Loading...
HomeMy WebLinkAboutPermit Plumbing 2018-05-11SPECIFICATION SECTION 15000 PLUMBING LIST SECTION 15010 -BASIC MECHANICAL REQUIREMENTS DIVISION 15100 VALVES A, General Conditions and General Requirements listed in the Index to Specifications apply to work underthis A. Work Included. Copper: US I PER ABBREVIATIONS n water 1 and [e g valves, Including the BCades, Rules and g tions.A systems shall be installed as to conform to the local Building Codes and the following'insfallahons Heater Plumbing Code. a. Drain valves c Guarantee. Twin Rivers Plumbing shall guarantee all work and material for a period of I year after the acceptance m Ball valves NOT IN CONTRACT of the building by the Owner, C Balancing valves. _--_--_ SANITARY SEWER VENT or Puberty valves, D. Drawings: Twin Rivers Plumbing shall submit Shop Drawings of all equipment to be serrated to the Architect.a Swung Check varrai I, Fluid hommor arers P PT map Vale(PPP, OR fit) SECTION 15060 - PIPES AND PIPE FIRING6 BACKFLOW PREVENTER A. GALLONS PER MINUTE B. NUMBER 1, or included Mandate, installation and testing of pipe, tubing and fangs. 1 Provide valves on branch connection to mains and at all major equipment for servicing. _�f_{_ Equipment g' add fittings of the type, flung requirements, grade, class, sae and weight dnor required farechheservice , as indicated in other Division 15 Specifications Where Pipe, grade, 2, with pipe, tube, and equipment or class Is not Indicated provide sopersefleclum as determined by Installer for Installation requirement., connections. Where more than one rypesindicated, selection is Installers option. and comply with governing regulations and industry standards PIPING BELOW GRADE j FEE 3. rm to ASTM or ANSI Standards and be approved by the governing Code for DIVISION 15149- SUPPORTS, ANCHORS, AND SLEEVES HEAD the application intended NOT TO SCALE VEL VELOCITY A, Work Included: material supportsanchors and included In the , in generator: Perform all necessary excavation and backfill Inquired for the Installation of the Plumbing Work CONDENSATE DRAIN HP HEAT PUMP nteLplping hangers sand siuvporfs,ngo ON CENTER W/ pipingcla ® all piping Conceded Nng m Me requirements of Plumbing Ends and submit "Cerliucate of Accessibility he ments. Owner. Test water piping at 150 PGIG for a period oft hours with no lose In pressure 4 Building attachments. 5, Saddles and shields. ARD 5, Mrsbeffamemus; materials. CL CENTERLINE 7. Roof equipment supports . Madflodurds B. Anchors. WC UndergroundDrainage PVCAUct Iron s. nitaPipework (Above Ground) IASSIPVGCast Iran Sanitary ves - Supply eLI 3, Water Pwork Geneve Ground)- Type M copper l PER. 11. EscutcM1eon plates 4. Pump Discharge Pipe (Underground) - Type K CopperB [cannons Hangers Provide approved pipe hangers In [cons as specified in the Plumbing Code. 5, Prefer nerPpe(Underground)-Type L Copper Soft Plumbers tapenot approved. R Steel PipeDIVISION 15199- MECHANICAL IDENTIFICATION OFOI 1. , Electric Resistance Welded or Seamless, Grade B. Black, unless otherwise Indicated, Schedule Work Included Mateals riand finals, a on of mechanical systems iCoonfleallon. WITHOUT as specified B Mech Mat 2. ATSM A-13SAI Grade As Black unless othei Indicated, Schedule as specified.General 1 dab Manufacturer's of categories and types required (or each F Copper Tuderm oroducls application as referenced in other ivision 16 sections. here single type is FLOOR DRAIN 1. drawn p elsewhere, unless core specified for application p ne g electron for each edenceotherviar directed. INSTALLED 2, Water Secure. ASUM Berk. Type as indicated for each service. 3. Darn, Waste, and Vent(DWVT ASTM B-306 Schedule 40. 2 Manufacturer. CLEAN OUT TO GRADE HTR a - (Nam)late. y,signmarkonfsfon G equipment (water heaters)for servloing. Install dielectric unions where two disaunharmetalscomelnnntact. Smtly b. eon arca Plate. DIVISION 5240- MECHANICAL EQUIPMENT SOUND. VIBRATION, ARE SEISMIC q pe vibration Isolation systems Inpropoorworkng ordern of vibration armed tle ices dna related TermsProvide B_ Ovallty Assurance: Provide seismic restraint per 2007OBSC along with current Seismic Zone. A. Plping and Equipment Insulation: acork cessories Materials and installations of insulation lackeys pipingHot and cold domestic water piping systems, A Heating and chilled water systems. c, o an co surfaces o mechanical equipment thi hill Water Heating Water 1 - - 12 thickPberglasinsulation pipe Insulation. 4. Tanks and Vessels. 1112 calcium sulcate. DIVISION 15420 - PLUMBING SYSTEMS 1 buildings, including soll stacks, vent slacks, horsontal branches,traps. and connections to tlxtures and brads. 2 Insppiipingbranches,to fir rains. end ons to stacks termination at connection to sanitary sewes 5 feet outerdecreation walloncese cold water pipingudi hot water piping proese s. Plu ngagorsl: piping UnrulLavataies.Water closetsShowers Water Heater.Pmmi PLUMBING SYMBOLS /ABBREVIATIONS LIST I Location Material rise I add and hot bev ground Copper: US I PER ABBREVIATIONS n water rains I. cod and hot Below traded Copper: K Heater AFF ABOVE FINISHED FLOOR GPH GALLONS PER HOUR NIC NOT IN CONTRACT TP TOTAL TEMPERATURE _--_--_ SANITARY SEWER VENT ABGIPVCgAst Iron PIPING BFP BACKFLOW PREVENTER GPM GALLONS PER MINUTE NO. NUMBER V VENT _�f_{_ SANITARY SEWER VENT PIPING BELOW GRADE j FEE BELOW FINISHED FLOOR Her HEAD NTS NOT TO SCALE VEL VELOCITY T DEMO CD CONDENSATE DRAIN HP HEAT PUMP OC ON CENTER W/ WITH ® FLOOR SINK ARD ROOF DRAIN CL CENTERLINE HP HORSEPOWER OD OUTSIDE DIAMETER WC WATER COLUMN VENT THROUGH ROOF CONT. CONTINUATION HTG HEATING OFOI OWNER FURNISHED OWNER W/O WITHOUT J ` 0 FLOOR DRAIN INSTALLED COTG CLEAN OUT TO GRADE HTR HEATER FLOOR CLEANOUT CO P PUMP PIPING SYSTEMS CV CHECK VALVE HW HOTWATER 12P PRESSURE DROP VALVES CW COLD `NATER ID INSIDE DIAMETER —"'— COLD WATER PIPING I PRV PtTFSSURE REDUCING VALVE —per VALVE, GENERAL DIA DIAMETER IF INVERT ELEVATION' H'd.`T WATER PIPING PSI POUNDS PER SQUARE INCH VALVE (E) EXISTING IN INCHES HOT WATER I:ETURN PIPING PSW PUMPED SANITARY WASTE -- GATE VALVE EL ELEVATION IR IRRIGATION —G GAS PIPING QTY' QUANTITY - PRESSURE REDUCING ELECT ELECTRICAL LBS POUNDS —D CONDENSATE PIPING (RL) RELOCATE —� CHECKVALVE FC FLEXIBLE CONNECTOR MH MOUNTING HEIGHT SAMIARRADE PIPING NET RETURN BELOW BELOW GRADE OR FINISHED FLOOR ��� QUARTER TURN VALVE FPM FEET PER MINUTE MIN MINIMUM SF SQUARE FEET SANITARY SEWER PIPING ABOVE GRADE ��'�� GLOBE VALVE FPS FEET PER SECOND MW MAKE-UP WATER OR FINISHED FLOOR SOV SHUT OFF VALVE BALANCING VALVE FT FEET (NJ NEW --Sp_— STORM DRAIN PIPING SP STATIC PRESSURE BELOW GRADE OR FINISHED FLOOR GAL GALLONS NIA NOT APPLICABLE VALVE IN VERTICAL TEMP TEMPERATURE STORM DRAIN PIPING —SD_ ABOVE GRADE f f'c7+H— GAS SHUTOFF AND UNION OR FINISHED FLOOR DIVISION 154411- PLUMBING FIXTURES ce I Location Material rise I add and hot bev ground Copper: US I PER closets n water rains I. cod and hot Below traded Copper: K Heater n water Valve are, drainage Above ground ABXdPVC1Cast Iron it antl waste, drainage el ground ABGIPVCgAst Iron DIVISION 154411- PLUMBING FIXTURES ei rise closets rains is Heater Valve DIVISION 15450- PLUMBING EQUIPMENT A. o ntertlad 2. Cvheaters culafien pumps B natitpteStangi tlards)°u manufacture pumps accordance won w(Hydraulic in. Electric type with upper and lower elements. Residential type heater, C mmlmuml year commercial warranty. See Schedule on Drawingscapaches wIM1 D. umps:P ted with enamel p rm p m. Prove pumps f same Pipe by same manufacturerPa A natu g dMaC s, Installation, and testing of piping valves, and appurtenances for ystems B Pipes and PIPs FiCnge: 1 6 �iedu[a 40, malleable Iron ize 2 Inches and threaded fitick fngs. FITTINGS PIPE RISE PIPE DROP TEE UP ON PIPE TEE DOWN ON PIPE CONTINUATION CAP PIPE BELOW GRADE HOSEBIBB WALL CLEANOUT DRAWING LIST P0.1 SPECIFICATIONS, SYMBOLS LIST, DRAWING LIST P1.1 FLOOR PLAN - PLUMBING Cw�uMEING INC. EAS 1525 FlVNQ FD, ELI 3 M All (5101!1111 q%i (6101mamP Tests PRINT is TREor AOR OJECT. silligs' USE BY BY es Tc 316/,c sac. FLOOR PLAN -PLUMBING D FIXTURE SCHEDULE SYMBOL DESCRIPTION caHrvEcnoN NOTES IN HW CW RM No. FB -1 FLOOR SINK--- --- --- --- 12x12, CONTRACTOR FURNISHED - CONTRACTOR INSTNIEO S-1 BPR SINK 2" 1-1 2" 1 2° 1/2- - CONTRACTOR INSTALEO 1. ALL To UPC CODE. 2 PVC DW FOR WASTE AND VENTS. 3. COPPER TYPE 'L' ; M', PVC, AND PIX FOR WATER. NOTES THIS SHEET O ;0EW 2 INCH WASTE PIPING TO EMORNG NU VERIFY CONNECTOR POINT AND ATION PRIOR TO INSTALLATON. O Ef0 RT ESIN W NY AND VENT PIPING. PING TO NG. WMWVERIFY ONNECPON POINTS PRIM To INSTALLATION. O PROVIDE 2 INCH CEEANOUT BELOW BAR SINK. ® is ETxTMRET, 1/2 INCH CW/HW DOWN UNDERSLAB 5O Rw ZAP PRIMERS TO UNDER SINK.