HomeMy WebLinkAboutComments CMO 1/23/2008
L1MBIRD Andrew
From
Sent
To
Subject
ERNST Dennis
Wednesday, January 23, 2008 1 02 PM
KNAPEL Carole, L1MBIRD Andrew
FW Rlverbend, Phase 2
FYI - County Surveyor's office comments
From
Sent
To
Cc
Subject
HUNTER Peggy K fm;:liltn Ppnr1\f HUNTER@C:O L;:lnP OR USl
Wednesday, January 23, 2008 12 20 PM
ERNST DenniS, MOORHEAD Oms
GIVENS Everett L
RJverbend, Phase 2
LANE COUNTY SURVEYOR'S OFFICE COMMENTS
Dear DenniS & Chris,
With regard to this SubdivIsion, please have Mr Denning address the followmg
General Comments,
1) Only the property owned by Peace Health should be Included within the plat ReVise the exterior boundary
lines and Surveyor's Certificate to depict what IS Included In the deeds and title report
I) The right-of-way of Martin Luther King, Jr Parkway and the westerly portion of Cardinal Way
should not be Included within the boundary of the subject property, as they have already been
conveyed to the city and are not Included In the deeds of the subject property or the title report
II) Deadmond Ferry Road, along the north boundary of Lot 9, IS a County Road and the boundary of
the plat should run along the southerly boundary of the right-of-way
III) A 25' right-of-way Baldy View Lane has also been formerly dedicated to the public It appears that
former dedIcations of for Baldy View Lane extend slightly farther south than what IS shown Has
this portion been vacated?
2) The exterior monuments, where there are changes In the direction of the boundary, must be set prior to
recording per ORS 92 060(5) The Post MonumentatlOn certificate on Page 22 seems to indicate that
these Will be set at a later date Please use a different symbol for the monuments set prior to recording,
and the ones set after recording, and revise post-man certificate
3) Can the boundary of Lot 9 along the northerly portion of the slough be monumented? It seems that If there
are found monuments In that area others could be set
4) The centerlines of rlght-of-ways must be monumented per ORS 92 060(2)
5) Please make a note on each page that the dimensions shown along boundary are record per CSF 39772
or LPPN 2006-P2030 Perhaps the dimenSions should be In parentheSIS or shown With a "*" With
applicable reference, so that It IS clear the dimensions are not necessarily the measured distance between
monuments
6) It would be helpful to have a legend on each page showing the monument symbols used on that particular
page
7) There are several eXisting easements noted In the title report that are not shown on the plat These should
1 Date Received '/'-'l./,UltJl
Planner AL I
be shown with recording numl'lG.'rs given If they are to be extlngUlsheo, please provide documents
shOWing they have been vacated, or updated title report with easement references removed
8) The Declaration appears to be a duplicate of Phase 1 and refers to some, but not all, of the newly created
easements They should either all be listed, or stated generally (Ie dedicate all PUE's as shown, all
Public Storm Drainage Easements, all Slope Easements, etc) If they are to be created by separate
documents, Indicate that In the declaration, also (Ie create by separate documents the private
easements as shown on the plat, etc )
9) Does the Floodway Information need to be on all sheets? If It were only on Sheet 1 It would make areas
with a lot of detail easier to read Recommend uSing different Iinotypes for Flood Hazard Boundary and
Floodway (or possible a light hatching on Sheet 1 to Indicate which IS what IS "In" those areas
10) Include SE Quarter of Section 22 In Title Block on all pages
11) Make changes on all pages to Tax Lot information In lower left corner (edits are noted In bold)
17-03-15-4
17-03-14 TL's 1200, 1600 & 1800
17-03-23-22
9) Update expiration date on Surveyor's Stamp
Page-by-page comments
1) Sheet 1
a) Revise boundaries (bold lines) as noted In #1 above
b) Give description of monument found at Northwest corner of DLC 46 Label NE Corner of DLC as
Imtlal POint
c) Remove "Exact Copy" statement
d) Label AdjOining subdivIsions (Ie First Add to Buena Vista and Baldy View Condo)
e) Label southeasterly boundary as Ordinary High-Water Line and easterly boundary as Spring
Slough
f) Include recording numbers for Improvement agreements In Note 4 Table
g) Legend
(a) Add a symbol Indicating monuments to be post-monumented
(b) Typo "Partition"
(c) Include "IN" abbreviation for Index Number of Lane County Corner Records
2) Sheet 2
a) Show r/w width along Deadmond Ferry Road
b) Bearing along west side of Lot 10 does not match Surveyor's Certificate
c) Separate table below for Curve 3 can be eliminated Are C119-C122 shown on thiS page?
3) Sheet 3
a) Make lines along MLK, Jr Pkwy right-of-way bold, since It IS not part of platted property
b) The alignment of MLK, Jr Pkwy does not match the deed or what the county surveyed (CSF #40328)
Has there been a recorded reVISion, or are there portions being dedicated on thiS plat? If so, It should
be delineated on the plat
c) Indicate that St Joseph Place IS being dedicated
d) Imtlals for c/l-c/llntersectlon should be MLK and ST J
e) Move "L-5" and "L-6" to base of arrow
f) Include the portion of E-19 where It meets St Joseph Place (NE corner of map)
4) Sheet 4
a) What does the chord Information pertain to on the left side of Curve Table?
b) Distance of tangent along MLK, Jr Pkwy, between Cardinal Way and a pOint near SE corner of LPPN
2002-P1627, IS shown as 23511 on Pg 4, but on Pg 5 It IS shown as 232 80
Date Received l~ ~/~Df
Planner AL
2
5) Sheet 5
a) Info for C29 In Curve Table IS Incorrect
6) Sheet 6
a) What IS E-13? If It IS road r/w, It should be monumented, shown with a solid line and named
b) To avoid confusion, please use a different line type than that of easements to distant found
monuments (Ie monument "59")
7) Sheet 7
a) C50 IS listed twice In Curve Table, but C54 IS not Included
8) Sheet 10
a) Distances between monuments along LPPN 2006-P2030 do not match what IS shown on plat
9) Sheet 12
a) Label First Add to Buena Vista
b) Move "L54" and "L55" to base of arrow
10) Sheet 14
a) The limits of E13 are unclear "L59", "L60" & "L61" are displaced
11)Sheet 15
a) Will there be additional dedication for r/w to round out curve for Baldy View Lane? If so, It should be
shown
b) Check limits of dedications It appears that It should be Reel 279/32298 (not 8544777) that ends at the
south line of TL 1802
c) CSF 39772 shows the Waterline Easement continUing southerly, but plat shows It terminating at
boundary line Give Recording number of Waterline Easement
12) Sheet 16
a) "L47", "L50" & "L51" are displaced
b) Label "Ordinary High Water Line" and "Spnng Slough"
c) Lot 9 River Frontage note IS on thiS page twice (see comment "c" on page 23 regarding thiS
easement)
13) Sheet 17
a) Note regarding Lot 9 Drainage easement IS on there twice
14) Sheet 18
a) Include beanng of southeasterly boundary along TL 1300
15) Sheet 19
a) Label Initial POint
b) Show full RIW of Deadmond Ferry Road Give Width of RIW
c) The 10' easement Rec 88-41977 should be pOinting to the more southerly dashed lines The Book
136/Page1097 are the reference of the Commissioners Journal accepting that deed
d) Several "L#'s" are displaced In the northeasterly corner
e) Give recording number for waterline easement
f) The recording #'s listed near monument 19, should be "End of #854477, Beginning of #32298
16) Sheet 20
a) Label Spnng Slough
b) Check beanng west of monument 73 Surveyor's Certificate calls It 74'
17) Sheet 21
a) Is thiS page needed? Are the Zones likely to change In the future?
b) Remove Exact Copy statement
3
Data ~ecelved
Planner' Al
,/'J,3/.).DOt"
I ,
18) Sheet 22
a) Surveyor's certificate
. Paragraph 2 Indicate that the Northeast Corner of DLC #46 IS the Imtlal POint
. Descrrptlon should be along the southerly boundary of Deadmond Ferry Road
. Check course 10 along Sprrng Slough Map has different bearrng
. "15 Courses" list (last paragraph of first column) Course 1 IS not the same as shown on Map,
Course 6 Distance IS different than map, Course 13 chord bearrng IS different
. "6 Courses" list (middle columl'1) The second course IS missing After the 110 62' course, there
should be a course of N02024'36W 192 37, before the curve (shown on page 3), Spelling of
northerly In course 2 & 3
. "3 Courses" list (after "Along the west ") Course 1, Map shows N1046' 43"E, Course after Course
3, Map shows 13731
b) Narrative
The narrative states that the boundary resolution IS as shown on CSF # 39772, except for TL 100 and
Lot 3 What IS TL 100? What Tax Map? The boundary shown IS not the same as CSF # 39772 along
Deadmond Ferry and Baldy Lane In Lot 9
c) Post-Mon Certificate
The Perrmeter of the plat must be monumented before the recording of the plat If open Circle symbols
are to Indicate monuments set after recording make the monuments set before a different symbol
d) References
I don't see any reference used from the county survey of MLK, Jr Pkwy (CSF# 40328) It seems
that since the road cuts through the middle of the plat that there should be some references used from
that survey
19) Sheet 23
a) Declaration (see note 8 In general comments)
b) Question marks after word "Acknowledgement"
c) Recommend putting recording Information for easements on the plat Just once and making a cross
reference note to see Sheet 23 (Ie Lot 9 River Frontage Reservation) Cross reference on the last
page With the easements "E#" shown on map
Peggy Hunter
Lane County Surveyor's Office
682-3633
4
Date f(acelved ~.Jo(:)r
Planner AL
.
Condlbon
rt"",No"~
SubdiVISion Tentative Plan Conditions of Approval - RESPONSES
PeaceHealth - RlverBend Campus PIP, P30465
The lot area of Lot 8 IS Identified twice on Sheet T1 4 With different acreage
calculations In the SubdivIsion Plat, provide the correct lot acreage
2
In accordance with RlverBend Master Plan Condition 35 pnor to Final Site Plan
Approval for the hospital the applicant shall sign a non-remonstrance agreement
covenng Improvements 10 the sections of RlverBend Dnve north of Maple Way as
descnbed In RlVerBend Master Plan Condition 35 The non-remonstrance agreement
shall be submrtted as part of the Development Agreement
To allow for construction of the City s preferred future transportallon system
Improvements and to accommodate Increased traffic volumes al the intersection of
RlverBend Dnve and Cardinal Way East no above-ground utility structures or below-
ground utility vaults shall be located within a 55-foot radius as measured from the
intersection of the centerllnes of RlverBend Dnve and Cardinal Way nghts--of-way
Provide a 12-foot median width to accommodate the future median BRT split station
platforms at RlverBend Dnve and Cardinal Way ThiS conditIon IS the minimum
necessary to assure the system s accessibility for passengers uSing wheelchairs
The final subdIVIsion plat shall consistently depict street nghts-of-way as follows
RlverBend Dove - 95 feet
Cardinal Way at RlverBend Dnve -112 feet
McKenzie way - 75 feet from MlK Jr Parkway to Maple Way ThiS IS the minImum
necessary to accommodate a future 12-foot center turn lane through the segment of
McKenZie Way between MlK Jr Parkway and Maple Way A landscaped median With
a minimum of one mid-block pedestnan crossing shall be constructed In the future turn
lane WIth the subdIVIsion Improvements and shall be shown In the Public Improvement
Plans Curb/sIdewalk bulb-out extensions shall be provided at both ends of McKenZie
Way
Any modification of street designs shall be In accordance With the approved Public
Improvement Plans
3
4
5
6
On future submittals to the City including the Public Improvement Plans and Final Plat
the 70-foot Wide eastward extension of the loop road Within lot 8 labeled as a reserve
stnp shall be shown as nght-of-way The dedication of thiS nght-or-way shall occur
With the Final Plat
Pnor to or concurrent With the Final Plat the applicant shall record against lot 8 an
Improvement Agreement for the full Improvement of the loop road from the terlTllnUS of
the proposed Improvements to the eastern property line
7
8
In accordance With SDC Article 32 020 (10) (b)(4) and RlverBend Master Plan
Condition of Approval 41 the applicant shall execute Improvement Agreements for
lots 1 2 and 3 for full urban Improvements along the east Side of Game Farm Road
South abutting the site pnor to approval of the final plat
9
In accordance With SDC Article 32 020 (1 D) (b)(4) the appllcant shall execute an
Improvement Agreement for full urban Improvements along the frontage of Deadmond
Ferry Road abutting lot 9
10
Pnor to or concurrent With the Final Plat the applicant shall record an Improvement
Agreement, Including a proVIsIon for replacement of required parking spaces for the
Improvement of the eastern Side of Maple Way along the unimproved frontage of
Maple Way of Lot 8 north of the intersection of Maple Way and the loop road
11
To Implement Master Plan Condition #28 the Public Improvement Plans shall proVide
at least 3 additIonal on-street (or bay) public parking spaces along Maple Way Baldy
Vie.N Lane and/or the loop road east of Baldy View Lane to provide a mlfllmum of SIX
total vehIcle park:lng spaces to accommodate citizens who Wish to access the
McKenZIe River Via the nverslde multi-use path
Applicant Response
Not apphcaPle to PIPs
Phase In which Action WIll be ReqUired
STP Amendments and Fmal Plat
Applicant Response
This document has been submitted as reqUired pnor to Final Site
Plan Approval
Applicant Response
The restncted zones of Cardlflal Way and RlverBend Dnve have
been kept clear of above-ground utility structures and below-
ground utility vaults In the PIP deSign See Sheets C2 3 and C3 1
Applicant Response
ThiS condition has been met In the PI P deSign
Applicant Response
Right-of-Way Widths WIll be shown consistently between the PIP s
and the Final Plat for all publiC streets Rlverbend Dnve IS shown
With a consIstent ROW Wldth of 95 feet Cardinal Way IS shown
With a ROW Width that vanes from 107 feet at MLK Jr Parkway to
95 feet at RlverBend Dnve We beheve based on conversations
With the City s transportation department that thiS IS consistent
With the agreed upon street deSign Intent 5t Joseph Place
(McKenZie Way) IS shown With a consistent ROW Width of 75
feet Regarding St Joseph Place the landscaped median has
not been Included because we beheve It Violates the emergency
access reqUirement of a 20 foot minimum clear travel path We
have also not shown the mid-block pedestnan crossing
ProfeSSionally we are concemed that thiS mid-block crossll1g on
a curved street WIth parallel parking on both Sides compromises
pedestnan safety We understand that thiS Will generate further
diSCUSSion With the City
Applicant Response
ThiS condition has been met In the PIP deSign See Sheet C5 5
Applicant Response
Not applicable to PIPs
Phase In which Action Will be ReqUired
Fll1al Plat
Applicant Response
Not applicable to PIPs
Phase 1n which Action Win be ReqUired
Final Plat
Applicant Response
Not applicable to PIPs
Phase In which Action Will be ReqUired
Final Plat
ApplIcant Response
Not applicable to PIPs
Phase In which Action will be ReqUired
Fmal Plat
Applicant Response
ThiS condItion has been met In the PIP design See Sheet C5 5
Responses to STP Conditions of Approval
Date Received ~ftiHDf
Planner AL
8/29/2005 Page 1 of 8
Subdivision Tentative Plan Conditions of Approval - RESPONSES
PeaceHealth - RlverBend Campus PIP, P30465
12
Street tree spacing along RlverBend Dnve Martin Luther King Jr Parkway and
Cardinal Way shall not exceed 45 feet Tree plantrng shall be continuous for the entire Applicant Response
17 length of the streets Trees shall be placed not doser than 35 feet from the ThIs condItion has been met In the PIP design See Sheet II 02
perpendicular curb line of Intersections of streets nor wlthrn 5 feet of alleys pnvale for overall street tree planting plan
dnveways or fire hydrants
Street trees along McKenzie Way and Maple Way shall be spaced al a minimum of 3(}' Applicant Response
foot Intervals In accordance with SOC 32050 (2) Tree planting shall be continuous for This condition has been met In the PIP design WIth the exception
the entire length of the streets Trees shall be placed not closer than 35 feet from the of trees located adjacent to street light standards Spnngfield
perpendicular curb lme of IntersectIons of streets nor WIthIn 5 feet of alleys pnvate Engmeenng Design Standard EDSP 6 02 4 C requires a
18 dnveways or fire hydrants minimum of 20' setback from street light At these locations the
tree spacing IS at 40 20 from each Side of street light See
Sheets L 1 09 for tree planting plan at St Joseph Place
(McKenZie Way) and Sheets L 1 1 D-L 1 12 for tree planting plan
at Maple Way
Applicant Response
ThiS condition has been met In the PIP deSign See Sheet L 1 09
far tree pit locations at St Joseph Place (McKenzie Way) Sheet
L 1 07 for tree pIt locatIons on RlVerBend Dnve and Sheet L 1 23
for tree pit detail
Applicant Response
ThiS condition has been met In the PIP deSign See Sheet L 1 09
for tree pit locations at St Joseph Place (McKenZie Way) Sheet
l1 07 for tree pIt locations on RlverBend Dnve and Sheet L 1 23
for tree pit detail
Applicant Response
Not applicable to PI Ps
13
Pursuant to RlverBend Master Plan Condition of Approval #45 the RlVerBendlCardlnal
mtersectlon shall be constructed With underground condUit crossings of all approaches
that are adequate to accommodate future traffic Signal faCIlities ProvIsion for condUIt
crossmgs shall be Included m the Public Improvement Plans
Pursuant to RlverBend Master Plan Condition of Approval #81 construct: the
accessway from Mallard Ave to MLK Jr Parkway With the Initial subdiVIsion
Improvements to the standards of SDC 32 040(1)(d)2 Top of curb elevations shall be
clearly shown on the Public Improvement Plans and shall be at an elevation equal to
or greater than the 50D-year flood elevation To assure a safe and effiCient mterface
WIth the Signalized MLKlRlverBend Dnve Intersection which IS to be constructed by
the City as part of the RlverBend publiC Improvement plan review process the final
deSign for thiS multi-use access way shall be as approved by the Spnngfield City
Engineer The reqUired IIghtmg for the accessway shall be shown In the lighting plan
14
PrOVide a street tree/street lighting easement along the east Side of Martin Luther King
Jr Parkway through the RlverBend site The easement shall be a minimum of 8 feet
WIde and shall be located 1 5 feet east of the curb The street tree easement may
overlap the 25 public trail easement as shown In the City s cross-section as updated
4/26/04 (see Condition 59, Exhibit A) The easement as descnbed In thiS condllton
shall be shown In the final plat
The applicant shall prOVide landscapmg mcludlng street trees for the entirety of the
applicant s property frontage along the eastern Side of MLK Jr Parkway Street trees
shall be placed WIthin the street tree easement All street tree speCIes and street tree
spaCIng shall be pre-approved by the City
In the Public Improvement Plans the street tree species shall be as preViously
approved by the City Northern red oak In the RlverBend Dnve planter stnps and
Armstrong red maple In the median Urbanite green ash In the planter stnps and
Greensplre linden In the median on Cardinal Way East Junglnger' Amencan ash In
IndiVidual tree pits on McKenZIe Way Armstrong red maple In the planter stnp on
Maple Way Redmond Amencan linden Zelkova Village Green and Green Vase
street trees along the east Side of MLK Jr Parkway frontage Any changes to the
proposed street trees species and tree spacing (for the east Side of MLK Jr Parkway)
shall be reViewed by the City dunng Public Improvement Plan re'JleW
15
,.
19
In the Final Plat the proposed indiVidual tree pitS on McKenZie Way shall allow at least
64 square feet per tree With a minimum Width of 4 5 feet [SDC 40 100 (4){a)] Space'
between the tree and paving may be covered by an approved non-permanent hard
surface mcludlng but not limited to grates bncks on sand paver blocks or
cobblestones
In the Public Improvement Plans all street trees shall be In conformance With the
standards of SDC 32 050 (5) Space between the tree and paving may be covered by
an approved non-permanent hard surface Including but not limited to grates bncks on
sand paver blocks or cobblestones
20
21
Pnor to Final Plat approval the applicant and the City shall enter Into an agreement
prOViding for the long-term access and maintenance of the proposed publiC
landscaping areas public access ways and paths and open public storm drainage
systems
22
In the Public Improvement Plans the applicant shall prOVide finallrngatlon system
deSign draWings for alllrngatlon placed Within the public nghts of way and to maintain
the landscaping and street trees on the east Side of MLK Jr Parkway for the entirety
of the subdIVIsion area In addition to the Information shown In sheets LS2 D-LS2 24
plans shall Include pomt of connectIon to potable water system backf\ow deVices
Springfield Ullhty Board (SUB) water meters sleeves under roadways to connect
medians and planter stripS timers and locatIons
Responses to STP CondItions of Approval
Date Received,
Planner AL
Applicant Response
CondUIts were madvertently missed on thiS submittal Future PIP
submittals Will have condUits shown as conditioned
Apphcant Response
The Intent of thiS condition has been met In the PIP deSign
Smce curbs are not part of the deSign the path Within the
accessway has been deSigned to lie at or above the 50D-yr flood
elevation
Applicant Response
ThiS condition has been met In the PIP design
Sheets C7 0 through C7 7 show thiS 8 -WIde easement adjacent
to the MLK ROW
Applicant Response,
ThiS condltlc1n has been met In the PIP deSign See Sheets
L 1 13--L 1 17 for MLK street tree planting plan
Applicant Response
ThiS condition has been met In the PIP desIgn See Sheet L 1 02
for overall street tree planting plan
Phase In which Action Will be Required
Final Plat
Applicant Response
ThiS conditIon has NOT been met In the PIP deSign DUring the
SubdiVISion TentatIve Plan process It was agreed to by the City of
Spnngfield that STP Imgatlon draWings would suffice for City
review and approval It IS recognized that pnor to construction
the City WIll reqUire final deSign draWings of the Irrigation system
. for approval
8/29/2005 Page 2 of 8
/n /:U>P!
/ /
Subdivision Tentative Plan Conditions of Approval - RESPONSES
PeaceHealth - R.verBend Campus PIP, P30465
23
In the Public Improvement Plans Include/amend the following street tree planting
speCIfications In addition to or other than those indicated In the subdivIsion landscape
plans
All street trees shall be 2 caliper or greater [Engineering DeSign Standards and
Procedures Manual 6023]
In the wider planter stnps on RlverBend Dnve and Cardinal Way place the trees In
the back half of the planter stnp closest to the sidewalk [Englneenng DeSign Standards
and Procedures Manual 6 02 5 5J
A 3 Inch layer of mulch shall be placed around the tree and kepI 6 away from the
trunk [Engineering DeSign Standards and Procedures Manual 6 02 5 7]
In the Public Improvement Plans proVide a lighting plan for the Game Farm Road and
Martin Luther King Jr Parkway off-street multi-use paths which demonstrates that
lighting levels are consistent with the Illumination standard of I E S Recommended
Practice RP8 Llghtll'\g plans shall conSIder the effects 01 adjacent tree canopIes on
lighting levels In cases where the applicant proposes to utilize adjacent street lighting
to prOVide path Iighllng such as on the east side of Martin Luther King Jr Parkway
submit documentation from the lighting engineer whIch venfies that tree canopies
between the street and the path WIll not reduce lighting levels below the reqUired
standard Light standards shall be Installed outside of the 2 foot dear zone on each
side of the path The City WIll be responSible for maintaining the path lighting on Game
Farm Road and Martin Luther King Jr Parkway
24
25
In the Fmal Plat a 25-1oot wide public trail easement for the nver path shall be shown
extending north along the McKenZie River frontage for the enllrety of SUbdiVISion Lot 8
to the common property line WIth Lot 9 The path shall be constructed With the Site
Plan Improvements In conformance WIth SDC 32 090 and the approved Master Plan
The path shall be 12 feet Wide With a 2-foot clear area on each Side of the path free of
above-ground obstructions The route alignment shall be staked In the field and
approved by the project arbonst and an authonzed representatIve of the City of
Spnngfield pnor to surveYing for the easement The route through the rlpanan area
shall be Sited In confonnance With Master Plan Condition of Approval #53 and
SubdiVIsion Condition 63 A 25-foot WIde public easement shall be dedicated/reserved
through the SubdiVIsion Plat process or through another mstrument approved by the
deSignee of the dedication (City of Spnngfield or Willamalane) and shall be recorded
pnor to or concurrently WIth the plat Submit easement dedication documents for
review by the City Surveyor pnor to filing
In the Final Plat a 25-foot Wide public trail easement for the nver path shall be shown
extending along the McKenZie River frontage for the entirety of subdiVISion Lot 9 The
route shall be In conformance With Master Plan Condition of Approval #53 The route
alignment shall be shall be Sited m conformance With Master Plan Condition of
Approval #53 anel SubdiVIsion Condition 63 and staked In the field and approved by
the project arbonst and an authonzed representative of the City of Sprmgfield pnor to
surveYing for the easement A 25-foot WIde public easement shall be
dedicated/reserved through the SubdiVIsion Plat process or through another
Instrument approved by the deSignee of the dedication {City of Spnngfield or
WilJamalane} and shall be recorded pnor to or concurrently With the plat Submit
easement dedication documents for revIew by the City Surveyor pnor to filing
A public trail easement With a minimum Width of 25 feet IS reqUired to accommodate
the MLK Jr Parkway multi-use path through subdiVISion Lots 4 5 6 7 a and 11 and
shall be shown In the SUbdlV\S\On Plat Plans for the MLK Jr Parkway multi-use path
construction shall be submitted With the Public Improvement Plans and constructed
With the SUbdiVISion Improvements In conformance With SDC 32 090 and the approved
Master Plan The path easement shall run Immediately east of the 8-foot street
IIghllng/street trees easement The path shall be 12 feet Wide WIth a 2-foot clear area
on each Side of the path free of above-ground obstructIons A 25-foot Wide public
easement shall be dedicated/reserved through the SubdiVIsIon Plat process or through
another Instrument approved by the City of Spnngfield and shall be recorded pnor to or
concurrently With the plat Submit easement dedication documents for review by the
. City Surveyor pnor to filing
Responses to STP CondItions of Approval
26
27
Appbcant Response
ThiS condition has been met In the PIP deSign See Sheets
L 1 03-L 1 07 for street tree locations and sIzing on RlverBend
See Sheet L 1 23 for planting and mulchmg notes
ApplIcant Response
The street trees are shown as 20 feet or more from light poles
per Spnngfield Englneenng Design Standard EDSP 6 02 4 C
With the lights mounted at 12 or 16 feet the trees Will have an
Initial minimal Impact on light distribution As the trees grow
mterference WIll mcrease but as trees reach approximately 20
years of age the trees Will be large enough and selective hmb
prumng/removal Will have reduced Interference WIth the light
dlstnbutlon pattern Thus lighting deSigns do not need to
conSider street trees when domg the photometnc analysIs to
demonstrate compliance With City lighting standards (Illuminance
method only) The City mcluded path lighting to IES standards as
a cntena In the des.gn contract for MLK et al wrth BHE The MLK
deSign has adequate lighting for the MLK path east of MLK from
Game Farm Road South to the chute A lighting plan IS being
prOVided for the multi-use path along Game Farm Road as part of
the PIP submIttal consistent With IES recommendations and CIty
standards
Refer to Sheet C12 4 for details of 2-foot clear zone
Applicant Response
ThiS conditIon has been met In the PI P design The trail
easement IS shown on SU'oOI\llSIOn Tentative Plan documents
(March 24 2005) on Sheet T1 4 and In the Site Plan ReView
DraWings (May 3 2005) on Sheets La 13-LB 17 The nver trail
alignment has been prelimmanly slaked In the field and .nspected
by the City Per Master Plan ConditIon #53 and Srte Plan ReView
Condition #82 the trail alignment walk-through was conducted on
March 17 2005 The attendees Included the City of Spnngfield,
trail design landscape architect (Walker Macy) npanan area
restoratIon landscape architect (DaVid Evans ASSOCIates) and
project arborlst (Kyle King) Based upon the findings at thiS
meeting trail alignment was reVised to meet the Intent of STP
Condition 64, documented and approved by the City of
Spnngfield (Memorandum Dated Apnl11 2005)
Refer to Sheets C 1 0 0 through C 1 0 a for the alignment and
Sheet C12 4 for the cross-section
Applicant Response
Not applicable to PIPs
Phase In which Action will be ReqUired
Final Plat
Applicant Response
ThiS condition has been met In the PIP design
C77
See Sheets C7 ()..
8/29/2005 Page 3 of 8
Date Received, ,/" /2oocf
Planner AL --tj
Subdivision Tentative Plan CondItions of Approval - RESPONSES
PeaceHealth - RlverBend Campus PIP, P30465
Dedicate a 25-1001 wide public trail easement along the frontage of the property
located at 17-03-22-00-903 (west of the SUB s1atlon) through separate Instrument
pnor to or concurrent with subdivIsion plat approval The construction speCIfications
forthls porbon of the multi-use path shall be Included In the subdIvIsion Public
lmprovemenl Plans
In the Public Improvement Plans tree SpeCIes selection and placement within the
Game Farm mufti-use path buffer shall be designed such that the mature tree sizes
shall meet vegetation clearance standards for the overhead electncaltransmlsslon and
distribution lines as follows
Transmission lineS - 22 mInimum clearance
Dlstnbutlon lines - 15 minimum clearance D
In order to minimize sanitary sewer service lateral connections to the Trunk Sewer line
the Public Improvement Plans shall demonstrate that the sanitary sewer system
deSigns have been modified to
Relocate the northern lateral servIng Lot 5 to '\he Caroma\ Way sewer mam
Eliminate the eastem lateral seMng Lot 7 and use the proposed lateral
approximately 200 feet south as a common lateral seMng Lots 7 and 8 Record the
necessary easement(s) for each lot to gain access to the lateral on the Final Plat
Pnor to recording the final plat the applicant shall provide the City With a memorandum
which states the maximum peak flow rate allowed to each sanITary lateral serving Lot Applicant Response
8 At the time of development for Lot 8 If the flow rate Increases to any of the laterals These flows are provided In the' Addendum to the Sanitary
over the values stated an evaluation of the downstream system capacity and/or Sewer Study for RlverBend SubdIVISion Spnngfield Oregon
rerouting of on site flows to altemate laterals may be reqUired submitted as part of thiS PIP package
A public trail easement WIth a minimum WIdth of 25 feet IS reqUired for the Game Farm
Road multi-use path through SUbdiViSion lots 1 2 and 3 The easement shall run east
of the nght of way such that It IS setback from the future nght of way location on Game
Farm Rd Plans for the path constructIon shall be submItted WIth the Public
Improvement Plans and constructed WIth the subdiVISion Improvements In
conformance \IIIlth SDe 32 090 and the approved Masler Plan The path shall be 12
feet WIde With a 2.foot dear area on each Side of the path free of above-ground
obstructions A 25-foot WIde pUblic easement shall be dedicated/reserved through the
SubdiVISion Plat process or through another Instrument approved by the CIty of
Spnngfield and shall be recorded pnor to or concurrent With the plat Submit
easement dedication documents for revIew by the City Surveyor pnor to filrng
28
28
3.
31
32
Applicant Response
ThiS condItion has been met In the PIP deSign
C85
See Sheets C8 D-
Applicant Response
ThIS condition has been met m the PIP deSign See Sheets C8 3-
C85
Applicant Response
ThiS condition has been met In the PIP deSign See Sheets
L 1 1B-L 1 21 for Game Farm buffer planting plan
Applicant Response
ThiS condItion has been met In the PIP deSign Sanitary sewer
laterals have been relocated as directed The Final Plat wdl shaw
easements on these lots to allow access to the laterals shown on
the plans
Refer 10 Sheet C3 1
Withm 60 calendar days of City CounCIl acceptance of the publIC sar.ltary sewer
Improvements constructed by the applicant to serve the subdIVISion the applrcant shall Applicant Response
obtain the necessary permits from the CIty and shall complete the work necessary to The STP Indicates the follOWing structures With plumbing fixtures
connect each of the eXisting structures labeled To Remain wlthm the subdiVISion that as to remain
has plumbing fixtures Within the structure to the publrc sanitary sewer The location of -Lot 10 Structure #1 Will be served from a lateral to be
each structure and ItS connection to the publrc sanitary sewer shall be shown on the constructed to the eXisting main located In Deadmond Ferry
Publrc Improvement Plans for the SUbdiVISion Road
-lot 8 Structure #15 Will be served from either a gravity system
or a pressure sewer connecting to the proposed pnvate sanitary
sewer system on the hospital site
-Lot 8 Structures #17 18 and 19 WIll be served from the
proposed 12-lnch saMary sewer connecting to the proposed
main located In Maple Way as shown In the PIP draWings
-Lot 8 Structure #26 Will be served from a 4-lnch service lateral
connectrng to the proposed main located In Maple Way as shown
In the PIP drawmgs
-Lot 9 Structure #27 Will be served from a lateral to be
constructed to the eXisting main located In Oeadmond Ferry
Road
33
As an altematlve the applicant may remove aU structures from the property that have
plumbing fixtures or may prOVide a certIfication to the City s BUilding OffiCial and City
Engrneer that these structures are no longer used for human habitation and WIll not be
used for human habrtatron untIl such tIme as they are connected to the publIC sanitary
sewer
34
Pnor to or concurrent With the Frnal Plat the applrcant shall record an Improvement
Agreement for Lot 8 to partiCipate In the construction of the public sanitary sewer line
extensIon In the loop road from the termInus of the proposed Impro\lemer'lts \0 the
eastem property lrne In the event thiS sanitary sewer line extension IS necessary for
compJrance WIth ConditIon 33 then thiS publJc sanitary sewer main shall be
constructed With the Public Improvement Plans
The applicant shall Install a sanitary sewer lateral servmg Lot 10 from the malnlrne In
Deadmond Ferry Road and the eXisting on-sIte sewerage disposal system shall be
decommissioned pnor to Final Plat approval
The eXIsting on-site sewerage disposal systems for the eXisting structures labeled To
Remain shall be decommiSSioned WIthin 60 calendar days of City Counal acceptance
of the publiC sanitary sewer Improvements constructed by the applrcant to serve the
subdIVISion
35
36
Responses to STP Conditions of Approval
Applicant Response
As descnbed If'> our. .:.;...._. ..:..:. to Condrtlon 33 the extension of
thiS main WIll not be necessary at thIS time and therefore It IS not
Included In the PIP draWings An Improvement Agreement WIll be
negotiated WIth the City pnor to the Final Plat approval
Applicant Response
The applicant Will make the connection and decommission the
onslte system pnor to Final Plat approval
Applicant Response
The applrcant agrees to the condition
Date Received
Planner AL
l/n/,;.oOi
/ I
8/29/2005, Page 4 of 8
Subdivision Tentative Plan Conditions of Approval - RESPONSES
Peace Health - RlverBend Campus PIP, P30465
The final deSign of the sanitary system shall be In accordance WIth requirements
outlined In EDSP Section 2 02 11 Any vanatlons from these standards shall be
approved on a case-by-case baSIS at the sole dIscretion of the City Engineer
37
38
The applicant shall record with the subdiVIsion plat a sanitary sewer easement on Lot 9
that provides off-Site properties Tax lots 1802 and 90000 access to the future
sanitary sewer 11ft station on Deadmond Ferry Road or the sewer basin mapping shall
be reVised to show these off-Site properties being served by an alternate system
39
The applicant shallrnstall with the subdivIsion Improvements a public 8-lnch sanitary
sewer line extending from MLK Jr Parkway at RlverBend Dnve to Game Farm Road
WIthin the proposed public accessway
Pursuant to RlverBend Master Plan Conditions of Approval 74 and 78 the applicant
shall provide final details and calculations for the selected stormwater detention
methods or by. pass system to mitigate a 25-year storm peak discharge rate greater
than 45 cfs from the Westem BaSin and It s tnbutary areas ThiS condition shall be
satisfied prior to the approval of the Public Improvement Plans In the event
comphance WIth thiS conditIon results In modifications to the Tentative Plan revISions
to the Plan shall be In accordance to the Master Plan Conditions of Approval
Spnngfield Development Code and the EDSP as determined by the City Engineer
40
41
Pnor to approval of the Public Improvement Plans for the subdiVISion the City and the
applicant shall select the preferred stormwater system alignment for connecting the
western baSin and 11 s tnbutary areas WIth the Deadmond Ferry Road stormwater
system In the event compliance WIth thiS condition results In modifications to the
Tentative Plan revIsions to the Plan shall be In accordance to the Master Plan
Conditions of Approval Spnngfield Development Code and the EDSP as determined
by the City Engineer
The CIty reserves the right to require the applicant to revise the approved Stormwater
Drainage Report to reflect the as-bUilt conditIons If the constructed system vanes from
the approved deSign
42
Applicant Response
Generally the sanitary sewer system has been deSIgned In
accordance WIth the reqUirements outlined In EDSP Section
2 02 11 Vanatlons from these standards are speCIfically
IdentIfied and explamed m the" Addendum to the Sanitary Sewer
Study for RlverBend SUbdiVISion Spnngfield Oregon" submitted
as part of thIS PIP package
Applicant Response
Not applicable to PIPs
Phase In which Action Will be ReqUired
Final Plat
Applicant Response
ThiS condition has been met In the PI P design
Refer to Sheet CB 0
Applicant Response
DeSign calculations final deSign and construction drawmgs have
not been completed for the offline detention pond proposed for
Lot 11 of the RlverBend SubdiVISIon PeaceHealth recogmzes
that these Items Will be needed prior to approval of the PIP s by
the City To date a final agreement between the City and
PeaceHealth has not been reached regardmg the configuration
and cost shanng for thiS faCIlity Subsequent to execution of the
Agreement the final deSign and construction draWIngs for the
detention facltly WIll be comp.leted and subrrllt\ed as part of the
RlverBend SubdiVISion PIP s
Applicant Response
ThiS condition has been met In the PIP design
Applicant Response
Not applICable to PIPs
Phase in which Action will be ReqUIred
Construction
On the Final SubdiVISion Plat the proposed SO-feet WIde public dramage easement
located on the north and east SIdes of Lot 9 shall termmate at the upstream end of the
eXisting natural swale (approximately 1 300 feet south of the north property line) The Applicant Response
extensIon of this public easement beyond the natural swale WIll be reViewed at the time Not applicable to PIPs
43 of a future development application for Lot 9 The Final Plat shall Include temporary
pnvate drainage easements on Lot 9 for the benefit of Lot 8 and off.slte properties Phase In which Action will be ReqUired
located east of Baldy View Lane and west of Lot 9 to proVide dramage access to thiS Final Plat
SO-feet WIde publIC draInage easement
44
Pnvate drainage easement{s) across Lot 9 for the benefit of off-Site properties shall be
a minimum of 14-fee1 Wide and shall be In a logical location to proVide service to the
property as determmed by the City Engmeer The easement(s) may be wntten as a
temporary easement(s) subject to relocation With the approval of future development
plans for Lot 9 At the time of future development for lot 9 or the off-Site properties
whichever occurs first the stormwater mfrastructure shall be constructed m the
easement
45
The City Engmeer Will determine on a case.by--case baSIS If any proposed additional
City maintained curb Inlets that are not reqUired by the City of Springfield s EDSP are
warranted
Prior to approval of the Public Improvement Plans the applicant shall prOVide a
proposal acceptable to the City Engineer for handling dramage from the public 500-
year flood emergency accessway between Game Farm Road and MLK Jr Parkway
46
Applicant Response
Not applicable to PIPs
Phase In which Action will be ReqUired
Lot 9 or off.slte properties development whichever occurs first
Applicant Response
The applicant WIll work WIth the CIty EngIneer dunng PIP reVIew
10 determine the number of Inlets
Applicant Response
A 12 Inch storm sewer lateral has been deSigned to pICk, up the
25-yr rate of runoff from the southerly catchment area dralnmg to
the elevated emergency access ThiS lateral Will draln to the MLK
Jr Parkway storm sewer system as shown on Sheet C6 0 of the
PIP s Pnvate drainage easements Will be mcluded on the Final
Plat for those portions of the lateral on PeaceHeatth property
The Impervious surface of the accessway IS deSIgned to sheet
flow to the north onto the perviOUS, ummproved eXIstIng ground
of Lot 3 of the TentatIVe Plan
Responses to STP ConditIOns of Approval
Date Received, 1,{3 ~(JDJ
Planner: AL -n
8/29/2005 Page 5 of 8
Subdivision Tentative Plan Conditions of Approval - RESPONSES
PeaceHealth - RlverBend Campus PIP, P30465
47
Prior to Fmal Plat approval the applicant shall provide Lois 10 and 11 with access to
an approved stormwater system On the Final Plat a pnvate drainage easement shall
be recorded across Lot 11 to provIde Lot 1 0 With access to the public system or
alternate drainage provIsions to serve Lot 10 acceptable to the City Engineer shall be
provided
48
Any fill sectIOns requIred to constructed the future open channel on Lot 9 Will require
certificatIon by an engineer demonstrating encroachments will not result In any
Increase In flood levels per FEMA s no nse certification gUidelines
49
The construction plans for the public pathway within the f100dway of the McKenZie
River shall c1earty indicate a finished grade of the pathway Will be at, or below eXisting
ground elevations or the applicant shall submit certIfication by an engineer
demonstrating the encroachment Will not result In any Increase In flood levels per
FEMA s no nse" certification gUidelines
1 DO-year flood elevation data shall be proVided and shown on the Final SubdiVISion
Plat Including the boundanes of the 10n-year nood plam and floodway
50
51
The project construction engmeenng team shall Include a geotechnical englneenng
firm which WIll be reqUired to have a represental1ve on-site to observe trenchmg
excavation cut and fill operations dunng the development of the project as may be
reqUired by the Public Works Director or the City s BUilding OffiCIal
52
Pnor to the submittal of Public Improvement Plans the applicant and the utility
prOViders shall coordmate the final utility deSigns and shall submit an Overall Utility
Plan which demonstrates that aU utlhtleS shalt be prOVIded In a manner whIch 15 no1 In
conflict With any requirements or conditions of thiS land use deCISion the RlverBend
Master Plan or the other land use deCISions for the subject property Utilities shall be
Installed pnor to Fmal Plat Approval
The applicant shall coord mate With the utlllty proViders to ensure that aU ground-
mounted utility equipment shall be placed to reduce visual Impact All backftow
deVices utility vaulls and transformers natural gas pressure regulators and relief
valves and other equipment shall be screened With landscaping from nghts of way and
adjacent properties and located outSide of VISIon clearance areas multi-use path clear
zones and stormwater management areas Landscape plans shall be amended as
necessary and additional planting Installed as necessary to prOVide screening ThiS
condition shan be met pnor to for Fmal Pial approval
53
54
A slope easement on adjacent properties IS preferred over the retaining wall deSign
concept for the Maple Way street Improvement If obtaining a slope easement IS not
Viable then the retamlng wall shall have a minimum 100-year deSign life and shall be
constructed of a low maintenance matenal acceptable to the City Engineer
55
Slope easements shall be recorded on the Fmal Plat or by separate document where
fill sections are necessary for the stability and long-term mamtenance of the elevated
roadway extend beyond the public nghtS-Of-way The easement may be extmgUlshed
upon future development applications that prOVide measures to ensure long-term
roadway stabllJty as determined by the City Engineer
56
The proposed 14-foot WIde sanitary sewer easement onented In the north-south
direction on the southern portion of Lot 3 shall be removed from the SubdiVISion Plat or
recorded as a pnvate easement
The proposed 14-foot WIde pUblic dramage easement onented In the north-south
direction at the southeast comer of Lot 1 shall be removed from the SubdiVISion Plat or
recorded as a pnvate easement
57
58
In the SubdiVISion Plat the location of the PUE and 25 publiC trail easement along the
east Side of Martm Luther Kmg Jr Parkway through the applicant s property shall be as
shown In the altemahve design appro\led by the CIty Identified as Exhlbrt A ~Northem
Segment of Parkway (TYPical Cross Section) Updated 4/26/04
59
Water power gas and telecommumcatlons lines shall be located WIthin PUE s and In
accordance With company specifications
Responses to STP CondItions of Approval
Date t~aceived
Planner. AL
Applicant Response
A pnvate drainage easement Will be located on Lot 11 on the
Final Plat to allow Lot 10 drainage access to the detention pond
proposed at the westerly end of Lot 11 Lot 11 has access to the
public storm sewer system as shown on Sheet C4 1 of the PIP's
Applicant Response
Not applicable to PIPs
Phase In which Action will be ReqUired
Lot 9 Development
Applicant Response
The proposed grades for the public pathway m thiS area as
shown on sheets C10 1 thru C10 4 meet thiS conditIon We
have proposed matching the eXisting grades WIthin the floodway
boundanes
Applicant Response
Not applicable to PIPs
Phase In which Action will be Required
Final Plat
Applicant Response
The construction englneenng team WIll Indude a geotechmcal
englneenng firm
Applicant Response
CoordInatIOn WIth the 1Tanchlse utIlity prOVlders IS on-gOlng
Copies of the PIP plans WIll be submitted to all utility proViders for
coordmatlon efforts Utilities WIll be either Installed or bonded
pnor to Final Plat approval
Applicant Response
Coordination IS ongoing and Will be completed prior to Final Plat
Applicant Response
The need for a retamlng wall has been removed The PIP deSign
relies upon a vanable-Wldth temporary slope easement as shown
on the plans for Maple Way
Refer to Sheets C5 0 through C5 6
Applicant Response
Slope easements have been shown where reqUIred on the PI Ps
and Will be Induded on the Final Plat
Applicant Response
ThiS condition has been met In the PIP deSIgn
Applicant Response
Not applicable to PIPs
Phase In which Action Will be ReqUired
Final Plat
Applicant Response
ThIS condItIon has been met In the PIP deSign The 25 .wlde
easement WIll be centered on the centerline of the 12'.Wlde
pathway shown on the plans Refer to Sheets C7 0 through
C77 The easement WIll be Included In the Final Plat
Applicant Response
Identified utilities Will be located Within PUEs
In/~ocf'
8/29/2005 Page 6 of 8
SubdiVISion Tentative Plan Conditions of Approval - RESPONSES
PeaceHealth - RlverBend Campus PIP, P30465
60
In the Final Plat Public Utility Easements shall be located as follows OR submIt
additional documentation from the utility providers wnlch explainS where additional or
alternate PUEs or PUE widths are reqUired INSERT Fmal design of the Public
Improvements may require additional PUE Widths or locations that are not apparent as
part of the Tentative Plan reView Said PUE S If any shall be dedicated to the public
pnor to or concurrent With the City s acceptance of the RlverBend SubdivIsion Public
Improvements or the Crty's approval of the Final Plat whichever comes first
61
Approval of ac.cess pomts IS limited 10 the locations a b c f h, I J k I m and n as
Indicated In the follOWIng table Approval of additional access pomts shall be
determmed m conJunctIon WIth future site development proposals
62
In accordance With RlverBend Master Plan Condition of Approval #2 The ripanan area
boundary must be shown In the Final Plat and on all future plans submrtted to the City
The vanable width setback shall be labeled McKenzie Rwer Rlpanan Area
63
In accordance With RlverBend Master Plan Condition of Approval #2 the entire
McKenZie River Rlpanan Area bOundary shall be demarcated on site With a permanent
monumentatlon system or otherwise delineated WIth permanent site deSign features In
a manner approved by the City of Spnngfield pnor to Final Plat
Applicant Response
KPFF w\lIldentlfy said PUEs and dedicate to the public
concurrent WIth the City s acceptance of the RrverBend
SubdiVISion Public Improvements or the City s approval of the
Fmal Plat whichever comes firsf
Applicant Response
This condition has been met In the PIP design
Applicant Response
This condition has been met The "McKenZie River Rlpanan
Area boundary has been Included rn the plans
Refer to Sheets C10 1 through C10 8
Applicant Response
Not applicable to PIPs
Phase In which Action will be ReqUired
Final Plat
Pursuant to Master Plan Condition of Approval #53, the rou1lng of the path and/or path
easement through the npanan area across subdiVISion Lot 8 and 9 shall be
established after a detailed site analYSIS of topography, location of trees and other
npanan vegetation and other eXIsting conditions In order to preserve and protect the
npanan area natural functions to the maximum extent while balancmg the need for
recreation and resource protection and In order to preserve fu1ure nverbank
restoration opbons the Final Plat shall show the location of the easement for the nver
multi use path across subdiVIsion Lots 8 and 9 which IS generally located along the
outer edge of the required npanan area away from the watercourse or upland of the
npanan area With the path dramage failing away from the watercourse [SDC 31 240
(2)(g)] except where eXlstrng tree groves require an alternate siting to aVOid Impacts
Any segment meandenng east of the westernmost portion of the nparlan area to aVOid documented and approved by the City of Springfield
conflicts WIth the eXisting Douglas fir and maple groves shall be setback a minimum of (Memorandum Dated Apnl11 2005) The trail prOfile and
25 feet from top of bank Additional mmor pedestnan & wheelchair acceSSible paths co drainage strategy has been documented In the final SIte Plan
ReView package dated May 3 2005 on sheet La 0
Phase In which Actlon will be Required
Lot 8 and Future Lot Development
Ten percent of the total number of trees In the final npanan restoratron planting plan for Applicant Response
the subdiVISion portions of the npanan area shall be cottonwood (Populus tnchocarpa Not applicable to PIPs
ssp balsamifera Cottonwoods may be clustered In the northern WIder end of the
npanan area to augment the ex\stlng cottonwood grove
64
65
The npanan area restoration/enhancement landscaping on the entirety of Lot 8 shall
be Installed With the Site Plan Improvements pnor to Issuance of Final Occupancy for
the hospital
66
To comply With RlverBend Master Plan Condltron #5 the reqUIred nparran area
restoration/enhancement landscaping on subdiVISion Lots 4 and 9 shall be completed
or bonded or Insured through other finanCial securrty approved b'l the Development
Services Director pnor to final plat approval
67
The rrpanan planting plans shall be modified to prOVIde additional tree canopy on or
adjacent 10 the bank throughout the entire corrrdor, except where eXisting large canopy
trees already eXist A mixture of high canopy deCIduous speCies and evergreens may
be utIlized to preserve Sight lines to the nver Trees shall be spaced a maximum of 10
apart Tree planting shall be a mlntmum of two trees deep throughout the npanan area
bank or top of bank to create a continuous fnnge of nparran vegetation along the
nver's edge ThIS condition may not be satisfied by rncreaslng the quantIty of Scouler
Willow (Sallx scoulenana) live stakes
68
Any modification to the npanan planting plans reqUired by other conditIons of approval
shall retain a mlntmum of 49 coniferous evergreen trees With a mature height equal to
or greater than the bUilding height Trees shall be placed to proVide a Visual and nOise
buffer between the npanan corrrdor and the developed areas of the site In
conformance WIth Master Plan Condition of Approval #25
6.
Responses to STP Condltrons of Approval
Date ~ecelved
Planner, AL
Applicant Response
ThiS condition has been met The river trail alignment has been
prellmlnanly staked In the field and reViewed by the City Per
Master Plan Condition #53 and Site Plan ReView #82 of the trall
altgnment walk through which was conducted on March 17 2005
The attendees Included the City of Sprrngfield tr811 deSign
landscape Architect (Walker Macy) nparran area restoration
landscape architect (DaVid Evans ASSOCiates) and project
artlorrst (Kyle King) Based upon the findings at thiS meeting trail
alignment was revised to meet the mtent of STP Condition 64
KPFF will take additional action at the time of Final Plat
Applicant Response
Not applicable to PI Ps
Phase In which Action WIll be Required
BUilding Permit ReView
Applicant Response
Not applicable to PIPs
Phase In which Action will be ReqUIred
Fmal Plat
Applicant Response
Not applicable to PIPs
Phase In whIch Action WIll be ReqUired
lot 8 and Future Lot Development
Applicant Response
Not apphcable to PIPs
Phase In which Action WIll be ReqUired
lot B and Future Lot Development
8/29/2005, Page 7 of 8
Jh~ /:YJM
/ /
SubdiVISion Tentative Plan Conditions of Approval - RESPONSES
PeaceHealth - RlverBend Campus PIP, P30465
b~
70
All areas seeded Wlth native grasses shall be monitored and maintained by the
applicant to preven1tnvaslon by non-native grasses and forbs to prevent the need for
routine mowing Wlthm the npanan area Any seeded areas which fall and rever110 tall
invaSive grasses shall be In Violation of the Code and shall be replanted wrth a drought
resistant dwarf turf mix which IS capable of outcompetJng invaSive weed speCIes and
whlCh does not requIre routme mowmg lmgatlOn or application of fertlhzers and
herbiCides
Provide notes In Rlpanan Planting Oe1all Sheets LS5 5 and LSS 6 which SpeCIfy a
minimum of 2 certified compost amendment for all planting
71
72
All construction grading trenching removal of inVaSive vegetation and planting In the
npanan area and within or adjacent to the eXlstmg trees groves shall be done In a
manner which avordslreduces soli compaction to the maximum extent practicable
Upon completlOr. of on-sIte staking af the mer mul\1-use path and pedestnan paths
Wlthrn the npanan area and pnor to commencement of work PeaceHealth s
construction manager shall arrange a site meeting to Include the project arbonst all
contractors performing work Within the npanan area and tree groves and a
representative from the City of Spnngfield Planning DIVISion to diSCUSS the work to be
performed and the methods to be used to aVOid soli compaction
Any additional tree felling necessary to construct the SUbdIVISion public Improvements
shall require another Tree Felling permit from the City
73
74
In order to ensure that the constructIon and planting of thIS stormwater management
faCIlity Will fulfill the Intent of GRP and SDC poliCies and RlverBend Master Plan
Condition #26 the final selection of the off-Site drainage alternative shall mclude
mitigation measures which replace the loss of GRP Natural Asset #4/NW Dralnageway
as follows
The mitigation shall provide an eqUIvalent replacement hydrologiC functIon/capaCIty
The mitigation shall provide an eqUIvalent replacement of tree canopy and vegetation
type
The mItigation shall restore natIve vegetation
The applicant shall submit a mitigation plan for approval by the City prior to Final Plat
submittal The approved mItigation shall be Installed or bonded pnor to Final Plat
approval
75
Pnor to Frnal Plat submittal the applicant shall submit documentation of reqUired
permits If applicable In conformance With SDC 35 060 (9) In the case that a federal
or state agency Issues a permit that substantially alters the approved Tentative Plan
the applicant shall resubmit the Tentative Plan for additional review
76
If construction of the draInage system to serve the SUbdiViSion requires alteration of
eXlstrng wetlands the applicant may be required to submit an approved Army
CorpslDSL permIt for the p-ropcsed wetland fill ior review wrth '!he Public Improvement
Plans and pnor to approval of the subdIVISion Frnal Plat
~~~'" ~~ ?:~ x":.:;:
Date Received
Planner AL
Responses to STP Conditions of Approval
Applicant Response
Seeding which occurs In ROW (PIP) are not natIVe These
seeded areas are Intended to be maintained as mown and
lrngated turf grasses (lawn) Seeding In areas disturbed by mass
gradmg Will be In conformance With the PIP ESC plans
Applicant Response
Not applicable to PIPs
Phase In which Action Will be Required
Lot 8 and Future Lot Development
Applicant Response
ThiS condition not yet been met as the final fiver trail alignment
has not yet been staked In the field The meettng Will occur once
final path staking has been done but before construction
commences on the fiver trail
Applicant Response
The Applicant acknolNledges that any additional tree felling
necessary to construct the subdiVIsion public Improvements shall
requIre another Tree Felling permit from the City
Applicant Response
The mitigation plan Will be submitted at the time that final deSign
and construction dfaWlngs for the northwest detention faCility are
submitted
Applicant Response
Not applicable to PIPs
Phase In whIch Action will be ReqUIred
Final Plat
Applicant Response
illS not anticipated that construction of the drainage system Will
alter an eXisting weiland
",
J /...~ /J..oO f
/
8/29/2005, Page 8 of 8
L1MBIRD Andrew
From
Sent
To
Subject
ERNST Dennis
Wednesday, January 23, 2008 3 38 PM
L1MBIRD Andrew
FW CCRs
Attachments
CCR Occ 062306-FINAL doc, RB DeslgnGUldehnes013105-SCANNED pdt
~
~
CCR Occ 0623 RB
FINAL doc (122Jldehnes01310S
Andy,
I don't know If you've seen these yet so I'm sendlng them to you Just lTI case I emall
Carol and we need to talk about thlS a blt There are a number of problems wlth them and
I'll need to see If they are somethlng that had been talked about earller I thlnk Carol
15 trYlng to flnd a tlrne to get together and go over them I'll keep you In the loop on
thlS
Thanks I
DennlS
-----Orlglnal Message-----
From Mlller, Tamara (SHMC) [mallto TaMlller@peacehealth org]
Sent Tuesday, January 15, 2008 6 13 PM
To ERNST Dennls
Cc FARRINGTON Phll (SMTP). Young, Andrew
SubJect RE CCRs
As requested, please flnd the draft CC&R's for PeaceHealth's RlverBend campus attached
These have not yet been recorded
-----Orlglnal Message-----
From FarrlngtOTI, Phll
Sent Tuesday, January 15, 2008 10 05 AM
To Mlller, Tamara (SHMC)
SubJect CCRs
Tamara,
Could you please send a dlgltal
at dernst@cl sprlngfleld or us
copy of the RlverBend CCRs to C1ty surveyor Denn1s Ernst
Copy me and Andrew Hall1burton
Thanks,
Phlhp
Th1S message 1S 1ntended solely for the use of the 1nd1vldual and ent1ty to whom 1t 1S
addressed, and may contaln 1nformat1on that 1S prlv1leged, confldent1al, anq exempt from
dlsclosure under appllcable state and federal laws If you are not the addressee, or are
not authorlzed to recelve for the lntended addressee, you are hereby notlf1ed that you may
not use, copy, d1strlbute, or dlsclose to anyone thlS message or the lnformatlon contalned
hereln If you have recelved thlS message In error, 1mmedlately advlse the sender by
reply emall and destroy thlS message
1
Date Received
Planner' AL
/';'~/:;Od.r
/