Loading...
HomeMy WebLinkAboutNotice PLANNER 2/9/2007 c1)M/ AFFIDAVIT OF SERVICE STATE OF OREGON) ) ss County of Lane 1 I, Karen LaFleur, being first duly sworn, do hereby depose and say as follows 1 I state that I am a Program Technician for the Planning DIVISion of the Development Services Department, City of Spnngfleld, Oregon 2 I state that In my capacity as, Program Technician, I prepared and caused to be mailed copies ofR~en'E>e... -ro ~-+t.mtLllne-~r f'vVurwla.- ~,,--dou.)~ (See attachment . "A") on ~ '9 , 2007 addressed to (see Attachment B"l. by causing said letters to be placed In a U S mad box with postage fully prepaid thereon ':V~~~ K1JN LaFLEUR \ / ) STATE OF OREGON, County of Lane ,i~.L- q, ,2007 Personally appeared the above named Karen LaFleur, Program Technician, who acknowledged the foregoing Instrument to be their voluntary act Before me I ~~"""7-::'7-=-=:: -::=0:;::'-- -:: -=-="= .=~ , ., OFFICIAL SEAL 1 ': BRENDA JONES I ! NOTARY PUBLIC OREGON 1 I COMMISSION NO 379218 I '..~.-~,-:_~Y~~~~~g~: ~~ ~~~~ ~Q- My Commission Expires ~11 :JPV% , r!JJijrjifiT;J&J.;I:(llri1ii1J::{ifiJffliJJ:I:(lfim~~:J!ilJ..Jj . DEVELOPMENT SERVICES DEPARTMENT ~.""<'" 1-<<'>':i~."~ ...!/,;~..,,~,,",-..-~. -'i,!:,-"";t 1I!:".,re~~" '.tt l<~\;V.?.r;.~~... February 9, 2007 225 FIFTH STREET SPRINGFIELD, OR 97477 PHONE (541) 726-3753 FAX (541)7263689 www c/ spnnqfleld or us Mr Richard M Satre, President Satre Associates, P C 132 East Broadway, SUite 536 Eugene, Oregon 97401 Re Response to the proposed time line for Marcola Meadows project Dear Mr Satre, The proposed draft time lines for land use applications and actual development on the Marcola Meadows sIte IS ambitious and I understand that you have a deadline you must meet to satisfy Lowe's desire to open In Apnl '08 You and I have discussed time lines In the past, In general, utilizing overlapping application submittals This letter IS a response to your January 30 draft time line As you know, I have been assigned as "project manager" for the Marcola Meadows development proposal In this role, I represent the Planning DIVISion My function IS to process all required land use applications for this project However, the review of these applications also requires several Public Works Department personnel, other City departments and Interested agencies that compnse the Development ReView Committee (DRC) Since the Public Works Englneenng DIvIsion will be the most Impacted work group, I met with Ken Vogeney and Les Benoy to diSCUSS the draft time lines We all agree there are a number of concerns about your proposal 1 Dunng other application review processes, the City allowed the submittal of concurrent overlapping applications including Metro Plan diagram/Zoning Map amendments, Master Plan, Site Plans and SubdivIsions ThiS resulted In several Instances of duplication of effort, and In fact added time to the review process Thus, the proposal to submit the additional required land use applications and cIvil englneenng plans for review pnor to Master Plan approval (In July, as proposed) may raise Issues that necessitate the redesign of vanous plan elements and delay the project 2 Another concern IS the availability of personnel to assign to the Marcola Meadows project As I've said previously, I have been assigned to represent the Planning DIVIsion My Job duties have been adjusted to allow me the necessary time to devote to thiS project However, from the Public Works Englneenng DIVISion's perspective, their plate IS currently full reviewing "routine" land use applications In order to accommodate the draft time line, the Englneenng DIVIsion would need to assign an Engineer to thiS project on a full-time baSIS While the Englneenng DIVISion IS at full staff, there are several new employees stili In a training phase We discussed two pOSSible options to address thiS dilemma a) uSing an outSide consultant to periorm the bulk of the review, with an In-house engineer acting as the Englneenng D,VIs,on's DRC representative, or b) If available, assigning an Engineer form the Englneenng D,VIsion's Capital Projects Section to thiS project Both the Planning and Englneenng DIVISions have used Option a) In the past, with limited success Option b) would be a burden to the Capital Projects Section, even If an Engineer was available For reasons Cited above, I cannot guarantee that any of the required land use applicatlonwlll meet staff's typical 75 day review turn-around time , Page 2 3 Then, there IS a number of pending large and/or time sensitive development proposals that are In process and will require extra efforts by both Planning and Public Works personnel 4 Finally, the draft time line does not take Into consideration any request to keep the public heanng record open or possible appeals Judging from past expenence concerning the development of a home Improvement center on thiS Site, the probability that either or both of these situations may occur IS high ThiS being said, we are Interested In providing proper and timely review for the Marcola Meadows project Approval of the Metro Plan diagram/Zoning Map amendment applications IS the first step on the road to "entitlements" The second step IS approval of the Master Plan, a key element that Will allow development of the Marcola Meadows project You have previously submitted a Pre-Submittal Report application (ZON2006-00030) to Initiate the Master Plan submittal process as required by SDC Article 37 The plan you are proposing today IS different from the plan you submitted In May In order to give you a "head start" you may resubmit thiS application as soon as the Planning Commission forwards a recommendation to the CIty Council on the Metro Plan diagram/Zoning Map amendment applications Be aware that If you choose to proceed pnor to City Council approval, you do so at your own nsk As you know, application completeness Will help make the Master Plan and other required land use review process easier for both you and the City After the formal Master Plan application IS determined to be complete for review we can reconsider the application process and work toward submittal of the additional land use applications as soon as the Master Plan has been approved by the Planning Commission Even the Property Line Adjustment application to establish the Lowe's parcel should be submitted after Master Plan approval so the proper easements for access and utilities can be established If you have any questions concerning thiS Issue, please let me know Sincerely, //::L: A Ie Gary M Karp, Planner III cc Mark Metzger, Planning Supervisor Ken Vogeney, City Engineer Les Benoy, Supervising CIVil Engineer ~ DEVELOPMENT SERVICES 225 FIFTH STREET SPRINGFIELD, OR 97477 . ", ".". r' i ~ OJ '" Mr. Rlchard M. Satre, Presldent Satre ASSOclates, PC 132 East Broadway, SUlte 536 Eugene, OR 97401 ~ ~ SPAINGFI~_.... February 9, 2007 225 FIFTH STREET SPRINGFIELD, OR 97477 PHONE (541)726-3753 FAX (541)726-3689 WWW CI spnngfield or us Mr Richard M Satre, President Satre Associates, P C 132 East Broadway, SUite 536 Eugene, Oregon 97401 Re Response to the proposed time line for Marcola Meadows project Dear Mr Satre, The proposed draft time lines for land use applications and actual development on the Marcola Meadows site IS ambitious and I understand that you have a deadline you must meet to satisfy Lowe's desire to open In Apnl '08 You and I have discussed time lines In the past, In general, utilizing overlapping application submittals ThiS letter IS a response to your January 30 draft time line As you know, I have been assigned as "project manager" for the Marcola Meadows development proposal In thiS role, I represent the Planning DIVIsion My function IS to process all required land use applications for thiS project However, the review of these applications also requires several Public Works Department personnel, other City departments and Interested agencies that compnse the Development Review Committee (DRC) Since the Public Works Englneenng DIVISion will be the most Impacted work group, I met with Ken Vogeney and Les Benoy to discuss the draft time lines We all agree there are a number of concerns about your proposal 1 Dunng other application review processes, the City allowed the submittal of concurrent overlapping applications including Metro Plan diagram/Zoning Map amendments, Master Plan, Site Plans and SubdIVIsIons ThIS resulted In several Instances of duplication of effort, and In fact added time to the review process Thus, the proposal to submit the additional reqUired land use applications and CIVil englneenng plans for review pnor to Master Plan approval (In July, as proposed) may raise Issues that necessitate the redesign of vanous plan elements and delay the project 2 Another concern IS the availability of personnel to assign to the Marcola Meadows project As I've said previously, I have been assigned to represent the Planning DIVISion My job duties have been adjusted to allow me the necessary time to devote to thiS project However, from the Public Works Englneenng D,VISion's perspective, their plate IS currently full reviewing "routine" land use applications In order to accommodate the draft time line, the Englneenng DIvIsion would need to assign an Engineer to thiS project on a full-time basIs While the Englneenng DIvIsion IS at full staff, there are several new employees stili In a training phase We discussed two possible options to address thiS dilemma a) uSing an outside consultant to perform the bulk of the reView, With an In-house engineer acting as the Englneenng DIVISion's DRC representative, or b) If available, assigning an Engineer form the Englneenng D,v,s,on's Capital Projects Section to thiS project Both the Planning and Englneenng DIVISions have used Option a) In the past, With limited success Option b) would be a burden to the Capital Projects Section, even If an Engineer was avaIlable For reasons Cited above, I cannot guarantee that any of the required land use application will meet staff's tYPical 75 day review turn-around time Page 2 3 Then, there IS a number of pending large and/or time sensitive development proposals that are In process and will require extra efforts by both Planning and Public Works personnel 4 Finally, the draft time line does not take Into consideration any request to keep the public hearing record open or possIble appeals JudgIng from past experience concerning the development of a home Improvement center on this Site, the probability that either or both of these situations may occur IS high This being said, we are Interested In providing proper and timely review for the Marcola Meadows project Approval of the Metro Plan diagram/Zoning Map amendment applicalions IS the first step on the road to "enlitlements" The second step IS approval of the Master Plan, a key element that Will allow development of the Marcola Meadows project You have previously submitted a Pre-Submittal Report application (ZON2006-00030) to Inlliate the Master Plan submittal process as required by SDC Article 37 The plan you are proposing today IS different from the plan you submitted In May In order to give you a "head start" you may resubmit this application as soon as the Planning Commission forwards a recommendation to the City CounCil on the Metro Plan diagram/Zoning Map amendment applicalions Be aware that If you choose to proceed prior to City CounCil approval, you do so at your own risk As you know, application completeness Will help make the Master Plan and other required land use review process easier for both you and the City After the formal Master Plan application IS determined to be complete for review we can reconsider the ap[1licatlon process and work toward submittal of the addllionalland use applications as soon as the Master Plan has been approved by the Planning Commission Even the Property Line Adjustment application to establish the Lowe's parcel should be submitted after Master Plan approval so the proper easements for access and utilities can be established If you have any questions concerning thiS Issue, please let me know Sincerely, Gary M Karp, Planner III cc Mark Metzger, Planning Supervisor Ken Vogeney, City Engineer Les Benoy, Supervising CIVil Engineer I I I I I I I I I I I I I ,. I I I I . I a SATRE \"t '\". I , THE VILLAGES AT MARCOLA MEADOWS ZONE CHANGE ZON 2006-00054 REVISED APPLICATION Lane County Assessor's Map 17-02-30-00, Lot 1800 and Map 17-03-25-11, Lot 2300 . ~':y ~- ,....... .', -.- .., -,. .;" 'l .. ....~ .'..-- ..- . , ~ " .... ~ .,'4 , ~' ..\' . . ,,' J,~ .. ... . ; -.;:..,. , 10 -............ ~ ..........~ . >'t." .-.... -. , ,. .....~. l'~ . ......:,?f#" 'T.i,. '-" ~:: . ....'. '. ".-l;' ~ J'''-'':,," ..... ,...,:f ~~..t:. . -: .;..; ..L ~~;, 1":;';.. "p'-' -~..' ...~.. ~t.. ,'" ~.., - ~,~~:-,..- ~;....;,~ ;" '" ... '.;- 0' . ~ '. - -t' ~ .' I I. :,~'\ ,~': \.~'-~'. 1 -'; , .,....,.U lh. . !4If.'J;,.l'l, ~"(-"'-:~' ~/.. ;-:""11/ ..........:. . -, ... ,.... -.,.,. ".. .' "';--;.c-'~":",., ~Ui16 .f" ,.. ~..-~~~ ., -"-'~",-'"'J-~~~ I" 1..,_. ",".'1 Townhome Village , lfr'~:-"" ~".), ,. ~"""~"" .-.' 'f...' , ;;00'::, ,.~ r,.::-:'t?~;2f; ;;;~:-.- ~'~';''':;~.'>::; '.~1~. . . (..J&.... ""=>-'::-~~o:::: ,'JIo1 .~.........~~:~. .......'~L ~f:..J -~. '. ..... -, , .".C" ....j.. ......,. . .)pen Space _.........,-.~l Main Street Retail Village SC Springfield, LLC 5440 Louie Lane, Suite 102 Reno, Nevada 89511 February 28, 2007 I I ,. I . I. I . . . . . . . . I I I I I I I III!tIII .. SAlKE ASSOCIATES Satre Associates, P.C. ) 32 Easl Broadway Suile 536 Eugene, Oregon 97401 Phone 541.465.4721 Fax 541.465.4722 1.800.662.7094 www.satrepc.com February 28, 2007 City of Springfield Development Services Department Planning Division 225 Fifth Street Springfield, Oregon 97477 Attn: Gary Karp Re: The Villages at Marcola Meadows Revised Application Zone Change (ZON 2006-00054) Dear Gary, Enclosed please find revised Zone Change application materials for the proposed development, The Villages at Marcola Meadows. Included are the revised written statement, associated exhibits and revised Traffic Impact Analysis. These revised materials replace all the materials in the application dated December 20, 2006 and submitted on January 11,2007, exceot the application form itself and the separately bound Preliminary Plan attachment. In our letter of February 7, 2007, we expressed our intention to revise our request and propose a combination of Medium Density Residential, Community Commercial and Mixed-Use Commercial zoning. Based on these changes, the revised written statement contains general project information, a summary of the land use request, information about the site, existing conditions and proposed use, as well as applicable approval criteria and findings. As the Applicant's designated contact, Satre Associates is available to answer questions or provide supplemental information as needed 10 facilitate the review process, Thank you in advance for your consideration of the application. We look forward to working with you on the project. chard M. Satre, AICP, ASLA, CSI President Satre Associates, P.C, Planners, Landscape Architects and Environmental Specialists I I THE VILLAGES AT MARCOLA MEADOWS ZONING MAP AMENDMENT ZON 2006-00054 REVISED APPLICATION I I I I I I I I I I I I I I I TABLE OF CONTENTS Cover Letter Table of Contents Wntten Statement (Revised) Exhibits (Bound Herem) I Legal DescnptlOn 2 Deed 3 EXlstmg Metro Plan DeSIgnatIOn 4 Proposed Metro Plan DesIgnatIOn (ReVised) 5 EXlstmg Zomng 6 Proposed Zomng (ReVised) 7 Flood Insurance Rate Map (FIRM) 8 UtIlity Capacity AnalYSIS Letter 9 Storm water Quantity and Quality SchematiCs Attachment (Bound Separately) Traffic Impact AnalYSIS (ReVised) No ofPa2:es I 1 41 2 6 1 1 1 1 1 2 10 ....I \ ~ I ~ I ~ I ~ I ,~ I -, I J I -, ] -I ] -, ] ] :-1 ~ -\ Page 2 of41 -I -I AoolicatlOn Team Owner/ApplIcant: SC Spnngfield, LLC 5440 LOUIe Lane, SUIte 102 Reno, Nevada 89511 AUn Jeff Belle (775) 853-4714. (775) 853-4718 PrOject Developer: The Martm Company PO Box 1482 Albany, Oregon 97321 AUn Bob Martm (541) 917-0071 . Fax (541) 917-0769. bob@tmcdevcom Planner/Landscape ArchItect. Satre AssocIates, P C Planners, Landscape ArchItects and EnvIronmental Specialists 132 East Broadway, SUIte 536 Eugene, Oregon 97401 AUn Richard M Satre, ASLA, AICP (541) 465-4721 . Fax (541) 465-4722. r satre@satrepc com Architect. Waterbury Shugar Architecture LLC 225 West 5th Avenue Eugene, Oregon 97401 AUn RIchard Shugar, AlA (541) 342-5777 . Fax (541) 343-6128. Rlchard@ws-archltecture com CIVil Engmeer/Surveyor' K & D Engmeenng, Inc PO Box 725 Albany, Oregon 97321 AUn Dan Watson, PE (541) 928-2583. Fax (541) 967-3458. dkwatson@callatgcom TransportatIOn Engmeer' Access Engmeenng, LLC th 134 East 13 Avenue, SUIte 2 Eugene, Oregon 97401 AUn Mike Welshar, PE (541) 485-3215. Fax (541) 485-3253. mlkew@accessengcom The VIllages at Marcola Meadows - Zonmg Map Amendment Application Wntten Statement - February 28, 2007 I I II. LAND USE REQUEST I I With this applIcatIOn, the applIcant proposes to change the zOning of the subject site Idenllfied on Assessor's Maps 17-02-30-00, Tax Lot 1800 and 17-03-25-11, Tax Lot 2300 The current zOning IS depicted In Exhibit 5 and Table I (below), the proposed zOning IS depicted In Exh[b[t 6 and Table I (below) This applIcatIOn IS concurrent with a separate applIcatIOn for Metro Plan Amendment Type II, specifically a change to the plan dIagram Therefore, pursuant to Spnngfield Development Code (SDC) 12 020(l)(b), this Zone Map Amendment applIcatIOn IS a leg[slallve dec[slOn that shall be revlCwed USing the Type IV procedure A descriptIOn of the site, relevant applIcatIOn informatIOn, and supportive facts and findings are outlIned In the sectIOns below I I I Table 1 EXISting and Proposed Zomng I ZOning District Medium Density Residential Community Commercial Mixed-Use Commercial Campus Industrial Acres EXisting Proposed 357 547 86 196 o 0 26 0 560 00 1003 1003 %Change 53% 128% n/a -100% Total I I I The applIcant, SC Spnngfield, LLC, IS preparing to submit applIcatIOns to the City for permits to bUild a mIxed-use residential and commercIal development The mix of uses reqUIres amendment of the Spnngfield ZOning Map applYing appropriate zoning d[strlcts to the site Because thiS amendment reqUIres a Metro Plan Amendment also, and shall be reviewed USing the Type IV procedure, Spnngfield City Counctl approval IS reqUIred .' I The proposed future uses for the subject site Include small-lot, single-family detached dwellIngs and townhomes (to be developed with the cluster development standards, SDC 16 100(3)), apartments, a congregate care faCilIty, cottages for seniors, a day care facIlIty, commercial and office bUIldings (main street retaIl, neighborhood retaIl, and profeSSIOnal offices) and a home Improvement store Under the Springfield Development Code, appropriate zOning districts for these proposed uses Includc MedIUm-DenSity Res[dentlal, Community Commerc[al, and Mlxed- Use CommercIal I . I . Therefore, the applIcant IS submitting concurrent applIcatIOns to . Amcnd the Metro Plan DIagram, elIminating the Campus Industrial designatIOn, then applYing and reconfigunng CommercIal and Med[um-Dens[ty Resldenllal designatIOns on the subject site, and applYing the Nodal Development Area deslgnallon overlay to portIOns of the subject site, and . Amend the Zoning Map, elIminating the Campus Industnal zOning dlstnct, then applYing and reconfigunng Community CommercIal, Mixed-Use CommercIal and MedIUm-DenSity ResidentIal zoning dlstncts on the subject site Th[s wntten statement applIes to the ZOning Map Amendment applIcal10n The referenced Metro Plan Amendment applIcatIOn [S being subnutted concurrently, but separately Refer to the Metro Plan Amendment applIcatIOn for specific Informal1on regarding th~se land use acl10ns I I The VIllages at Marcola Meadows - Zomng Map Amendment ApplicatIOn Wntten Sta1ement - February 28, 2007 Page 3 of41 I III THE SITE AND EXISTING CONDITIONS A Location and Context LocatIOn The subject site IS located north of Marcola Road at ItS intersectIon with North 28th Street and approximately one-quarter mile east of North 19th Street/Marcola Boulevard Lots Affected bv the Prooosed Amendment The subject site consists of two properties IdentIfied as Tax Lot 1800 of Lane County Assessor's Map 17-02-30-00 and Tax Lot 2300 of Lane County Assessor's Map 17-03-25-11 Tax Lot 2300 was platted 10 1994 as Parcel 3 of land partitIOn plat 94-P0491 A property Ime adjustment was recorded With Lane County 10 1997 affectmg the common boundary between parcels 2 and 3 of land partitIon plat 94-P0491 10 so domg completmg the current configuratIOn of the subject site (City of Sprmgfield file# 97-02-029) Plan DeSllmatlon The Metro Plan Diagram applies multIple plan designatIOns to the subject site CommercIal, Campus Industnal and MedIUm Density ReSidential A current Metro Plan Diagram for the subject site IS attached as Exhibit 3 Zonm!! The OffiCial Zonmg Map applies multIple Zonmg Dlstncts to the subject site CommerCIal, Campus Industnal and MedIUm Density ReSidentIal A current Zonmg D1stnct map for the subject site IS attached as Exhibit 5 B SIte DescrIptIOn and EXlshng CondItions Sublect Site The subject site has been used for a vanety of agncultural uses It IS currently vacant, With the exceptIOn of a small mdustnal bUlldmg to the south of the subject site The Sprmgfield City LimIts abuts the subject site on small portIOns on the west and northeast Tax Lot 2300 IS partIally developed With a vacant mdustrIal bUlldmg Tax Lot 1800 IS vacant A storm dramage faCIlity runs through the center of the subject site runrung east to west The storm dramage faCIlIty IS proposed to be enhanced through the process of development of the subject site The site IS located outSide of both the 100-year flood and 500-year flood areas (see Exhibit 7, FIRM Map 41039C1153F) AdditIonal detail on adlacent uses IS as follows North The property to the north of the subject site IS separated by an EWEB utIlity comdor that also serves as a multI-use path North of the EWEB comdor IS property owned by Wtllamalane Park and RecreatIOn Dlstnct (Tax Lots 1500 and 2300), Bnggs Middle School and Yolanda Elementary (Tax Lots 2200 and 3002) and smgle famIly reSidentIal properties The properties to The VIllages at Marcola Meadows - Zonmg Map Amendment Apphcatlon Wnlten Statement - February 28,2007 Page4of41 I I I I I I I I I I I '. I I I I I I I I I the Immediate north are zoned MedIUm DensIty ResIdential wIth PublIc Land and Open Space zoning on the School and part of the WIllamalane and EWEB properties I I I I I West The property to the west IS zoned and developed wIth low-densIty sIngle-famIly residential dwellIngs Southwe~t The property to the southwest IS zoned CommunIty CommercIal and IS developed wIth a vanety of retaIl commercIal uses IncludIng a grocery store and a bank South The property to the south IS zoned and developed wIth low-densIty sIngle-family residential dwellIngs I I Southeast To the southeast are propertIes that are zoned for LIght-MedIUm Industnal (across North 28lh Street) and Heavy Industnal (across Marcola Road) Several of these propertIes are currently developed WIth Industnal uses East To the east (across North 281h Street) are propertIes zoned and developed WIth low-densIty SIngle-famIly resIdential dwellIngs I I IV. PROPOSED USE I A. General Project InformatIOn ContIngent on approval of the current applIcatIOn and other applIcatIOns as required, the applIcant IS prepanng to submIt applIcatIOns to construct a mIxed-use residentIal and commercial development In conformance WIth the needs of the Spnngfield communIty B Specific Proposal InformatIOn The Spnngfield ZOnIng Map applIes MedIUm Density ResIdential, Campus Industnal and CommunIty CommercIal zOnIng to the subject sIte The applIcant Intends to changc the zonIng of the property as descnbed above to accommodate a master-planned mIxed-use development (see PrelIminary Plan, Attachment 2 for more InformatIOn) I I I Maps shoWIng the eXIstIng ZOnIng Map D1stncts and the proposed ZonIng Map Dlstncts are attached to this applIcatIOn packet as ExhIbits 5 and 6 I I The proposed zonIng amendment IS a dIagram amendment only C AddItIOnal Proposal InformatIOn ThIs ZOnIng Map Amendment applicatIOn, submitted concurrently With the Metro Plan Amendment applIcatIOn, IS In preparation for appropnate land use permit applIcatIOns to construct a mixed-use residential and commercial development as descnbed hereIn The appropnate land use permIt applIcatIOns Include Master Plan Review and Traffic Impact AnalYSIS RevIew I The VIllages at Marcola Meadows - Zomng Map Amendment Apphcatlon Wntlen Statemen1- February 28,2007 Page 5 of 41 I Although applIcatIons for Master Plan, SubdivIsIOn and Site Plan approvals would be premature at his time, elements of the anticipated PrelImmary Plan are matenal to the current applIcatIOn To provide specific informatIOn about the mtended mixed-use development and ItS relevance to the current applIcatIOn, a prelmunary plan has been submItted as Attachment 2 and as descnbed below I I Proposed Prellmmary Plan DescriptIOn The Villages at Marcola Meadows IS a proposed mixed-use development compnsed of residentIal, office and retail villages Referencing the dramatIc wooded backdrop of the Coburg and Marcola hills to the north, and the large plane of valley floor meadow on Site, Marcola Meadows has been conceived to blend In With thiS overall settmg while creatmg a bndge and supportive transitIOn m the scale and mtenslty of larger commercial uses to the south With qUlet residential neighborhoods to the north I I Wlthm Marcola Meadows a sUlte ofmne Villages will eXist Four residentIal Villages compnsed of smgle famtly homes, apartment homes, townhomes and an assisted lIvmg facIlIty With semor cottages Will occupy the northern extent of the site, buffenng eXlstmg residentIal developments to the northwest, north, and northeast One office Village, conslstmg of profeSSIOnal offices, Will occupy the southeast area Four retail Villages, general retail, commumty retail, neighborhood retail, mam street retatl Will face 28th Street and Marcola Road I I I Marcola Meadows Will not only be a great place to call home, but an exciting place to shop, With specialty retail shops and umque dmmg venues Stores Will have welcommg front doors, large wmdows and high cetlmgs, all With natural matenals and muted colors I I I I Each of the Villages IS envIsIOned to be umque, yet part of the whole The overall Meadows theme Will appear throughout, With the use of meandenng waterways, natIve plans and generous open space Wlthm each Village, PaCific Northwest design aesthetIc Will prevail, supported With the generous use of stone, wood and steel It Will be easy to get around, and to do so on foot All streets Will have Wide Sidewalks, many of them setback from vehicle traffic The entIre commumty Will be connected With all-weather multi-use off street pathways It Will be convement, and safe, to walk from one Village to the next I I It Will be a great place to be outdoors, With meadow-flavored open spaces, native plant commumtIes, lIghtmg, bndges, seatmg, and overlooks to support walkmg and relaxmg I It Will be a healthy place, With ample use of oxygen-generatmg trees to cleanse the air, catch the wmd and cool the temperature I It wtll be an environmental place, utllIzmg a network of blOswales, shallow seasonal ponds, and a meandenng dramageway to capture and cleanse stormwater I I In all, The Vtllages at Marcola Meadows wtll not only be a great additIOn to the commumty but a wise use ofland and smart approach to design The Villages at Marcola Meadows - Zonmg Map Amendment ApphcatlOn Wnllen Slatemen1- February 28, 2007 Page 6 of 41 I I I I I I I I I V CRITERIA AND FINDINGS Spnngfield Development Code 12030(3) reqUires an evaluatIOn of any Zomng Map Amendment to determIne whether the amendment IS consistent with the folloWIng cntena Cntena are shown In bold and Italics text SDC 12 030(3)(a) Consistency with applicable Metro Plan poliLles and the Metro Plan dIagram, Resnonse The adopted Metro Plan "Land Use Diagram" (2004 update) shows three land use deSignatIOns on the subject site Campus Industnal, Commercial and Medmm DenSity ReSidential (see Exhibit 3) A metro plan diagram amendment changIng the land use deSignatIOns IS under concurrent review With thiS zomng map amendment applIcatIOn (see Exhibit 4 for proposed deSignatIOns) If the concurrent amendment to the Metro Plan diagram changIng the allocatIOn ofland use deSIgnatIOns for the property IS approved, the proposed Zomng Map Amendment wIll be consistent With and Implement the Metro Plan "Land Use Diagram" I I RegardIng conformance of the proposed zonmg map amendment to the wntten text of the Metro Plan, the applicant's responses follow I I I Growth Management Metro Plan, PolIcy I. The UGB and sequentIal development shall continue to be implemented as an essentlOl means to achieve compact urban growth The prOVi;iOn of all urban serviGeS shall be concentrated l1lSlde the UGB Resnonse The two parcels affected by tlus applicatIOn are currently Within the Spnngfield portIOn of the MetropolItan Urban Growth Boundary and have been Incorporated mto the City of Spnngfield The annexatIOn was made m complIance wIth an acknowledged comprehenSive plan and Implementmg ordmances, and establIshed the availabilIty of urban faCIlItIes and servIces As annexed land, the subject site proVides for compact urban growth With essentIal services avaIlable for development I The Metro Plan defines comnact urban !!rowth as "The filling In of vacant and underutllized land; In the UGB, as well as ledevelopment inSide the UGB" The PAPA will allow compact urban growth to occur on lands that are currently wlthm the UGB and underutIlIzed for an urban area The development of the site wIll proVide needed commercial employment opportumtIes and also proVide medmm denSIty reSidentIal development I I I I I Metro Plan, PolIcy 24. To accomplish the Fundamental PrinCiple of compact urban growth addressed m the text and on the Metro Plan DlOgram, overall metropolitan-wide denSity of new residentlOl constructiOn, but necessallly each proJect, shall average approximately SiX dwellmg umt; pel gross acre over the planmng periOd The VIllages a1 Marcola Meadows - Zomng Map Amendmenl ApplicatIon Wnlten Sla!emen! - February 28, 2007 Page 7 of 41 I ResDonse The proposed development seeks to achIeve a density for all residentially designated and zoned land of approximately twelve dwellmg UnIts per net acre The future development of the site, therefore, will help the regIOn achieve ItS goal of compact urban development I I I Metro Plan, ObjectIve 8. Encourage development of sUitable vacant, underdeveloped, and redevelopable land where services are available, thus capltahzlng on public expendItures already made for these servIces I ResDonse The subject site IS currently underdeveloped with access to readily aVaIlable publIc facIlItIes and services Approval of this proposal w1l1 capitalIze on the publIc services and expenditures already made and planned for In the Immediate area In short, the underdeveloped subject site IS sUItable for residentIal and commerCIal uses (specifically the proposed mixed residentIal and commercIal area) and has access to public facllltIes and services I I I Metro Plan Specific Elements A Re~ldentlal Land Use and Housmg Element ResDonse With the adoptIon of the Eugene-Spnngfield MetropolItan Area General Plan 2004 Update (effective February 2006) the subject site's residentIally deSignated land was removed from the mventory of land deSignated for low-density resIdentIal uses and was deSignated for medlUm- denSity residential uses (An applIcatIOn concurrent with thiS applicatIOn proposes to "fix" the boundary of the residentially deSignated land) Therefore, the current MDR, MedIUm DenSity ResidentIal zone IS m complIance with the current Metro Plan deSignatIon I I I I Metro Plan, PolIcy A.8 ReqUIre development to pay the cost, as determined by the local JUTlSdlctlOn, of extending pubhc services and Infrastructure The cltzes shall examine ways to pi oVlde subSid,es or incentives for prOVIding Inji-astructure that support affordable hOUSing and/or higher denSIty hOUSing ResDonse Through codified approval processes for thiS and subsequent applIcatIons, development shall conform to City of Spnngfield reqUIrements to pay the faIr cost of extendmg public services and mfrastructure These reqUIrements melude System Development Charges wluch Will be assessed and applied to future speCific development permits Infrastructure proVided by the proposed development Will faCIlitate a vanety ofhousmg types meludmg small-lot smgle-famIly detached homes, townhomes, apartments, senIor cottages and a congregate care faCIlIty I I I Page 8 of41 I I I I Metro Plan, PolIcy A 10 Promote hIgher resldentwl denslty inSIde the UGB that utlhzes eXIsting Infrastructure, Improves the effiCIency of pubhc serVices and faclhtles, and conserves rural resource lands outSIde the UGB Metro Plall, PolIcy A.ll Generally locate higher denSity resldentwl employment or commercwl servIce, In proxlllllty to major transportatIOn transportatIOn-efficIent nodes The Villages a1 Marcola Meadows - Zomng Map Amendmen1 Apphca1lOn Wnllen Slalemenl - February 28, 2007 development near systems or wlthln I I I I I I I I Metro Plan, Pohcy A 12 Coordznate higher density ,esldentwl development with the prOVt;lOn of adequate znfrastructure and services, open space, and other urban amemlies Metro Plan, Pohcy A.13 Increase overall resldentwl density zn the metlopoiltan area by creatlllg more opportumtles for effectively designed Ill-fill, redevelopment, and mixed-use whlie conslderlllg Impacts of IIlcreased resldentwl density on hlstonc, eXlstlllg and future neighborhoods I ResDonse The proposed PAPA wIll faclhtate approval of a Master Planned hIgher densIty development mcreasmg the supply of MedIUm DensIty ReSidentIal designated and zoned land wlthm the metropohtan area The Nodal Development Area desIgnatIOn IS proposed for portIOns of the subject site whIch IS located wlthm "PotentIal Nodal Development Area 7C" (TransPlan) The reSIdentIal portIOn Will be developed under Spnngfield and Metro Plan nodal development standards, WIth a mmlmum net denSity of 12 umts per acre In addItIon, the SIngle-family portIOn IS proposed under the standards for cluster development WIth notably smaller lot SIzes and common open space proVIded Along WIth the mIx of SIngle-family small-lot development and multI-famIly development, the apphcant IS propOSIng commerCIal development provldmg employment opportumtIes and commerCIal scrvlces for current and future reSidents of the area DeSIgned to be a walkable commumty, It Will proVIde a combmatlOn of higher reSIdentIal denSIties combmed wIth employment and commerCIal opportumtIes , I I I I I The antICIpated Master Plan WIll mtegrate the proposed hIgher denSIty development WIth eXisting neighborhoods m several ways Most of the development's boundary WIth eXIstIng reSIdentIal neighborhoods to the west and north WIll be composed of the lowest denSIty development (smgle-famIly detached lots) The plan WIll locate higher denSity housmg (apartments, cottages and congregate care) along the east SIde of the subject SIte, separated from development to the east by North 31" Street The proposed development WIll mInImiZe the dIsturbance to eXlstmg development whIle achlevmg the cIty's and regIOn's need for hIgher denSIty, mIxed-use development Metro Plan, Pohcy A 17. Provide opportumtles fOl a full range of GhOlCe zn houslllg type, denSity, Size, Gost, and locatIOn I I I I I I ResDonse The apphcant's proposed Prehmmary plan mcludes a vanety of housmg types mcludmg small- lot smgle-famlly development, townhomes, apartments, semor cottages and congregate care The denSIty of development IS proposed wlthm the deSired ranges for medIUm denSity reSIdentIal and mcludes more than 20% of common open space for use by the reSIdents of the development The locatIOn of the housmg IS central to the proposed nodal development area 7C (TransPlan) and shall proVIde a vanety of employment and commerCIal opportumtIes for the eXIstmg reSIdents of the area and future reSidents of the development Metro Plan, Pohcy A 20. Encourage home owners/up of all houszng types, particularly fOl low- zncome households The Villages at Marcola Meadows - Zomng Map Amendment ApplicatIOn Wnllen Slatemenl- February 28, 2007 Page 9 of41 Resnonse The applIcant's proposed development wIll Include a vanety of home ownershIp optIOns on small smgle-famlly lots and townhome lots The size of the lots and the optIOns for home ownershIp WIll Increase the supply of affordable ownershIp housing In the regIOn I I Resnonse A detailed analYSIS of EconomIc Element polIcIes IS contaIned In the applIcant's response StateWIde Planmng Goal 9 - "EconomIc Development" Those responses are hereby Incorporated by reference I I I I I I Metro Plan, PolIcy A.22. Expand opportunztlesfor a mix of uses In newly develoPing areas and eXisting neighborhoods through local zonzng and development regulatIOns Resnonse The proposed PAPA WIll facIlItate approval of a Master Planned development WIth expanded opportumtles for resIdentIal and commerCIal (maIn street, neIghborhood retaIl, profeSSIOnal office) development The project WIll Increase the dlvefSlty of uses where current opportumttes are limited Current residents of adjacent neIghborhoods and future residents of the development Itself WIll all benefit from Increased commercIal and employment opportumtIes B. Economic Element Resnonse The project area IS currently served by Marcola Road, 28th, and 31 st streets Marcola Road, the southern border of the subject Site, IS fully Improved and IS designated as a MInor Artenal 28th and 31st streets border the eastern boundary of the subject sIte The CIty of Spnngfield's Conceptual Road Network Map IdentIfies 28th and 31 st streets as the "31 st Street Connector" The 28th street portIOn of the 31 st Street Connector IS fully Improved and classIfied as a Collector street Thlrty-FlfSt Street IS not fully Improved and IS classIfied as a Collector street Currently, 31 st street IS a two-lane asphalt paved road that does not have gutters, curbs, or SIdewalks There IS a CIty of Spnngfield 10' utIlIty and SIdewalk easement on the west SIde of 31 st street to facIlitate road Improvements In the future I I I I I F. Tran~portatlOn Element The Villages at Marcola Meadows - Zonmg Map Amendment Apphcatlon Wntten Statemen1- February 28, 2007 Page 10 of 41 I I I I I I AddItIonal mformatlOn In thIS statement's response to Statewtde PlannIng Goal 12 - "TransportatIOn" IS hereby referenced and mcorporated Metro Plan, PolIcy F 1 Apply the nodal development strategy In areas selected by each JUrisdictIOn that have Identified potential for thiS type of transportatIOn-efficient land use pattern Resnonse The subject sIte IS WIthIn the area Identtfied In the TransPlan as "Potenttal Nodal Development Area" 7C The applIcant seeks to develop the majorIty of the sIte under the nodal standards as detailed In the SprIngfield Development Code The applIcant's proposed development Will I I I I I I I I I I I Include resIdentIal and commercIal development creatIng a mix of uses that complements the nodal standards Metro Plan, Pohcy F 13. Support tlansportatLOn sO ategles that enhance neighborhood livability Metro Plan, Pohcy F.14 Address the mobility and safety needs of motOrists, transll users, bicyclists, pedestrians, and the needs of emergency vehicles when planning and constl uctlng roadway system Improvements Metro Plan, Pohcy F.26. Provide for a pedestrian environment that IS well Integrated wllh adjacent land uses and IS designed to enhance the safety. comfort, and convelllence of walking ResDonse The proposed development shall be served by the eXistIng streets (Marcola Road, North 28th Street, North 31st Street) and future streets IncludIng a collector and local streets It wIll be easy to get around, and to do so on foot All streets wIll have wIde sIdewalks, many of them setback from vehicle traffic The entIre commumty WIll be connected wIth all-weather multI-use off street pathways It WIll be convement and safe to walk from each of the nIne master planned villages to the others Metro Plan, Pohcy F.36 ReqUire that new development pay for lis capacity Impact On the tlansportatLOn system I I ResDonse A detailed analysIs of the PAPA's consIstency wIth the State TransportatIOn PlannIng Rule, OAR DIVISIOn 12, 660-012-0000 et seq, (TPR) IS contaIned In the apphcant's response StatewIde Planmng Goal 12 - "TransportatIOn" Those responses are hereby Incorporated by reference They Included a Traffic Impact AnalysIs (T1A) to determIne the effects of the proposed PAP A The T1A proposes necessary mItIgatIOns of transportatIOn system capacity Impacts WIth regard to the TransportatIon Element of the Metro Plan, the CIty can find that the proposed PAPA wIll not make the Metro Plan Internally InconsIstent I I I I I I G. PublIc FacilitIes and Services Element Metro PIon, Pohcy G l. Extend the minimum level and full range of key urban facilities and service, In an orderly and ejJlclent manner consIstent wllh the growth management poliCIeS In Chapter II-B, relevant poliCies In thIS chapter, and other Metro Plan poliCies I I ResDonse The two parcels affected by thIS apphcatlOn are currently WithIn the Urban Growth Boundary and were annexed Into the City of Spnngfield The annexatIon was made In comphance WIth an acknowledged comprehensIve plan and nnplementIng ordInances, and estabhshed the avallablhty of urban faclhtles and services A detaIled analYSIS of the avallablhty of those services IS contaIned In the apphcant's response StatewIde PlannIng Goal II - "Pubhc FaclhtIes and Services" Those responses are hereby Incorporated by reference Metro Plan, Pohcy G 5 Consider wellhead protectwn areas and surface water supplies when planlllng storm water faCIlitIes The Vtllages at Marco!a Meadows - Zonmg Map Amendment ApplIcatton Wntten Statement - February 28, 2007 Page 11 of 41 ResDonse A stormwater management plan shall be created dunng the Master Plan approval process SpecIal emphasIs will be placed upon the wellhead protectIon area and surface water supplIes when plannmg stormwater facIlItIes See Exhibits 8 and 9 for more mformatlOn I I ResDonse The changes proposed by this applIcatIOn will have no Impact on any recreatIon area, facIlIty or opportumty that has been mventoned and designated by the Metro Plan or any relevant facIlIty plan regardmg the City's recreatIonal needs The recreatIOnal needs of the commumty are adequately met by the eXlstmg and planned facIlIties enumerated m the Willamalane 20-year Park and RecreatIOn ComprehensIve Plan, 2004 and other associated documents A detailed analysIs of the subject site m relatIOn to the vanous parks and recreatIOn system studies, mventones, refinement plans, and facIlItIes plans IS contamed m the applIcant's response Statewide Plannmg Goal 8 - "RecreatIOn" Those responses are hereby mcorporated by reference With regard to the Parks and RecreatIOn Element of the Metro Plan, the CIty can find that the proposed PAP A will not make the Metro Plan mternally mconslstent I I I I I I H Parks and RecreatIOn Element 1. HIstorIc Preservation Element ResDonse The changes proposed by this applIcatIon will have no Impact on any hlstonc resource that has been mventoned and designated by the Metro Plan or any relevant facIlIty plan or mventory regardmg the City'S h1stonc resources With regard to the Hlstonc PreservatIOn Element of the Metro Plan, the City can find that the proposed PAPA wIll not make the Metro Plan mternally mconslstent I , I J Energy Element Metro Plan, Goal 1: MaxImIze the conservatIOn and efficIent utl/tzatlOn of all types of energy ResDonse The proposed PAPA and subsequent development of the site will encourage conservatIOn and efficient utilIzatIOn of energy by a concentratIOn of employment, services and residences on the site, and facllItatmg transit services to the site I I Metro Plan, Pohcy J 3 Land allocatIOn and development paUelns shall permzt the hIghest pOSSIble current and future util,zatIOn of solar energy for space heatzng and coolzng, zn balance WIth the requzrements of othel plannzng polzcles, and I I ResDonse The applIcant shall design future development accordmg the standards of the Spnngfield Development Code meludmg all standards relevant to solar onentatlOn The Villages a1 Marcola Meadows - Zonmg Map Amendment ApplIcatIon Wnllen Slatemen1- February 28, 2007 Page 12 of 41 I I I Metro Plan, Pohcy J 8 Commerczal, resIdentIal, and recreatIOnal land uses shall be znteglOted to the greate;t extent pOSSIble, balanced WIth all plannzng polICIes to reduce travel dIstances, optznuze reuse of waste heat, and optImIze potentzal on-sIte energy generatIOn I I I I I ResDonse The requested approval of the PAPA proposed hereIn, If approved, will enable the subsequent zone changes and development of a master planned mixed-use development providIng employment, services and residentIal opportunItIes (see PrelImInary Plan, Attachment 2) The proposed development enVISIOns a serIes of nIne (9) villages that Include main street retml, neighborhood retml, general retail and resldent131 uses (sIngle-family detached, townhomes, apartments, senIor cottages and congregate care) Workers and residents will have the optIOn to obtaIn dInIng, shoppIng, and other commerc131 amenItIes less than a mile from the subject site consistent with PolIcy J 8's mandate to balance all plannIng polIcies to reduce travel distance EXistIng reSidentIal neighborhoods are adjacent to the subject site Schools and the WIllamalane Park to the north proVide access to recreatIOnal (and educatIOnal) faCIlItIes and services I I I I I I I Because the amendments faCIlItate review and approval of an Integrated master planned m1xed- use development with a mix of commerc13l and resldent13l ZOnIng adjacent to eXistIng and planned recreatIOnal uses (all withIn reasonable walking distance, which allows mixIng of uses and reduces travel dIstances) It IS consistent with thIs polIcy (see PrelImInary Plan, Attachment 2 for more InformatIOn) K CItizen Involvement Element Metro Plan, Goal: Continue to develop, maintain, and refine programs and procedwes that maXimize the opportunity for meaningful, ongoing citizen Involvement In the community's planning and planning ImplementatIOn processes consIstent with mandatmy otatewlde planning standards I I I I I I ResDonse As noted In applIcant's findings regardIng StateWide PlannIng Goal I, Cltlzen Involvement, the City's acknowledged program for cItIzen Involvement proVides cItIzens the opportunIty to review and make recommendatIOns In WrItten and oral testImony on the proposed PAPA, consIstent With Goal I The actIOn proposed IS consIstent With and does not amend the Citizen Involvement element of the Metro Plan SDC 11 030(3)(b) Conmtency With applicable adopted Refinement Plans, Plan District maps, Conceptual Development Plans and functIOnal plans; and ResDonse A Conceptual Development Plan (COP), preVIOusly created for the 56 acres of eXistIng Campus IndustrIal (CI) zoning on the subject sIte per SDC 2 I 020, was approved by the City of Springfield In 1999 (file number 98-02-47) SDC 21 020 states that "A Master Plan shall comply WIth any applzcable approved Conceptual Development Plan or upon apploval of a Master Plan or SIte Plan for the entire CI DIStrzGt, the Maoter Plan or Site Plan may supplant and take precedence over an approved Conceptual Development Plan " ThiS proposed ZonIng Map Amendment, If approved, shall remove the CI zonIng from the subject sIte Subsequently, a Master Plan applIcatIOn for the entIre subject Site, IncludIng all land WithIn the preVIOusly adopted COP, wIll be submitted to the City (see PrelImInary Plan, Attachment 2) With approval of the forthcomIng Master Plan, the previously approved COP Will be supplanted pursuant to SDC 37 010 et seq Therefore, the conditIons of the preVIOusly adopted COP (98-02-47) are not applIcable to thiS proposal and a findIng of consistency would be moot I I The Villages a1 Marcola Meadows - Zomng Map Amendment ApplIcatIOn Wnllen Sta1ement - February 28, 2007 Page 130f41 SDC 12.030(3)(c) The property IS presently provided with adequate public facilities, services and transportatIOn networks to ~upport the use, or these facilities, services and transportatIOn networks are planned to be provided concurrently with the development of the property I I ResDonse The dIscussIon of complIance with Statewide Planmng Goal II - "PublIc FacIlItIes and ServIces," and Goal 12 - "TransportatIOn" m the findmgs regardmg the StatewIde Plannmg Goals (see below) are mcorporated herem by reference WIth the findmgs establIshed and referenced herem, the proposal complIes wIth thIs cntenon I I 1. Meet the approval criteria specified III Article 7 ofthl~ Code; and 2. Comply with Oregon Admllllstratlve Rule (OAR) 660-012-0060, where applzcable I I I I SDC 12 030(3)(d) Legislative Zonlllg Map amendments that lllvolve a Metro Plan Diagram amendment shall ResDonse This applIcatIOn IS concurrent wIth a separate applIcatIon for Metro Plan Amendment Type 11, specIfically a change to the plan diagram Pursuant to Spnngfield Development Code (SDC) 12020(1)(a), thIs Zone Map Amendment applIcatIOn IS a legislatIve decIsion that shall be reviewed usmg the Type IV procedure Therefore, the cntena of SDC 12 030(3)( d) must be addressed With regard to SDC 12 030(3)(d)1 ,the first cntenon ofSDC 7 070(3) IS as follows I I I SDC 7.070(3)(a), The amendment must be conmtent with the relevant Statewide Plannlllg Goals adopted by the Land ConservatIOn and Development Commlswon; Responses to each of the StatewIde Plall1l1ng Goals follow Goal I - Citizen Involvement To develop a clllzen IIlvolvement program that IIlsures the opportumty for citizens to be IIlvolved III all phases of the planmng process I I I Resoonse The CIty of Spnngfield has an acknowledged cItIzen mvolvement program and an acknowledged process expressed m the Spnogfield Development Code for securIng cItIzen Input on all proposed zone map amendments It msures the opportunIty for cItIzens to be Involved m all phases of the plannmg process and sets out reqUIrements for such Involvement The amendments proposed do not amend the acknowledged CItIzen mvolvement program The process for adoptIng these amendments complIes with the requlIements of the CItIzen Involvement provIsIOns I The Metro Plan contaInS an acknowledged Citizen Involvement program satIsfymg Goal I The cItIzen mvolvement program IS In Metro Plan Chapter III, pp III-K-I to III-K-4 The proposed amendment complIes with and does not affect or amend the CItIzen mvolvement element In the Metro Plan I I The VIllages at Marcola Meadows - Zonmg Map Amendment ApplIcatIOn Wntlen Stalement - February 28, 2007 Page 140f41 I I I I I I The Metro Plan dIagram amendment IS subject to the publIc notification and publIc heanng processes provided for Type IV applIcation procedures as stipulated In SDC 3 100(1) through (7), WhiCh, along with the remaInder of the Code and with Statewide Goals and state statutes, proVide the provIsIOns for cItizen Involvement The City's acknowledged program for Citizen Involvement, IncludIng publIc notice, publIc heanngs at the level of the planmng commiSSIOn and city councIl, notification of deCISion and notification of the nght of appeal, proVides cItizens the opportunity to review and make recommendations In wntten and oral testimony on the proposed amendments to the Metro Plan DIagram and on the proposed zone map amendment These acknowledged cItizen Involvement provIsIOns afford ample opportunIty for cItizen Involvement consistent With Goal I I I I I For the reasons Cited, IncludIng the Metro Plan's and the City of Spnngfield's acknowledged programs for Citizen Involvement, the amendment IS consistent With Goal I Goal 2' Land Use Plannl1lg: To establIsh a land use plannmg process and polIcy fiamewOlk m a baSIS for all deCISIOn and actIOn; I elated to use of land and to assure an adequate factual base fa, such deCISIOns and actIOns I I I Resnonse Goal 2 reqUires that plans be coordinated With the plans of affected governmental umts and that opportunIties be proVided for review and comment by affected governmental UnIts In order to comply With the Goal 2 coordInatIOn reqUirement, the City Will be responsible for coordInatIng the adoptIOn of thiS amendment by proVidIng notice to all affected governmental UnIts and respondIng In ItS findmgs to the legitimate concerns of affected governmental UnIts There are no requests m the applIcation that would reqUire exceptions to any StateWide Planmng Goals under the Goal 2 ExceptIOns process I I I I I I I The Eugene/Spnngfield Metro Area General Plan (Metro Plan), the Spnngfield Code, and the StateWide Plannmg Goals and applIcable state statutes and admmlstratlve regulations, proVide polICies and cntena for the evaluatIOn of plan amendments ComplIance With these measures assures an adequate factual base for approval of the amendment As discussed elsewhere m thiS document, the amendment IS consistent With the Metro Plan, the Spnngfield Code, and the StateWide Goals Therefore, the amendment IS consistent With Goal 2 Goal 3 - Agricultural Land To pre~erve and mamtam agllculturalland; Resnonse Tills goal applIes to lands that are deSignated Agncultural ThiS amendment IS for property located wlthm the city lImits of Spnngfield and does not affect land deSignated for agncultural use Therefore, Goal 3 IS not applIcable or relevant to the amendment Goal 4 - Fore~t Land. To conserve forest lands by maintaining the forest land base and to protect the state's forest economy by making pOSSIble ewnonllcally effiCient forest practIces that assure the contmuou; growlIlg and harvestmg offorest lIee specIes as the leadmg use onforest land consl;tent wah sound management of sorl, air, water, and fish and wrldlife resoUJ ces and to prOVIde for recreatIOnal opportumtles and agnculture The VIllages a1 Marcola Meadows - Zonmg Map Amendment ApphcatIon WnUen Slatement - February 28, 2007 Pagel5of41 I ResDonse Tills amendment IS for property located wlthm the City lImIts of Spnngfield and does not affect land desIgnated for forest use Therefore, Goal 4 IS not applIcable or relevant to the amendment I I Goal 5 - Open Spaas, Scenic and Historic Area, and Natural Resources. To conserve open space and pi otect natural and scemc resources I I ResDonse Pursuant of Goal 5, the City of Spnngfield has adopted the followmg documents . Eugene-Springfield Metropolitan Area Gene/al Plan, revIsed 2004 . Cay ofSprzngfield, Local and NatIOnal Wetlands InventOlY Map, December 2005 . CIty ofSpnngfield Natural Resource Study, adopted, November 2005 I I I I Oregon AdmmlstratIve Rule 660-023-0250 establIshes the applIcabIlIty of Goal 5 rules to Post Acknowledgement Plan Amendments (PAPA), and specIfies certam procedures and reqUIrements for local governments to follow m the adoptIon or amendment of all plan or land use regulatIOns pertammg to Goal 5 resources The rule states "(3) Local governments are not reqUIred to apply Goal 5 m consIderatIOn of a PAPA unless the PAPA affects a Goal 5 resource For purposes of thIs sectIon, a PAPA would affect a Goal 5 resource only If (c) The PAPA amends an acknowledged UGB and factual mformatIon IS subrmtted demonstratmg that a resource SIte, or the Impact areas of such a SIte, IS mcluded m the amended UGB area" I I I I I I I I I (a) The PAPA creates or amends a resource lIst or a portIOn of an acknowledged plan or land use regulatIOn adopted m order to protect a slgmficant Goal 5 resource or to address speCific reqUIrements of Goal 5, (b) The PAPA allows new uses that could be conflIctmg uses WIth a partIcular slgmficant Goal 5 resource SIte on an acknowledged resource lIst, or The followmg dISCUSSIOn WIll demonstrate that the proposed PAPA does not raise any Issues that would reqUIre the CIty ofSpnngfield to apply Goal 5 FIrstly addressmg OAR 660-023-250(a) The changes sought by thIS applIcatIOn do not create or amend a resource lIst or any portIOn of an acknowledged plan or land use regulatIOn adopted m order to protect a slgmficant Goal 5 resource on the subject site Secondly addressmg OAR 660-023-250(b) The changes sought by thIS applIcatIOn WIll not allow new uses that could conflIct WIth a slgmficant Goal 5 resource site There are no SIgnIficant Goal 5 resources on the site Itself None of the vanous studIes, mventones, refinement plans, and faCIlItIes plans list thIS speCIfic site as a slgmficant resource, apply a Goal 5 resource overlay, or otherwise regulate or lImIt the redevelopment of thIS sIte as a Goal 5 resource The VIllages a1 Marcola Meadows - Zonmg Map Amendment ApplIcatIOn Wn1ten Statement - February 28, 2007 Page 16 of 41 I I I I I I There IS drainage dItch' on the site that was Inventoned dnd hsted (M32) by the Cay of Spl/ngfield Natl/ral Resolll ce Stl/dy It was classIfied as a Low Quahty Wetland and dId not meet the slgmficance cntena of the Oregon Freshwater Wetland Assessment Methodology The closest Goal 5 resource IdentIfied by the Cay ofSprmgfield Natl/ral RewlIIGe Stl/dy IS the Irving Slough located approxImately 550 feet to the east It IS hsted as both a HIgh Quahty RIpanan Resource SIte (S20 and S21) and a Moderate Quahty Wetland (M16b and M16c) However, the resource Impact area, defined by the study, does not reach the subject site Therefore, the uses allowed by the proposed PAPA wIll not conflict WIth a Goal 5 resource I I I Lastly addressing OAR 660-023-250(c) The changes sought by thIS applIcatIOn do not amend the acknowledged City of Spnngfield Urban Growth Boundary Therefore, With regard to thIS cntenon, the City IS not reqUIred to apply Goal 5 I ConclUSIOn Oregon Ad1mmstratlve Rule 660-023-0250 "Apphcablhty" stipulates that local governments are reqUIred to apply Goal 5 when consldenng a Post Acknowledgment Plan Amendment If the amendment affects a Goal 5 resource For the purposes of that rule, the sectIOn hsts three cIrcumstances (OAR 660-023-0250(3)(a), (b), and (c) quoted above) under whIch, and only under whIch, a Post Acknowledgment Plan Amendment would affect a Goal 5 resource As eVIdenced above, none of the three circumstances are raIsed by the proposed amendment, and therefore the amendment will not affect a Goal 5 resource The City IS not reqUIred to apply Goal 5 when consldenng the proposal The City of Spnngfield can find that the actIOn requested by thiS apphcatlOn IS consIstent WIth Statewide Planning Goal 5 I I I I I Goal 6 - AIr, Water and Land Resources Quality. To mamtmn and Improve the ql/allty of the all, water and land reSOl/rces of the ~tate ResDonse Nothing In the proposal or the character of the site or potentIal uses indIcates a future development that would compromIse air, water and land resources Future development of the sIte will be In conformance WIth local, state and federdllaw lI1cludIng aspects of the Spnngfield Code As indicated In findings regarding Goal II, Incorporated herein by reference, options for accessing or provIding the necessary urban services are available Therefore, the amendment IS consIstent WIth Goal 6 I I Goal 6 reqUIres all waste and process dIscharges from eXisting and future development to be consIstent With apphcable state for federal envIronmental quahty statutes SpecIfically, It reqUIres local governments to estabhsh that there IS a reasonable expectatIOn that a proposed use will be In comphance WIth the apphcable state and federal environmental quahty standards (FI/ends of the Applegate v Josephme COl/nty, 44 Or LUBA) I I I There are three federal envIronmental quahty acts relevant to Statewide Planning Goal 6 Clean Water, Clean Air, and the Resource ConservatIOn and Recovery Acts I These acts are enforced by the EnVironmental ProtectIOn Agency (EPA) to maintain air, water, and land resource quahty I The Clean Water Ac1 estabhshes the baSIC regula10ry slructure for regulatmg discharges ofpollu1ants m 1he wa1ers of the United States The Clean Water Act IS tmplemented 1hrough mdustry standards and reqUirements The Clean Air Act regulates an emISSions from area, statIOnary, and mobIle sources ThiS Act sets maximum pollutant standards and dIrects states to develop stale ImplementatIOn plans (SipS) apphcable 10 appropnate mdustnal sources The Villages at Marcola Meadows - Zonmg Map Amendment Apphcalton Page 17 of41 Wntten Statement - February 28, 2007 I a Review of all major publtc capital expenditure projects for potential air qualtty Impacts b IntegratIOn of air qualzty concerns Into the comprehensive land use plan c Active partzclpatlOn In develoPing and zmplementlng additIOnal controls, as needed I I I I I I I I I I I I I The EPA delegates authonty to Oregon Department of EnvIronmental QualIty (DEQ) to enforce federal envIronmental statutes In the State of Oregon (I e Clean Au Act, Clean Water Act, and Resource ConservatIOn and Recovery Act) The DEQ admlmsters the federal statutes (acts) through the Oregon AdmmlstratIve Rules (OAR), Oregon RevIsed Statutes (ORS), and Department programs The OARs regulate nOise control, groundwater qualIty protectIOn, solId waste, hazardous waste management, ambIent air qualIty standards, and transportatIOn conformIty The ORSs proVide procedures for compliance wIth sewage treatment and dIsposal systems, solId waste management, reuse and recyclIng, hazardous waste and hazardous matenals, nOise control, and aIr and water quality standards At the local level, the Eugene-SprIngfield MetropolItan Area General Plan (Metro Plan) contaIns polICies related to Goal 6 that mamtam air, water and land resource qualIty In the metropolItan area and are as follows C 25 Springfield, Lane County, and Eugene shall con~zder downstream ImpaGfs when planmng for urbamzatlOn, flood control, urban :,torm runoff, recreatIOn, and water qualtty along the Wzllamette and McKenZIe Rivers C 26 Local governments shall continue to mom tor, to plan for, and to enforce appltcable air and water qualtty standards and shall cooperate In meeting appltcable federal, state, and local air and water qualtty standards C 27 Local governments shall continue to cooperate In developing and Implementing programs necessary to meet air qualzty standards ThiS effort should Include but not be ltmzted to Supplemental to the Metro Plan ]S the Central Lane MetropolItan Planmng OrgarnzatlOn RegIOnal TransportatIon Plan (RTP) Tills plan IS the federal RegIOnal TransportatIOn Plan for the Eugene-Spnngfield metropolItan area A plan as such, must comply WIth the federal TransportatIOn EqUIty Act for the 21st Century (TEA 21), NatIOnal AmbIent AIr Quality Standards, and the State of Oregon TransportatIon PlannIng Rule (TPR) AddItIOnally the RTP must demonstrate consideratIOn for system preservatIOn and efficIency, energy conservatIon, and congestIon relIef The proposed Post Acknowledgement Plan Amendment (PAPA) does not amend any of the RegIOnal TransportatIOn Plan goals, obJectives, or polICies Future land use plannIng applicatIOns I I The Villages al Marcola Meadows - Zonmg Map Amendmen1 AppilcallOn Wntten Slatemen1- February 28, 2007 Page 18 of41 I I I Fmally, the Resource Conserva11On and Recovery Acl controls hazardous wasle ITom the "cradle-Io-grave", which mcludes the generatIOn, transportatIOn, treatment, storage, and disposal of hazardous waste ThiS act also sets forth a framework for the management of non-hazardous wastes I I I I I I I I I I I I I (ConditIOnal Use Permit and Site Plan) wIll conform to federal, state, and local regulatIOns related to Statewide PlannIng Goal 6 Further, when land use approvals are procured, at that lIme the apphcant w1l1 obtam the relevant atr quahty permits from the Lane RegIOnal Air ProtectIOn Agency (LRAPA) SpeCIfically, the applicant will obtam Air Contammant Discharge Permits as needed and Indirect Source ConstructIOn Permits for the proposed parkmg facllltles In the Eugene-Spnngfield metropolitan area, Lane County, Lane CouncIl of Governments (Metropolitan Plannmg OrganIzatIOn), Lane RegIOnal Air Pollution Agency, and the City of Eugene mamtam comphance With DEQ regulatIOns by the followmg · Lane County provides residents wIth waste management services through a network of disposal sites The County's waste reductIOn and recychng programs are managed to conserve resources and prevent waste . The Lane Council of Governments proVIdes wastewater and stormwater systems, ground and surface water, dnnkmg water source assessment, watershed assessment studies and plannIng and protectIOn for the Eugene-Spnngfield Metropohtan Area AdditIOnally, the Lane RegIOnal Air PollutIOn Agency regulates regional au quahty m Lane County through regulatIOns, programs and pernuts for reSidents and busmesses · The City of Sprmgfield Public Works Department mamtams water quality m the city through metropohtan sewage stormwater treatment systems that are reqUIred to operate under specific gUldehnes set forth by the DEQ The City of Spnngfield also has design standards for wastewater and stormwater collectIOn systems m the City of Spnngfield Public Works, Standard ConstructIOn SpecIficatIOns and the Engmeermg Design Standards & Procedures The CIty of Spnngfield's Development Code has three articles relevant to Goal 6 that proVide resource protectIOn Article 17 - DWP Dnnkmg Water ProtectIOn Overlay DIStnCt, Article 27 - FP Floodplam Overlay DIStnCt, Article 32 - Public and Pnvate Improvements I The proposed PAPA does not amcnd any ofthe Goal 6 related pohcles of the Metro Plan or the RegIOnal TransportatIOn Plan nor amend any regulatIOns Implementmg those poliCies As demonstrated m responses regardmg Goal II, mcorporated herem by reference, these urban services are avatlable I I I I Because the proposed PAPA docs not authonze any speCific development at thiS time, there can be no direct Impact to atr, water, or land resource quahty When development occurs on the subject Site, all development Will comply With all applicable local, state, and federal regulatIOns that protect au, water and land resources As mdlcated m findmgs regardmg Goal I I, mcorporated herem by reference, optIOns for accessmg or provldmg the necessary urban services are avatlable Therefore the proposed amendments are consistent With Goal 6 In additIOn to the precedmg facts, the eVidence supports a reasonable expectatIOn that future development resultmg from the proposed PAPA Will be consistent With Goal 6 reqUIrements Therefore, the City of Spnngfield can reasonably expect that future oevelopment under the proposed PAPA Will comply With applicable state and federal environmental quality standards The proposed PAPA IS consistent With Goal 6 I I The VIllages al Marcola Meadows - Zonmg Map Amendment ApphcatlOn Wnllen Statemen1- February 28, 2007 Page 19 of41 The Metro Hazard Plan does not IdentIfy any known hazards w[thm the area of the subject site AddItIOnally, the subject site IS outsIde of the 100 year and 500 year flood plams (ExhIbIt 7) There are no adopted or non-adopted maps that IdentIfy the subject site to be wlthm a know hazards area The proposed amendments do not affect any addItIonal geographIc area than the subject sIte, nor IS any specific development proposed at thIs time [n due tIme, future development of the subject sIte wIll mclude a full analysIs of hazard nsk and mitIgate the nsk through appropnate constructIon As such this amendment IS m complIance with Goal 7 I I I I I I I I Goal 7 - Areas Subject to Natural DI~asters and Hazards: To protect life and plOperty from natural dIsasters and hazards ResDonse Goal 7 reqUIres that development subject to damage or that could result m loss of lIfe not be planned or located In known areas of natural hazards and dIsasters wIthout appropnate safeguards The goal also reqUIres that plans be based on an mventory of known areas of natural dIsaster hazards (floods, landslIdes, earthquakes, wIldfires and other related hazards) The Mulll- Hazard MlIlgallon Plan for the Eugene/Sprmgfield Metropolitan AI ea (Metro Hazard Plan) that was adopted by the CIty of Sprmgfield IS a non-regulatory plan but provides an mventory of known hazards Goal 8 - RecreatIOn Needs' To satIsfy the recreatIOnal needs of the clllzens of the state and vlsllors and, where appropnate, to provIde for the sllmg of necessary reaeatlOnal facl/lIles mcludmg destmatlOn resorts I In LoordmatlOn WIth pnvate enterpnse, 2 In appropnate proportIOns, and 3 In ~uch quantIty, quality and locatIOns as I~ consistent wllh the aVallabllity of the resources to meet such reqUIrements " I I I I I ResDonse Regardmg recreatIOn, StatewIde Planmng Goal 8 states, "The reqUIrements fOl meetmg such need~, now and m the future, shall be planned for by governmental agencIes havmg responsIbIlity for recreatIOn area, faCilities and opportUnities Pursuant to Goal 8 reqUIrements, the CIty of Spnngfield and other local junsd[ctlOns have developed the followmg relevant plan documents . Eugene-Spnngfield Metropolitan Area General Plan (Metlo Plan), ReVIsed 2004 . Rivers to RIdges, Metropolitan RegIOnal Parks and Open Space Study, 2003 . Lane County Parks Master Plan, 1980 . Willamalane 20-year Park and RecreatIOn Comprehensive Plan, 2004 I I The proposed Metro Plan Land Use DIagram amendment Will not change the status of any recreatIon area, faCIlIty or opportumty that has been lllventoned and deSIgnated by the Metro Plan or any other relevant faCIlIty plans regardmg recreatIOnal needs None of the vanous studies, mventones, and faCIlItIes plans have designated the subject site for parks and open space m an adopted mventory, declared [t a sIgmficant resource, or slated thiS pnvately owned property for acqulSltlOn I I The VIllages at Marcola Meadows - Zonmg Map Amendment ApphcatlOn Wnllen Statement - February 28, 2007 Page 20 of41 I I I I I I I I I I I I I I I The WIllamalane Park and RecreatIon DIStnCt, responsible for parks and recreatIon plannIng In the CIty of Spnngfield, has developed the Wi/lamalane 20-year Parks and RecreatIOn Comprehensive Plan The City ofSpnngfield has adopted thIs plan as a refinement of the MetlO Plan The plan proposes a 5 5 acre community park on two undeveloped parcels north of the subject sIte, between Bnggs MIddle School and the EWEB utlhty easement (bike path), and owned by the Willamalane Parks and RecreatIOn Dlstnct The WIllamalane comprehensive plan refers to these parcels as "the PIerce property," donated In 1993 and elsewhere IdentIfied wIth adjacent parcels as the "Y 0landa/Bnggs/P1erce School Park" The plan observes that "there are opportunitIes to work wIth the School Dlstnct and EWEB on future Improvements to the Pierce property as a neIghborhood park and a waYSIde for the EWEB BIke Path" (pg A-46-7) The W,llamalane 20-year POI ks and RecreatIOn Comprehensive Plan, 'Table I Neighborhood Parks" hsts actIon Items for neighborhood parks ActIon I 4 suggests, "InvestIgate expansIOn of the park onto the vacant land to the south," the subject sIte However, such InvestIgations, If they have been pursued, have led to no further defined actIon or pohcy ActIOn I 5 suggests, "pursue opportunities to Improve the EWEB bIcycle path and develop park faclhtles on adjacent land to help meet neIghborhood park needs "The prehmmary plan for the subject sIte mcludes several pedestnan and bIcycle connections to the EWEB path and the proposed parks to the north The subject sIte Itself wIll Include extensIve pubhc open spaces As a commentmg agency, the Wlllamalane Parks and RecreatIon Dlstnct wIll have, through the prehmmary plan and site plan revIew processes, the opportunity to coordInate plans wIth future development Rivers to Ridges, MetropolItan RegIOnal POI ks and Open Space Study does not IdentIfy the subject site as a resource The study maps the EWEB bIcycle path that borders the northern boundary of the subject sIte as an element of the area's "Major Pubhc Parks and Open Space" However, thIS bIcycle path IS outSIde the boundanes of the subject sIte ConclusIOns No part of the subject sIte IS desIgnated by the Metro Plan as Parks and Open Space The Wi/lama lane 20-year POI k and ReGreatlOn ComprehenSive Plan does not Identify the subject sIte as an "exIsting park and recreatIOn resource" No acknowledged plan declares It a SIgnificant resource or slates thIS pnvately owned property for acqUIsitIOn Therefore, the proposed PAPA IS consIstent WIth StatewIde PlannIng Goal 8 I I Goal 9 - Economic- Development To prOVide adequate opportumtles throughout the state for a vanety of economIc actlvllles VItal to the health, welfOl e, and prospenty of Oregon's CItizens I I Resoonse StatewIde Plannmg Goal 9 - Economy of the State, reqUIres communitIes to Inventory, plan, and zone enough commercIal and mdustnal land to support the dIversificatIOn and Improvement of the economy Pursuant to thIS, the CIty of Spnngfield has adopted the followrng documents I Eugene-Sprll1gfield MetropolItan Alea General Plan (Metro Plan), RevIsed 2004 Spllllgfield Commerual Lands Study, February 2000 MetropolItan Industnal Lands SpeclOI Study MetropolItan Industnal Lands Inventory Report, July 1993 MetropolItan IndustllOl Lands PolIcy Report, July 1993 I I The Villages al Marcola Meadows - Zomng Map Amendmen1 ApplIcatIOn Wntten Slalemen! - February 28, 2007 Page 21 of41 The Metropohtan Industrial Lands Special Study (MILSS) commenced In 1989 and produced two documents, the Metropolztan IndustrlOl Lands Inventory Report (MILlR) and the Metropolztan Industrial Lands Polzcy Report (MILPR) In 1995, the Sprmgfield CommerclOl Lands Study (SCLS) was Inltlated The City of Spnngfield adopted the study In 2000 and the Oregon Department of Land ConservatIOn and Development (DLCD) acknowledged the SCLS as a pen odic review task The study looked only at lands withIn Spnngfield's urban growth boundary and did not make changes to either the Metro Plan or the Spnngfield Development Code However, as an area specific pen odic review task, It updates the "Economic Element" of the Metro Plan and Includes findIngs, pohcIes and ImplementatIOn strategies regardIng the supply of commercial lands Oregon AdmInlstratlve Rule (OAR) 660-009-000 et seq (DIVISIOn 9) estabhshes the apphcab1hty of Goal 9 rules to Post Acknowledgement Plan Amendments (PAPA), and specifies certaIn procedures and requirements for local governments to follow In the adoptIOn or amendment of all plan or land use regulatIOns pertaining to Goal 9 In OAR-660-009-0010(4) the rule discusses procedures relevant to tills apphcatlOn and states Notwlfhstandmg paragraph (2), [660-009-0010(2)), ajUllsdlctlOn wh,ch changes Its plan desIgnatIOns of land~ m exce~s of two acres to or from commerclOl or mdustrlOl use, pur~uant to OAR 660-Dlvl~lOn 18 (a post acknowledgement plan amendment), must address all applzcable planmng reqUIrements, and (a) Demonstrate that the proposed amendment IS consIstent WIth the parts of ItS acknowledged comprehensIve plan wh,ch address the reqUIrements of thIS dIVISIOn, or (b) Amend lfs comp' ehen~lve plan to explam the propo~ed amendment, pursuant to OAR 660-009-0015 through 660-009-0025, or (c) Adopt a combmatlOn of the above, consistent With the reqUIrements of thIs dIVISIOn The plan deSignatIOn changes antlclpated by the proposed PAPA will remove 56 0 acres of Campus Industnal deSignatIOn In ItS stead, the supply ofland With CommerCial deSignatIOn wIll Increase 37 0 acres and the remaInIng 19 0 acres will receive a MedIUm DenSity Resldentlal deSignatIOn AdditIOnally, 26 0 acres of the Commercial land will also have a Nodal Development Area overlay deSignatIOn See Exhibits 3 and 4 and Table I (above) for more Informatlon The folloWIng facts will demonstrate that the proposed amendment IS consistent WIth the most recent economic opportunities analYSIS and With the sectIOns ofthe acknowledged Metro Plan which address the reqUIrements of DIVISIOn 9 The Metropolztan Industrial Lands Inventory Report (MILPR) estlmated that the 20-year Industnalland supply was about 3,600 acres WithIn the Metro UGB and about 709 acres WithIn the Spnngfield portlon of the UGB (MILPR, Table 5, p 47) It further estlmated that the most hkely projected 20-year demand for Industnalland for the Metro UGB would be between 650 and 1,172 acres, one-fifth to one-thIrd of the supply (MILPR, p 7) The MILPR does not estimate demand WithIn the Spnngfield UGB alone The subject site was Included In the hst of short-term sites for new Industry (MILPR, p 20 and p 45, SubregIOn 7, Site 5) In response to thiS study, the Metro Plan was amended deletIng a findIng that the supply was nol adequate to meet the projected growth In the commercial and hght manufactunng segments of the economy (MILPR, p II) The follOWIng pohcy was added to the Metro Plan The Villages at Marcola Meadows - Zomng Map Amendmen1 AppltcatlOn Wntlen Statement - February 28, 2007 Page 22 of41 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I EeOllOmlL Element Polley #8 12 DlsLOwage future Metlo Plan amendments that would change development-ready lIldustnallands (sites defined as short-term III the Metropolltan Industnal Lands Special Study, 1991) to non-lIldustna/ deSignatIOns CURRENT LAND SUPPLY The Lane County CommerCIal and Industnal BUIldable Lands Project (a collaboratIve effort of Lane County, the cItIes of Eugene and Spnngfield and Lane Metro Partnership) contracted ECONorthwest to create an updated database of Goal 9 lands A report entItled "The Supply of CommerCIal and Industnal Land m Lane County A Database and PrelImmary AnalysIs" (ClBL) was completed m September 2006 ThIS publIc document does not contam any adopted polIces or recommendatIOns, but the data collected by It, to the degree that It can be assumed to be accurate, IS referred to m thIS diSCUSSIOn The MlLPR estImated the most lIkely 20-year demand for mdustnalland to be 650 acres (p 8, MILPR) Table 2 shows absorptIOn rates for all lndustnalland, and for Campus lndustnalland, thIrteen years mto the 20-year plannmg penod WhIle the Campus Industnal2 share of all vacant unconstramed mdustnal land has remamed nearly constant (27% denved from Table 5 of the MILJR, p 47 and 25% denved from Table 3-9 of the ClBL, p 17), the absorptIOn of all vacant lndustnal land has exceeded projectIOns Companng the total of unconstramed vacant land m the MlLPR to the ClBL, the lndustnalland Inventory has been reduced by approxImately 2,600 acres wlthm the Metro UGB (an absorptIon rate of 72%), though at least 155 acres were converted to other uses (residentIal or commerCial) The 69% absorptIOn rate wlthm Spnngfield's UGB IS SimIlar ThIS contrasts WIth the MlLPR predictIOn of 20% for the entire planning penod Table 2 Unconstramed Vacant Industrial Acres and Absorption Acres RegIon MILPR (1993) CIBl (2006) Change Absorption Metro (Total) 3,604 999 2,606 72% Springfield (Total) 709 222 487 69% Metro (CI Only) 990 318 672 68% Sprlnglleld (CI Only) 255 74 181 71% Source Information dcnved from MILPR (1993) and CIBL (2006) analYSIS performed by Satre ASSOCiates PC Note There IS a slight dIfference between reportmg methods for mdustrlal acres In the MILSS, which accounted for lands \\lthm Spnngfie!d s UGB and the CIBL which did not Table 3 shows the Impact of the proposed PAPA on Spnngfield's current mventones of Campus Industnal, CommerCIal and CommerCial Mixed Use deSIgnatIOns (The CMU deSIgnatIOn corresponds to the area of the project that WIll receIve the Nodal DeveloPJ11ent Area designatIOn) The total supply of unconstramed Campus lndustnalland wlthm Spnngfield WIll be reduced by 75% The combmed overall supply of unconstramed CommerCIal and CommercIal Mixed-Use land WIll mcrease by 50% I I 2 The MllSS uses the tern! "SpeCIal lIght" whIch has smce been changed to "Campus Industrial" In thIS report we will use the later tenn "Campus Industrial" I The VIllages at Marcola Meadows - Zonmg Map Amendment Applicatton Wntlen Statemen1- February 28, 2007 Page 23 of 41 I I Table 3 Spnn{!field Land Use ClaSSifications and Plan Desumatlons Affected bv the Proposal I Plan Designation Campus Industnal Commercial Commercial Mixed Use TOTAL Total Acres 2129 5645 1578 9352 Vacant 1175 669 131 1975 Unconstrained 742 634 108 1484 Proposed -560 110 260 Net Unconstrained 182 744 368 Percent Change Unconstrained -75% 17% 241% I I Source Data from CommerCial and Industnal lands Database ECONorthwest, 2006, analysIs performed by Satre Associates, PC FUTURE LAND SUPPLY I The short and long term supphes of bUIldable CommefCIal and Campus Industnalland are both cnl1cally madequate However, the draft Jasper Natron Specljic Development Plan proposes to add about 20 acres ofCommercml and 118 acres ofCI land to Spnngfield's long-term supply by the year 2015 Nonetheless, hlstonc mventory absorptIOn rates, when extrapolated mto the future, predIct a deficIt of Commercial land m 2015 The resultmg mventones of bUIldable Commercial and Campus IndustrIal lands are shown m the Table 4 I I EXIsting Campus Industnal (CI) 74 2 Commercial (C, CMU) 742 Source analysIs performed by Satre Associates, PC Absorption rotes are from an analyst'> ofMILSS and ClBL !otudles, and SCLS data (SCLS, p 19) 2015 Jasper-Natron 1178 201 2015 Total 1920 943 AbsorptIon Rate (acres per year) 139 170 2006-2015 AbsorptIon 1251 1530 2015 Acres 669 ,-587 I Table 4 Absorption of SprlDgfield's Land Supply for Relevant DeSignatIOns I Although the proposed PAP A will slgruficantly reduce the supply of bUIldable CI land, proJecl1ons mdlcate a small mventory wIll remam m the plan year 2015 Through thIs proposed PAPA, the supply of CommercIal land wIll be slgmficantly mcreased, yet there wIll sl1ll be a plan year deficit m thIs mventory Spnngfield's 2015 supply of Commercial land will not meet demand If the hlstonc rate of absorptIon contmues The effect the proposed PAPA will have on future land supphes IS mcluded m Table 5 I I Table 5 Absorption of Land Supply Under Proposed Amendment I Post PAPA Campus Industnal (CI) 182 Commercial (C, CMU) 111 2 Source analysIs performed by Satre ASSOCiates PC AbsorptIOn rates are from an analysIs ofMILSS and C1BL studies and SCLS data (SCLS, p 19) 2015 Jasper~Natron 1178 201 2015 Total 1360 1313 AbsorptIon Rate (acres per year) 139 170 2006-2015 AbsorptIon 1251 1530 2015 Acres 109 -217 I I These economIc land mventones m Spnngfield are small and dwmdhng Decldmg to reduce the supply of CI land IS not an easy chOIce, a matter of robbmg Peter to pay Paul However, there IS synergy between mdustnal and commercIal land uses and a balance should be mamtamed Manufacturers are drawn to areas that provIde the commercIal support they reqUIre These Issues are dIscussed further m the next sectIOn of the report I I Lookmg farther mto the future, the relatIve growth predicted for the vanous sectors of the economy can be analyzed The table below shows projected economic growth for the Southern Wlllamette Valley from 2000 to 2055, and mdlcates shifts of the sectors m relatIve Importance to the overall economy The largest growth wIll occur m the services sector, predommately I The Villages at Marcola Meadows - Zonmg Map Amendment ApphcatlOn Wntlen Statement - February 28, 2007 Page 24 of 41 I I I I I I I I I I assocIated wIth commercially desIgnated land Manufactunng, whIle expenencmg a 30% growth rate, will nonetheless reduce ItS share of the overall economy by 2% Table 6 2000-2055 Employment Growth by Selected Indnstry Sectors, Sonthern WIllamette Valley Industry 2000 2055 Growth Emp Share Emp Share (2000-2055) Shift Construction 6,586 490% 9,880 510% 50% 020% Manufaclurlng 22,800 17 20% 29,640 1530% 30% -190% Trans, Comm , 3,706 280% 5,930 310% 60% 030% and Utilities Wholesale Trade 6,189 460% 9,880 510% 60% 050% Retail Trade 27,715 20 90% 41,490 2140% 50% 050% Finance, Insur & 5,973 450% 7,900 410% 32% -040% Real Estate Services 37,813 28 50% 59,080 30 50% 56% 200% Government 21,640 1630% 29,640 1530% 37% -100% Total 132,422 100% 193,440 100% 49% 000% Source RcglOnall::.conOlTIlC Opportunities AnalysIs, ECONorthv.cst May 2006, page 13 ShIft calculated by Satre ASSOCIates, Pc. COMPREHENSIVE PLAN POLICIES I I I I The Metro Plan has the followmg polIcies directly relevant to the proposed PAPA EconomIc Element Pohcy #B 6 Inc/ease the amount of undeveloped land zoned for hght Industl/al and commercwl uses correlating the effective supply In terms of sUltablhty and availablhty wIth the projectIOns of demand Econonllc Element PolIcy #B 12 Discourage futU! e Metro Plan amendments that would change development-ready Indu;tnal lands (slles defined as shOlt-term In the metropohtan Industnal Lands Specwl Study, 1991) to non-Induslrlal deSignatIOns I I I I I Clearly, these two polIcIes often wIll be m conflict With a lImited supply of urbamzable land, mcreasmg the amount of undeveloped commercial land WIll frequently be at the expense of the mventory of mdustnalland The Metro Plan addresses the Issue of conflict between polIcIes "The respectIVe junsdICtlOns recogmze that there are apparent conjhas and inconsistencies between and among some goals and pohcles When making deCISIons based on the Metro Plan, not all of the goals and pohCles can be met to the same degree In every Instance Use of the Met/a Plan reqUires a balancing of lis varIOus components on a case-by-case baSIS, as well as a selectIOn of those goals, objectIves, and pohcle; most pertinent to the Issue at hand" The Springfield Commerczal Lands Study, the most recent economIc opportumtIes analYSIS regardmg land suppy, contams the followmg key polICies "PolIcy I-A Mamtaln a mIxed supply of large and small commerCial sites through strategies such as rezonmg or annexatIOn to serve Spnngfield' s future populatIOn" I I The Villages at Marcola Meadows - ZonIng Map Amendmenl ApphcatlOn Wntten Statemen1- February 28, 2007 Page 25 of41 "Policy I-C Malntam at least a five-year supply of commercIal land w1thm the Urban Growth Boundary (UGB) that IS currently served or readIly serviceable wIth a range of urban public facIlities and servIces" I I I I I I I I "Policy I-B Ensure that an adequate amount of commercIal land IS desIgnated m the undeveloped IdentIfied nodes such as JasperINatron and McKenzIe/Gateway, to accommodate a portIOn of the demand for commercIal acreage, and to Implement the policies and objectIves of the TransPlan " "Policy 3-A Redesignate and rezone portIOns of mdustnal land or reSIdentIal land wlthm IdentIfied Employment Center, NeIghborhood Center, or CommercIal Center nodes to Mixed-Use CommerCIal to achIeve the objectIves of TransPlan, TransportatIOn Plannmg Rule 12, and to mcorporate hIgher mtenslty development m conjunctIon with reSIdentIal and employment opportumtIes " Metro Plan EconomIc Element "Policy #B 6" IS ImperatIve and prOVIdes clearer guIdance than "Policy #B 12," whIch merely dIscourages The poliCIes of the Sprzngfield Commercwl Lands Study, particularly "Policy 3-A," clearly trump "PolIcy #B 12" when consldenng the proposed PAPA The proposed PAPA places the Nodal Development Area overlay deSIgnatIon on most of the site, addressmg "PolIcy I-B," and "Policy 3-A " However, the site and surroundmg areas are already subject to some of these Impacts, which may partIally explam why the site has not yet been developed with CI uses The City'S pre- applIcatIOn report lIsts "aIr pollutants from surroundmg heavy mdustnal uses, overhead electncal lines and nearby rall lInes whIch cause problems for certam types of hIgh technologIcal mdustnes Several hIgh tech firms had conSidered the Pierce Property for a potentIal locatIOn, and all found It unSUItable because of these problems" I I I I I I I The reqUIred mventones of Goal 9 lands are approxImate m extent, and there IS fleXibility m the compoSItIon of those mventones Nonetheless, the CIty must conSIder the appropnateness of approvmg the proposed PAPA compared to mamtammg the current land use deSIgnatIon and zomng dlstnct Several Issues must be addressed, SUItability of the land for the current deSIgnatIOn, the availabilIty of substItutes If the deSignatIon IS changed, economIc diversity, and famIly wage employment SUITABILITY The site has been reserved as development ready Campus Industnal land smce 1995 The majonty of It was deSignated as SpeCIal Light Industnal (the precursor of Campus Industnal) for years before that DespIte the dwmdlmg supply of CI land, there has been no proposal for a comprehenSIve development of the site The reasons the project sIte has not yet been developed are complex However, the sIte IS not Ideal With regard to the qualItIes that the CI deSignatIon IS mtended to foster and preserve To attract the desrred mdustnes, the zone Imposes performance standards to reduce conflIcts With adjacent zonmg dlstncts and negatIve Impacts between sites wltlun the CI district Itself From the Metro Plan, "The actIvItIes of such firms are enclosed wlthm attractIve extenors and have mlmmal envIronmental Impacts, such as nOIse, pollutIOn, and VIbratIOn, on other users and on surroundmg areas" I I The VIllages at Marcola Meadows - Zonmg Map Amendmen1 ApplIcatIOn Wnllen Statement - February 28, 2007 Page 26 of 41 I I I I I I I I I I I I I I I Lane Metro Partnership confirms this mformatlOn The agency provides economic development and busmess mformatIon for Eugene, Spnngfield and Lane County, and mamtams a computenzed mventory of vacant mdustnalland and bUlldmgs They report that while numerous mqUlres about the subject site are receIved from busmesses consIdenng It as a locatIOn for new faCIlIl1es, there are common ObjectIOns These mclude the site bemg too close to established resldenl1al areas for mdustnal uses, and too close to the Kmgsford charcoal plant for high-end office or research facIlIties SUBSTITUTION Despite whatever ImpedIments to campus mdustnal development the site may have, the City should preserve the current desIgna110n If It represents the last best hope to attract compames offenng above average wages The CI zone limits retaIl uses, m part, to keep lower paymg employers from competmg for SItes However, recent data show that thIS strategy IS not as effectIve as hoped Commercial land IS SUItable for many hIgh-wage, economic export employers Although the Campus Industnal zone allows certam manufactunng uses that are not allowed under the proposed Commercial deslgnal1on, many uses that are penmtted proVide famIly wages New and growmg sectors of the economy blur the lme between commercIal and mdustnalland use ThiS IS discussed further m the next sectIon ECONOMIC DIVERSITY The Land ConservatIOn and Development CommISSIOn (LCDC) recently reported to the Governor on the converSIOn of mdustnal land to non Industnalland The report was concerned wIth mamtammg an adequate local supply of Industnalland and preventmg converSIOns of pnme mdustnal land to non-mdustnal uses TheIr report was l1tled "Promotmg Prospenty Protectmg Pnme Industnal Land for Job Growth" It made the followmg observatIOn "The Issue of converSIOn of mdustnallands IS linked directly to the goal of provIdmg an adequate supply of mdustnal and other employment land for a vanety of economic actIvIl1es UntImely or undesIrable conversIOn of mdustnallands, particularly converSIOn of strategic sites with umque market features, can mterfere With accompllslung the goal of provldmg adequate land development opportuml1es for economIC growth and Job creatIOn" (p 11) I I I I 'The GMELS' [Greater Metropolitan Employment Lands Study] Phase I findmgs remforce the committee's assertIOn that tradll10nal mdustnal areas, mcludmg those featunng heavy manufactunng, warehouse/dlstnbutIOn, mdustnal service and waste management acl1vll1es should be protected from encroachment by mcompat1ble non- mdustnal uses by placmg these areas m so-called mdustnal sanctuanes" (p 19) However, the report also observed, I I "To better understand the concept of 'employment lands,' the commIttee exammed the Phase I findmgs of the Greater Metropolitan Employment Lands Study (GMELS) The study IS based on an assessment of the need for a broad category of employment lands wIthm the greater Portland metropolitan region Committee members concurred With a major findmg of GMELS that the line between mdustnal and non-mdustnal use IS The VIllages aI Marcola Meadows - Zonmg Map Amendment ApphcaIIOn Page 27 of 41 Wollen SIa1ement- February 28, 2007 "New and emerging industrIal uses These are high-tech, bIOtech, some manufacturIng and research and development and are often located In office and tech-flex settings They are most productIve when adjacent to similar companIes and theIr non-industrIal supplIers, lenders and support systems SUItable locatIOns for these actIvItIes Include many mixed-use zones, as long as their scale, deSign and operatIOnal characterIstIcs are compatible with surroundIng uses" (p 20) I I I I I I I I becoming increasingly blurred In the new economy because many traded-sector and industrIal actIvItIes are now camed out In office and tech-flex settings The latter type of Industnal uses IS perfectly compatIble With other employment actIvities and, thus, can be accommodated In mixed-use zoning dIstrIcts that Include retaIl, office, instItutIOnal and/or lIght Industnal and even reSidentIal uses" (p 18) Although the conversIOn of CI land to other deSignatIOns may seem to have a negatIve effect on the potentIal for economIc development, the net effect IS very pOSItive when conSiderIng the benefits of adding to the extremely scarce supply of commercial land As the DLCD report to the Governor pOints out, high-tech research and development firms are most productIve when non-industrIal supplIers and supporting servIces are aVailable to them FAMILY WAGE EMPLOYMENT Table 7 SprIngfield, Oregon Average Honsehold and Famtly SIZe Number of IndiViduals 255 303 Average Household AveraQe Family I I I I I The abilIty for SprIngfield to attract Jobs that proVide a family wage IS among concerns over changing the CI deSignatIOn of the subject site Although there IS no precIse definItIOn of "family wage," the term came Into use dUrIng the IndustrIal RevolutIOn when work was separated from home to a degree not seen before The concern was that the breadWInner earn enough to allow the spouse to stay home tendIng the house and children It became a somewhat controversial term, some commentators assignIng sexist overtones to It The follOWing data (Tables 7 and 8) creates a statIstIcal context for the diSCUSSIOn If "family wage" can be defined as the gross Income needed to cover typical expenses of the average family, the tables below estImate these figures In SprIngfield and Oregon Source U S Census Bureau Census 2000 Summary File 3 Poverty In America 1 E P I' Two Adults, One Child $34,905 $36,408 Two Adults, Two Children $43,862 $41,748 I I I I Table 8 Sprmgfield, Oregon TypIcal 2004 Famtly Expenses Source 1 Poverty In Amenca Project Penn State Umverslty 2 EconomiC Policy Institute Figures are for tYPIcal expenses Figures for One Adult and Two Children are WIthin approximately one percent of Two Parent One child expenses Table 9 below gives U S Census data regarding the medIan Incomes of IndlVlduals and households Note that the family household Income IS SIgnIficantly higher than the highest The Vtllages at Marcola Meadows - Zomng Map Amendment ApplicatIOn Wntten Statemenl- february 28, 2007 Page 28 of41 I I I I I I I I I I I I I Individual median Income Data about the proportIOn of two-Income households or the average wage of pnnclple breadwInners IS not aVailable Heads of family households may be makIng slgmficantly more than the average or many households may have two Incomes Some combInatIOn of the two IS hkely Regardless, It Indicates cautIOn should be used when makIng assumptIOns about family wages Table 9 Springfield and Oregon MedIan Incomes Oregon Springfield, Oregon Family Households $55,196 $43,539 Non-family households $29,209 $23,734 All Households $46,393 $37,452 Male full-lime, year-round workers $41,485 $35,118 Female full-time, year-round workers $30,591 $25,524 Source U S Census Bureau Census 2000 Summary FIle 3 adjusted to 2004 Consumer Price Index To assess Impact of the PAPA on family wage Jobs, we can esl1mate the average wage of employment 111 the relevant land use deSIgnatIOns The table below (Table 10) uses InformatIOn from the Lane County Council of Governments and the Oregon Labor Market InformatIOn Service to correlate the esl1mated number of people employed by each Industry sector witrun a plan deSignatIOn, and the Lane County average pay WithIn each sector, to denve an estimated average pay for employment In a land use deSignatIOn Table 10 Plan Deslgnahon Average Wage CommercIal Employment 676 2% 779 2% 767 2% 585 2% 8,890 25% 2,455 7% Industry Conslructlon Manufacturing Trans, Comm , and Utilities Wholesale Trade Relall Trade Finance, Insurance and Real Eslate Services Governmerlt Total WeIghted Average Pay I I I I I I I I 20,348 57% 1,218 3% 35.718 100% $25,73213 Comm Mixed Use Employment 107 4% 99 4% 128 5% 68 3% 332 13% 342 13% 1,252 48% 279 11% 2.607 100% $30,905 80 Average Pay $37,751 00 $38,05721 $35,09020 $40,622 86 $19,30919 $34,737 05 $27,34014 $37,239 00 Source of wage data OLMIS Lane County 2000 mdustry sector average adjusted for 2004 Consumer Pnce Index except the figure for Government which IS from 2004 Source of Industry sector employment by plan deSignation LCOG - 2004 To better understand the Impact of the PAPA on conditIOns In Spnngfield, Table 11 below provides an overview of the types of bUSInesses and the approximate number of employees currently located In the Gateway area (the only other CI zone In Spnngfield with slgmficant development Most of the bUSInesses lIsted In the table would be allowed WithIn the proposed PAPA redeslgnatlOns The VIllages a1 Marcola Meadows - Zonmg Map Amendment ApplicatIOn Wntten Sta1ement - February 28,2007 Page 29 0141 I Table 11 Types of Busmesses and Approximate Employees for Gateway De\Olopment I Gateway Businesses Address Type ApproxImate Number of Employees Royal Canbbean CruIse Lines 1000 Royal Canbbean Way Travel sales call center 250-500 (3900 Sports Way) Symantec 555 International Way Computer Support Call 1200 Center Comp Tech PacrficSource Health Plans 110 International Way Health Insurance 275 Headquarters Oregon Medical Laboratones/ 123 I nternal,onal Way Medical Laboratones 300 Oregon Vetennary Laboratory Sacred Heart Medical Center Financial services 260 Foundallon 123 Internallonal Way Sacred Heart Medical Center Matenals (Supply 30 Matenals Management handlers) Shorewood PackaglOg Inc 500 International Way Manufacture paperboard 60 packag,ng products Wholesale dlstnbutlon Global'ndustnes 950 International Way automotive parts and 10-19 accessones Grand Slam USA 921 International Way Indoor recreation Batting 1-4 cages, basketball, etc McKenzie Athletics 909 International Way Uniforms screen prlntlng 10-19 and embrOIdery PacifiC Office Automation 911 International Way Copier sales and copy'n9 20-49 services Rex Myers Transfer 915 1 nternatlonal Way Moving and storage 5-9 FedEx 700 Intematlonal Way Couners and messengers 20-49 Learnrng Tree 100 International Way Child Day Care N/A Planned Busmesses A ProfessIonal Credit Service Collecllon Agency 177 McKenzie Leasmg and Finance Heavy equipment leaslOg 13 I I I I I I I I I I I I I I Source Information gathered from Dex Lane Metro PartnershIp and GLMIS mfo and links A Professional Credit SeNlce and McKenzie Leasmg and Fmance purchased 7 acres m Gateway and will move headquarters there Source The Register Guard - Tuesday, November 14 2006 I The VIllages at Marcola Meadows - Zonmg Map Amendment ApplIcation Wnllen Statemen1- February 28, 2007 Page 30 of41 I I I I I I Table 12 below shows the estImated wages for employment tYPical of the busInesses III the above table Companng thIs data WIth Table 10 IndIcates that the average pay for employment III the deslgnatlOns proposed by the PAPA are sImIlar to the average pay III Spnngfield's CI deSIgnated lands I Table 12 Employment and Wage EstImates for Sprmgfield CI Busmesses 50 or more employees Employment Number Percent 177 640% 535 1930% 1,200 43 30% 300 1080% OccupatIon B,II and account collectors Billing and Posting Clerks Computer Support SpeCialist Medical and Clinical Laboratory T echmclans Miscellaneous Manufacturing Travel Customer Service Representative Total employees Weighted Average Pay Ayerafle Pay $30,06000 $26,95600 $34,87400 $27,083 00 I I 60 2 20% 500 1800% $32,29200 $22,88000 2,772 100% I I I I $29,97594 Source Wage data for Lane County 2004 from OlMlS webslte except Travel Customer Service Rep starting pay published In Portland Busmess Journal v November 18 2004 Source Employment data from Lane Metro Partner ship and from mfoUSA webslte ConclusIon Economic trends Illdlcate that by the year 2015, Spnngfield's supplies of CommerCIal and Campus Industnallands wIll be depleted WhIle the Inventory of CI land wIll be small, a deficIt IS projected for CommerCIal land The proposed PAPA wIll bnng Inventones of these lands closer to balance, though stIllleavmg a deficit, albeit a smaller deficIt, of CommercIal land I I I I I I I I Metro Plan Policy #B 6 directs the CIty to correlate the effectIve supply III terms of sUitabIlity and avaIlabIlity wIth the projectIons of demand The sUitabIlIty of the subject sIte for ItS current CI deSIgnatIon IS questlOnable III lIght of ItS long-standIng undeveloped status despIte the dWllldlmg supply of CI land By the planmng year 2015 and III the absence of the proposed PAPA, CI land wIll be In relatIve abundance compared to CommerCIal land If past demand trends contInue Most of the types of bUSInesses currently III developed Campus Industnal areas can also locate In CommercIal areas There IS a synergistIc relatIonshIp between Illdustnal and commercIal uses that reqUires a balance between them m order to sustalll economIc dIverSIty FInally, analYZIng average wages III the dIfferent land use deslgnatlOns shows that pay rates In the proposed deslgnatlOns are SImIlar to those III Spnngfield's currently developed Campus Industnal area ThIS redeslgnatIon of Campus Industnal land for CommerCIal, and CommerCIal MIxed-Use development land WIll support the dIversIficatIon and Improvement of the economy It IS consIstent WIth the pnontIes establIshed by adopted and acknowledged polICies Therefore, the amendment IS consIstent With statewide plannmg Goal 9 The Villages at Marcola Meadows - Zonmg Map Amendment ApphcatlOn Wnllen Slatement - February 28, 2007 Page3lof41 GoalIO - Houslltg: To provIde for the housing needs of cItIzens of the state I I I ResDonse Goal 10 reqUires bUildable lands for residentIal use to be mventoned and reqUires plans to encourage the avallablltty of adequate numbers of needed housmg uruts at pnce ranges and rent levels commensurate With the financIal capabilities of Oregon households Oregon Admlmstral1ve Rule 660 DlVlSlOn 8 defines standards for compliance With Goal 10 OAR 660- 008-00 I 0 reqUires that Sufficient bUIldable land shall be designated on the comprehenSIve plan map to satIsfY housing needs by type and density range as determined In the houszng needs projectIOn The local buzldable lands znventory must document the amount of bUIldable land zn each resldentwl plan desIgnatIOn I I I I Approval of the applicant's proposed PAPA changmg approXimately 19 acres from Campus Industrial to MedIUm Density Resldenl1al on the Metro Plan dIagram and zomng map, reqUires compliance With statewide plannmg Goal 10, Housmg (OAR 660, DlVlslOn 8) (The total acreage of MedIUm Density Resldenl1alland IS proposed to mcrease from 35 7 to 547 acres) The Post Acknowledgement Plan Amendment (PAPA) IS consistent With the parts of the Metro Plan wluch address the reqUirements of Goal 10 The Eugene-Sprzngfield Resldentwl Lands Study (RLS) was completed m 1999 as a techmcal document mfonmng policy changes to the Metro Plan as part of the area's penodlc review reqUirements The RLS was acknowledged by the state Land ConservatIOn and Development COIrumsslOn as bemg consistent With Goal 10 The purpose of the RLS was to compare resldenl1al land needs With aVailable land supply The analYSIS does not reqUire bUlldout of parl1cular densll1es or numbers ofumts on specific sites or wlthm the metro area as a whole I I I I The RLS contams a detailed site mventory m the Techmcal AnalYSIS, whICh IS summanzed below (Table 13) as It pertams to the subject sIte Table 13 ReSldent131 Land Stndy SIte Inventory Mareola Meadows Property SIte (Subarea 18\ Total Acres UnbUlldable Acres Constrained BUIldable Acres 2 37 1 0 4 0 0 36 7 Source ReSIdentIal Lands and Housmg Study Drafllnventory Document 1999 page 64 I I Of the subject site's total bUildable reSidential gross acreage that was mcluded m the mventory, all 37 I acres IS designated for MedIUm Density Resldenl1al development The RLS assumes that 32% of reSidentIal lands Will be developed With non-resldenl1al uses, mcludmg public and CIVIC uses, roads, etc Subtractmg thiS 32% leaves 25 2 net acres that one can reasonably assume was considered available for development m the RLS I I DensIty AssumptIOns The RLS does not specIfY an assumed average density m the MDR deslgnal10n Rather, It outlines the range of allowable densll1es (14 28 to 28 56 umts per net acre) which comclde With the gross density range descnbed m the Metro Plan (10 through 20 umts per gross acre) It also descnbes the assumed dlstnbutlOn ofhousmg types wlthm each reSidentIal designatIOn (page 21) and the assumed density by housmg type (page 22) The VIllages at Mareola Meadows - Zomng Map Amendment Application Page 32 of 41 Wntlen Statement - February 28, 2007 I I I I I I I I I I The RLS also contains data summanzlng actual bUIlt densItIes In the metro area However, only limIted data was avmlable, and bUIlt densItIes were assumed based upon data from years 1986, 1992, and 1994 USing these three years, the data show bUIlt denSItIes between 21 and 23 umts per net acre for multI-famIly development (RLS Techmcal AnalysIs, p 21) No longer-term trend analysIs IS avaIlable These figures reflect bUIlt densIty for multI-famIly projects only, not all development bUIlt In the MDR desIgnatIOn Since Single famIly houses and duplexes are allowed In MDR, the average densIty across the desIgnatIOn IS likely slgmficantly lower WhIle average densIty figures have not been calculated for MDR areas due to the dIfficulty of obtaining the data, Single famIly development occurred at roughly 4 umts per net acre and duplex development at 10 umts per net acre dunng the same years (RLS TechnIcal AnalYSIS, Page 21) Surplus of Resldentlal Land There IS documented a net surplus ofresldentIalland to serve metro hOUSing needs through 2015, for all reSIdentIal land categones combined, and medIUm denSIty reSIdentIal land In partIcular The companson of resIdentIal land supply and demand IS shown In Table 14 below I I I I I I Table 14 Compamon of ReSidential Land Snpply and Demand, In Acres Medium DenSity ReSidential Supply 828 Demand 589 Surplus . 239 SOUlce RLS Technical Analym, J999, page 52 All ReSidential 5,802 4,564 1,238 The supply figures also do not Include mIxed-use and commerCIal deslgndtlOns that can accommodate reSIdentIal development In addItIOn to calculating supply and demand In acres, the RLS consIdered the supply and demand for hOUSing umts ThIS companson also shows a net surplus across all reSIdentIally deSIgnated land, and WIthin the MDR deSIgnatIon In partIcular, as shown In Table 15 below Table 15 Compamon of ReSIdential Land Snpply and Demand, In DUlts I Medium DenSity ReSidential Supply 13,078 Demand 9,432 Surplus 3,646 SOUl ce fiLS Technical Analyw, 1999 page 53 I I I I I All ReSidential 48,519 40,406 7,913 If the assumed surplus of medIUm denSIty umts (3,646) IS dIVIded by the assumed number of surplus medIUm denSIty acres (239), the denved denSIty for MDR land IS 15 25 umts per net acre ThIS IS not, however, an adopted denSIty assumptIon The RLS does not specIfy how to determine expected denSIty or number of umts on a partIcular sIte One source of expectatIOn IS the McKenZIe Gateway MDR sIte Conceptual Development Plan, whIch accommodates a total of 1,195 umts across 185 acres, at an average denSity of II umts per acre, In ItS preferred alternatIve (Scenano E) AlternatIvely, one can estImate the The VIllages aI Marcola Meadows - Zonmg Map Amendment Apphcallon Wnllen Slatemen1- February 28, 2007 I Page 33 of41 amount of expected development on the site by extrapolatmg assumptIOns contamed wlthm the Residential Lands Study itself I I In fact, the applIcant's proposal retams a surplus m the residential housmg mventory, wlule mcreasmg the mtenslty of residential development This strategy supports nodal development and fulfills the reqUirements of Goal 10 by accommodatmg a quantity of Units that can be reasonably defended given the adopted findmgs, analysIs, and polIcies contained In the RLS I I I DensIties will In fact be Increased over what would otherwise lIkely be bUilt The Residential Lands Study concluded that through the planning honzon (2015), the area would have a surplus of land In all types of residential land use categories The study was adopted and Incorporated Into the Metro Plan In 1999, and was acknowledged by LCDC as meeting the area's Goal 10 reqUirements Specifically, the RLS concluded that there was a surplus of 239 acres and 3,646 Units In the MDR category (Metro Plan, pages IIl-A-3 and II-A-4) In addition, the applicant's proposal IS supported by applicable Metro Plan housing polIcies, including those m the residential land supply and demand, resIdential density, and design and nuxed-use areas, as outlined In the Metro Plan SpecIfic Elements sectIOn, (beginning at page 32 below) I I I OAR - DIvIsion 8 does not prohibit creatmg additional residential land after a local government has established an adequate supply Therefore, for the purposes of DIVISion 8, It IS not necessary to establish a maximum acreage or to JUStify the designatIOn of residential land In excess of projected land needs The Resldentzal Lands and HouslIlg Study estimates of the long term projected land needs, and the determinatIOn that there IS an adequate Inventory, served to demonstrate that the minimum needs had been met They did not establIsh a maximum and did not freeze the residential land supply If the proposed PAPA sought an exceptIOn from a stateWide planning goal, there would be a greater burden of JustificatIOn for the expansIOn of residential lands The exacting standards for taking a Goal 2, Part II exceptIOn would apply, the eVidence would have to establIsh that "Areas which do not reqUire a new exceptIOn cannot reasonably accommodate the use" However, pursuant to OAR 660-004-00 I 0(2), such an exceptIOn IS not reqUired m tlus case Once the suffiCiency of the land supply IS established, determining the extent of the Goal 10 land supply above that level IS merely a matter of polIcy for the local JUrisdictIOn I I I I I In summary, our analySiS finds that the applIcant's plan amendment proposal meets the reqUirements of stateWide planning Goal 10, supports applicable adopted poliCIes, and furthers the objectives of nodal development I I I I The VIllages at Marcola Meadows - Zomng Map Amendment ApphcatlOn Wntten Statement - February 28, 2007 Page 34 of 41 I I I I I I I I I I I I I Goal 11 - Publtc Faclllues and Services: To plan and develop a tImely, orderly and efficIent arrangement ofpublzcfacllztles and servIces as aframeworkfor wban and rural development OAR 660-011-0005(7)(a)-(d) DefiJlltlOn of Publtc Facllttle' (a) Water (b) Sanztary Sewer (c) Storm sewer (d) TransportatIOn Pursuant of statewIde planmng goal II, the City of Spnngfield has adopted or endorsed the following documents . Eugene-Sprzngfield Metropolztan Area General Plan, revIsed 2004 . CIty of Sprzngfield Zomng Map, May 2006 . Eugene-Sprzngfield Metropolztan Area Publzc Facllztles and ServIces Plan, 2001 . CIty of Springfield Storm water Management Plan, RevIew Draft January, 2004 . CIty of Sprzngfield Storm water Management Plan, Major Basins/Sub Basins Map, RevIew Draft, January, 2004 . CIty of Springfield Conceptual Road Netwo, k Map, Updated July, 2005 · CIty of Springfield Drznkzng Water ProtectIOn Plan, adopted May, 1999 I ResDonse The Eugene-Spnngfield Metropolztan Area General Plan DIagram and the CIty of Spnngfield Zonzng Map shows that the subject sIte IS inSIde of the CIty of Spnngfield Urban Growth Boundary StatewIde Planning Goal 11 ensures that publ1c faCIlItIes and servIces are provIded In a timely, orderly, and effiCIent manner ThIS apphcatlon proposes to amend the Eugene- Splzngfield Metropoiltan Area General Plan Dzagram and wIll not affect proVISIOn and arrangement of pubhc facllltles and servIces The followmg findIngs demonstrate that the eXlstmg pubhc faclhtles and servIces have the capacIty to serve future development on the subject sIte and will be provided In a timely, orderly, and effiCient manner Subsequent plannIng actIOns hmlted to the subject sIte (I e Master Plan and SIte Plan apphcatlOns) In due time wIll address the arrangement of pubhc faclhtles and servIces on the subject sIte See ExhIbIts Sand 9 for more InformatIOn I Potable Water ServIce The subject sIte WIll be served by connectIng to eXIstIng Spnngfield Utlhty Board (SUB) water lInes adjacent to the sIte There are SIX potential water hnes adjacent to the subject sIte to have the capacIty to serve future development There are two 12" PYC water lInes along 2Sth street have the capacity to serve development In the southwest portion of the subject sIte There IS an IS" water lIne In the RIght -of-Way of 31" street that has the capacIty to serve future development Currently, there are two ]0" water hnes that can serve future development on the west portIOn of the subject sIte One of these water hnes In located approxImately 100' north of the center line of/Bonnie Lane and the other IS approxImately 120' south of the center lIne of Bonrue Lane AdditIOnally, there IS a 16" water lIne on the south SIde of Marcola Road approxImately 1075 ft west of the IntersectIOn of Marcola Road and 2Sth street that has the ablhty to serve development In the southern portIOn of the subject sIte The water hnes In Marcola Road and 31 ,t Street contaIn suffiCient capacIty to serve the sIte Therefore, thIS key urban servIce WIll be prOVIded In an orderly and effiCient manner I I I I I The VIllages at Marcola Meadows - Zoning Map Amendment ApplicatIOn WntIen Slatemen1- February 28, 2007 Page 35 of41 I Sanitary Sewer The City of Spnngfield provides sarutary sewer service for lands wlthm the City of Spnngfield City hmlts The subject site IS wlthm the City of Spnngfield City hmlts and can be served by connectmg to eXlstmg samtary sewer lInes adjacent to the property The subject site IS located m the North Spnngfield waste water basm and currently has adequate capacity A 42" concrete mam Ime for the City of Sprmgfield traverses the lower third of the subject site that flows east to west and collects all samtary sewer water for the subject site with some fill reqUIred m the north The northeast corner of the project Will be served by an eXlstmg sewer m 31 st Street Currently, thiS mam Ime has the capacity to faCIlItate the proposed development's sanitary sewer needs I I TransportatIOn The project area IS currently served by Marcola Road, 28'\ and 31 st streets Marcola Road, the southern border of the subject site, IS fully Improved and IS deSignated as a Mmor Artenal 28'h and 31 st streets border the eastern boundary of the subject site The City of Spnngfield's Conceptual Road Network Map Identifies 28'h and 31 st streets as the "31 st Street Connector" The 28'h street portion of the 31 s, Street Connector IS fully Improved and claSSified as a Collector street Thlrty-FlfSt Street IS not fully Improved and also IS claSSified as a Collector street Currently, 31 s, street IS a two-lane asphalt paved road that does not have gutters, curbs, or Sidewalks, although there IS a City of Spnngfield 10' utilIty and Sidewalk easement on the west Side of 31 s, street to faCIlItate road Improvements m the future I I I I I I I I I There are three sewer hnes that connect to the mam trunk Ime on the subject Site, an 8" PVC Ime connects to the mam trunk Ime from the south, approximately 250' west of the mtersectlon of 28'h street and Pierce Parkway, an 8" PVC Ime runnmg north and south along 31s' street connects to the mam trunk Ime from the north m the pubhc Right-of-Way for 31s' street, an 10" concrete Ime runmng north and south connects to the mam trunk Ime from the north, approXimately 240' west of the northwest boundary of the subject site Therefore, tlus key urban service Will be proVided m an orderly and effiCient manner In thiS sectIOn of thiS statement addressmg Statewide Plannmg Goal 12 - "Transportation" there are additIOnal findmgs regardmg pubhc faclhtles and services, and those diSCUSSIOns are hereby referenced and mcorporated I I Storm Water Control The subject site IS located m #18 Sub-Basm of the West Spnngfield/"Q" Street Major Basm Storm water facilities Will be deSigned as a component of subsequent land use approvals to meet City of Spnngfield storm water pohcles and regulatIOns Prehmmary storm water plans Will keep the development's storm water runoff rates equal to pre-development peak storm water runoff rates ThiS Will be achieved through multiple on-site detentIOn ponds, blO-swales, and open- channels See Exhibits 8 and 9 for more mfonnatlOn I ConclUSIOn The subject site IS mSlde of the Eugene-Spnngfield Metropohtan Urban Growth Boundary and City of Spnngfield city hmIts ThiS enables pubhc faclhtles and services to be extended to the site m a timely, orderly, and effiCient manner The subject site has eXlstmg pubhc faclhtles and servIces adjacent to the site which also have the capacity to serve future development Therefore, thiS amendment IS m comphance WIth Goal II I I I The VIllages at Marcola Meadows - Zonmg Map Amendment Apphcatton Wntten Statement - February 28, 2007 Page 36 of 41 I I I I I I I Goal 12 - TransportatIOn' To provide and enwUl age a safe, convement and ewnonllC transportatiOn system ResDonse Goal 12 IS Implemented through DlVlSlOn 12, OAR 660-012-0000 et seq The goal and dlVlslOn are Implemented at the local level by the Eugene-Springfield MetropolItan Area TransportatiOn Plan (TransPlan) acknowledged for complIance with Goal 12 m 2001 Plan amendments and land use regulatIOn amendments are regulated under OAR 660-012-0060, the "TransportatIOn Planmng Rule" If an amendment slgmficantly affects a transportatIOn facIlIty, a local government must provide a form of mItIgatIOn OAR 660-012-0060(1) states I I I "A plan or land use regulatIon amendment slgmficantly affects a transportatIOn facIlIty If It would '\ (a) Change the functIOnal classIficatIOn of an eXlstmg or planned transportatIOn faCIlIty (exclusIve of correctIOn of map errors m an adopted plan), (b) Change standards Implementmg a functIOnal classIficatIOn system, or I I I I I I I (c) As measured at the end of the planmng penod IdentIfied m the adopted transportatIon system plan (A) Allow land uses or levels of development that would result m types or levels of travel or access that are mconslstent wIth the functIOnal classIficatIOn of an eXlstmg or planned transportatIOn faCIlIty, (B) Reduce the performance of an eXlstmg or planned transportatIOn faCIlIty below the mlmmum acceptable performance standard IdentIfied m the TSP or comprehenSive plan, or ( C) Worsen the performance of an eXlstmg or planned transportatIOn faCIlIty that IS otherwIse projected to perform below the mmlmum acceptable performance standard IdentIfied m the TSP or comprehenSive plan" OAR 660-012-0060(1), WIth regard to OAR 660-012-0060(1)(a) and (b), the proposed Post Acknowledgement Plan Amendment (PAPA) would not change the functIOnal classIficatIon of any transportatIon faCIlIty, nor would It change the standards for Implementmg a functIOnal classIficatIOn system I I WIth regard to OAR 660-012-0060(l)(c)(A), the PAPA would not allow types or levels of uses whIch would result m levels of travel or access which are mconslstent wIth the functIOnal classIficatIOn of a transportatIOn faCIlIty The polIcIes of the City of Sprlllgfield Development Code and the TransPlan establIsh the requested plan deSIgnatIOn as appropnate to the classIficatIOn of the streets servmg the sIte SpecIfic reqUIrements for access to those streets wIll be determmed through the Master Plan and SIte Plan revIews and approved only upon I The VIllages at Marcola Meadows - Zonmg Map Amendment ApplicatIOn Wnllen Stalement - February 28, 2007 Page 37 of41 I I demonstratIOn of comphance wIth the provIsIons of the acknowledged comprehensIve plan and Implementing regulatIOns I WIth regard to OAR 660-0l2-0060(1)(c)(B) and (C), a Traffic Impact AnalysIs (TIA) evaluatmg the performance of eXIstmg and planned faclhtIes as a result of the development proposed by tlus apphcatlOn has been performed That TIA (Attachment 1) IS submItted concurrently wIth thIS wntten statement and the findmgs of that analysIs are hereby mcorporated by reference I I TIA Scoam!! When determmmg the effect of a proposed Post Acknowledgement Plan Amendment (PAPA), the TPR reqUIres local governments to evaluate Impacts to planned facIlItIes as well as those already eXlstmg AccordIng to OAR 660-0 I 2-0660(4)(b)(C), transportatIon faClhtles, Improvements or servIces Included In a metropolItan planmng orgamzatlOn's federally-approved, financIally constraIned regIonal transportatIOn system plan must be Included In tlIe analysIs The MetropolItan PlannIng CommIttee adopted the Central Lane Metropolltan Planmng OrgamzatlOn RegIOnal TransportatIOn Plan on December 9, 2004 The MPO-RTP estabhshed a plannIng honzon of2025 Tlus IS the plannIng honzon used by the TIA The follOWIng projects (Tables 16, 17 and 18) are wIthIn the study area of the TIA and are hsted In MPO-RTP "Table la - FInancIally ConstraIned CapItal Investment ActIons Roadway ProJects" I I I I Table 16 Project Category Artenal Capacity Improvements Name Geographic Limits DeSCription JUriSdiction Estimated Length Number Cost 42nd Street @ Marcola Road Traffic control Spnngfleld $248 000 0 712 Improvements 42nd Street at 42nd SVHwy 126 T raffle control Springfield $200 000 0 799 H,ghway 126 Improvements Eugene-Springfield @ Mohawk Boulevard Add lanes on ODOT $310,000 068 821 H,qhwav (SR-1261 Interchanqe ramps Table 17 Project Category New Collectors Name Geographic Limits Descnptlon JUrisdiction Estimated Length Number Cost V Street 31st Street to Marcola New 2 to 3Mlane Springfield $2 173,000 065 777 collector Table 18 Project Category Urban Standards Name Geographic limits Desen pllon JUriSdiction Estimated Length Number Cost 42nd Street Marcola Road to Reconstruct to 3 Springfield $2,551,000 103 713 RaIlroad Tracks lane urban facility 315t Street Hayden Bridge Road to Upgrade to 2 to Springfield $1,300,000 085 765 U Street 3-lane urban facllltv I I I I I I I I Because the ultimate purpose of the proposed PAPA IS to gaIn approval of a master planned development, transportatIOn modelIng of post-development tnp generatIOn IS based on the prelImInary plan (see Attachment 2) In addItIOn to calculatIng the maxImum Impact of future development restrIcted only by the regulatIOns of the proposed plan deSignatIOn, the TIA I The VIllages at Marcola Meadows - Zomng Map Amendment ApplIcatIOn Wntlen Statement - February 28, 2007 Page 38 of41 I I I I I I I I I I I I I I I I I I I I I employed an altematlve worst-case scenano based on stipulated development restnctlons The level of development possIble under the restnctlOns IS far greater than what IS proposed by the prehmmary plan, but stlll results III fewer velucle tnps than the unrestncted worst-case The TIA compared the Impacts of future development under the eXlstrng plan designations, under the proposed plan designatIOns without restnctlons, and under the restncted proposed plan designatIOns The mtegnty of the post-development transportatlon modehng assumptions can be assured by the condItIOnal approval of the proposed PAPA and mamtamed by subsequent site plan review and development constramts Traffic Imoact OAR 660-012-0060(1)(c)(B) Though some faclhtles w1thIll the scope of the study are projected to operate below the performance standard III the plan year, none will do so as a result of the proposed PAP A Those facilItIes projected to operate below the performance standard III the plan year will do so regardless of the proposal under review Therefore, no faCIlitIes are slgmficantly affected under tlus defimtlon OAR 660-012-0060(l)(c)(C) Wlthm the scope of the study, one faCIlity that IS otherwise projected to operate below the performance standard m the plan year IS made worse by the proposed PAPA Therefore, thIs faclhty IS Significantly affected under this defimtlOn . Mohawk Blvd @ Eugene-Spnngfield Hwy eastbound ramps OAR 660-012-0060(3) permIts local governments to approve a PAPA that slgmficantly affects a faclhty without requmng that mltlgatlOns bnng the faclhty up to the apphcable performance standards ThIs IS allowed only where the faclhty IS currently operatmg below the performance standard and, despite any planned faclhtles as defined m SectIOn (4) of the TPR, It IS also projected to operate below the performance standard III the plan year Takmg IlltO account the planned facilitIes preVIOusly discussed, the TIA demonstrates that these condJt1ons are met for the faclhty hsted above OAR 660-012-0060(3) reqUires transportatIOn Improvements that mltlgate the net Impact and aVOid further degradatIOn III the development (openmg) year To address Impacts at the eastbound ramps of the Mohawk Blvd @ Eugene-Spnngfield Hwy IlltersectlOn the TIA proposes the followmg mitIgatIOn . Traffic control changes allowmg left-turns form the eastbound ramp center lane WIth regard to OAR 660-012-0060(l)(c)(B) and (C), the analysIs has determmed that measured at the end of the plannmg penod the proposed amendment Will neIther reduce the performance of eXlstmg or planned transportatIOn faclhtles below the mlmmum acceptable performance standards Identified m TwnsPlan nor worsen the performance of transportatIOn faclhtIes that are otherwIse projected to perform below the mmlmum acceptable performance standard Identified m TransPlan ConclusIOn Pursuant to OAR 660-012-0060(1), the proposed PAPA slgmficantly affects a transportatIOn faclhty The TIA proposes to mitIgate the degradatIon of the faclhty under the conditIOns of OAR 660-012-0060(3) By requmng development to meet the condItIons of OAR 660-012- 0060(3), the City may approve the PAPA m comphance WIth OAR 660-012-0060 Therefore, The Villages at Marcola Meadows - Zonmg Map Amendment ApphcatlOn WrItten Statement - February 28, 2007 Page 39 of4] ReSDonse I I I I I I I I the City of Spnngfield can find that the proposed PAPA IS consistent with Statewide Planning Goal 12 Goal 13 - Energy ConservatIOn' To conserve energy Land and uses developed on the land ,hall be managed and controlled so as to maXlInlze the conservatIon of all forms of energy, based upon sound economiC prmclples The purpose of thiS Metro Plan Diagram Amendment (PAPA) applIcatIOn IS to alter the Metro Plan Diagram designatIOns for the subject Site, elIminating the Campus lndustnal deslgnal1on, then applYing and reconfigunng Commercial and MedIUm-DenSity ReSidential designatIOns on the subject Site, and applYing the Nodal Development Area designation overlay to portIOns of the subject site The Metro Plan IS an acknowledged plan by the Oregon Department of Land ConservatIOn and Development Therefore, the Metro Plan IS currently consistent With the provIsions of Statewide Planmng Goal 13 The City of Spnngfield adopted the Metro Plan (Ordinance No 6087) on May 17, 2004 ThiS applIcatIOn does not amend any component of the Metro Plan that IS related to Goal 13 as adopted by Spnngfield City councIl on May 17, 2004 Therefore, thiS PAPA applIcal10n IS consistent With the Metro Plan and Statewide Planrung Goal 13 ResDonse All of the parcels affected by thiS applicatIOn are currently Within the Urban Growth Boundary and were annexed Into the City of Spnngfield The annexatIOn was made In complIance With an acknowledged comprehenSive plan and Implementing ordinances, and establIshed the aVailabilIty of urban faCilities and services Therefore the amendment IS consistent With Statewide Planning Goal 14 I I I I I Goal 14 - UrbanizatIOn: To prOVIde for an orderly and effiCIent twnsztwnfrom rural to urban land use Goal 15 - Wlllamette River Greenway To protect, conserve, enhance and maintain the natural, scenzc, hlstorzcal, agrzcultural, economIc and recreatIOnal quahtles of lands along the WIllamette R,ver as the WIllamette River Greenway ResDonse The subject site IS not Within the WIllamette River Greenway Therefore, thiS goal IS not relevant and the amendment Will not affect complIance With Goal 15 I I Goal 16 through 19' (Estuarine Resources, Coastal Shorelands, Beaches and Dunes, and Ocean Resources) ResDonse There are no coastal, ocean, estuanne, or beach and dune resources related to the property or Involved In the amendment Therefore, these goals are not relevant and the amendment Will not affect complIance With Goals 16 through 19 I I The VIllages al Marcola Meadows - Zonmg Map Amendment ApphcatlOn Wntten Statement - February 28, 2007 Page 40 of 41 I I I I I I I I I I I I I I I I I I I I I W,th regard to SDC 12 030(3)(d)1 ,the second cntenon ofSDC 7 070(3) IS as follows SDC 7070(3)(b) AdoptIOn of the amendment must not make the Metro Plan lIlternally lIlCOnslstent Responses were presented earher m thIS wntten statement to address the cntenon of SDC 12030(3)(a), "ConsIstency wIth apphcable Metro Plan polIcIes and the Metro Plan dIagram" Those responses are here mcorporated by reference SDC 12.030(3)(d) Legislative ZOlllng Map amendments that lIlvolve a Metro Plan Dzagram amendment shall 1 Meet the approval crzterza specified III ArtIcle 7 oftlus Code, and 2 Comply with Oregon Administrative Rule (OAR) 660-012-0060, where applzcable SDC 12030(3)(d)1 was addressed prevIOusly WIth regard to SDC 12 030(3)(d)2, responses were presented earher m thIS wntten statement to address the cntenon of SDC 12 030(3)(d)(l) whIch referred m turn to SDC 7 070(3)(a), "The amendment must be consIstent wIth the relevant StatewIde Planmng Goals adopted by the Land ConservatIOn and Development CommIssIOn" Oregon Admmlstral1ve Rule (OAR) 660-012-0060 sl1pu1ates how apphcal10ns such as thIS must address StatewIde Planmng Goal 12 The prevIOus sectIOn of thIS wntten statement addressmg StatewIde P1annmg Goal 12 IS here mcorporated by reference VI CONCLUSION Based on the above analysIs and findmgs of comphance wIth approval cntena and adopted plans and pohcles, the requested Zonmg Map Amendment should be approved as proposed If you have any questIOns about the above applIcatIOn, please do not heSItate to contact RIchard M Satre, AICP at Satre ASSOCIates, P C (465-4721) The VIllages at Marcola Meadows - Zonmg Map Amendment ApphcalIon Wntten Statement - Febmary 28, 2007 Page 41 of41 I EXHIBIT 1 I I K & D ENGINEERING, Inc Engmeers . Planners. Surveyors I Legal descriptIOn For "Mal cola Meadows" Comp Plan and Zone Change, , I I Two (2) Parcel. ofland located 111 Spullgfield, Olegon that ate 1110le pattlcularly dCSCllbcd as follow, I I Pal cell I Beglnnlng at a pOlnt on the North marg~n of Marcola Road, sald pOlnt belng North 89 57' 3011 East 2611 60 feet and North 00 021 00" Webt 45 00 feet from the Southwest corner of the Felix Scott Jr D L C No 51 In Townshlp 17 South, Range 3 Neat of the Wl11amette Merl.dl.<ln, thence along the North marglD of Man.ala Road South 99 571 3D" West 1419 22 feeL to the SoutheasL corner of Parcell of Land ParLitlon Plat No 94- P0491, Lhence leavlng Lhe North margl11 of Marcola Road and rurmlug along Lhe Cast' boundary of Bald parcell and the Northerly cxtensl0n thereof North 00 02 I 00 If Weot 516 00 feet to a p01nt on lhe South boundary o[ NICOLE PARK as platted and recorded ~n F1.1e 74, b11des 30-33 of the Lane County Oregon plat Records, Lhenee along the South boundary of said NIC.OLE :PARK NorLh 09 571 3011 East 99 62 feet to the Southeast corner of sald NICOLE PARK, thence along the East boundary of satd NICOLE PARK North 00 021 00" Went 259 82 feet to the Northeast corner of saId NICOLE PARK, thence along the North boundary of sa1d NICOLE PARK South 89 58' 0011 WesL 6 20 feet to the SoutheclElt corner of LOCH LaMOND TERRACE FIRST ADDITION) as platted and recorded 111 Book 46, Page 20 of the Lane County oregon Plat Records, thence. along the Easl boundary of saJ.d LOCH LOMOND leRRACE li'IRST ADDITtON North 00 O? I 00" West 112 BS feet to the Southwest corner of AUSTIN PARK SOUTH as platted and recorded 1n Io1.1e 74, S11des 132-134 of the Lane County PIal Records, thence along the South boundary of sald AUSTIN PARK South North OS 58' 0011 East 260 00 feet to lhe SouLheast corner of ~u~d AUSTIN PARK SouLh lhence along lhe Fast boundary of ea~d AUSTIN PARK South North UO 02' 0011 WebL 909 69 feet to the Northeast corner of &a1d Aust~n Park SouLh, said p01.nt be1ng on the South boundary of that certa~n tract of land dcscr1bed 1n a deed recorded July 31, lS41, ~n Book 359, Page ')BS of the Lane County Oregon Deed Records, thence along the South boundary of Sdld lust descr~bed LLact North 79' 41' 54" Cast JOB3 15 feet Lo the Lntersection of the South 11.ne of the last descrlbed tract and the cdsl I1ne oi that cer~a1.n tract of land conveyed to R H P1erce and Elizabeth C P1erce and recorded 1D Book 238, Page 464 of the Lane County Oregon Deed Recordsl thenc...e along the Cabt l1.ne of sa1.d last descr:Jbed trac...L South 00 021 00" Cast 1991 20 feet to the po~nt o[ be9~nning, all ~n Lane County, Oregon I I I I I I I I I Page 1 of 2 276 N W IhckolY Street. POBox 725. Albany, OR 97321 . (541) 928-2583 . Pax (541) 967-3458 I I' I I K & D ENGINEERING, Ine Ellgilleers . Plallllel s . Surveyors I I Pal eel 2 Beg~nn~ng aL a YOlnt tD the center of CounLy Road No 753, 3170 24 teet SouLh and 1319 9 feeL East of the Northwebt ~orner o( the Felix Scott Donatlon land Cla~m No 82, lU Townshlp 11 South, Range 7 West of the Wl11amette Merldlan, and belng 866 feet South of the Southe.ast c.orner of tract of land conveyed by The Travelers Insurance Company to R 0 Kercher by deed recorded J.n Book 109, Page 260, Lane County Oregon Deed Records, thence WesL 1310 feel to a pOlnt 15 links East at Lhe West 11n8 of the Fellx Scott Donatlon Land ClaJ.m No 82, NotJ.fJ.catlon No 3255, J.O Township 17 South, Range 2 West of the WJ.llamette MerJ.dian, and runnJ.ng lhence South parallel WJ.Lh and 15 IJ.nks dlstant from saLd WesL l~ne of sa~d Donat~on Land Cla~m a distance of 2304 76 feet to a pOlnt 15 links Easl of the Southwest corner ot sald Donat~pn Land Cla~m, Lhence Baal [ollow~ng along the cenLer IJ.ne of County Road No 278 a dlstance of IJI0 feet La a pOlnt ~n the center of sa~d County Road No 270 due South of the place of beg1nnJ.ng, thence North following the center lJ.ne of said County Road No 753 to the pOlnt of beglnnlng, all In Lane County, Oregon, EXCEPI the rlght of way of Lhc Dugenc~Wcndllng Branch of the Southern P~Gl[LC Rallroad, ALSO EXCEPT LhaL portlon descr1bed ~n deed to The Clty of Eugene, recorded 1n Book 359, Page 285, I,ane County oregon Deed RecordE, I I I I I ALSO EXCEPT beginnlng at a pOlnt WhlCh 18 lS89 47 teet South and 1327 33 feet East of the SouLhwesL corner of Seetlon 19, Townshlp 17 South, Range 2 West, Wlllamette Merldlan Lane County, Oregon, Ba~d point also belng Opposlte and 20 feet Easterly from Stat10n 39+59 43 P 0 S T , sa1d SlaL~on belog 1n the center line of the old route of County Road No 112-5 (formerly 11753), thencE'" South 0 II 1 Wes~ 183 75 feet Lo th~ ~ntersecL~on wlth Lhe Northerly Rallroad R1ght of Way l~ne, Lhence SouLh 84 45' W~st 117 33 feet, Lhence SouLh 79 301 Wesr 48 37 feet to Lhe lntersectlon of sald Ra~lroad Rlght of way 11ne wlth the Southerly Rlght of Way l~ne of the relocated sald County Road No 742-5, thence along the arc or a 316 48 foot radlus eurve left (the chord of WhlC.h bears NorLh 39 03 I 3511 East ~61 83 feet) a d.J.Eltance of 269 94 feet to the place of beglnning, in Lane County, Oregon, AI.sa EXCEPT that porL~on described in deed to Ldne County recorded October 19, 19!.>5, RecepL1..on No 68852, I,ane County Oregon Deed Records, ALSO EXCEPT that portlon described ln deed La Lane County rccolded January 20, 1986, Rpcept~on No 86022] " Lane County Offlc~al Records, ALSO EXCEPT that porLion descrlbed J.n Lhat Deed to lhllamalane Park and ReereatJ.on Distrlct recorded December 4, 1992, ReceptIon No 9268749, and Correctlon Deed recorded February 9, 1993, RecepLion No 9308469, Lane County Offlc~al Records, ALSO hXCDPT that port~on descrlbed 1n Fxhlblt A of Lhat Deed Lo the Clty of SprlngfJ.eld, recorded September 22, 1993. Rcceptlon No 9360016, Lane County O[flc~al Records nLSO EXCEPT Marcola Road Indubtrlal Park, as platted and recorded In Flle 75. S11des 897, 898 and 899, Lane County Plat Recordst Lane County, Oregon I I I I I I I I Page 2 0/2 276 N W HIckory Street' PO Box 725' Albany, OR 97321' (541) 928-2583' Fax (541) 967-3458 I I I I I I I I I I I I I I I I I I I I I S~P-28-2006 14 14 541 485 03( EXHIBIT 2 d Cordell (f) cr 2,l.tt..4 z.z4 R&TURN TO CASCADE TITLe CO ... t.;vDS~ ()3'i'-l6~ ~ \1-D~-~-Il"ZSoO 11-Cl:t.~~-Q"~ 1800 Afterreoo~d\IJ 1111 Wlllam~tta Street _l'lInQnP. OR ~7401.3107 ( Dlvlslo~ 0' Chi.' Depyly Olerk L.... Counly D..... ...d R.......d. Until a change is requested, mall aU lIIX statements to: sn sIlr:l.nefiald. LLC -5440 LouteLn ste 102 Ileno, NV 2006-024293 '\ UU I ~m IIII~ U~IIIIII[m $51,00 .. 29 04/101Z006 03 :55: OS pn RI'R-DEED Cftl=l Stn=9 CASHIER C4 $30,00 $11.00 $10.00 Tax Account No, TRUSTEJtS' DEED (Statutory Bargain and Sale Deed) Allan Millar Pierce and Nonnon J. LeCompte, Jr, as Co-Trustees pUfll\lllllt to the wi win and Testament of Elizabeth C. PIerce, a deceased person, and Allan Hillar Pierce and Nonnan 1 LeCompte, Jr., as Co-Trustees pursuant to the Last Will wad Testament of Ralph H Pierce, a deceased person (colleotively, "Grantor"), convey to SC Springfield LLC. a Delaware lunited \lability company ("Grantee'? the real property descnbed on the attached Exlnblt A, together with all of the rigbt, till.. and interesl of Grantor tn, to end under adjoining st:l'eel8. rights of way lI11d easements. The true consideration for this conveyance is Ei,\lht Million Dollars ($8,000,000), plUd by lUl 8ecommodator P\lf!j\l8l\t to Section 1031 of the United States Intema1 Revenue Code BEFORE SIGNING OR ACCEPTING THIS INSTRUMENT, THE PERSON TRANSFERRINO FEE TITLE SHOULD INQUIRE ABOUT THE PERSON'S RIGHTS, IF ANY. UNDER ORS 197.352, THIS INSTRUMENT DOES NOT AI.J..OW USE OF TIlE PROPERTY DESCRD3ED IN THIS INSTRUMENT IN VIOLATION OF APPLICABLE LAND USE LAWS AND REGULATIONS. BEPORE SIGNING OR ACCEPTING TIllS INSTRUMENT, THE PERSON ACQUIRING FEE TITLE TO THE PROPERTY SHOULD CHECK WITH THE APPROPRIATE CITY OR COUNTY PLANNING DEPARTMENT TO VERIFY APPROVED USES, TO DETERMINE ANY LIMITS ON LAWSUITS AOAINST FARMING OR FOREST PRACTICES AS DEFINED IN ORS 30930 AND TO INQUIRE ABOUT THE RIGHTS OF NEIGHBORING PROPERTY OWNERS, If' ANY, UNDER ORS 197 352. SIGNATURE PAGE FOLLOWS TRUSTEES' DEED. Page I o \u,rlNJL\CllCll~Ple"," TrustIMarlln Saloldoodl\ll 060331.&.0 SEP-Z8-2006 14 14 Cr ;orda 11 641 486 0307 .. . DATED: AprilL, 2006. D ~J Allan Hdlar lerce, Co-Trustee pumlllJlt to the Last WlIl and Testament of Elizabeth C. Pierce, a d~ased pmon Norman J. LeCompte, Jr., .Trusl p\ll'S\lant to the Last Will and Testament of BIIz C. PIerce, a deceased person Allan HllIar Pierce. Co. Trustee pursuant to the Last Win and Testlm1ent of Ralph H. PIerce, a deceased person ~- NOllDan J LeCompte, Jr., C Truster pursuant to the Last Will and Testammt of Ralph H. PIerce, a deceased person STATBOFOREOON ) ) 88. COUNTY OF LANE ) This inslnlment was acknowledged before me on Aprll/() . 2006, by Allan HiIlar Pierce, Co-Trustee pursuant to the Last Will and Testament of Eb~ C. l'ieroe. a deceased pel'$on, and Co. Trustee pursuant to the Last Will and Testament of Ralph . a deceased person , r-u...."." . ~. ~HIi.=_ ~ f)I>IPSI/l.G.IST2&,..... ,,1M', TRUSTEES' DEEP -l'age 2 G \usr\NI~\Cllo:fttll'l"",,, T",stIMlll\In Saleldeed 1\11060331 d.. P 02 I I I I I I I I I I I I I I I I I I I srATEOFOREGON ) ) as. COUNTY OF LANE ) ThIs II\Stnmlent was acknowledged before me on April L2-., 2006, by Nonnan J. LeCompte, Jr., Co-Trustee pursuant to the Last Will and Testlunent of Elizabeth C. Pierce, a deceased person, and CQ-Tmstee pursuant to the Last Will and Teatament of h H. Pierce, a deceased pernon. 'I .II JI,I,..,.1aoJl"I~.II i..I' ;." 110.1 .,.;Il.:'I.II;'''I"''.'oIj''''''''~ . NIml\'(i'\lMJ!l.~ Ul ,,~~s=-~\_ I I I I I I I I I I I I I I I I I I I SEP-2B-2006 14 14 ad Corde 11 ." . TRUS'fEES' DEED - Page 3 G:\U,FlNILlCllonllPlorcc 1\'U.,IM.ttib Salold... nil 000331.aoc . 541 485 0307 P.03 .. SEP-28-2006 14.14 :ordell 5U 485 0307 P.04 CI (1;:-' " EX""""," A Real Property Detlllrlptlon TRUSTEES' DEED - Exhibit A G lu.r\NIL\ClleruIPlefCl'TtIlSfIMottln s.lcldocd njl Q6(l33 \'doo I I I I I I I I I I I I I I I I I I I I SEP-28-2006 14 14 ld Cordall 541 485 0307 P 05 I "", , I I I PMCI!L 1; 1l0g1Ming at a point On the North l.'ight"ot-WIl" Un, of Hutoh 1I111d.. adell'Dint ~lng ~e~th 88' f7' 30' Ea.t 2'11.'0 Cta. and ND~th 00' OZ' 00' Heot .'.00 r..t f~om the Southwell.' oorner of the "BUll' S<lon ill.'. !l.II.C. 110. 51 in 'l'OwDahip 17 1l000th. Il4ngo 3 Waet of the Wll1amotte ",oridlon, tbence along the Ko~th right.or-way l1ne of Marcola Road Ilouth 8" 57' JO' Noet 1.1',22 feet to the Southeast oornar of pa~cel I of Land Partltlon plat NO. 84-PO.'l, thance 10aV1"i the No~th rlght,of-way line Qf Mal.'oQlo Road and. """"ing along the Eut bWM4>:y of said parcel 1 ""d the 1I0rthe;ly axtens10n thereot 1I0rth 00' 02' 00' Weet 518.00 feat to a polnt on the South boundary of >>:COLB PMlt as pllltted and recorded ln PU" 7t. Slides 30.3) of the Lane (:OUllty Orogon Plat ll,floordG, thoono. alollg the lli:Juth lx>lInclary 02 add II1COLll PAAl; Ilar;h U' $7' 30' Il&st 99 U hat: to the 80llaheut ""rnel: of sald HIC01.ll PA1l.K, the""e alon; the BUt bounda.,. of said HleOkS PARK Nerth 00' 02' 00' Weet 289.82 feet to the Northeast "i:Jrne~ of sa~d "~C01Jl PMII. thon". alon!f ehe North I)Ounda.,. of oaid NICOL! ~AR1I: South 8t' n' 00' WeGe ~.20 fClet to the $outheut cornel.' of ~ LQ"OllP TImlU\CB PIRST Aww"'''''' ... platted and re"o...s"d in Book 4~. palle 20 02 the t.tmo County oregon Plat Recordal thence .10nll thl! BUt boUndS.,. of said LOCH ~Im TWIlW:Il FIRSt' AlIDI'I'IOII NOrth 00' 02' 00' He.; lU. se feet to the Southwaat corner of AUS1'IN P~ SOOTH, 418 platted end reco~..d in pilo 74, glidee 132-13. Df the ~en. County Plat ReCOrds, th~c" along the South boundary Ot eaid AUSTlIl I'MI\ >lPtmlllorth s,' 58' 00' Eaet 2'0.00 feet to th.. SOIll>h...st cornel: of /raid )lUST:" PI\llK 1l0ll'l'll. thence al.llIS the Sast bo\ll\cla>:y of "aid IIIlS'i1N pMIt SOtml Nor:t:h 00' 02' OQ' ~eet 90f.59 feet to tne Noraheaa; corn"r of aalQ AUSTIN p~ SOOTK, ~ald point belng on ~b.e South boundary of that ontein tract of 1"1'111 d..soribed in .. oI0B. "".o>:ded ~uly 31, 1941. in Book 399. Page 285 02 the Lone County O~e9on Deod Rccords; thence along the south lx>uncl&ry of n1d last desetibed tract NQrtb 79' 41' 54' ltaet: 1083 .15 fcet to th.. interlleatii:J1l of the South line of the laet de.o~lbed ~ract and the 24St 11M of tM.t ell'rt$ tnct of ~"nd eonvaylld 00 R. H. pierce anl1I1Uaahetl\ <:. pierae anel l."ocorded in Book 2)8, page .64 of tile Lane eounty O~egon Deell aeoQrds, th8ll<la alQng the East line Of said laet described traet South 00' 02' 00' East 1991.28 feet to the po~nt of be9iMi.ng. all in Lane CO\ll1tl'. Oreion. I I I I I I I I PIUlC~ 2 I aeginning lit .. pol.r1t l.r1 th" <lent..- at e<oll1\ty Ro-" 110. 753, ~~70.2. feet souah and 1319. 9 ~....t !last of t:ho NDrthw.... OO""eT of tho polix Scett DD....thn LaM Cl..1.. 110. ea, in Townsbip ~7 south, Renge 2 Hcat of the Wil1am.tt.. Morldian. ..~ being 888 feet south of tho 1l0000theAlIt oomer of tract of land oonvo)'4e1 by The Trave1e"e l""urance ColnplUly tQ R. I). KeTohor Ily deed raoordad in Book 189. Page ua. Lane CUunty o...son Ileed RcOOr<l" tbllnee Heet 1310 t"lle te .. foint 18 llnks Bast ot thO We.o lillO of the Pal1x 'gott Ponatian Land Cla~m ~c. 8~, Noo1!10ation No, 3255. in Town.blp 17 Bouth, Ranga 2 Weat of the HL11amette Merid1an. en~ ~1ng thenee South parallel with ano 15 linke di.tant fr~ o"id Weet line of lIaid Donat10n LAnd Claim a dlatanca of 2304.75 feat to a point 15 linke ra.t of the Southweat corn.r at ellid Donation Land Clalm, thene. aatt following alone tha cootor llne Of cOUnty aoa~ 110, ~78 . di"tanoe of 111~ foat to a ~oint In the cent.~ of sal~ County RoAd No. 2?8 due South of tne pla.. at begi~lng, thenoe 1I0l.'th following the oenter ling of said County Rood NO. 753 to the point Of beginnlng, !Ill in loane CoWlty, Or"iOn I IlXCIll'T the riglle of way of the Iu,ene-H..ndling Branoh of th.. SDuthern Pacifio RaUrDad; ALSO BXC2n thU portion described in deo~ to The City of EUgen8. recorded 1:> l/Iook 35', PAll" ~8S. Lan.. couney QreQ'on Veed Records: oonr:inued- I I I I I l;lCHtBIT A, Page 1 I SEP-28-2006 14 14 c ordell Ml 4~b U~U ( ~ Ub I '; , I ~, . d: I P~opa~ty D8sc~ip~lon eontinued.[PARc!u 2) ~o RXeK~ b.~innin~ at . point whion is 1,B9 4' fee. South anQ 1327.33 feet East of the Southwest corae~ of seation 19. Township 17 South, RInge ~ weat, WUliUl10tte Meridian, Lafta (lounty, Ongen. .aid. polnt alma bdp,1J OpJlosil:cl and 2D feot saete~ly fro~ station 39.~9,e3 p,o,s.1" paid StatiOR beins in the .en~.r line of the old route 0' county Road No. 142-B (fofm.~ly "'B31, t~.n.e SOUth O' 11' We.t lB3.'S fe.t to the int,r,eetion with tb9 NortharlY Railroad Rieht of way line, thenee south 8e' el' W.e. 117.33 '..t, thenoe South ,,' 30' Weet 40.31 feet to tn. lnter.e.~ion of I,id Railrold Right of way line with the southerly R19ht of Way line of the r'loeated ..id county Road No, 14~-S, thenoe elong the ata of a 31G.48 fDO~ radiuD eurve left (~h. ohord Df which ~'ars No~th 39' 03' 35' EAvt 261.81 feetl . d.istance Of 269.94 feet to the pl.ell Of he~innin9. in J,oane CQ\It\ty. Ore'iO'" ALSO EXCEPT ~h.t portion sC8cr1bed in de~ ~O Leoe ~ounty re.orded Oc~o~er 19, US5. ReOePtion No. ,U8I2, Lana CO\lnty ORgon Deed Reaordll, I\I,lilO ElI\lBl'T that poreion llucrl.llod in deed to 1oI\ne COWley raaorl1ed JlUmary 20. 1985, ReceptiDn NIO. 86102217. Lana County OfficLal RAcords; ALSO Uc:zn chllt porel011 clIl.c~ib$\ in .hac Deed to WUl...alane parK and Reo~eaticn Dieerio! ree~dsll Decsbher 4, 1992. Reoeption No. 9268749. and eo:t""ectlon De4!d E'Olilo:t:delcl a?ebnaaxy " 1993, Rel!ept.ton NO. 9~a.4G', LAne COunty Offioial Recerds. JU,SO Dan that pore ion described in 1IxIl1l>it A Of tMt lIead to thll City of sprinVf1cld, reoorded aept~.r 22, 1993, aeoeption No. '360016, Lan. Cgonty Official Reoorcla, ALSO IXO!PT Kareola Road ~ndu.trial Park, &0 plattlld and reclOrded in Vile 7S. Slidee 897, ,Be and 899, Lalle county Plat RecordS. Z.ne Caunty, o~.gon. I I I I I I I i'ARCBL 3 I ^" e..ement fDr ililJ"UO and egress, pa~King anel dp PUlIPOe... IlO deleribed in tbat certaln aDaip~o..l BQSe~nt Agreoment, recorded Apr11 22. 1994, Reel Nc. 1943, R~.~pCion No. '42'~~3. Lan. CQUQty Olli~lal Roca~.. I i'MaL 4 I I An easement for ingress, egreae on4 parl<ll1\l II d.....1I>cd. 1" thee certaio Deolaration of RG8t~ig~1ona and Grant of la..menta, teggrded March ~1, 1989, Re=l NOy 1&11, R.cep~icn No. Ul),162, as am.neled !:Iy t~t corcain Fiut llIIIendnlenc to ~"clal;'at.i= ..t R<oacrlctl01la "lid Grant of &aeemen~e. recorded Octaber 3L. t"', Re..l ND. 1600, ROo.peioD No. 0949059, as modified by th,t cereaio Restated ~alsration of Restrictien, Jn4 Grant of l!:uell\ente. J.'(/ao~eel ~y la, 1"1, Reel Ne. 16llS, R"cepti..n No. 9L21698. IUId lly that oe~tel.. 1lIII0ignment Jn4 A,sumption at 0~119.tl~B, reGorclecl November 2. 1994, Reel No. 20~', RaceDt10n No. 947'981, all of ~ne ~ty Of!iaial B.co~e. I I I I -\ I ~~jj, A, Page 2 ~ I TOTAL P 06 I ----------------- Ii " , I I N 17T1i [o....L..sr>>;- .!....J': r-~~ .... '" -t'lH'i';i.....T :j .--~l 'J~ ~ ,~+ '..y-<P 11 NI8TH'T " 1 ,_$ f -~EEN.e~ T \ I ! i :.:Jr '" -I- ~:-C' ..N..nrs~ : '1 ~ I \ I : ---.-~ , :lr" j . \ . ~I 1r I '~ : I 1 I ~l ' . ~. ~'. ! .~I.. .~.' .-:? , '\. ..', L r. !i2QTl; [sr... .' _ '. ~i I!~ g~,_ .....~ _ '~;" ~f ijl--, ~~ " '.' _ .;~~ . Iiktifr~~~ ~~'\i-' b.-=t(~' .~ ~'." ~~~IT' \- COAAAl= r -.:1 + '~-. \ ~ , I r- 1 ," ~'_. ,. U. ~ ~ , i) -...... ..___._ l\, I Ii! _ : ]L -~-,''j)-- --. ----.------------,-~ l -.1' b ~. ~. .~_' _ WI""_____:~.. , I' I \ . i I ~L, L 1. . , - : - i.OCuSt : i J . ~ i~ , ,.. '-r~l, 1- ____.01 .. .~ '. . :';";:;1' fl'';''''' '+ ~I~~J flrT~ I n I r- u "r-~~F J.. ~. .:__._________.1____ ,.'! I 'L~ I I L Sf ~ '" ~ ~ . ~ .' . J . . . i . , , , , { , , 1 I: , I' --..NJlsr"':ST~ It ~ '! I ~.. I;' ~ i 1 rtJ~. I ;.. r. ~'tit'~~ ~ ,nl. I'.... . :sr:"\ ) ~ I '. I ',I J, \.. I. I , I -, . I , , . i I . , , . . " , " , -_# ... \1 ,- 'j '-I" ~ ..... f (f't13...."":'~ ~; l~ " - . -J3RD"'Sli 1 \_ \ 3Z:H"~'; '. ~. I '~';:X;~ -J5n1 , ~ ~ """'~' " '.JL '" ,l I --.="':-\ \ l ~~-(1~~ ,. + ~ I ~ S:' z o :II -l ::t I '! L - , . ~ I ". .~.~ ,. . i . ~.~ J-eaend ~ "" ""1 Mixed Use Areas Low Density Residential _ Medium Density Residential _ Commercial _ Major Retail Centers _ Heavy Industrial _ Light Medium Industrial ~ Campus Industrial _ Parks and Open Space Mjscellaneou~ Boundaries jU___, Springfielc . . C'ty L' 't .--.... I Iml s Plan Ok,;, I\"" Boundaries Existing ~ P,: ...:\>;. . I Subject Site oil. "te: <awn: -: evIsed: 0609 12I20I06 I.IH RS The Villages at Marcola Meadows Existing Metro Plan Diagram o 300 600 , ~- SCate: 1" 3 600' Feet 1,200 I ..~ - SATR . A\\(X',^", ----------------- I j jl /1, j I 11 il -~- , !. I IL~ (-'j- I I ) , 2: \ J \ iJ \. " iaend ~, ~ Nodal Development Area Low Density Residential . Medium Density Residential Plan District Boundaries .. Commercial .. Major Retail Centers .. Heavy Industrial 0609 02128107 AN ,d: RS d: " 1 jJ ,[ I."~I' - ----',--- -- ..,. ,- ....1.. - --r-. ' - -j '. I. I '- I' '!iF -" ------'-. 'i--..~i I I , " '1--, -_JT" f , +-_L , ' ., r \ L '\ \ --.-\ 1- , \' -\ ~/ \ ' -}., -1 . .' , i h.!;;- 1..:_ I 1 r' : ,; 1- , ., j- .- ~ 1 . T Ij,l.J I '_ ,J.. ~ ~ '-- I I 'T i..- 1,1 . - -;- ~ N21ST ST__ r l' o 0 ~ -8 -~ ~ - j f/J i ;:0 '-~--r~ N 2atU)"$'t - .-\ f \ \ .- 0 ," u i- .. ::\ .. .' \) ~. 9 ,.' rJ--'IJj' l:/) d""'" \ .~.. 8\ \" I .-.t-y :-T~ -8:---. -T .." I' ;lIi '~',I~llI.',",IIW ,-\ r - I I[ i I )-, \=" 1- '" ;;; ~ ~ .- ~ T T - , 1 I Yy~ ~ N21S~ --" .il I ~II ~ " ~ -!--"" - -" --l ~. m ] i- . ~j .~ -i ., -~ , I l- " , I ! I, f-- , T I I , "I ,IIII;UI, ,1111 \ , L- I \' -ti ~, I I ". ' .1 -"ti'" I. .\ \. i '- ~ - - ' \ I \ . i ~'-r."n I I ,.. j lllll.l!Il!,:l1 '.--T~~-' I ~-.. J I i" I I ,: i" r I) v1 i I,I! II, \ \ I I IJ I I I .- ~"1 I I ,Q;l~Il3.l~~ - J J - j" f .. V I I ., -t , ; I '\'- -':~:~ . .--'-r \-- "., I -.-+ r t ., ,I _J .. r" ...\.. -- _J.. " -'\'~' ;,,: \ ' -t- ~ 1 ' I , _ \ r- J' , ---I \ 1\ I r- ,~ . Miscellaneou Boundaries .. Light Medium Industrial ~ Campus Industrial .. Parks and Open Space ~...._~ Springfie ~.._..: City Limil Existing Parcels I Subject Site , o 250 500 1,000 Feet The Villages at Marcola Meadows Proposed Metro Plan Diagram - IIi!I .. SATF AS>OClA 1 inch equals 500 feet ----------------- ij ~ i - --I I -. - '-- J'[ 1 t l' ':n ~ - l{ I I n ' .' 'r"". 'T:JG- I . '.Ih-!.,... NI1Tl< S'F"'""""~o: ' NI7TK....='1 I ,. NJl'TH_$~ _ .IL$'! ...... .' U ~ rn11" % ,L"...wJ [l[i, ~ ': """"""'" ~J~': ,J~: GREE)<8R~jr \, . )l..~ - 'uu_____moL__ ~ : : :_J JI \ 1 ~ ~:. 'J] 1 1_1-..... f. L lD7N"~r I . \ : I --=-- 1-~HJ.OlN Ir-n J.' .1 i i ~ 1 rl-' r II.. , -;- .L ~ ~ T -N2CtH I _ ..... ~~ ~T. _, rST..-~ ~ ;~+J.-+- \ ~l..... Ll 'I] -w~~ l~ ~., ~"'tbrlT!~~~~ u. ---r-uhf.\ I. ~ " II -+- r, ~ Ii.' ,c-Jr' 1-< 1,-- .]~- -.- -- IF: ir~ _~Ci ~ ~.~~.;:, J . ... I ',~ I ; ;0."; !i II ail :l! ~ , f: ~ ~ t- 1 ",,>- m ; ~ '\ 11 ~ ~ -I ~ ~ J ~ . ~ . . . . . . I -r e , :-lrN3IST"'lr-lr"-\ o L~ ~ 'I ')~.~ ~'~ '; rr \ i~~' ... 32Nj:-ST~ 1 ~ I ,," V I '" j v"" 1 ..." , J, ... II L !l -+ ~ T I .~ . ~~ I T I ,- , z o :Jl -l :I: \ .. .. .. .. ", .. .. .. . , \ , , , . . , 1 - \ 1- + p' 8~~ ~ ' i I i-'~'l3IIll,S1] .. I I L I -r \. \., 8~4~l~ \ \~ . . "'fl\ c=. .:-. ~ .:\ _).<> I 1 " ,I'"""""'- . i \. - ~~ <l Ii ~ I.;~ L I, II' 1 -f Ie, ;. . . T" -\-. ~ - . I. Leaend Miscellaneow Zoning District Boundaries Boundaries - High Density Residential - Community C. : ..:] _ Ught Medium Industrial i - u u, Springfiel< , , C't L' 't - 11111111 ~ Campus Industrial ~___u' I y Iml! Medium Density Residential Major Retail Commercial Existing - - Parcels Low Density Residential Mixed Use Commercial Heavy Industrial I Subject - - - . Site Mixed Use Residential ~ '. .. . . .1 Commercial Public Land & Open Space Job' :>ot.: :lravm: ::hecked: ~evilled: 0609 12/20.U6 MH RS The Villages at Marcola Meadows Existinq ZoninL 1.200 , ~ ill SATR . ASIOCIAT Sca": 1- . 60CI Feet ----- ------------ r 1 ~ 11 ~l N 171H I S' , , '-- " , ~ ....' <3i\?~ :;0. iJ.'?) j; . ~"- ~ G') I -.11'" m , , , 'tJ I GREENBRIAR ST --r I : . . . . .... , " . '.' ---eel N19TH sr , , , , , . is HJ.OZN , , , 1 N171H ST N 17TH ST N 17TH ST '" -< '!'. " ,. ..... ~ i--......-------.... , , . , . '-..---- --- -- ---- . o :j' o N 17TH Pl ,0 ," :~ r z ~ ~ ~ o !!l .--, 1.._' ~ III 8 -..-------------.. ~ o " N20TH ST l ~ N 21ST ST ;U ~ or ~ g 0 s 8 \ ~ 0 '!'. or m Z Z CORRAL OR m 0 '" ~ -< -< 0 ~ Z '" < ilOCU 0 0; ~ N21S,. ~ '!'. ~ m C ~ '" -< N28TH ~ ~ or ~ ~ o ~ z c ~ - , , , ~ l ~ " o \: n ; ~ C ;u !l '. " , I . , , , , , , , , . . , , . , , , , , , , , I ~ i ~ -- JJ1ST Sf c < !l !l 0,,15- >~ \ , . " " " " " , , " , , . , , , , , , , , , ., '" -< ,- . , , . . , , . . , , , . . ....... . " , , , . , . , , , , , , , \ \ , " , ~ , '" , , , , , o 11393..lNQJ1t 32ND ST ~ m 33RO S 34Tl-1 Sf .." ~"'" '10"" 351 =eaend Miscellaneou Zoning District Boundaries Boundaries - High Density Residential .. Community Commercial Light Medium Industrial i-----' Springfie , , ,,_____1 City Limi --, " "" II ~ _J Medium Density Residential Major Retail Commercial Campus Industrial I _ --.J Existing .. .. Parcels Low Density Residential Mixed Use Commercial Heavy Industrial Subject - .. , I Site Mixed Use Residential I.. Nieghborhood Commercial Public Land & Open Space ,# 'e: Iwn: ~cked: Jised: 0609 02/28/07 AN RS The Villages at Marcola Meadows Proposed Zonina 300 600 1,200 , Q.11 ill SATE '\~~lIUI' Scale: 1" = 600' Feet ~ ~. h v />- ~} :c,;;~~~~~~-n~ _ .<.,~ J _'_,.,__-__ '_~_ ""~c> -' I :~~k: -~1~;: \ - ir ,../ I ';,~- C'PRINGml"~:C~~~l t1 (- -.JJ' I ,,='~~i,,<t:'~=!:&~I-.J _ p i ir:o~AA" ,~" - - -- ~. ~';.,"O-'--y .ff .L.~ - - ~!!~~~~~~~~11~(-- - _~ ______,>___.-----...-..--~' .- I '4.,-" -""'-'-":::--:c\;-~, :-",c~,_ /___ __. I~ rEi?I~:J:7oJ:,o~,:~~:~~~:;:;'~,~~;;: i-'lL (// Il I, __ "J ) iil /___ ~ ~,;~'" I c " I I ~'~ I I " I I - IONIX ......"... s.." Subject Site h, I ~ I I " ~, .1<11 ,," " ~~ ~ lOHf ~ " " ~,~l @--I ~OonKTI"""'J ~ IK~~~~_ EXHIBIT 7 LEGEND .."'""OC<> ",,"""......"........'T10 _ .:~~m~~..~ ~_ ,""".. ~ .......-.........- """." .....~~"\..-'''.:.~ -"' TO" AO ;:.:'~~ .fr'":;~ """.... ..,...,............., "":;' :::..........-"'::""... ...... -.. ~~".~~~... ........ ~t:'.:,::.::.:-::.:;;: Ie """""'''~......"'''-''.A' [JIT2J <l.~.."OUl::...,":.:-:.....~......f~';.. ,';Li.;:~::. ";.-=.,';; D ",~=:,.......u .....;~..,..,..__....... <00.. :........,_""'..... ~ U>.1lt\1W1'lo<u"'A>l""''''' m ISSSI - .......,.. - '~j- '-- !ZJ -'- - ,- ~ ,.......- -....~- '.....N.. ~~0:~~ i:::., .:,:--....::. ,,.......... ,,~ ~~ :::,,:~~~t:~~~ , ..........,~... ~;.:<t.:~~;;.'1f ~-~ _513_ @ -----@ 1l'",1 fJl1X tJ'O'" J> l~!O .. - ......:...n~'::'^~,.w::.".: :E:~11';:~1::~~:~:::'~: ti1J;~2 ~~~!~~i~~~~i~ ,~.."..,. _~... n .......... ""~u"::':~7':..:" ..._ fflCI"O'. "","'J.>W"<w.I...'~~;\f'" '.... l'''c>~[ Olr...o _( $\."0.\'10 IoU '''-'- :-:;::.~~~~~~:;;:~ ~ .. """''''''''ICLl'''UI ~___' '0 ~lIAlJCllAlnQQDIHSll.WlC[PID'WI ~ FIRM floon IHSURAHC[ RUf YAP LANE COUNTY ORECON AND INCORPORATED AREAS jf~~~~r ~Sl'...~,.... ...., '~~ .","""- il~11 ;;-' f MAPIIUMBER lIt 4 41Q39CIl$Jl ~ EfJECn'tIDATE JU1Il2lS9S ~ ~ '"m"."".,..._ ''''''. I I I I I I I I I I I I I I I I I I I EXHIBIT 8 Septembel 28, 2006 RICk SatIe, AICP Satre Associates 321 East BlOadway, Smte 536 Eugene, OR 97401 RE, Malcola Meadows Utilities Deal Rick We have pel formed plehmlllalY mvestIgatIon on utIlity aVailability fOl the Marcola Meadows PlOject We find that theIe ale suffiCient utilities avatlable at 01 neal the site to serve the plOposed ploject "Wtll Serve" lettels have not been requested Storm Drainal!c A dramage ditch luns through the property that dlams the site and some upstream off-Site developed plOpelty Some mdustnal flows (cooling water) are leleased tluough the ditch durmg summel months The ditch dlschalges to a public storm dralllage system Watel qual1ty and quantity mItIgation measmes Will need to be deSigned mto the system Sheet 11 shows a conceptual plall to Implement water quality and quantity measmes Watel qual1ty mitigatIOn measmes Will be Implemented m accordance With adopted City 01 dmances (Portland Standards) The proposed features mclude use of grassy swales, loweled planter stnps, vegetated bas1l1s, pelmeable paVl11g, wet detentIOn and dry detentIOn ponds A sample of the details aVailable from our menu of optIOns fOl use m final deSign of watel qual1ty featules IS attached The mam dlamage swale tluough the SIte will be Ie-routed tluough the SltC As part of thiS wOlk thiS dramage featUle will be Widened, planted, mealldeled an utll1zed as a water quality feature as well as an amelllty fOl the usels of the project ThiS enhanced dlamage will also be constlUcted seI ve as a detentIOn faCIlity to mitigate runoff quantity flOm the site Sewer I A large sewel mam, 42 mches diameter, runs tluough the project site and IS deep enough to serve the SIte With some fill reqUired 111 the nOlth The northeast COlnel of the project will be served by an eXlstmg sewel 111 31 st SlI eet I Water SUB watelll11es eXist m Marcola Road, 16 mch diameter, and 31st SlIeet, 18mch dIameter These lines aI e of suffiCient capacity to sel ve the proj ect Smcelely, . I . I . . . . . . '. I . . . . . . I Elect! ieal SUB has planned fOl and has sufficlCut capacity at the site to sel ve the plOposed project Natural Gas Northwest Natmal Gas Company has a high pressme gas lme located at the mtelsectlOn of 281h Street and Marcola This Ime has capacity to serve the plOJect If you have any questions please contact me at (541) 928-2583 Dan Watson, P E K&D Engmeermg, Inc - - - - - - - - - - - - - - - MOUNDED EARTH CHECK DAMS ... . . Grassy Swale 71Z6102 - - - - m >< :!: !E -; co - - - - - - - - - - - - - - - DRIVEWAY CULVERT PIPE, TYPICAL 24- IF PARKING" ON STREET \ IS ALLOWED TZ- .,_MIN '.. " ' l\,II'I, , .. ~ \,! ...... # _~ I ,.....1.. ". -<\~),~ 'fir J i".;' ~ .. cl' oJ l , - ~ ~' f' : ", " "",,' :.." k I/., ' ~ l~", f1 ,;Y? " ,- ,.>...._,;, ' ~;;..~ .7" ~ A\.~'.."';":.I -"'~~~ 1j ~'\=;.(...-; _# ,,"" ......." . A -... ~..-d.z,-~.!6..1~1 .'" P _ -,: ~ t \J -> :.;r-.. ...., ,-_ - -H _~4'~_ \ ~ ,: ~~!:\~~ ~ ~L.;""'~- __ - ~~l ....._ 'r _::; ~ ..c'.:::;~ ,. ~' ~_""-':i:~, ,_,,~;!!"~ :,':::-~~;~ -,...;-( ~~. ?- ->- ,f''t...'...~ "~~~~~.. -.f'" 'Y f...'~J~t,. ~ :~:;~~~f.~~: ~~r~~~- ~~~~i}~~ ,~_,~ .. I ~ I ,( ;'1'; , ~l GRASSES .. ," SIMPUFIED APPROACH DESIGN CRITERIA Side Swale - Cross Section l1W02 - . - - - - - - - - - - - OPEN CHANNEL IN \ AREAS OF CURB CUTS \ ,. 24" I. . - ;)J nee I . - ------ - - -- , . 2" - 6" ROUND RIVER ROCK SURFACE lAYER, 6" THICK, WI CHECK DAMS EVERY 1 Z 6- PERF PVC PIPE - SIMPLIFIED APPROACH DESIGN CRITERIA Lowered Planter Strip - Parking Allowed 718102 - - - - - - - - - - - - - - - - , ~ ',. 6- DEEP CHECK DAMS 2:1 MAX SIDE SLOPES TYPICAL [SIDEWAlK ) SLOPE TO DRAIN AWAY FROM ::>IIU:EOJ' -r I ~, "j PERF PIPE 7'Mlrl SIMPUFIED APPROACH DESIGN CRITERIA Lowered Planter Strip - Private Street Design 7/8/fU - - - - - - - - - - - - - - - - - - Pl.ANTINGS: See BES Recommended Plant Un 6" DEEP CHECK DAMS AT 12' INTERVALS Vegetated Infiltration Basin 1/26/02 - - - - - - - - - - - - - - - - - - - Wet and Extended Wet Ponds The plan below Illustrntes a hJPlcal plantmg plan for an appronmat!!ly 3,.5UO squar!! foot wet or extended wet pond. Tlus plan IS diagrammatIc use only, Tlte actual project SIte ccmdltio1T Illay requIre desIgners to consider numerous oUter pond amfiguratJ(1T1s aITd planting layouts Grasses Of Groundcov~ A rc-a to ('over cnh rc pond sidc-slopcs and Buffer 7.onc Plant 12" on center, WIth tnangular ~paClng Wetland Plants covermg at least 25% of total we-t porhon a,ea of pond Plant 1 wetland plant per 2 square feet of emergent plant area J"and Buffer LlOe: outhnes the area used 10 calcula fe the number of planungs req wred Fxtend...-l Detenllon Hu.h Water Mark or edge of pond gradmg Le2:enq , Evergreen Tree DecIduous Tree ~-Upl.md 1<> Dry Condihoru. . 5ohrub~ MCJ~t to Dry Cond!buru:. e Shrub- Mo>& Lo We' Conditions ~ G~ dJ'ld GttJundcO'\. ere N (f) MOlSt/Saturntcd PI:mhngs ~ Aquahc/Emergent Plantmgs ~ [nlet/Outlet S:ru"ture .~~... Appro. Scale J" =20 - - - - - - - - - - - - - - - - - - - Drv Detention Ponds The plan below Illustrates a typIcal plantmg plan for an appro-anuliely 3,500 square foot dry detentIOn pond ThIS plan IS dl1lgralllmatze use only. The actual proJect SIte condItIon may req/llre desIgners to cOnsuter numerous other pond configuraholTs and plantlllg layouts Extended Detentmn HI,,} Water Mark or edge of pond grading Le!1:eng I Evergreen Tree Oeoduous Tree r ~ Shrub-Upland to Dry Condlhons . Shrub- MOISt to Dry Condlhons . Shrub- MOISt to Wet CondlhOns '@ G~ and Groundcovers ~-::W?:0'< ~ r.;:.:{;;'?-r..'\.~ ..~ Inlet/Outlet Structure ..>>:> .~ Grasses or GroundcoveI' Area to cover entire pond SIde-slopes and Buffer Zone Plant 12"on center, WIth tnangular spaang N (f) Approx- Scale 1"=20' - - - - ------------------- LEGEND DECIDUOUS TREE - SHRUB OR lARGE GRASS UKE PlANT *' SMAl.L GRASS UKE PLANT ~ GROUNDCOVER EVERGREEN TREE number of pfantings Notes t. At least 50% of the facility $hall be plante<! with grasses or grass-like plants, pnmarily in the flow path, or Dasin Dottom. sware Area = Aopmx. ] 000 s9- It. INot to Scale} 2 Large grass like pJants can be consi<:lerea as: shrUbS. See BES r-ec:ommended plant lISt and parking lot tree list. Vegetated Infiltration Basin or Detention Pond - Plan 712W02 ------------------- PLANTlNGS: See BES Recommended Plant Ust "'" ;6" DEEP CHECK DAMS r- LOW PLANTlNGS I UNDER CAR OVERHANG Vegetated Swale Parking Lot Application 1126/02 - - - - - - - - - - - - - - - - - - - LEGEND DEODUOUS " SHRUB OR LARGE ~ SMALL GRASS GRASS UKE PlANT UKE PLANT TREE - . GROUNDCOVER EVERGREEN TREE Notes' 1 At feast 50% of the f<lality $11"" be planted with ::r~"'" or grass-like plants, pnmanly in the flow path Swale Area = ADprox. 400 59 ft. (Not to Scale) 2, Large grass like plants can be consIdered as shrubs. see BES recommended plant list and parking lot tree list and plant quanti1;y requirements. Vegetated Swale - Plan Parking Lot Application 712610'