Ridge Dr:In this segment, no parking consolidation is proposed, with no signifi cant eff ect on parking availability.Ridge Dr to Bob Straub Parkway:Based on low existing parking utilization, this segment proposes the removal of parking on both sides of the street (with the exception of one block on the north side near 5660 Daisy Street (Western Loop). The observed weekend parking peak consisted of 5 cars. After implementation, this segment will have an estimated 15 parking spaces, which will more than serve the parking utilization needs.Attachment 1, Page 81 of 146 VIRGINIA-DAISY BIKEWAY: REFINED DESIGN CONCEPT19 Daisy Street: S 42nd Street Intersection Safety AnalysisPros: Reduces speedsProvides more protected pedestrian crossings movementsCreates safe areas for people walking and bikingAccomplishes the project goals to create a safer intersection for all usersLimits the need for additional signalsReduces delay, improves traffi c fl owCon: • Will require additional right-of-wayDESIGN OPTION 1 - ROUNDABOUTDESIGN OPTION 2A - FULL SIGNAL & BIKE BOXES OPTION 2B - PEDESTRIAN HYBRID BEACONDESIGN OPTION 3 - PEDESTRIAN AND BICYCLE SIGNALPros: • Signalized intersection allows controlled crossing for people walking and biking• Accomplishes the project goals to create a safer intersection for all users and to calm traffi c along the corridor• No additional right-of-way required• Improves intersection alignment • Provides buff ered area for people biking to line up and cross• Reduces north-south pedestrian crossing distanceCons: • Expense• Requires advanced warning to the south on S 42nd Street • Sight lines still provide diffi culties for turning movements• People walking and biking may not always activate signal • Added maintenance for green paint• Does not signifi cantly reduce speed or improve stopping sight distancePros: • Provides warning for people walking and biking• Least expensive• No additional right-of-way required• Provides buff ered area for people biking to line up and crossCons: • Does not signifi cantly reduce speed or improve stopping sight distance • Unconventional design may cause confusion for drivers• No change to off set intersection alignment• Left turns from Daisy St restricted• Sight lines still provide diffi culties for turning movements• Requires advanced warning to the south on S 42nd Street• People walking and biking may not always activate signal • Added maintenance for green paintPros: • Alerts people driving about people crossing on foot or bicycle• Lower cost alternative• No additional right-of-way required• Intersection alignment is slightly improved• Provides buff ered area for people biking to line up and crossCons: • Does not signifi cantly reduce speed or improve stopping sight distance • Sight lines still provide diffi culties for turning movements • Requires advanced warning to the south on S 42nd Street• People walking and biking may not always activate signal PREFERREDFor full safety analysis report, see attachment 4: S 42nd St and Daisy St Safety Technical Analysis MemoAttachment 1, Page 82 of 146 Appendix 3: 32nd St and Virginia Ave Gap Analysis Memo Attachment 1, Page 83 of 146 Attachment 1, Page 84 of 146 Attachment 1, Page 85 of 146 Attachment 1, Page 86 of 146 Appendix 4: 42nd St and Daisy St Safety Technical Analysis Memo Attachment 1, Page 87 of 146 1020 SW Emkay Drive, Suite 100 1 Bend, OR 97702 541.322.8962 Technical MemoTo: Joe Gilpin, Mary Stewart, ALTA, City of SpringfieldFrom: Jim Pex, P.E. Date: 7/13/16 Re: 42nd and Daisy/Virginia Planning Level Intersection Safety Analysis Background: As part of the City of Springfield and ALTA contract agreements, the City requested that Jim Pex, P.E. (Century West Engineering) provide a planning level review of the intersection at Virginia-Daisy and South 42nd Street. The review is based on the following parameters: Sight Distance Standards – AASHTO Method Crossing Sight Distance T = T(pr) + T(A) = 4.5 sec.T= time to cross, T(pr)=reaction time (2 sec), T(A)= time to accelerate and cross the intersection (2.5 s field timed) AASHTO Minimum Stopping Sight Distance for Intersection turns – 250-feet AASHTO Intersection Sight Distance for passenger Cars Left turn from Stop (35 mph) = 390- feet Posted Speed Limit on South 42nd – 35 mph (51.33 ft/sec) Height of Object (sitting in vehicle, average height of drivers eyes) – 3.25-3.75 feet Findings Jim Pex observed and timed vehicles at the intersection the morning of February 19, 2016 at approximately 8 am. Weather was overcast and intermittent drizzle. During the time of observation it was readily apparent that sight distance issues were a particular problem for vehicles traveling North on 42nd coming out of the turns south of the intersection with Virginia-Daisy. From this direction of travel, several objects obstruct a full field of view for the intersection including power poles, planted trees, and placement of vehicles on private property. Additionally, the last light pole is located roughly 100-feet from the intersection. The power pole at the SE corner of the intersection potentially blocks the field of view for pedestrians and partially blocks the view of drivers attempting to turn left from Daisy to go South on 42nd. At the time of observation, Mr. Pex witnessed a vehicle lock-up its brakes and narrowly miss another vehicle making this turn (left from Daisy on to SB 42nd). The details of the intersection are shown below:Attachment 1, Page 88 of 146 1020 SW Emkay Drive, Suite 100 2 Bend, OR 97702 541.322.8962 Crash Data Crash data was reviewed for the site. No fatalities were shown at the intersection and very few crashes with physical injuries were noted. However, Oregon is a self-reporting state, so unless obvious injuries occur and officers are called to the scene, nothing is reported. This produces a limited amount of data to work with. However, the lack of crashes reported up to 3/16/2015 was a positive. Intersection Field Investigation Vehicles timed coming out of the curve where they would have the first opportunity to see someone (pedestrian or vehicle) located in the middle of the intersection; Vehicle 1 – 4.5 seconds Vehicle 2 – 5.45 sec Vehicle 3 – 5.15 sec Vehicle 4 – 4.66 sec Overall average = 4.94 Seconds From the last visual blockage (light pole at 100-feet south of intersection) Vehicle 1 – 3.0 sec Vehicle 2 – 3.22 Vehicle 3 – 3.05 Vehicle 4 – 3.22 Vehicle 5 – 3.48 sec Overall average = 3.19 SecondsAttachment 1, Page 89 of 146 1020 SW Emkay Drive, Suite 100 3 Bend, OR 97702 541.322.8962 Reaction Time and Allowable Sight Distance ComparisonsGeneralized allowable reaction time is 1 second for a middle age driver to recognize an issue. Muscle movement from that reaction is 1.5 seconds in ideal conditions and full awareness of the driver. Realistically an overall assessment is 3 seconds for allowable deviation for age differences of drivers and conditions. Note, this is the time from awareness to the point of muscle movement to react and does not include the time for a vehicle to come to rest, as those times are dependent on the speed and weight of the vehicle. Using the reaction time of 3 seconds and a speed of 35 mph (51.33 ft/sec) would give a distance of 154-feet traveled before the driver reacts. The pin location shown in the following images is located at approximately 154 feet from the intersection. Items in ORANGE show obstructed view obstacles and gray shaded regions indicate obstructed view zones shown below;Attachment 1, Page 90 of 146 1020 SW Emkay Drive, Suite 100 4 Bend, OR 97702 541.322.8962 Noting again that the last light pole obstruction is located at approximately 99-feet from the intersection, the current configuration does not meet any minimum standard sight distance calculation traveling North into the intersection. Noted from the timing in the field, the time to react (not counting deceleration) is nearly equal to the time measured from the last light pole obstruction for a vehicle to reach the intersection (average of 3.19 sec). The noted obstructions and limited sight distance is below sight distance minimums that include braking distance requirements traveling North into the intersection of 250-feet (AASHTO) and a comparison of time at 4.87 seconds for a 35 mph roadway. Attachment 1, Page 91 of 146 1020 SW Emkay Drive, Suite 100 5 Bend, OR 97702 541.322.8962 Approaching the intersection from directions other than 42nd Traveling NorthWhile the approach traveling North on 42nd is the worst scenario for the intersection, other approaches to the intersection have similar problems. The ability to approach from the East on Daisy, then turn South onto 42nd has similar sight distance problems noted previously in the opposite direction. Power and light poles create immediate sight barriers, but the driver also has to take into account movement from 3 other directions prior to proceeding. This complicates vehicle movements and increases reaction time from the stopped vehicle assessing the ability to turn as shown on the next below; This does not include the additional time needed for drivers to account for pedestrians in the crosswalk. Noted previously, 4.5 seconds is the average time from a stopped vehicle to clear an intersection. Adding 1 second to processing each direction of travel prior to starting, it’s reasonable to estimate a vehicle needs 7.5 seconds of clear travel to turn left. This exceeds the visual capabilities for drivers traveling north. Other visual obstructions at the intersection came from vehicles on private property parked too close to the intersection. The NW corner and SE portions of the intersection had parked vehicles which impaired the ability to see oncoming traffic clearly. The location where the vehicles are parked can change daily and drastically affect the sight corridors of the intersection. Attachment 1, Page 92 of 146 1020 SW Emkay Drive, Suite 100 6 Bend, OR 97702 541.322.8962 Existing Condition Safety SummaryThe intersection in question does not meet sight distance requirements for vehicles traveling South to North on 42nd or from the East to West on Daisy. Traveling from the West on Virginia does not meet requirements when looking south but does meet distances to the North when private vehicles are not parked too close to the intersection. The only direction of travel that meets sight distance standards is traveling North to South on 42nd Street. The existing right-of-way configuration on south 42nd and corresponding curves limit improvement options for the intersection. Interim improvements could include, closing the crosswalk located on the South side of the intersection, and eliminating left turns onto 42nd from Daisy. The drivers do not have enough time to react at current speed limits with a clear view of the intersection. Temporary signage should be considered on 42nd Street to notify drivers of the oncoming intersection. Speed reduction signs are located south of the intersection currently, however field observations show that vehicles accelerate back to the 35 mph limits on the last turn prior to the intersection in question based on observation. Privately parked vehicles are a continuous problem around this intersection. It is recommended that the City discuss alternative parking options with the property owners and the potential danger the visual obstructions from parked cars create for people walking, biking and driving through the intersection.Attachment 1, Page 93 of 146 1020 SW Emkay Drive, Suite 100 7 Bend, OR 97702 541.322.8962 Improvement OptionsALTA has provided multiple options for improvements to the intersection and will be discussed below;Option 1 Round-About Configuration (Preferred Solution) Pro Reduces speeds in the intersection Allows Pedestrian Movement behind thru traffic area Creates safe areas for Pedestrians. Accomplishes the goals of the City to create a safer intersection for all users. Limits the need for additional signals. Con Radius Turn on East Daisy will need to be evaluated further in final design. Southern pedestrian crossing on 42nd should be reviewed and possibly eliminated. Sight distance concerns pertaining to existing obstructions are outlined within this memo. Speeds, removal of visual obstructions, and sight distance calculations will need to be checked with the final layout if the crossing can remain as shown. Final design will provide clarity on this issue. Will require right-of-way acquisition.Attachment 1, Page 94 of 146 1020 SW Emkay Drive, Suite 100 8 Bend, OR 97702 541.322.8962 Option 2A Full Signal and Bike Boxes (Preferred Alternative Solution) Pro Mandatory stopping requirements with a signalized intersection will allow controlled movement for pedestrians and cyclists crossing the intersection. Accomplishes the goals of the City to create a safer intersection design. May be able to accomplish improvements without Right-of-Way acquisition Intersection alignment is slightly improved from the current configuration. Con Signalized intersections tend to be expensive. Will require additional advanced warning to the south on 42nd Street due to stopping distance. Right hand turns could be troublesome for larger vehicles due to available area in the proposed intersection. Left hand turns traveling S-N on 42nd Street would be troublesome due to stopping sight distance. These issues remain the same on the existing intersection configuration as outlined in the report. Attachment 1, Page 95 of 146 1020 SW Emkay Drive, Suite 100 9 Bend, OR 97702 541.322.8962 Option 2B Pedestrian Hybrid Beacon Pro Provides warning for pedestrians in the intersection. Low cost alternative to the existing footprint of the intersection. May be able to build within the existing Right-of-Way footprint for the intersection. Intersection alignment is slightly improved from the current configuration. Con Does not account for existing issues with regards to stopping sight distance from the south of the intersection for vehicles and pedestrians. The layout does not fix existing problems with speed reductions for the intersection. Left hand turns traveling S-N on 42nd Street would be troublesome due to stopping sight distance. These issues remain the same on the existing intersection configuration as outlined in the report. Attachment 1, Page 96 of 146 1020 SW Emkay Drive, Suite 100 10 Bend, OR 97702 541.322.8962 Option 3 Pedestrian and Bicycle Signal Pro Provides warning for pedestrians in the intersection. Low cost alternative to the existing footprint of the intersection. May be able to build within the existing Right-of-Way footprint for the intersection. Con Does not account for existing issues with regards to stopping sight distance from the south of the intersection for vehicles and pedestrians. The layout does not fix existing problems with speed reductions for the intersection. Unconventional design may cause confusion for drivers where they should be turning and areas of avoidance. Alignment of the intersection remains offset in the current configuration. Left hand turns traveling S-N on 42nd Street would be troublesome due to stopping sight distance. These issues remain the same on the existing intersection configuration as outlined in the report. 0’10’20’30’40’Attachment 1, Page 97 of 146 1020 SW Emkay Drive, Suite 100 11 Bend, OR 97702 541.322.8962 ConclusionDesign option number one (Roundabout) will provide the best alternative to the various issues discussed within this report. This design provides allowance for the ability to slow traffic, continuous movement for vehicles in all directions, advance warning for pedestrians, and safe areas for pedestrians to cross, which all fall within the City’s goals for an improved intersection. However, due to the size and needs for public right of way for this improvement, it will require acquisition of existing private parcels to meet minimum standards of design. The entry turning radius angles will need to be verified during final design to accommodate all vehicles that utilize this busy intersection. Although costs to create this design are not typically as high as signalized intersections, land acquisition will remain an unknown cost to move forward. If land acquisition becomes too cumbersome to continue, the next best option is to signalize the intersection and provide direct control over the movements for vehicles and pedestrians.Attachment 1, Page 98 of 146 Appendix 5: Communications Plan Attachment 1, Page 99 of 146 1/29/16 Development & Public Works Department Virginia-Daisy Bikeway Communications Plan 2016 Introduction The City of Springfield was selected to receive funding for Virginia-Daisy Bikeway project covering the design development and selection phase through the Oregon Bicycle and Pedestrian Advisory Committee’s Transportation Enhancement grant program. The goal of the project is to provide a safe and comfortable bicycle corridor that can be used by people of all ages and abilities. Additionally, the design should enhance the overall appeal of the corridor for all users, improve pedestrian safety and usage, and provide traffic calming for automobile traffic to emphasize the active transportation priority along the bikeway. This Communications Plan will support the Virginia-Daisy Bikeway project by setting objectives, strategies, and tactics to increase awareness and understanding of the overall project and specifically to inform Springfield residents that live within the project area about the overall goal of the project and opportunities to give input. Individual tactics identified in this plan will be developed using this plan as a guide and the Virginia- Daisy Bikeway Communications Project Plan will contain more in-depth details. Tactics may be used multiple times to implement more than one communication strategy. This plan will be updated as needed during the duration of the project and was developed using the DPW Communication Team’s guiding principles that project information provided is accurate, effective, consistent, cost-efficient, engaging, and fun. Goals The goals of this plan will help guide the overall communications for the project. Ensure the Springfield community has opportunities to be informed about the project. Ensure the Springfield community has opportunities to provide input on the project; specifically businesses and residents within the project area. Project communication is effective and efficient. Objectives These stated objectives were developed based on known effective outreach for similar types of City projects previously conducted. A significant portion of the Springfield community is aware of the project and its objective, especially residents living in the immediate project area.Attachment 1, Page 100 of 146 1/29/16 A significant number of Springfield residents that are located within the project area provideinput on the project.Opportunities to continually improve project communication are captured.Core Message These core messages help describe the need for a project communications plan and provide consistent messages for implementing and managing the plan. The City of Springfield is committed to providing safe transportation options. The goal of the Virginia-Daisy Bikeway project is to provide a safe and comfortable bicycle corridor that can be used by people of all ages and abilities. The design of the bikeway should enhance the overall appeal of the corridor for all users, improve pedestrian safety and usage, and provide traffic calming for automobiles to emphasize active transportation along the street and enhance the neighborhood feel. There will be multiple ways for the Springfield community to receive and seek project information and provide input on the project; specifically the design of the bikeway. Audience The target audiences for project information will be the broader Springfield community, and specifically residents that are located within and around the project area; immediately along Virginia Street and Daisy Street. Also, the City will engage partner agencies that will be involved in the design and subsequent construction for the project. Audiences will be provided information that aligns with communications guiding principles. Strategies & Tactics The strategies and tactics of this plan will be implemented to reach the stated objectives. Strategies define how to achieve overall objectives by answering the “what” will be done. The strategies outlined in this plan were developed to address all objectives. The tactics answer the “how” by identifying the specific activities that will be implemented to further strategies and overall objectives. Key staff identified for each tactic will provide direction and/or input on implementation. 1.Provide the Springfield community multiple ways to receive and seek project information. 2.Inform Springfield residents that are located within the project area about the project and opportunities to give input. 3.Elicit feedback from the community to improve two-way communication. 4.Evaluate the effectiveness of strategies and tactics implemented and adjust as needed.Attachment 1, Page 101 of 146 1/29/16 Deliverables Tactic Timeline Key Staff Project Web Page Establish early 2016/ on-going Loralyn Spiro, Emma Newman Newsletter Article(s) Edition(s) TBD Loralyn Spiro, Emma Newman Social Media On-going/ as needed Loralyn Spiro LTD Advertising Specific dates in 2016 TBD Loralyn Spiro Flyer/Poster Create based on project timeline/ update as needed Loralyn Spiro, Emma Newman FAQs Create based on project timeline/ update as needed Loralyn Spiro, Emma Newman Talking Points As needed Loralyn Spiro, Niel Laudati Media Advisories As needed Loralyn Spiro, Niel Laudati Open Houses Date(s) based on project timeline Emma Newman, Michael Liebler, Loralyn Spiro, other Community Development staff or Consultant as needed Events Research/ establish list Emma Newman, BPAC Members Presentations Research/ establish list Emma Newman, BPAC Members Postcard Mailings Create based on project timeline/ update as needed Loralyn Spiro, Emma Newman One-on-One Meetings Research/ establish list Emma Newman E-Updates Establish sign up mechanism early 2016/ as needed Loralyn Spiro, Emma Newman Survey At end of project Loralyn Spiro, Niel Laudati Analytics On-going Loralyn Spiro, IT Department Debrief Meetings After key project milestones Emma Newman, Michael Liebler, Loralyn Spiro, other Community Development staff or Consultant as needed Attachment 1, Page 102 of 146 Appendix 6: Written Comment Log Attachment 1, Page 103 of 146 VirginiaDaisy Bikeway Log of Written Comments2/5/2016,Resident at 40th and Virginia Ave:Is the City planning to eliminate parking along Virginia Ave.to put in bike lanes?Many of my neighborsareupsetaboutthispossibility.This would be VERY distressing due to the fact that this is the onlyparkingforanyguestsatmyhouse.My suggestion for bike safety on this street is not to add bike lanes,but to find some way to slow traffic down.City Staff called Resident at 40th and Virginia Ave back:spoke with him about the project andaddedhimtotheinterestedpartieslist. 5/18/2016,Resident at 48th and Daisy St: I’m excited to see that there could possibly be a roundabout at the 42nd Street Intersection (that intersection is a huge pain when driving and biking).My house is located on the South side of Daisy St. at the intersection of Daisy St.and S.48th St.One of the proposed plans show a tree being placed right in front of my house.Is there any way to request a tree not to be placed in front of my house?There used to be a tree near where this proposed tree is,and the roots of that tree snaked its way all throughout the yard and under the house.That tree was cut down several years ago,and when we installed a sprinkler system in our front yard 2 years ago,we had the task of digging up all those roots, and I would hate for a new tree’s roots to do the same thing. My dog and I go on a lot of bike rides,and we always see families out with small children biking as well, but we tend to bike on the Weyerhaeuser Haul Rd.to avoid all the traffic.Am I correct in assuming that you wouldn’t be able to turn that into a nice bike path because it’s owned by Weyerhaeuser?Weyerhaeuser Haul Rd.could make an awesome bike path because it’s away from cars, and it would be safer for folks with kids,and dogs. Thanks!! City Reply Hi (48th and DaisySt Resident), Thank you very much for reaching out to me regarding the VirginiaDaisy Bikeway project. We are in the preliminary design concept phase of the project and there are still plenty of opportunities for amendments to the initial design concepts.The tree wells depicted in the preliminary design are conceptual and the specific locations of that treatment are yet to be determined.I have documentedyour request and will make sure that it is incorporated into design conversations as we refine the project.Your input is greatly appreciated. The Weyerhaeuser Haul Rd is also identified in the City’s Transportation System Plan as an opportunity for additional pedestrian and bicycle improvements.Willamalane and the City will be partnering on that project,but it is a separate project from the onstreet VirginiaDaisy Bikeway project that is currently underway and has funding available.I will be reaching out to Willamalane staff and to learn more about the timeline for improvements along the Weyerhaeuser Haul Rd since other residents in the area have also asked the same question.Attachment 1, Page 104 of 146 VirginiaDaisy Bikeway Log of Written CommentsWewillbehostinganopenhousefortheVirginiaDaisyprojectatMt.Vernon ElementarySchoolstartingat6pmonWednesday,May 25th.I hope that you are able to attend,learn moreabouttheproject,and provide additional feedback.Would you like to be added to the interested parties email list for the project?If so,please clickheretosignup.Thanks again, Emma Newman Transportation Planner City of Springfield 541726 4585 5/19/2016,Property Owner at 51st and Daisy St: I am the owner of XXXX Daisy property. I received a post card with information regarding the project.I would like to be included in receiving additional information and details of upcoming meetings. I was unable to find when and where the open houses will be held.I would like to add –the post card is the first I have heard of the project but I am thrilled and would like to support the effort. Thank you! 5/26/2016,Community Member: I was unable to attend the meeting,but would like to suggest this: There are few places for these people to walk safely without being endangered bybikes/skateboards. Families with toddlers,and elderly persons would appreciate a "walking only"lane on one side of a bikeway (could just be painted on). City Reply Thank you for your comment.Have you had a chance to look through the Preliminary Design Concepts,available on the VirginiaDaisy Bikeway project website?The current preliminary concepts propose including additional sidewalk and ramps to fill the gaps that currently exist along the corridor.Typically we would not stripe a walking lane along a street in the same location where sidewalks are provided. 5/27/2016,Comment Member Reply ...sidewalks/ramps are great....perhaps occasional signs re where skateboards go (hopefully not on sidewalks with pedestrians).(no need to respond to this email)Attachment 1, Page 105 of 146 VirginiaDaisy Bikeway Log of Written Comments5/31/2016,Resident at Bob Straub Parkway and DaisySt:Dear Ms.Newman:I do have a lot of questions.I live on the corner of Daisy and Bob Straub.1.Where is all the money coming from for this project?When they put in Bob Straub parkway they hadnicewidesidewalks.I have tried walking them but the exhaust fumes from all the vehicles make thatunpleasantandunhealthy. 2.Are there plans to install traffic signals at the corners of 42nd and one for Bob Straub and Daisy?One can hardly get off or on 42nd and the curve before Daisy is deadly.Drivers on Bob Straub try to beat the traffic signals coming from the south and going north.It is quite hard to get across Bob Straub and walking requires either going down the block to the south or going north to one of the median strips. There have been quite a few accidents at that corner. 3.I walk on Daisy Street and there are houses all along 98%of Daisy Street.How are you going to widen these streets so you can put in extra trees and lanes?Is this another plan to steal land so our properties are devalued or raise taxes?Will this mean I will be able to step from my front door directly on to Daisy? 4.I do not have a problem crossing Daisy.Why would you need a special walk way?The biggest problem are the cars racing through the intersection of Daisy and Bob Straub.If you happen to be crossing at the corner at Daisy you better be ready to run.I suspect there is a problem at the 42nd St crossing also. You can't fix stupid which is how most people drive and pedestrians think they are special and can stop 3000 lb vehicles.EVERYONE needs to pay attention whether walking or driving. Thank you, (Resident) City Reply Hi (Resident), Thank you for writing to us regarding the VirginiaDaisy Bikeway project.Here are some responses to your questions: 1.There is some federal funding for an overlay project that will precede the bikeway treatments.The bikeway project itself is funded through the Oregon Bicycle and Pedestrian Advisory Committee’s enhance grant funds.Some additional funds may be allocated to be able to cover the cost of safety improvements at the 42nd and Daisy intersection,depending on the final cost of the project.Attachment 1, Page 106 of 146 VirginiaDaisy Bikeway Log of Written Comments2.A full traffic signal is one of the current preliminary design concepts under consideration forthe42ndandDaisyintersection.To see the full preliminary design concepts and specifically viewthe42ndandDaisyintersectiontreatmentsunderconsideration,please click here (pages 7 9).For the full project website,please visit http://www.springfieldor.gov/dpw/VirginiaDaisyBikewayProject.htm.The project is working to address the safety concerns at the 42nd andDaisyintersectionthatyoustated.The Daisy and Bob Straub Parkway intersection is not withinthescopeofthisspecificproject.We recognize that intersection could also benefit fromimprovements,but no funding is available for that location at this point. 3.The majority of the project will maintain existing curbto curb widths with the exception of a little bit of potential corner widening at 42nd St.We also heard from residents along the corridor at the Open House last week that they would like to see the narrow section between 51st and 52nd widened.There would be no widening along the portion of Daisy St near your location. 4.The project design’s goal is to enhance the overall appeal of the corridor for all users, improve pedestrian safety and usage,and provide traffic calming for automobiles to emphasize active transportation along the street and enhance the neighborhood feel.We hope that this will address your concern regarding cars racing along the corridor.I am not sure which specific special walk way you are referencing in the design,but would be happy to answer your question if you clarify the location. Thanks again for your input, Emma Newman Resident Reply Thank you Ms.Newman for your prompt reply.I passed it along to some of the people in the HOA. 6/1/2016,Resident at 49th and Daisy St: Questions we have as residents of Daisy Street: Will the hazardous old maple trees come down that were severely damaged in the ice storm two years ago?One of the cityowned trees in front of our house has a split that’s about 20 feet in length from the tree top to the trunk area.When the wind blows we can still hear cracking in the upper limbs,and a lot of debris still drops periodically to the ground.The tree is not safe to be left in the condition it’s currently in.We repaired our own roof and replaced our own broken window,caused by the storm, after we didn’t hear back from the city with 3 attempts to get in touch with them following the storm. Will parking be restricted making it difficult for home owners that live along Daisy? Specifically,what will be done to slow traffic as we see numerous cars blow through the only stop sign (at 49th Place)between 42nd and Bob Straub?Our 16box mailbox was knocked off the support andAttachment 1, Page 107 of 146 VirginiaDaisy Bikeway Log of Written Commentstossedacrossadrivewayfromacarthatspedthroughthestopsignafterithit another car.It thenrestedonthewrongsideofthestreetintheyard(2 houses from the stop sign)across from ourproperty.Current traffic completely disregards the speed signs posted.We know of 5 cats including 2ofoursthathavebeenkilledinfrontofourhouse.There are a lot of young children that now live nearourhome.It’s hard enough to see animals killed,but we cannot help but be concerned about childreninourneighborhood.What will be done to the area that bottlenecks between 51st and 53rd,where there is a fence built on the curb? Will the traffic still be blocked on 49th Place where road access to Main Street once existed?49th Place to Main became a WALKING PATH (seriously?)when a series of apartments were built in the field that was once a Drivein Theater.This makes it very hard for cars to pass to Main Street between the assisted living housing and apartments meandering around to come out at 48th and Main.That street is barely passable by two cars going in opposite directions now;therefore,people blow through our street to get to either 42nd or Bob Straub.It makes one wonder who dreams up such plans?Certainly not someone who lives in this neighborhood. This was a wonderful treelined sleepy lane when we moved in 21 years ago.That peace and quiet was completely destroyed when the city punched through Weyerhaeuser Road making this a speedway.Our street became one of the longest parallels to Main.Since that street change we see many frightening characters day and night that now roam the street,some digging through residents’garbage cans.And, we’ve witnessed highspeed pursuits by police attempting to do their job when chasing criminals.This is no longer the pleasant area we once experienced.Hopefully some of your plans with these proposed bike lanes will do something to correct some ofthe difficulties that were created when Daisy Street’s neighborhood was turned into a highspeed nightmare. Thank you for listening to these questions and concerns, (Resident) City Reply Part 1 Thanks for writing with regards to the VirginiaDaisy Bikeway project.I am looking into some of your questions regarding the tree concerns with our maintenance staff and will send you a full reply to your email when I am back in the office early next week. The full Preliminary Design Concepts are available on the project website at http://www.springfieldor.gov/dpw/Transportation/SupportFiles/Virginia Daisy_Bikeway_Preliminary_Design_Concepts.pdf.A variety of different traffic calming treatments are proposed,which may interest you and address some of your concerns expressed below. City Reply Part 2Attachment 1, Page 108 of 146 VirginiaDaisy Bikeway Log of Written CommentsHi(Resident),Thanks again for writing to us with regards to the VirginiaDaisy Bikeway project.Below I haveprovidedtheanswerstoyourvariousquestions.1) Our operations and maintenance staff are looking into the trees that you described andassessingwhatcanbedonetoimprovethesituation.The preliminary feedback was thatitappearsasifthetreesweretoppedmanyyearsagoandarenowexperiencingtheresultsoftopping. 2) The majority of the existing parking is maintained in the Preliminary Design Concepts. The last page of the document explains the parking utilization study that was conducted, which informed the Preliminary Design Concepts.Some locations have parking consolidated to one side of the street in locations where very low utilization was observed.As you can see for your portion of the corridor,almost all of the existing parking would be maintained as currently proposed.The primary treatment proposed is a shared lane marking,also known as a “sharrow,”which is marked with paint. Additional trees are proposed at some locations along the corridor to help provide additional traffic calming and neighborhood beautification.As the design progresses from preliminary concept into a refined design,we will work with residents along the corridor to place trees in the most appropriate locations.The result will most likely be fewer trees than are currently shown.The trees would also be selected to be appropriate street tree varieties so they do not create some of the same problems you are currently experiencing with the silver maples.What do you think about the trees? 3) Traffic calming to create an environment that encourages people to drive neighborhood appropriate speeds is a priority for the project.Along the corridor,we are looking at a variety of different physical engineering treatments to achieve this goal.There are various locations that are being considered for raised crosswalks,others with mini roundabouts (see attached photo),as well as a few locations with planted buffer areas. The trees that are proposed would also help traffic calm as well,which helps to prevent people from speeding.The Preliminary Design Concepts show a raised crossing or mini roundabout treatment every several blocks,which would help deter people from using the length of the corridor as a speedway.Additionally,we are looking to fill in a few sidewalk gaps that exist to ensure pedestrians have a safe place to walk. 4) The Preliminary Design Concept shows additional sidewalk being added to fill in the existing gap from 51st to 53rd and to provide one travel lane in either direction.This configuration would also be signed with no parking through the narrow section,similar to how it is currently unsafe to park in that location.The preliminary proposal would not require any additional right of way.The gentleman’s property you referred to comes up to the edge of the road currently.I’d be interested to hear your thoughts about this couple block area. 5) The location to the north of Daisy at 49th Pl is not within this project’s scope,but appreciate your feedback about that location as well.Attachment 1, Page 109 of 146 VirginiaDaisy Bikeway Log of Written Comments6) We have heard from you and many of your neighbors about speeding concerns alongDaisyStandVirginiaAve.We also have worked with police officers who work in the areaaspartoftheconceptdevelopmentandtheyaresupportiveoftheproposedtrafficcalming,which will help deter speeding.I hope that the VirginiaDaisy Bikeway project can help make your street more pleasant.Pleaseletmeknowifyouwouldlikeclarificationonanyofthetopicsabove.Thank you, Emma Newman Letter from Two Residents at 44th and 45th and Daisy: Dear Emma Newman: We are contacting you to give our opinion of the proposed VirginiaDaisy Bikeway Project.We realize that the project has already been decided on and that it is likely too late to cancel the project,but we would still like to state our objections. 1.Before city officials decide to do something,they should live in the neighborhood for a year or two in order to understand the dynamic of the neighborhood.Since that is likely impossible,a questionnaire should be sent to those who live in the neighborhood to assess the feasibility of a project. 2.When it was decided to put Daisy Street completely through,we were assured that our neighborhood wouldn't be impacted by extra traffic.Before the street was put through,we had approximately 300 vehicles a day drive past our houses.Most of those were in the morning,people in the neighborhood going to work,or in the late afternoons when they were returning home.We had very little traffic mid day and late at night.Now,traffic is constant.I believe that you're count shows approximately 3000 vehicles a day.Those vehicles ignore traffic safety and regulations.We have vehicles going by our house at 4080 mph mid day and late at night. 3.Because of the excess traffic,the road surface has deteriorated.The street was repaved several years ago,when the anticipated traffic load was approximately 300 vehicles per day.Now that the traffic load is 3000 vehicles per day,the pavement is in extremely bad condition. 4.We have noticed that where there are bike lanes,bicyclists realize that they're being encouraged to use those routes.But...they don't use the bike lanes.They ride on the sidewalks.One of us was struck by a bicyclist when she was walking down the sidewalk and the cyclist,coming up behind her,wasn't paying attention to where he was going or what was in his path.Like vehicle drivers,bicyclists often are busy talking or texting with their cell phones and not paying attention to what is around them or in their path. 5.With the increased amount of traffic caused by the through opening of Daisy Street,it's very difficult to back out of our driveways when we need to go somewhere.We frequently have to wait for several minutes before there is a large enough gap in traffic to allow us to back out without causing an accident.Attachment 1, Page 110 of 146 VirginiaDaisy Bikeway Log of Written Comments6.Because we already have a large number of bicyclists traveling on this street (actually riding on thesidewalksincethat's where they prefer to ride)we have almost caused an accident with a bicycle.Theydon't follow common laws (bicyclists are supposed to follow basic traffic laws about which side of thestreettoridewhengoingaparticulardirection,etc.).They pay no attention to cars trying to legally exitadrivewayorsidestreet.7.One of the issues that is a problem in the section of Daisy Street where we live is designating parkingonthenorthsideofthestreet,the side of the street where our houses are located.We live across thestreetfromtheCountryManorMobileHomePark.At one time,it was a Mobile Home Park.Now,it a trailer court.The Park has rules and regulations about how many vehicles can be parked in and around each space. If the residents of a particular space have more vehicles than permitted,then they park them along Daisy Street.With designated parking on the north side of the street,the side where we live,then those extra vehicles will be parked in front of our homes.That means our invited guests,family and friends, won't be able to park by our home.They might have to park several blocks away.This last weekend, there were 6 vehicles parked on the south side of Daisy Street.When the Bikeway is established,those vehicles will have to park on the north side of the street.I don't know how you feel about the area in front of your home being taken up with parking by strangers,but it doesn't sit well with us. Daisy Street was originally a quiet,back street in a residential neighborhood.It was not designed to be a major thoroughfare,an adjunct to Main Street.However,with the changes that have been made,and that are scheduled to be made,it is no longer the quiet family area where we have lived for so long. Sincerely, (Resident) (Resident) City Reply (Letter Mailed 7/1/2016) Thank you for sending in your letter expressing your opinions on the project.We are still in the process of collecting input from residents in the area.Final decisions on design have not been made yet and there are more opportunities coming up to express you opinion moving forward. We have heard similar concerns from our police department and others in the neighborhood in relation to the numerous occurrences of speeding along the corridor.One of the goals of the project is to improve safety by installing traffic calming measures to get vehicles to slow down. In relation to your comment about road deterioration,this project is being performed in combination with a repaving project to address the roadway condition.By combining our efforts for preservation and enhancement we hope to save money,minimize construction impacts to the citizens on the corridor and return the street to more of aresidential neighborhood condition and detract its use as a higher speed major thoroughfare. If you would like to provide additional comments,we have another public open house coming up from 6:00 to 7:30pm on Tuesday July 12,2016 at Papa’s Pizza on Main Street.You are always welcome to contact us directly as well and we are more than willing to set up a time to come to your residence to discuss your concerns in person.Attachment 1, Page 111 of 146 VirginiaDaisy Bikeway Log of Written CommentsThankyou,Michael Liebler and Emma Newman7/10/2016,Resident at 51st and Daisy St:Hi, Finally got a chance to look at project ideas. I have lived here on Daisy for 14 years and can say without a doubt that a round about at the 42nd and Daisy intersection is a bad idea. I've always wished for a traffic light there. As having driven my children to Mt.Vernon Elementary has always been a dangerous endeavor. Please put up traffic lights!!!It would be better for everyone. City Reply:Emma Newman called resident back and shared project update and answered questions.Emma shared the safety information from the project and explained the benefits associated with roundabouts compared with traffic signals and she said,“what do I know?If a roundabout is safer,that’s good.”Overall,she was very glad that something will be done to address the safety at 42nd and Daisy St and along the corridor. 7/12/2016,Property Owner at 40th and Virginia Ave: Emma, My name is XXXX.I am a teacher and I own a home at XXXX Virginia with my husband and my 1.5 year old son who was at the open house with me tonight.(I felt awkward because I forgot his shirt.Oops!) We didn't stay long. I wanted to say that overall I think this project is a great idea for Springfield.I heard many people who seemed caught up in the nitpicking specifics as it pertains to their house.I am fortunate that we live in the cul desac and therefore my home won't be directly impacted,but I will be driving and walking this bikeway everyday.I think it will make it safer and more enjoyable for pedestrians and bikers as well as the kids playing in their yard. Thanks, (Property Owner) City Reply Thank you so much for taking the time to come to the open house and to follow up with your feedback.If you would like to receive email updates about the project,please click here to signAttachment 1, Page 112 of 146 VirginiaDaisy Bikeway Log of Written Commentsup.We will be having a public hearing at the City Council this fall,tentatively scheduled forOctober3rdifyou'd like to provide additional comment.7/15/2016,Resident at S 44th St:I received the post card in the mail re:the open house to discuss this project.I was unable to attend butdohavesomeinput.I live off of Daisy on S.44th.I have nearly been hit on my bike a handful of times trying to cross at 42nd headed south while I'm on my bike.This is the route to Clearwater bike path that my family uses.My daughter is in middle school and I will not let her ride her bike to school (ASMS)due to this bike crossing problem.Not only would a rounda bout be helpful for pedestrian and bicycle crossing,it would make traffic slow down for cars too.the corner south of daisy on 42nd street does not have good vision to predict turning times from daisy to 42nd in any direction.Often traffic is speeding around this corner. In addition,my middle school daughter has a babysitting job that she bikes to on 50th pl.,so she heads east on Daisy.It is not at all set up for bicyclists and is concerning for sharing of the road.I,at this time, have advised her to ride her bicycle on the sidewalks (wherethere are actually sidewalks).This is unreasonable for the amount traffic,cars and bicycles,in this area of town. I think this proposal is worth being pushed.My family would very much benefit from the improvements. Please let me know if there is anything I can do to help this to come to fruition. Sincerely, (Resident)&Family City Reply Thank you very much for taking the time to provide feedback on the VirginiaDaisy Bikeway project and sharing your story. There will be an opportunity for people to speak at the City Council meeting prior to the approval of the project design concept,which is currently scheduled for the evening of October 3rd,but could change.If you would like to stay informed about the project and the public hearing information,please click here to sign up for project email updates. 7/18/2016,Community Member: Hi,I missed coming to the open house last Tues.July 12th,and main input I had concerns the intersection at 42nd and Daisy.I gave comment earlier at the Mt.Vernon School display to the effect that I thought we seriously needed a regular traffic light at that intersection,but now realize it's pretty close to the intersection at 42nd and Main Street to be having another traffic light so soon on 42nd south of Main Street.I would be content with a "calming"traffic circle at that intersection,but I wonder how it could be done with homes presently on every corner of that intersection and having enough landAttachment 1, Page 113 of 146 VirginiaDaisy Bikeway Log of Written Commentsroomtomakethatmodification.Oh yes and I love the idea of a yellow blinking light and crosswalkacross32ndattheendofVirginiatogettoWillamalaneCenterfromourneighborhood.Thank you fortheplanningworkthat's going into this project.City ReplyThankyou very much for taking the time to provide feedback on the VirginiaDaisy Bikewayproject. The singlelane roundabout that is the preferred design concept treatment for the 42nd and Daisy intersection would require some additional space on a couple of the corners.However,we have spoken multiple times with the property owners whom we would be buying a small portion of land from and they are supportive of the project and have both expressed support for increased safety at the intersection.As the project moves from design concepts into detailed design in the fall,we will continue to work with the property owners to reduce impacts to their properties. Have you signed up for our interested parties email list?If you'd like to stay more informed about the project and opportunities to provide further comment,please click here to sign up.Attachment 1, Page 114 of 146 Appendix 7: Open House 1 Comments Attachment 1, Page 115 of 146 VirginiaDaisy Bikeway Open House #1 CommentsCommentssubmittedbyOpenHouse#1 participants:Comment form question:“Are the proposed refined design concepts presented today moving in therightdirection?” Yes –9 participants Maybe –3 participants No –3 participants General Comments: 32nd and Virginia –slow traffic down turning onto Virginia Ave with the proposed intersection treatment.Supports sharrows.Concerned about trees and effecting visibility. Not happy with roundabout proposal.Improve intersection at Daisy and Bob Straub Parkway (roundabout would be OK)and 42nd and Daisy (but not roundabout).Loss of parking on one side of the street. Interested in bike path.Does not like proposed design concepts proposed today.City of Springfield is running a parallel project with Booth Kelly and Weyerhaeuser Rd.Why spend taxpayer money on VirginiaDaisy on residential street with more conflicts?Would like to see offstreet paths developed instead. No trees that the City has to maintain,staff and funds do not exist.Miniroundabouts are okay if they don’t block the view so that neighbors can’t see across or down the street.Don’t mess with the parking. Changing 42nd and Daisy intersection is great.Roundabout option is good.Opening Daisy and adding sidewalks and the buffered bike lanes are great.Overall good conversations from folks who live along Daisy and want to slow the traffic.Keep up the good work.Concern about 53rd [51st –52nd]and Daisy issue –property and fence are at the street,would like to see widened improvements. Like the roundabouts with single lanes for slowing traffic and it makes it safer for bikes.Bike boxes are great.Also buffered bike lanes in some places are great for safety.Not enough speed bumps [raised crosswalks].Great job! Roundabout at 42nd would work if all the blind spots were removed.Having a curb extension close to my address is a great idea and would slow traffic.More narrowed,raised crossings. Keep up the great work. Roundabout will keep traffic flowing and provide safe crossing for pedestrians and bicycles.Add more speed bumps [raised crosswalks]and raised crosswalks between 42nd and 46th.Slow traffic on Daisy.Keep green space between sidewalk and street. Would like to see more raised crossings.Keep up the good work.Would like the right turn on 42nd only. Yes,most of the ideas are great.42nd and Daisy no roundabout.Light would be better.S 52nd St and Daisy is a concern.Attachment 1, Page 116 of 146 VirginiaDaisy Bikeway Open House #1 Comments Excited project is moving forward and it has been needed in Springfield.Would like to see moreofthisinthefuture,great job!The roundabouts,just the large one [42nd]are a bit concerningregardingpedestriansafety,which is usually caused by unobservant drivers. More bikers =more broke people who steal my stuff.When Albert Einstein made the nuclearbombandthearmyusedithefeltterrible.I feel the engineers off this project will feel the same.Does not support the design.The trees are going to be absolutely terrible for bikes and a busstop[school bus]is where one of the trees is currently located in the design. Slow the traffic down with speed bumps [raised crossings],traffic circles [miniroundabouts]and stop signs.Traffic circles are fine and the large speed bumps.Use the money to pave existing spur streets and put in speed bumps to slow traffic.Already have enough nonmaintained trees on the street.More stop signs and traffic islands.Does not really like the proposed design. Street parking would be gone.More bike traffic means more transient traffic.Cars already being broken into and bikes being taken from property.Maybe come down the street after 7pm and on the weekends to see everyone parked on the street. Support the shared travelway,beacons at 32nd and Virginia Ave,miniroundabouts at 35th and 41st,bicycle lanes on Daisy all the way,and 42nd/Daisy traffic light,full signal preferred.Adding trees is not necessary,let people do it in front of their house if they want to.Safely crossing 42nd and Daisy on foot or bicycle is concerning currently,as well as 32nd and Bob Straub.Can the Weyerhaeuser Haul Rd have a path without the gates on either end? The width of the street is inadequate now.Condemn the north side to allow the street to be widened [52nd]. Mapbook Comments During the open house,the Preliminary Design Concept mapbook pages were displayed and sticky notes were provided for participants to leave comments.The following comments were submitted on sticky notes on the mapbook pages during the event. Page 1: No comments. Page 2: 32nd St.and Virginia Ave.–Make this a round about. 32nd St.and Virginia Ave.–Willamalane will begin construction at this location midJuly.We will have signage here.Simon is the proj.manager.Thx! Page 3: General Comment If Booth Kelly Road is going to be improved as a pedestrian/bike path in the future…why put money into DaisyVirginia? S.35th St.and Virginia Ave.–Single car drive 3450 Virginia Ave. S.35th St.and Virginia Ave.–What about paving 35th St.?It’s rock.Attachment 1, Page 117 of 146 VirginiaDaisy Bikeway Open House #1 Comments S.37th and Virginia Ave.–Looks great! S.37th and Virginia Ave.–More speed bumps,no trees. S.37th and Virginia Ave.–Crashes,traffic calm here? S.37th and Virginia Ave.–There is already a tree in the yard at 3716 Virginia. S.37th and Virginia Ave.–Duplex on corner of 37th and Virginia always has 410 cars parked onbothsidesofthestreet.State run disability home.Fire hydrant on corner. S.37th and Virginia Ave.–Why put in trees along road –who will water?SUB will only have tocomealongandtrimthemback.And die with no water. Page 4: General Comment –No round about at 35th.We have too many tweekers casing our area.We are a good neighborhood watch.We need to see up and down the street.Use speed bumps. General Comment –Plant lots of trees! S.38th and Virginia Ave.–Speed bumps!!!Just put speed bumps,Jesus!!! S.38th and Virginia Ave.–Why did 3785 Virginia lose access to the east side of their house off 38th?That fence has been there for at least 30 years. S.39th and Virginia Ave.–This large house has at least 10 cars and a taco truck with expired tags that park every night.They use their driveway and the street on both sides.No trees here. S.39th and Virginia Ave.–This house uses street parking only.No trees S.39th and Virginia Ave.–No tree here.Need parking on the street. S.40th and Virginia Ave.–I live here.Please no tree in front of 4022 [Virginia Ave.]–need the parking. Page 5: 40374053 Virginia Ave.Colde sac –I live at 4042 Virginia.I don’t want a tree or planter on front of my house. Roundabout at S.41st St.and Virginia Ave.–Roundabouts without landscaping.Want to see through for security. Page 6: General Comment –Not enough traffic control S.42nd St.and Virginia Ave.–Looks great.Slow the cars down. S.42nd St.and Virginia Ave.–This is the best option for this intersection. S.42nd Pl.and Virginia Ave.–I like this idea [curb treatment].Curb treatments would slow the traffic. Page 7: 42nd St.and Daisy St.Option 1 –Great idea,roundabout at 42nd and Daisy! o Agreed.I like this option. o Yes!Attachment 1, Page 118 of 146 VirginiaDaisy Bikeway Open House #1 Comments 42nd St.and Daisy St.Option 1 –Much prefer this option. 42nd St.and Daisy St.Option 1 –No,not this option.o Not an option –too dangerous! 42nd St.and Daisy St.Option 1 –No fix.Very scary and dangerous for peds and bikers.o Definitely not.Page 8: 42nd St.and Daisy St.Option 2B –Option #2A 42nd St.Ok light,not a roundabout. o Yes! 42nd St.and Daisy St.Option 2A –Best option.Love bike boxes and bike signals. 42nd St.and Daisy St.Option 2A –Yes!!Much safer for peds and bikers. o Best option 2A. o Yes I agree! Page 9: 42nd St.and Daisy St.Option 3 –No way for Daisy traffic to continue straight.Not good.Round about. 42nd St.and Daisy St.Option 3 –No,not this option. o No. o Agreed,no to this option. o No! 42nd St.and Daisy St.Option 3 –No.Not safe.Very inconvenient for traffic flow. 42nd St.and Daisy St.Option 3 –Much prefer roundabout. Page 10: S.44th and Daisy St.–Raised crossing. Daisy St.between S.44th and S.46th St.–Add some speed humps. Page 11: No comments. Page 12: S.Weyerhaeuser Rd.and Daisy St.–More of the raised crossing areas on Daisy to help slow the speeding traffic would be great. o Yes. S.Weyerhaeuser Rd.and Daisy St.–Raised crossings are great! S.Weyerhaeuser Rd.and Daisy St.–Use the [Weyerhaeuser]Haul Rd.between 48th and Bob Straub as bike path. o Yes.Attachment 1, Page 119 of 146 VirginiaDaisy Bikeway Open House #1 Comments S.Weyerhaeuser Rd.and Daisy St.–I live here (4801 Daisy St.)and I do not want a tree in frontofmyhouse.If you have any questions please call me at 541968 4814. Daisy St.between S.48 th St.and Camellia St.–Tree canopy is great! Daisy St.between S.48th St.and Camellia St.–Raised crossing.More.Page 13: S.49th Pl.and Daisy St.–Yes to the roundabout. Page 14: S.51st Pl.and Daisy St.–Yes to this roundabout. Fence at 52nd St.and Daisy St.–Make this side wider.Add parking. o Agree Fence at 52nd St.and Daisy St.–Visit the dedication of ROW or condemnation. Page 15: No comments. Page 16: Daisy St.after future trail connection –Take 2nd look at parking here. Daisy St.,54th St.to Bob Straub Pkwy Options –Option 1 seems safer with buffered lanes. Page 17: Gateway St.and Daisy St.–This is a “gateway”street.It’s not “Gateway St.” Bob Straub Pkwy and Daisy St.–Improve this intersection. o Yes I agree!! Page 18: No comments.Attachment 1, Page 120 of 146 Appendix 8: Open House 2 Comments Attachment 1, Page 121 of 146 VirginiaDaisy Bikeway Open House #2 CommentsCommentssubmittedbyOpenHouse#2 participants:Comment form question:“Are the proposed refined design concepts presented today moving in therightdirection?” Yes –8 participants Maybe –1 participant No –3 participants General Comments: Yes!Thank you for the excellent design and safety!So nice and upgrading to all areas.This design just rocks!Great job Springfield. No.Remove in street tree planting.Buffered bike lanes restrict on street parking.Design impediments fail to acknowledge MD50 standards and restrict movement of mobile homes.My concerns are loss of on street parking,extra maintenance costs for in street trees,parkingloss will adversely impact residents along Daisy,the general design will cause movement problems with manufactured homes and large vehicles.Why not utilize Booth Kelly and Weyerhaeuser Haul Road as bicycle path,it would be cheaper. I like basically everything,especially all the roundabouts and flipped stop sign.Also the protected bike lanes.Please,please push for the 54th St.connection to Safeway and remove the gate on the Weyerhaeuser trail.Thank you!Keep up the good work. I like these refined design concepts:yes,as far as I understand them.My concerns are what kind of trees will be added?And where? I like the roundabout at 42nd.I suggest omitting the trees.My concerns are trees in the street – especially by our house 4022 Virginia –tress already in parking strips don’t get trimmed. I like the treat 36th across from the mail boxes at 3566.Where I live the traffic through here travels very fast –too fast.My concerns are between 32nd and 37th is a speedway.A lot of pre school aged kids at 33rd and 35th. I don’t want to change the street. Roundabout at 42nd and Daisy is a great idea for safety of drivers and pedestrians. I like street modification of curb extension planted area,added trees,and raised crosswalks.My concerns are parking in front of mail boxes prevents delivery of the mail. I think that the bike route should utilize the Weyerhaeuser Haul Road once you get to 49th going east.I understand Willamalane owns this path.This would bring a ride out on 57th and the stop light across Bob Straub.I realize that Bob Straub is not part of this project,but the route leads you to a crossing that is very difficult.I think the roundabout at 42nd St.is an excellent idea.I have ridden the Daisy/Virginia route many times and have not had any problems with traffic. This corridor does not seem to be a cut through.Traffic seems to be mostly local residents.I am not sure all of the traffic calming is necessary or justified.Sharrows would be nice and bike route signs.My concern is the Bob Straub crossing.Is there any concern about changing the stop signs at 37th and 38th causing traffic to use this as a cut through or increase car speed?I like the 32nd St.crossing concept as a lot of kids could use this crossing.Is there a future plan for west ofAttachment 1, Page 122 of 146 VirginiaDaisy Bikeway Open House #2 CommentsVirginiatogetacyclistacrossthecitywithoutridingonMainSt.?Will there be signage to getfromVirginiatothenewMillRacetrail? Roundabouts are a really good idea.I suggest fewer trees in the street. I like the roundabouts,especially at 42nd and Daisy,bike lanes,shared lane markings,andanythingelseyoucandotoinformothersofcyclistsontheroad.Looks great.Remember todesigntheprojectlikeyourkidswillbeusingit.My concerns are that generally motorists farexceedthepostedspeedlimit. Mapbook Comments During the open house,hard copies of the Refined Design Concept mapbook were available for review and sticky notes were provided for participants to leave comments.The following comments were submitted on sticky notes on the mapbook pages during the event. Page 2: 32nd St.and Virginia Ave.Like it at S.32nd to the park for walking our grand kids.Thank you. Page 3: No tree at 3495 Virginia Ave. S.35th and Virginia Ave.I favor roundabout here at 35th for safety. S.35th and Virginia Ave.Round on 37th needed,not on 35th.Oregon and Virginia both have stop signs.No problems there but several accidents are on 37th,39th,and 40th every year. We don’t want speed bumps that will cause damage to our camp trailers.Too tall and it will cause damage. S.35th and Virginia Ave.–Remove this tree S.35th and Virginia Ave.–Mine are perfect S.37th and Virginia Ave.–Vehicles hit 35th37 th.Add speed cushions before 35th and 38th. Page 4: S.38th and Virginia Ave.–No trees S.38th and Virginia Ave.–No tree S.38th and Virginia Ave.–No trees S.38th and Virginia Ave.–Leave stop sign on Virginia Ave. S.40th and Virginia Ave.–More speed cushions,less trees S.40th and Virginia Ave.–Please no trees @ 4022 Virginia S.40th and Virginia Ave.–Median island will interfere with emergency vehicle’s ability to make turns at 40th and Virginia. S.40th and Virginia Ave.–Leave street the way it was –no trees 4022 Virginia Ave. S.40th and Virginia Ave.–4042 Virginia leave street as is.People park their cars in street. Page 7:Attachment 1, Page 123 of 146 VirginiaDaisy Bikeway Open House #2 Comments S.42nd Ave.and Daisy St.–I favor a roundabout at 42nd and Daisy for safety.o Me too. Please I beg of you,put a roundabout here. S.42nd Ave.and Daisy St.–Yes!To the roundabout.o Yes!Roundabout at 42nd St.much safer than is nowPage6: Daisy St.between S.42nd Pl.and S.43rd St.–Concern about parking in front of mail boxes preventing postal delivery. Page 9: Country Manor Mobile Home Park periodically enforces #of vehicles per space.At some times of the year cars will be bumper to bumper on the south side of Daisy. Page 11: Daisy St.between S.48th St.and Camellia St.–I like the look of trees,but not the silver maple that the contractor put on either side of my driveway.They are huge,with roots cracking and raising the sidewalk and my driveway and yard.4833 Daisy.. No trees at 4801 Daisy Please.Thanks. More raised crossings along Daisy would be great.Between Weyco Rd.and 47th.Thank you. At 4819 Daisy and 4817 we don’t want the tree but we would like a speed bump.Speed bumps every few blocks. S.48th St.and Daisy St.–Speed bump doesn’t also need to be narrowed.It disrupts traffic more than reduce speeding.Speed bump is enough. 4817 Daisy has a 37’motor home that would not fit with the proposed tree.We need to be able to park to load andunload. The more speed bumps the more it will slow people down.If we don’t get them they will speed up after they over them. Page 15: Daisy St.between future 54th St.trail and Bob Straub Pkwy –Speed bumps for all of Springfield <3 Trees (maybe not too many):) Avoid too many speed bumps Roundabouts are a great solution Page 16: Daisy St.and Bob Straub Pkwy –No street parking!!!Make people park in their own driveways or the overflow parking. Daisy St.and Bob Straub Pkwy –When the time comes a pedestrian activated red light to cross Bob Straub Pkwy would be nice.Attachment 1, Page 124 of 146 Appendix 9: Outreach Materials Attachment 1, Page 125 of 146 Learn more about the Virginia-Daisy Bikeway Project! Virginia-Daisy Bikeway Project The City of Springfield is working on the Virginia-Daisy Bikeway Project and we need your input on the design concepts being considered. The project will develop a preferred design to provide a safe and comfortable bicycle corridor that can be used by people of all ages and abilities from 32nd to Bob Straub Parkway. Additionally, the design will enhance the overall appeal of the corridor for all users and residents, improve pedestrian safety and usage, and provide traffic calming to support active transportation along the corridor. Visit Our Website Open House Event - We Need Your Input! What type of design and improvements would you like to see? Come to our open house event to learn more and share your ideas! When: 6 to 7:30 p.m. on Wednesday, May 25, 2016 Where: Mt. Vernon Elementary, 935 Filbert Ln, Springfield in the cafeteria Questions? Contact Emma Newman, Transportation Planner, at 541.726.4585 or enewman@springfield-or.gov with project questions. You can also check out our Frequently Asked Questions for more information: Frequently Asked Questions Attachment 1, Page 126 of 146 STAY CONNECTED: City of Springfield, Development & Public Works Department, 225 Fifth Street, Springfield, OR 97477 SafeUnsubscribe™ {recipient's email} Forward this email | Update Profile | About our service provider Sent by lspiro@springfield-or.gov in collaboration with Try it free today Attachment 1, Page 127 of 146 Learn more about the Virginia-Daisy Bikeway Project! Virginia-Daisy Bikeway Project The City of Springfield has been working on the Virginia-Daisy Bikeway Project and we need your input on the refined design concepts to move forward to the Springfield City Council for consideration this fall. Over the past two months, we have received feedback and input from numerous neighbors and the broader community through our first open house, emails, one-on-one meetings, and phone calls. We appreciate the concerns, ideas, and thoughts shared and the time to do so. We have taken the feedback and input from neighbors, the City Planning Commission, and the City Council, and refined the design concepts to reflect the desire and needs of neighbors along the Virginia-Daisy Corridor. We want to share the refined design concepts with you. Visit Our Website Open House Event - Are We on the Right Track with the Refined Design Concepts? We invite you to our Open House #2 to view the refined design concepts, ask questions, and provide additional feedback. When: 6 to 7:30 p.m. on Tuesday, July 12, 2016 Where: Papa's Pizza at 4011 Main Street in Springfield Attachment 1, Page 128 of 146 Questions? Contact Emma Newman, Transportation Planner, at 541.726.4585 or enewman@springfield-or.gov with project questions. You can also check out our Frequently Asked Questions for more information: Frequently Asked Questions STAY CONNECTED: City of Springfield, Development & Public Works Department, 225 Fifth Street, Springfield, OR 97477 SafeUnsubscribe™ {recipient's email} Forward this email | Update Profile | About our service provider Sent by lspiro@springfield-or.gov in collaboration with Try it free today Attachment 1, Page 129 of 146 Learn more about the Virginia-Daisy Bikeway Project! Virginia-Daisy Bikeway Project Open House #2 A friendly reminder about our second open house for the project. We hope to see you there! Open House Event - Are we on the right track with the refined design concepts? We invite you to our Open House #2 to view the refined design concepts, ask questions, and provide additional feedback. When: 6 to 7:30 p.m. on Tuesday, July 12, 2016 Where: Papa's Pizza at 4011 Main Street in Springfield Questions? Contact Emma Newman, Transportation Planner, at 541.726.4585 or enewman@springfield-or.gov with project questions. You can also check out our Frequently Asked Questions for more information: Frequently Asked Questions STAY CONNECTED: Attachment 1, Page 130 of 146 City of Springfield, Development & Public Works Department, 225 Fifth Street, Springfield, OR 97477 SafeUnsubscribe™ {recipient's email} Forward this email | Update Profile | About our service provider Sent by lspiro@springfield-or.gov in collaboration with Try it free today Attachment 1, Page 131 of 146 Virginia-Daisy Bikeway Open House Wednesday, May 25, 2016 6:00 to 7:30 p.m. Mt Vernon Elementary Cafeteria What type of improvements would you like to see along Virginia Ave and Daisy St? Drop-in at your convenience; no RSVP needed. Light refreshments will be provided. Attachment 1, Page 132 of 146 Virginia-Daisy Bikeway Open House Tuesday, July 12, 2016 6:00 to 7:30 p.m. Papa’s Pizza – 4011 Main St. in Springfield Drop-in at your convenience; no RSVP needed. Light refreshments will be provided. Attachment 1, Page 133 of 146 225 Fifth StreetYour input isneeded on theVirginia-DaisyBikeway ProjectFor details pleasesee reverse...225 Fifth StreetYour input isneeded on theVirginia-DaisyBikeway ProjectFor details pleasesee reverse...225 Fifth StreetYour input isneeded on theVirginia-DaisyBikeway ProjectFor details pleasesee reverse...225 Fifth StreetYour input isneeded on theVirginia-DaisyBikeway ProjectFor details pleasesee reverse...Attachment 1, Page 134 of 146 Q: How can I stay informed about the Virginia-Daisy Bikeway Project?Virginia-Daisy Bikeway ProjectA: For more information or to sign up on our mailing list visit: springfield-or.gov/dpw/Virginia-DaisyBikewayProject.htmQ: Who can I contact if I have questions about the Project?A: Please contact Emma Newman, Project Manager, at 541.726-4585 or enewman@springfield-or.govThe City of Springfield is starting work on the Virginia-Daisy Bikeway Project and wants your input on the design concepts being considered.The project will develop a preferred design to provide a safe and comfortable bicycle corridor that can be used by people of all ages andabilities from 32nd Street to Bob Straub Parkway. Additionally, thedesign will enhance the overall appeal of the corridor for all users andresidents, improve pedestrian safety and usage, and provide trafficcalming to support active transportation along the corridor.There will be multiple ways to provide input. Open Houses will bescheduled so watch for future postcards with details. You can alsoconnect with the project manager to provide comments.Q: How can I stay informed about the Virginia-Daisy Bikeway Project?Virginia-Daisy Bikeway ProjectA: For more information or to sign up on our mailing list visit: springfield-or.gov/dpw/Virginia-DaisyBikewayProject.htmQ: Who can I contact if I have questions about the Project?A: Please contact Emma Newman, Project Manager, at 541.726-4585 or enewman@springfield-or.govThe City of Springfield is starting work on the Virginia-Daisy Bikeway Project and wants your input on the design concepts being considered.The project will develop a preferred design to provide a safe and comfortable bicycle corridor that can be used by people of all ages andabilities from 32nd Street to Bob Straub Parkway. Additionally, thedesign will enhance the overall appeal of the corridor for all users andresidents, improve pedestrian safety and usage, and provide trafficcalming to support active transportation along the corridor.There will be multiple ways to provide input. Open Houses will bescheduled so watch for future postcards with details. You can alsoconnect with the project manager to provide comments.Q: How can I stay informed about the Virginia-Daisy Bikeway Project?Virginia-Daisy Bikeway ProjectA: For more information or to sign up on our mailing list visit: springfield-or.gov/dpw/Virginia-DaisyBikewayProject.htmQ: Who can I contact if I have questions about the Project?A: Please contact Emma Newman, Project Manager, at 541.726-4585 or enewman@springfield-or.govThe City of Springfield is starting work on the Virginia-Daisy Bikeway Project and wants your input on the design concepts being considered.The project will develop a preferred design to provide a safe and comfortable bicycle corridor that can be used by people of all ages andabilities from 32nd Street to Bob Straub Parkway. Additionally, thedesign will enhance the overall appeal of the corridor for all users andresidents, improve pedestrian safety and usage, and provide trafficcalming to support active transportation along the corridor.There will be multiple ways to provide input. Open Houses will bescheduled so watch for future postcards with details. You can alsoconnect with the project manager to provide comments.Q: How can I stay informed about the Virginia-Daisy Bikeway Project?Virginia-Daisy Bikeway ProjectA: For more information or to sign up on our mailing list visit: springfield-or.gov/dpw/Virginia-DaisyBikewayProject.htmQ: Who can I contact if I have questions about the Project?A: Please contact Emma Newman, Project Manager, at 541.726-4585 or enewman@springfield-or.govThe City of Springfield is starting work on the Virginia-Daisy Bikeway Project and wants your input on the design concepts being considered.The project will develop a preferred design to provide a safe and comfortable bicycle corridor that can be used by people of all ages andabilities from 32nd Street to Bob Straub Parkway. Additionally, thedesign will enhance the overall appeal of the corridor for all users andresidents, improve pedestrian safety and usage, and provide trafficcalming to support active transportation along the corridor.There will be multiple ways to provide input. Open Houses will bescheduled so watch for future postcards with details. You can alsoconnect with the project manager to provide comments.Attachment 1, Page 135 of 146 City of Springfi eld225 Fifth StreetSpringfi eld, OR 97477Join us to learnmore about the Virginia -DaisyBikeway Project! Open House6 to 7:30 p.m. Wednesday, May 25 Mt Vernon Elementary CafeteriaAttachment 1, Page 136 of 146 Dear Neighbor,The City of Springfi eld is working on the Virginia-DaisyBikeway Project and we need your input on the designconcepts being considered. The project will develop apreferred design to provide a safe and comfortable bicycle corridor that can be used by people of all ages and abilities from 32nd to Bob Straub Parkway.Additionally, the design will enhance the overall appeal ofthe corridor for all users and residents, improve pedestriansafety and usage, and provide traffi c calming to support active transportation along the corridor.What type of design and improvements would you like to see? Come to the neighborhood meeting to fi nd out more and share your ideas!Questions?Emma Newman, Transportation Planner541.726.4585 or enewman@springfi eld-or.govNeighborhood MeetingWhat type of improvements would you like to see?6 to 7:30 p.m.Wednesday, May 25, 2016Mt Vernon ElementaryRoom - CafeteriaDrop-in at your convenience; no RSVP needed. Light refreshments will be provided.Para esta comunicación en Español, por favor llame a Molly Markiaran 541.726.4611Attachment 1, Page 137 of 146 City of Springfi eld225 Fifth StreetSpringfi eld, OR 97477Join us to learnmore about the Virginia-DaisyBikeway Project! Open House6 to 7:30 p.m.Tuesday, July 12Papa’s Pizza onMain StreetAttachment 1, Page 138 of 146 Dear Neighbor,The City of Springfi eld is working on the Virginia-DaisyBikeway Project and we need your input on the refi ned design concepts to move forward to the Springfi eld City Council for consideration this fall.Over the past two months we have received feedback and input from numerous neighbors and the broader community through our fi rst open house, emails, one-on-one meetings, and phone calls. We appreciate the concerns, ideas, and thoughts shared and the time to do so.We have taken the feedback from neighbors, the City Planning Commission, and the City Council, and refi ned the design concepts to refl ect the desire and needs of neighbors along the Virginia-Daisy Corridor. We want to share the refi ned design concepts with you. We invite you to our Open House #2to view them, ask questions, and provide additional feedback.Questions?Emma Newman, Transportation Planner541.726.4585 or enewman@springfi eld-or.govOpen HouseAre we on the right track with the refi ned design concepts?6 to 7:30 p.m.Tuesday, July 12, 2016Papa’s Pizza4011 Main Street in Springfi eldDrop-in at your convenience; no RSVP needed.Light refreshments will be provided.Para esta comunicación en Español, por favor llame a Molly Markiaran 541.726.4611Project website:springfi eld-or.gov/dpw/Virginia-DaisyBikewayProject.htmAttachment 1, Page 139 of 146 Springfi eld Virginia-Daisy Bikeway Project Frequently Asked QuestionsQ: What is the Springfi eld Virginia-Daisy Bikeway Project?A: The Virginia-Daisy Bikeway Project will develop a preferred design to provide a safe and comfortable bicycle corridor that can be used by people of all ages and abilities from 32nd St to Bob Straub Pkwy along Virginia St and Daisy Ave. Additionally, the design will enhance the overall appeal of the corridor for all users and residents, improve pedestrian safety and usage, and provide traffi c calming to emphasize the active transportation priority along the street. The project will provide an east-west alternative to Main Street for people wishing to ride bicycles in our community. Once the fi nal design is selected, the project will move forward into construction in summer 2017. Q: Why is the Virginia-Daisy Bikeway Project necessary? A: The City of Springfi eld is committed to providing safe transportation options. The Virginia-Daisy Bikeway will serve as a key east-west connection in the Springfi eld bicycle network and will provide a more comfortable alternate biking route instead of along Main St. The project is consistent with the Springfi eld Transportation Plan, TransPlan, the Central Lane MPO Regional Transportation Plan, and the Lane County TSP. It is also identifi ed as a need in the Springfi eld Bicycle Plan. The Springfi eld Transportation System Plan identifi es the need to, “expand and enhance Springfi eld’s bikeway system” and “provide bike lanes on collector streets and provide parallel routes and bike boulevards on adjacent streets where appropriate.” Q: What changes will be implemented through this project? A: The changes that will be implemented will be identifi ed through the design development process, which will include comments and feedback from residents along the corridor and the broader community. A range of treatments will be considered, including, but not limited to, striping of bicycle lanes, sharrows, traffi c calming infrastructure, intersection treatments, automobile traffi c diversion, limited lighting additions, ramp improvements, speed and designation signs, and a crossing improvement at 42nd St. As the design options are developed and refi ned, updates will be posted to the project website. Q: What is the main purpose of the Virginia-Daisy Bikeway? A: The primary goal of the Virginia-Daisy Bikeway project is to provide a safe and comfortable corridor that can be used by people of all ages and abilities to ride bicycles to move about our community.Attachment 1, Page 140 of 146 Springfi eld Virginia-Daisy Bikeway Project Frequently Asked Questions ContinuedQ: What public outreach and involvement eff orts are proposed for the Virginia-Daisy Bikeway Project? A: There will be two open houses that residents and community members are encouraged to attend to learn more about the project and provide feedback during the design development process. Additionally, comments can be submitted to Emma Newman at enewman@springfi eld-or.gov. For the detailed outreach and involvement eff orts, please see the Virginia-Daisy Bikeway Communication Plan. Q: Where can I learn more and follow the process? A: For more information on the project, please see the Virginia-Daisy Bikeway Project web page. http://www.springfi eld-or.gov/dpw/Virginia-DaisyBikewayProject.htm Q: Who can I contact if I have questions? A: Emma Newman, Transportation Planner at 541-726-4585 or enewman@springfi eld-or.gov. Para obtener información en español, comuníquese con Molly Markarian al 541-726-4611. Attachment 1, Page 141 of 146 Appendix 10: Cost Estimate Attachment 1, Page 142 of 146 Item Estimated Quantities Unit Unit Price Total Cost Notes Design Feature Quantity Cost By Feature Group Curb Removal 87 LF 6.00$ 522$ Standard Curb & Gutter 100 LF 40.00$ 4,000$ Sidewalk - 4-inch 1,222 SF 15.00$ 18,330$ Curb extensions and sidewalk infill Asphalt 975 SF 5.00$ 4,875$ Includes grinding Crosswalk 1 EA 1,200.00$ 1,200$ Cushion Chevron Symbol 2 EA 150.00$ 300$ Includes AC Removal Wayfinding Sign 1 EA 400.00$ 400$ Cost per Asphalt Raised Crossing (Speed Cushion)29,627$ Quantities from 38th St & Virginia, other raised crossings vary in total area. Cost w/ Contingencies & Other Costs Added 39,996$ 35%7 279,975$ Notes: Asphalt Removal 1,200 SF 1.00$ 1,200$ Standard Curb & Gutter 412 LF 40.00$ 16,480$ Tree 4 EA 500.00$ 2,000$ Includes curb extensions Landscape 1,200 SF 5.00$ 6,000$ Includes grinding Cost per Landscape Median (w/ trees)25,680$ Cost w/ Contingencies & Other Costs Added 34,668$ 35%1 34,668$ Asphalt Removal 75 SF 1.00$ 75$ Standard Curb & Gutter 55 LF 40.00$ 2,200$ Yellow Solid Line 60 LF 5.00$ 300$ Includes curb extensions Landscape 75 SF 5.00$ 375$ Includes grinding Cost per Landscape Median (w/ trees)2,950$ Cost w/ Contingencies & Other Costs Added 3,983$ 35%2 7,965$ Asphalt Removal 284 LF 1.00$ 284$ Mountable Curb & Gutter 53 LF 40.00$ 2,136$ Concrete Median 387 SF 12.00$ 4,644$ Yellow thermo solid line 453 LF 5.00$ 2,267$ Median Warning Signs 4 EA 350.00$ 1,400$ Cost per Mini Roundabout 10,731$ Total w/ Contingencies & Other Costs Added 14,486$ 35%3 43,459$ Asphalt Removal 725 SF 1.00$ 725$ Curb Removal 150 LF 6.00$ 900$ Concrete Sidewalk Removal 689 SF 2.00$ 1,378$ Standard Curb & Gutter 177 LF 40.00$ 7,080$ Sidewalk - 4-inch 1,796 SF 15.00$ 26,940$ Raised Island (Median)456 SF 12.00$ 5,472$ Crosswalk 4 EA 1,200.00$ 4,800$ Tactile Warning Panel 4 EA 250.00$ 1,000$ Yellow thermo solid line 149 LF 5.00$ 745$ White thermo solid line 420 LF 5.00$ 2,100$ White thermo skip line 84 LF 5.00$ 420$ Stop bar (Thermo)58 LF 24.00$ 1,392$ Stop Symbol (Thermo)2 EA 150.00$ 300$ Wayfinding Sign 2 EA 400.00$ 800$ Stop sign 2 EA 350.00$ 700$ "Bikes to use pedestrian signal" sign 2 EA 350.00$ 700$ Two-sided RRFB 4 EA 10,000.00$ 40,000$ 32nd Ave Intersection Virginia-Daisy Bikeway: Preliminary Cost EstimateDesign Feature Cost BreakdownAsphalt Raised Crossing (Speed Cushion) - Includes Sidewalk Curb Extensions & Ramps Mini Roundabout - 17' Diameter and oval - At S 35th St, S 41st St, & S 51st Pl 1) If raised crossings are not implemented, this area would be added into asphalt overlay area total. Median Island - Between S 47th St & S 48th St Mini Median Island - At S 40th St & S 44th StAttachment 1, Page 143 of 146 Item Estimated Quantities Unit Unit Price Total Cost Notes Design Feature Quantity Cost By Feature Group Virginia-Daisy Bikeway: Preliminary Cost EstimateDesign Feature Cost BreakdownPole-mounted pedestrian push-button 4 EA 250.00$ 1,000$ Stand-alone pedestrian push-button 2 EA 2,750.00$ 5,500$ Stand-alone bike push button 2 EA 2,750.00$ 5,500$ Total 32nd Ave Intersection Improvements 107,452$ Total w/ Contingencies & Other Costs Added 145,060$ 35%1 145,060$ Notes: 1) Asphalt overlay not included. See individual bottoms-up total for overlay. Asphalt Removal 2,361 SF 1.00$ 2,361$ Curb Removal 453 LF 6.00$ 2,718$ Concrete Sidewalk Removal 2,050 SF 2.00$ 4,100$ Standard Curb & Gutter 606 LF 40.00$ 24,240$ Sidewalk - 4-inch 7,410 SF 15.00$ 111,150$ Stormwater Catch Basin 5 EA 2,500.00$ 12,500$ 12-inch SDR 35 Storm Sewer 75 LF 80.00$ 6,000$ Raised Island (Median)1,433 SF 12.00$ 17,196$ Roundabout - mountable apron 706 SF 15.00$ 10,590$ Crosswalk 4 EA 1,200.00$ 4,800$ Tactile Warning Panel 4 EA 250.00$ 1,000$ Yellow thermo solid line 662 LF 5.00$ 3,310$ White thermo solid line 658 LF 5.00$ 3,290$ White thermo skip line 49 LF 5.00$ 245$ Yield Markings (Thermo)12 EA 50.00$ 600$ Wayfinding Sign 2 EA 400.00$ 800$ "Roundabout Ahead" warning sign 4 EA 350.00$ 1,400$ Utility Relocation 1 LS 12,000.00$ 12,000$ OH Pole Relocation Total 42nd Ave Roundabout (Option 1)218,300$ Total w/ Contingencies & Other Costs Added 294,705$ 35%1 294,705$ Notes: 1) Asphalt overlay not included. Extents of overlay at 42nd shown in overlay total costs. 2) ROW purchase not included. Asphalt Removal 1,571 SF 1.00$ 1,571$ Curb Removal 316 LF 6.00$ 1,896$ Concrete Sidewalk Removal 2,052 SF 2.00$ 4,104$ Standard Curb & Gutter 376 LF 40.00$ 15,040$ Sidewalk - 4-inch 4,039 SF 15.00$ 60,585$ Raised Island (Median)- SF 12.00$ -$ Roundabout - mountable apron - SF 15.00$ -$ Crosswalk 4 EA 1,200.00$ 4,800$ Tactile Warning Panel 4 EA 250.00$ 1,000$ Yellow thermo solid line 278 LF 5.00$ 1,390$ White thermo solid line 246 LF 5.00$ 1,230$ White thermo skip line 240 LF 5.00$ 1,200$ Traffic Turn Symbol (Thermo)4 EA 200.00$ 800$ Stop bar (Thermo)69 LF 24.00$ 1,656$ Stop Symbol (Thermo)- EA 150.00$ -$ Green Bike Box (Thermo)935 SF 5.00$ 4,675$ Bike Box Border (Thermo)347 LF 4.00$ 1,388$ Wayfinding Sign 2 EA 400.00$ 800$ Mast pole with 2 traffic signal heads 4 EA 30,000.00$ 120,000$ Pole-mounted pedestrian signal heads 8 EA 400.00$ 3,200$ Pole-mounted pedestrian push-button 8 EA 250.00$ 2,000$ Stand-alone pedestrian signal head with push button 4 EA 3,150.00$ 12,600$ Stand-alone bike push button 2 EA 2,750.00$ 5,500$ Bicycle conductive loop detector 2 EA 2,000.00$ 4,000$ Stand-alone advance traffic signal head 1 EA 25,000.00$ 25,000$ 42nd Ave Roundabout (Option 1) 42nd Ave Layout (Option 2A)Attachment 1, Page 144 of 146 Item Estimated Quantities Unit Unit Price Total Cost Notes Design Feature Quantity Cost By Feature Group Virginia-Daisy Bikeway: Preliminary Cost EstimateDesign Feature Cost BreakdownTotal 42nd Ave (Option 2A)274,435$ Total w/ Contingencies & Other Costs Added 370,487$ 35%1 370,487$ Notes:1) Asphalt overlay not included. Extents of overlay at 42nd shown in overlay total costs. 2) ROW purchase not included. Asphalt Removal 50 SF 1.00$ 50$ 6" Curb 22 LF 20.00$ 440$ Tree 1 EA 500.00$ 500$ 36" box PVC Underdrain - LF 30.00$ -$ Connection to Ex. SW System - EA 750.00$ -$ Drain Rock 0.37 CY 45.00$ 17$ 3" Aggregate Base Rock 1 CY 45.00$ 50$ 1' Cleanout/Overflow Inlet - EA 1,500.00$ -$ Water Quality Growth Media 4 CY 40.00$ 178$ Topsoil, 4' depth Cost per Bumpout On-Street Tree Planter 1,234$ Cost w/ Contingencies & Other Costs Added 1,666$ 35%47 78,315$ Asphalt Removal 750 SF 1.00$ 750$ Curb & Gutter 160 LF 40.00$ 6,400$ Tree 1 EA 500.00$ 500$ 36" box PVC Underdrain 175 LF 30.00$ 5,250$ Connection to Ex. SW System 1 EA 750.00$ 750$ Check Dam 2 EA 300.00$ 600$ Concrete splash pad 2 EA 500.00$ 1,000$ Drain Rock 28 CY 45.00$ 1,238$ 3" Aggregate Base Rock 28 CY 45.00$ 1,250$ 1' Overflow Inlet 1 EA 1,500.00$ 1,500$ Water Quality Growth Media 42 CY 40.00$ 1,667$ 1.5' Cost per Curb Extension Stormwater Treatment Area 20,904$ Cost w/ Contingencies & Other Costs Added 28,221$ 35%1 28,221$ Driveways 1 EA 1,850.00$ 1,850$ Cost w/ Contingencies & Other Costs Added 2,498$ 35%115 287,213$ Curb Ramps 1 EA 3,700.00$ 3,700$ Cost w/ Contingencies & Other Costs Added 4,995$ 35%38 189,810$ Asphalt Overlay 1 EA 370,000.00$ 370,000$ Total Asphalt Overlay - Option 1 370,000$ Total w/ Contingencies & Other Costs Added 499,500$ 35%1 499,500$ Notes: Asphalt Overlay 1 EA 370,000.00$ 370,000$ Total Asphalt Overlay - Option 1 370,000$ Total w/ Contingencies & Other Costs Added 499,500$ 35%1 499,500$ Notes: ADA Curb Ramp Corridor Upgrades Driveways Bumpout On-Street Tree Planter (30 SF) Curb Extension Stormwater Treatment Area - 150' Approx. Length Asphalt Overlay - 42nd Ave Option 1 (Roundabout) 1) The asphalt overlay total area assumes proposed medians, raised crossings, mini roundabouts, and 42nd Ave roundabout are being constructed. It does not account for the area of the tree planters or curb extension planter. 2) Extent of concrete pavement on 42nd Ave to be coordinated with overlay extents. Asphalt overlay area is conservative in that it doesn’t include 42nd Ave concrete pavement. Asphalt Overlay - 42nd Ave Option 2A 1) The asphalt overlay total area assumes proposed medians, raised crossings, and mini roundabouts are being constructed. It does not account for the area of the tree planters or curb extension planter. Attachment 1, Page 145 of 146 Item Estimated Quantities Unit Unit Price Total Cost Notes Design Feature Quantity Cost By Feature Group Virginia-Daisy Bikeway: Preliminary Cost EstimateDesign Feature Cost Breakdown 1,888,890$ 1,964,673$ Safety and Bike Treatments 805,832$ Asphalt Overlay 499,500$ ADA & Driveway Upgrades 477,023$ Stormwater Facility 106,536$ Total 1,888,890$ *Includes contingency Safety and Bike Treatments 881,615$ Asphalt Overlay 499,500$ ADA & Driveway Upgrades 477,023$ Stormwater Facility 106,536$ Total 1,964,673$ *Includes contingency Total - 42nd Ave Option 1 Total - 42nd Ave Option 2A 2) Extent of concrete pavement on 42nd Ave to be coordinated with overlay extents. Asphalt overlay area is conservative in that it doesn’t include 42nd Ave concrete pavement. Cost Summary (42nd Ave Option 1) Cost Summary (42nd Ave Option 2A) Attachment 1, Page 146 of 146