Loading...
HomeMy WebLinkAboutCorrespondence SUR 5/9/2008 1;.. ~ARD NORTHWEST LANOSURVEYING . LANOPLANNING' FORESTRY .~ PO Box 105 . Florence, OR 97439 ~ ~hone 541.997.9201 . Fax 541.997.3546 ,f}, 5/9/2008 Andy Llmblrd - Planner II Development Services Department City of Springfield 225 Fifth Street Springfield, OR 97477 RE Land DIvISion Tentative Submittal - McKee Property Dear Mr Llmblrd I wanted to clarify how the storm water IS to be handled for this project As you know, the streets within this area were constructed dUring the mid 1990's At that time, the street stormwater system was designed with the future partltlonrng of eXisting lots In mind A copy of the Original street design IS on file with your Public Works Department The Site Assessment Map shows the location of weep holes that were Installed as part of the Original construction EXisting homes and any proposed homes will connect to those weep holes to carry stormwater run-off from roof drains Driveways are and will be designed to shed water to the curb line gutter I have also Included 8 additional copies of the Site Assessment Map The only change IS that I Included the location of a power vault, phone riser and broad band riser These utilities are located near the northeast corner of proposed Parcel 2 As you recall, the Springfield Utility Board representative indicated that power for proposed Parcel 2, would come from the power vault at the northeast corner of proposed Parcel 2 The 7' PUE will prOVide a path for power, phone and broad band service to the property I will be present at ttie meeting scheduled for 11 OOam, Friday, May 16th Please call If any further clarification IS required Sincerely, ~tf/J- Rob Ward Date Received Planner AL S/;~/)(JOl I I