HomeMy WebLinkAboutPermit Building 2006-9-12
.CITY VI< ~rIuNGFIELD
Building/Combination Permit
eERMlT NO: COM2006-01l78
eo,\JWIS8UED':.'\'I 09/12/2006
of' \'3-'>/'1 I e Ole)(~~Bi~p:. 09/12/2006
O~" Ole~eO \)'1\'\'1 luwsEXp"IRES:N 03/12/2007
...-(\:.~\ <; '3-00? ,'\'lOse ~'\'I iY1\~{JE:S v $ 8,000.00
1'\ .'_", lu\e. ~o(\\el, ," \'\'110\) _c 0\ \" ~.,.,of'e
\U\'~. _1'\\\0\\ -....('\'\..\)V. '", (',OV'- l-hP. "\'0'- 'r r?;.\\v'.
SITE ADDRESS: 1001 MAIN ST ~o';'~~ <:\1j(..-~Sptit.gl!ellt\('+~f.E'OF:~,ORK: ReRoof
ASSESSOR'S PARCEL NO.: ,1703354105300f' a<:\a,'lOU \'\'Ie cef\\Ole~0~_"'3?-?3
a C'3-\\\f\~ \01 \'\'Ie, \_'OC.TYPE OF USE: Repair
PROJECT DESCRIPTION: Re-roofwith class A sp'ray'~p"hlyurethabe roof insulation and coating
\~v,. vtl..
.
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Commercial
Owner: SPRINGFIELD UTILITY BOARD
Add ress: 223 A ST
SPRINGFIELD OR 97477
Phone Numher: 541-746-8451
I CONTRACTOR INFORMATION I
.. _...,\~'\lo.~
License ExpiratIon Date \\\rlion'b \
147014 02l2212()()?< \~ :,\~411~4-0310
BUILDING INFORMATION I ~\.\. ~1-~\S ~\.;~S\) \,\)"
C<<;. ~ S\'\ X-,'\lo. '\ l'-~\)
# of Stories: ~\)\'\ ~~""'"'~ \) ~'ii~Si,zS:"~
Height of Structure -<,-\\S ....,,\1t: (. SiFt Ist,F'loor:
\ \' -(\\\J~ CJ\. \ I ....,;\.\'-'
Type of Heat: ~\) \ ~~~ ~q I!nnd Floor:
Water Type: c,~~ '0\\ '\Sq Ft Basement:
Range Type: I^~~ \ Sq Ft Garage/Carport
Energy Path: Sq Ft Other:
Sprinkled Building: n/a Occupant Load:
Contractor Type
General
Contractor
J & B INC
# of Units:
Primary Occupancy Group:
Secondary Occupancy Group:
Primary Construction Type
Secondary Construction Type:
# of Bedrooms:
I DEVELOPMENT INFORMATION I
Front yard Setback:
Side I Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
Overlay Dist:
# Street Trees Rqd:
Paved Drive Rqd:
% of Lot Coverage:
REQUIRED PARKING
Total:
Handicapped:
Compact:
I PUBLIC IMPROVEMENTS I
Street Improvements:
Storm Sewer Available:
Special Instruction:
Sidewalk Type:
Downspouts/Drains:
Notes:
I Valuation Descriotion I
Description
Type of Construction
$ Per Sq Ft
or multiplier
Square Footage
or Bid Amount
Value
Date Calculated
Paee I on
.
.CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2006-01 178
ISSUED: 09/12/2006
APPLIED: 09/12/2006
EXPIRES: 03/12/2007
VALUE: $ 8,000.00
Status
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Lin~
Bid Amount
Use Bid Amount
$1.00
8,000,00
$8,000,00
$8,000,00
09/1212006
Total Value of Project
Fees ~
Fee Description
+ 100/0 Administrative Fee
+ 5% Technology Fee
+ 8% State Surcharge
Building Permit
Amount Paid
Date Paid
$9,18
$4.59
$7.34
$91.80
9/12106
9/12106
9/12106
9/12/06
Receipt Number
220060000000000t264
2200600000000001264
2200600000000001264
2200600000000001264
Total Amount Paid
$112,91
I Plan Reviews I
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
[..R.eauired Insn~
Roofing: Prior to installing any roof covering.
By signature, 1 state and agree, that I have carefully examined the completed application and do hereby certify that all
information bereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any st~ucture without permission of the Community Services Division, Building Safety,
I further certify that only contractors and employees who are in compliance witb ORS 701.005 will be used on this project,
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the
street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
o.""/;!:J.~),f!"- .
v I I
I
1-/L -Or
Date
Paee 2 of2
2250 ~ifth Street
Springfield: Oregon 97477
541 ~726-3759 Phone
. 8P;:~~
~.
Caof Springfield Official Receipt
~Iopment Services Department
Public Works Department
Job/Journal Number
COM2006-0 1178
COM2006-0 1178
COM2006-0 1178
COM2006-0 1178
Payments:
Type of Payment
Check
cReceinl1
RECEIPT #:
Description
Building Permit
+ 5% Technology Fee
+ 8% State Surcharge
+ 10% Administrative Fee
Paid By
CHASE ROOFING
2200600000000001264
Date: 09/12/2006
lIem Total:
Check Number Authorization
Received By Batch Number Number How Received
djb 3339 In Person
Payment Total:
Pa~e I of I
II :48:57 AM
Amount Due
91.80
4,59
7.34
9.18
$112,91
Amount Paid
$112.91
$112,91
9/1 2/2006
~.
.'
SECTION 01194
Fluid Applied Elastomeric Latex Roof Membranes
For Spray-In-Place Polyurethane Foam Roofing
.
,Benchmark@
Rapid Roof m
.
.
.
" Part 1-GENERAL
1.01
.
1.02
1.03
.1.04
.
Description
A. Work included: all labor, materials, equipment and accessories to furnish and install fluid
applied Benchmark" or Rapid Roof" III elastomeric latex roof membrane over sprayed
polyurethane roof insulation,
B. Related work specified elsewhere:
Sprayed polyurethane roof insulation: Section 07215
Quality Assurance
A. Certification of roofing system: (Applicable for manufacturer's limited joint warranty only.) Upon
completion of the roofing system, an inspection shall be made by a representative of Conklin
Company Inc. to ascertain that the roofing system has been installed according to
manufacturer's published specifications and details.
B. Certifications of materials: Manufacturer of Benchmark" and Rapid Roof" III shall furnish upon
written request, certification that the material furnished meets the physical properties set forth
in this specification.
C. Requirements of regulatory agencies: Furnish and install all roofing materials required to meet
regulatory agencies and appropriate building codes. If changes are required of drawings or
specifications in order to meet requirements of regulatory agencies specified or to provide
guarantee specified, cost of such changes shall be included. Any changes to drawings or
specifications shall be approved by architect before work commences.
Submittals
A. Shop drawings: Shall include outline of roof and roof size, location and type of penetrations,
perimeter and penetration details, special details, location of anchors and bill of materials.
(Applicable for manufacturer's limited joint warranty only.)
B. Product data: Shall include manufacturer's product specifications and installation instructions.
C, Certified tests: Submit copies of certified test reports which indicate compliance with the
specified minimum physical properties and performance requirements.
Product Delivery, Storage and Handling
A, Delivery of materials:
1, Benchmark" or Rapid Roof" III materials shall be delivered to job site in manufacturer's
original label.
2. Related miscellaneous items shall be delivered to job site in new condition, and where
applicable, properly labeled.
B. Storage of materials:
1. Store materials in accordance with manufacturer's recommendations.
2. Store Benchmark and Rapid Roof III materials so they will not freeze.
C. Handling and protection of materials: Meet requirements of manufacturer's recommendations
for handling and protection of materials during installation. Handle materials so that they are
not contaminated by foreign materials,
D. Damaged materials: Contaminated or damaged materials shall not be used in the installation
and shall be removed from site immediately upon discovery.
1.05
Job Conditions
A. Environmental requirements:
1. General requirements: Application of Benchmark" or Rapid Roof" III shall not proceed unless
environmental conditions are suitable as prescribed by the manufacturer of the material being
supplied, Applicator shall be held responsible for contacting manufacturers of materials
being applied and verifying manufacturer's requirements for environmental conditions.
2. Application temperature requirements:
a. Ambient: Application shall not proceed when ambient temperature is less than 400F or
greater than 100oF.
b. Surface: Application shall not proceed when surface temperature is less than 400F or
greater than 120oF.
B. Protection of unrelated wO.ke all measures necessary to protect unr_d work and
surfaces not to receive coati rigs from overspray.
"
1.06 Specific product guarantee
A. Conklin Company's guarantee to the Distributor: Conklin Company Inc. guarantees for a period
of five (5) years from date of purchase that Benchmark' and Rapid Roof' III are free of any
chemical defects in manufacturing. This guarantee is limited to replacement of product at the
expense of the company, when such product proves to be defective in manufacture. Among
other things, this guarantee does not apply to coverage failures due to improper application.
Proper application includes but is not limited to the requirements that the product must be
applied in a continuous, unbroken (closed seal) film of dry thickness no less than 27 mils for
Benchmark and 25 mils for Rapid Roof III.
This company shall not be liable for incidental or consequential damages from any cause
whatsoever.
THIS WARRANTY IS IN LIEU OF THE IMPLIED WARRANTY OF MERCHANTABILITY AND
ALL OTHER WARRANTIES EXPRESSED OR IMPLIED.
This guarantee applies only to the Conklin distributor who purchases the product and cannot
be extended to any other person.
B. Optional manufacturer/contractor warranty: Please consult with the manufacturer for details
and availability of warranty program.
.
Part 2-PRODUCTS
2.01 Fluid Applied Elastomeric Latex Roof Membrane
A. Acceptable manufacturer: Conklin Company Inc., Shakopee, Minn., "Benchmark'" and
"Rapid Roof' III"
B. Product Description:
1. Benchmark is an acrylic latex, elastomeric, monolithic roof coating system designed for use
on spray-in-place polyurethane foam insulation, consisting of a light blue base coat and a
white top coal.
2. Rapid Roof III is an acrylic latex, elastomeric, monolithic roof coating system designed for
use on spray-in-place polyurethane foam insulation, consisting of a light tan base coat and a
hi-hide white top coal.
C. Physical and performance requirements. The complete membrane consisting of base coat and
top coat, shall meet the following minimum requirements when tested in accordance with the
standard indicated:
1. Elongation (ASTM D412): Benchmark - 338%; Rapid Roof III - 276%.
2. Tensile strength (ASTM D412): Benchmark - 416 psi; Rapid Roof III - 157 psi.
3. Moisture vapor permeance (ASTM E96 Procedure B): Benchmark - 4.6 perms at 29 dry milS;
Rapid Roof III - 3.4 perms at 25 dry mils.
4. Underwriters Laboratories exterior fire resistance (UL 790); Benchmark or Rapid Roof III -
Class "A" classified for use in Underwriters Laboratories (UL) construction numbers 136, 181
and 206.
5. Accelerated weathering (ASTM G23) 2,000 hours: Benchmark - no effect; Rapid Roof III -
NA.
6. Color: Base coat Too coat
Benchmark blue white
Rapid Roof III tan hi-hide white
7, Solar reflectance (ASTM E903): Benchmark - 85%; Rapid Roof III - 67.8%.
2.02 Miscellaneous Materials
A, Caulking; White, bronze or gray Kwik Kaulk' acrylic caulking compound or Conklin 360-S'
urethane sealant as approved by membrane manufacturer.
.
.
..
.
" Part'3-EXECUTION
.
.
.
3.01
Inspection
A. Inspection of polyurethane foam: Membrane shall be applied only to polyurethane foam
insulation which meets the following requirements:
1. Roof surface shall be free of ponding water. A roof surface which has 36 or more square feet
of water in any area, V. inch deep or more, 48 hours after a rain, shall be considered
unacceptable. All water shall drain off the roof. Small "bird baths" cannot account for more
than 5% of the entire roof surface.
2. Has surface texture between smooth and coarse orange peel. Texture of popcorn or tree
bark shall not be acceptable.
3. Minimum thickness is not less than one inch.
4. Contains no blisters or tunneling.
5. Is securely bonded to substrate.
6. Has been exposed for a minimum of two hours and not longer than 72 hours before coating.
7. Is clean, dry, free of contaminants and capable of accepting membrane,
8. Has a density of not less than 2.5 pounds per cubic foot.
9. Is free of pinholes and voids.
3.02
Foam Preparation
A, Caulking: Apply Kwik Kaulk' to all pinholes, voids and irregularities.
B. Cleaning: Clean surface free of all contaminants which will affect bond of membrane to
polyurethane foam.
3.03
Coating Application
A. Application method: Both Benchmark' and Rapid Roof' III base coat and top coat shall be
applied by airless spray or '!4 inch nap roller.
B. Application rate:
1. Base coat: Absolute minimum application rate for base coat shall be 1.9' gallons per square
on smooth foam. Textured/rough surfaces shall require additional coatings. The dry mil
thickness of Benchmark base coat shall be 13.5 (24 wet mils) and Rapid Roof III base coat
shall be 13.0 (24 wet mils).
2. Top coat: Absolute minimum application rate for top coat shall be 1.9" gallons per square on
smooth foam, Textured/rough surfaces shall require additional coatings. The dry mil
thickness of Benchmark top coat shall be 13.5 (24 wet mils) and Rapid Roof III top coat shall
be 12.0 (24 wet mils). '
3. Total thickness of membrane: Combined thickness of base coat and top coat shall be not
less than the following: Benchmark - 27 dry mils; Rapid Roof III - 25 dry mils.
'To achieve minimum requirements, the application rates listed include 15% for application
loss and 10% to compensate for surface texture other than smooth orange peel.
C. Application procedure:
1. Develop a systematic method for application of coating to surface.
2. Allow each application to dry thoroughly prior to additional applications. Do not allow less
than 12 hours drying time between coats.
3. Do not apply coating in excess of 2,0 gallons per square per coat.
4. Backroll base coat after application by airless spray.
5. Backrolling top coat is optional after application by air less spray.
D, Service walkways: Where service walkways are indicated on the drawings, provide the
following additional work:
1. Walkways shall be constructed following complete drying of roof membrane system.
2. Mark off area and apply an additional base coat of Benchmark or Rapid Roof III at a rate of
1.5 gallon per square.
3. Embed 38 inch wide Spunflex fabric into the wet coating and smooth out with a roller.
4. Immediately overcoat the fabric with an additional .5 gallon per square of base coat
permitting this applicaiton to dry completely.
5. Apply 1.9 gallon per square of Benchmark or Rapid Roof III top coat and allow to dry,
6. Apply V3 gallon per square tinted Show Kote' top coat to walkways if a color other than white
is desired.
END OF SECTION
.
.
'.
.
TOP COAT
Ly APPUED
URETHANE FOAM
GRANULES
<OPTIONAL>
CONKLIN COMPANY, INC.
SHAKOPEE, MN
BENCHMARK~ DR
RAPID ROOF III~
DETAIL NUMBER
3-1
.
+-----+,' KVIK KAUL~
, :~ BASE COAT AND TOP COAT
~ ~. SPRAY APPLIED
~,"",,,,:,"I -/ URETHANE FOAM
1-:-:- - PRIMER-IF REQUIRED
.... .
I #I.. .. .
..... .
...... .
F.'.'...,....~.................
...................... .
...................... .
..................... .
~
Ly-L
.. .. .. .. . ~.. .. .. .. .. ..
...................... .
......... ............
,........ ............
,\
BUR DR OTHER
SUBSTRATE
- TOP OF DECK
VENT FLASHING
(REMOVE -OPTIONAL>
-.
CONKLIN COMPANY, INC.
SHAKOPEE.. MN
MECHANICAL VENT
DET AIL NUMBER
3-2
.
"
.
I
'?f..'.............'.',.,'......
v......... .
~
I
- EXISTING BUR
AND INSULATION
.
.
J
r KW'IK KAUL~
~ ~ BASE COAT AND TOP COAT
URETHANE FOAM
t DECKING
INSULA TIoN
- HOLE CUT THRU
8. SUBSTRATE
CONKLIN COMPANY, INC,
SHAKO PEE, MN
.
z
~
BASE COAT AND
TOP COAT ~
1
\/
RELIEF VENT
DET AIL NUMBER
3-3
--
411 MIN.
KW'IK KAULK9
-
.<E,--
-=-- .
--
-'
.........--:-:-.. .
I -w-. ...................
':,:,:-:-:.:,:,:.:.:.:.:.:.:.l.:~~:::::::::::::::::::::::::::::::::::::::::::::::::::
'.............................................. .
............................ ...................
~:,:,:,:,:':::::::::::::,:::::::::':::::':::::,::::f::::.:::::::::::::::::::::::::::::::::,
~:~
PRIMER DR VAPOR -
BARRIER IF REQUIRED
SUBSTRATE
.
CONKLIN COMPANY, INC,
SHAKoPEE.. MN
<E;- NE'w' SHEET
METAL FOAM
STOP
(26 GAUGE
MIN.-
FABRICATE TO
REQUIRED
DIMENSIONS)
'-..
- TOP OF DECK DR ~ FACE OF
EXISTING SUBSTRATE BUILDING DR
EXISTING
r -..J FASCIA
SPRAY APPLIED
URETHANE FOAM
FDAMSTDP
DET AIL NUMBER
3-4
PAD-BED IN
COMPATIBLE CAULK --.- --------
REINFORCE UNDER \ - --
PAD 'wIITH
ADDITIONAL \
COATING ~ ~
I ~I
.
"
.
. / SUPPORT
BASE COAT AND TOP COAT
SPRAY APPLIED
URETHANE FOAM
'-II
i
.,.....,..,.....,.,.........,......."..\~.".*
......................................... ."'....
. . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . '.' . . . . . . . .
.............................................. .
............................................... .
............................................... .
,2 COATS BASECOAT
\ PLUS
\ 1 COAT TDPCOA T \ K'wIIK KAUL~
,1.\
~l · ] ] J] j J(!!t:
...,.,,::c:i~n~l ~ 0 0 0 0 ~ ~>. ....
---7~.---~---~~O 0 0 0 j~i--------------
I LI 1---1, I II
II I I I
I I
I I
I I
I I
I I
I I
~
CONKLIN COMPANY, INC,
SHAKOPEE, MN
, ,
I / - 'wIOOD I BLO~KIING
hRAIN FLASHING
CONKLIN COMPANY, INC,
SHAKOPEE, MN
SUBSTRATE
PIPING ABOVE ROOF
DET AIL NUMBER
3-5
.
- SPRAY APPLIED
URETHANE FOAM
\' SUBSTRATE
- DECK DR EXISTING
SUBSTRATE
.
ROOF DRAIN
DETAIL NUMBER
3-6
.
.
..
-------
MECHANICAL EQUIPMENT. .
.
,
18n MIN.
--^v- -
-BASE COAT AND --0--
TOP COAT
- SPRAY APPLIED
URETHANE FOAM
K'w'IK KAUL~AT
MECHANICAL
EQUIPMENT LEGS
I ~ ~ 'f \1 . ~-:':-"'" .':
1. -:.:-:-:.::-:-:-:-: -:.' , , , . . ',:-:-:-:-:.::-:- .'V-: -:'::-:.::- :..:.' . , . . . , '-: -:-:.:-:-:: -:.::- :-.{
, .. . .. .. .. .. .11><.11.. .. .. .. '.' . . . . . , . . ' , .11>< II . . , . . . . . . . . .
. . . . . . . . . . . . . . . . . . '. . . '. . . . . ... . . . . . . . . . . . . . . . .
I --. . 7T,---'L. TOP OF DECK OR I
EXISTING SUBSTRATE
PRIMER (IF REQUIRED>
CONKLIN COMPANY, INC,
SHAKO PEE, MN
MECHANICAL
EQUIPMENT ST AND
DET AIL NUMBER
3-7
..
I I
. .
L._._,_._._._.__.~._.__,__._._.J
PRE-FOAMED to
COATED SLOPE
---- INSULATION BOARD
OR
- SLOPED METAL PAN
r--c-
:::Y"
ADHESIVE OR
~ MECHANICAL BONDED
- EXISTING SUBSTRATE
BASE COAT
AND
TOP CoA T
h'..'/t',....,
'.'............,t, =
....... .
- PITCH
...,c; POCKET
..
CONKLIN COMPANY, INC,
SHAKoPEE:, MN
EXISTING PITCH POCKET
8< LO\J EQUIPMENT
DET AIL NUMBER
3-8
~
/ / CARRY PROTECTIVE COATING
/ / 2" MIN, ABOVE FOAM TERMINATION
~........................"t:[2=D~~. C;:;::A~~Pi:~~
""% ________~-j'-------- SUBSTRATE
IlEUSE IF MINOR 'vIALLw /( rr:TAL DECK
MOVEMENT MAY OCCUR
DR EDGE OF DECK SUPPORT / <i:-- JOIST
IS QUESTIONABLE, /
-~-
COUNTERFLASHING-
OPTIONALIIE '-.
K'vIIK K2ULKII9
.
CONKLIN COMPANY, INC,
SHAKDPEE.. MN
HIGH 'WALL
"
.
DET AIL NUMBER
3-9
'.
- TOP COAT
- FABRIC REINFORCEMENT SECOND APPLICATION
BASE COAT
- TOP COAT I FIRST APPLICATION
-BASE COAT ~
v
, "
I -..- ~.~~ ~~~ <J t ~~~ ~.~., - .-- ~ ~~
~...................,................,.................... ......;.-SPRAY APPLIED
<:'..................,'....,......'.',.....,.....,.... '........,....'......,.,...,'..........,..........................'." URETHANE FOAM
BUR DR OTHER -
SUBSTRATE
~----------------------------------
I J I
DECKING
CONKLIN COMPANY, INC,
SHAKOPEE.. MN
'WALK'vIAYS
EQUIPMENT AREA
PRIMER DR
VAPOR BARRIER
<IF REQUIRED>
.
DETAIL NUMBER
3-10
..
..
.
RUBBER EXPANSION BULB
METAL FLANGE OF EXPANSION
JOINT (PRIME BEFORE FOAMING)
BASE COAT AND TOP COAT
.
I
4/1 MIN, ~-::~
I I ~::/ I
f:.. ....., r' ,...,.. ... . ::::-:.~.-:: ' x---
........ ................ -- ~
,.....,..,..,..,..,...... -:><1'
:::: ::. ':. : f:.'::: :::::.... ::.
.........)..j.t..............
~~><
,
"
EXPANSION JOINT I
OPENING ~
- EXISTING SUBSTRATE
DR INSULATION
CONKLIN COMPAN~ INC
SHAKOPEE, MN
- SPRAY APPLIED
URETHANE FOAM
1-
"
.---?
----
- W'OOD BLOCKING
(ATTACH TO DECK DR
EXISTING BLOCKING)
NOTEI DO NOT FOAM OVER RUBBER
EXPANSION JOINT
DET AIL NUMBER
3-11
EXPANSION JOINT
J
~~ ~ METAL FLANGE OF EXPANSION
(( y ~ \\ ,I, JOINT (PRIME BEFORE FOAMING)
... . j
4/1 MIN,
.
NOTE: DO NOT FOAM OVER
RUBBER EXPANSION JOINT
BASE COAT AND TOP COAT
~
SPRA Y APPLIED
URETHANE FOAM
~,..,..
1~ """"'" . "'~,... ...:.::~.:::-:::
.............................
............................
...........................
.........................
.........................
........................
I
EXPANSION JOINT OPENING
- RUBBER EXPANSION BULB
,......
. , . . . , , I
~.... ..
~.:-::::::::::-:-..,.,.."'...." f'....... t'
.................... ........
............................
.................. ........
t ".:-:,:-:,:-:-:-:-:-:-:-:-:,:-:-:.:.:-:,:-:-:-:-:
2x6 DR 2x8 W'OOD BLOCKING
(ATTACH TO DECK DR
EXISTING BLOCKING)
.. -
--
CONKLIN COMPANY, INC,
SHAKOPEE, MN
EXPANSION JOINT
(CURB TYPE)
DET AIL NUMBER
3-12
. SUPPO: I
.J:--' I
~ :1
COMPATIBLE CAULK'?; ..:-::- ':
l..-_ .. :':':':' ,:
.. .7.. .. .~....... I
............,.. '1
r CONTINUOUS INSULATION STRIP
REAL NAILS \JITH CAULK
AND COATING
V
"_hl -----+---=r BASE COAT AND
~' - ~l' OP COAT
, -L~, SPRA Y APPLIED
I " V.,~ r URTHANE FOAM
JJ, .... :.........
..,.........................<...
_ .. 'L _ _' ..'.... ..... ...or
. ~\-/~I:
___$_____________L1 --Z~~=---.----
F -I FLEXIBLE I L \JOOD i-r- I
BELLOW'S BLOCKING
- BUR DR OTHER
DECK - / --- I SUBSTRATE
> EXPANSION JOINT J
-<- IN DECK
.
EXPANSION JOINT COVER -
.
'.
.
METAL
JOIST
NOTE' DO NOT FOAM OVER EXPANSION JOINT,
CONKLIN COMPANY, INC,
SHAKO PEE, MN
EXPANSION JOINT \.,lITH
METAL COVER FLASHING
DETAIL NUMBER
3-13
,
.
FASTEN YOOD BLOCKING
TO METAL DECK YITH
MECHANICAL FASTENERS
./' FASTENERS
/./'/ APPROXIMATELY 24' O.C,
~/~ FIBER CANT STRIP
"/L. (DPTIONAL>
/ BASE COAT AND
_ TOP COAT
/
/
/. / SPRAY APPLIED
/ URETHANE FOAM
/
~
I
NEY DR EXISTING
ROOF DECK
.
CONKLIN COMPANY, INC,
SHAKOPEE, MN
AREA DIVIDER
DETAIL NUMBER
3-14
..
..
",
~
.
1
I
.
/'
t.'
atN<lIN'
Building ProduclS Olvl.lon
Rooting System.
Specially Coating.
Distributed by:
,
1-000015
@1994ConklinCompanylnc. 078513 1294
Specification Guide =~. ~
~.... 'iiliIii'W
I
ie
!
, /
,'/
SECTION 07215.
I .
Spray
Polyurethane
Roof Insulation
~
'.
.
~
/
.
~
.
PART1-GENERAL
.
.
1,01
Description
A. Work included: all labor, materials, equipment and accessories to provide the following:
1. Prepare surfaces to receive insulation in accordance with insulation manufacturer's application requirements.
2. Apply sprayed polyurethane foam roof insulation over substrate approved by insulation manufacturer in
accordance with manufacturer's requirements.
B. Related work specified elsewhere:
1. Fluid applied roof membrane: Section 01194 or 03195
2. Sheet metal work
3. Roof accessories
1.02 Quality Assurance
A. Foam applicator's qualifications: Applicator shall be trained and have experience with the proper application of
the material being applied. Applicator shall be licensed or otherwise approved by manufacturer of material
being specified.
B. Regulatory requirements:
1. Underwriters Laboratories: polyurethane material shall have Underwriters Laboratories classification
numbers when required by governing codes. Refer to Underwriters Laboratories Roofing Materials and
System Directory for specific details.
1,03 Submlltals
A. Shop drawings: shall include outline of roof and roof size, location and type of penetrations, perimeter and
penetration details, special details, location of anchors and bill of materials. (Applicable for manufacturer's
limited joint warranty only.)
B. Product data: shall include manufacturer's product specifications and installation instructions.
C. Certified tests: submit copies of certified test reports which indicate compliance with the specified minimum
physical properties and performance requirements.
1.04 Product Delivery, Storage and Handling
A. Delivery of materials:
1. All materials associated with the foam system shall be delivered to the job site in unopened standard
commercial containers bearing the manufacturer's original label with the following information:
a. Name of the manufacturer.
b. Name of contents.
c. Net weight of contents.
d. Lot or batch number.
e. Recommended storage temperature range.
I. A "caution" label giving safety instruction for handling and storage temperature range.
g. Mixing instructions.
2. The applicator shall keep a record of this information throughout the guarantee period.
3. Don't open containers unless ready for immediate use.
4. Avoid undue agitation of containers.
B. Storage of materials: store materials in accordance with manufacturer's recommendations.
C. Handling and protection of materials: meet requirements of manufacturer's recommendations for handling and
protection of materials during installation. Handle materials so that they are not contaminated by foreign
substances,
D. Damaged materials: contaminated or damaged materials shall not be used in the installation and shall be
removed from site immediately upon discovery,
1.05
.
.
Job Conditions
A. Environmental requirements: application of insulation and related materials shall not proceed unless
environmental conditions are suitable as prescribed by the manufacturer of the material being applied.
Applicator shall be held responsible for contacting manufacturers of materials being installed and verifying
manufacturer's requirements for environmental conditions.
B. Protection of unrelated work: apply protective covering to surfaces not receiving polyurethane foam to protect
against overs pray.
C. Health and safety procedures: adhere to health and safety procedures of product manufacturers, governing
codes and as follows:
1. Respiratory protective devices:
a. Type: respiratory protective equipment shall be worn by all personnel involved in the application of.foam.
Respiratory protective devices shall be appropriate to the hazardous material involved and the extent and
nature of the work performed.
b, Instruction: employees required to use respiratory protective devices shall be instructed in their use.
c. Inspection: respiratory protective equipment shall be inspected regularly and maintained in good
condition.
2. Eye and face protection: provide eye and face protection for persons working with material.
3. Skin protection: protective clothing and gloves shall be worn. Skin areas not covered by clothing can be
protected by suitable protective creams.
4. Protection against ignition or explosion: smoking, open flames, high temperatures, welding or electric sparks
shall be strictly prohibited during application. Post conspicuous and legible signs prohibiting smoking in
application and material storage areas.
.
.
,
.~
,
~
PART 2-PRODUCTS
2,01 Materials
A, Polyurethane foam
1. Acceptable manufacturers: as approved by membrane manufacturer.
2. General description: polyurethane foam insulation shall be a two-component system formulated for existing
climatic conditions. .
3. Physical and performance requirements: polyurethane foam shall meet the following minimum requirements .
when tested in accordance with standard indicated:
a. Density (ASTM D1622): 2.8-3.0 Ibs./cu. fl. in place.
b. Compressive strength parallel (ASTM D1621): 40 psi minimum at yield.
c. Tensile strength parallel (ASTM D1623): 60 psi.
d, Shear strength perpendicular (ASTM C273): 35 psi.
e. Thermal conductivity (ASTM C177): 12 max. BTU/sq, fl./oF/in. (unaged).
f. Closed cell content (ASTM D1940): 90% minimum.
g. Water absorption (ASTM D5270): 0,10 Ibs./sq. fl.
h. Dimensional stability (ASTM D2126): 28 days, 15% maximum.
i. Flammability: Class A (ASTM E108) or Underwriters Laboratory 790.
PART 3-EXECUTION
3.01 Inspection
A. General inspection requirements: inspect substrate to ensure that substrate is clean, dry, structurally sound,
stable and well secured.
B. Metal item: inspect metal items to ensure that they are securely attached.
3,02 Preparation
A. Preparation requirements for eXisting built-up roof:
1. Built-up roofs which are in excess of two complete roof systems shall be removed down to deck.
2. Built-up roofs which are severely alligatored (30% of a square or more), blistered, split, cracked or brittle and
exhibiting gravel turnover shall be removed down to deck.
3. Remove and replace wet insulation.
4. Remove loose material and dirt from surface.
5. Remove or repair blisters and major defects. .
6. Caulk and joint tape cracks, splits and minor defects.
7. Apply primer material where necessary for proper adhesion.
,
.
"
r'
c
,
,
.
.
B. Preparation reqUire!s for concrete: .
1. Surface shall be free of dirt, contamination and loose material and dry at time of application,
2. Existing coating shall be removed.
3. Spa lied concrete and defects shall be repaired.
4. Efflorescing concrete shall be acid etched followed by a thorough water rinse and drying of the concrete.
5. A primer is recommended for concrete surfaces. Consideration should be given to a vapor retarder type
primer.
6. Joints in excess of one-fourth inch shall be filled or taped as recommended by foam manufacturer.
7. Check with foam manufacturers per approved concrete substrates.
C. Preparation requirements for plywood and wood boards:
1. If required, vapor retarder material should be installed prior to plywood and board stock application.
2. Plywood and board stock should be mechanically fastened to roof deck in accordance with Factory Mutual
and A,P,A. standards,
D. Preparation of metal components: metal shall be cleaned and free of rust by power washing, sandblasting or
acid etching and primed where necessary.
3,03 Application
A. General requirements: follow manufacturer's application instructions at all times.
B. Application equipment: plural component, airless spray equipment.
C. Application procedure:
1. Polyurethane foam shall not be applied during inclement weather conditions.
2. Polyurethane foam shall be sprayed with a minimum lift thickness of one-half inch to reach required
thickness.
3. Minimum thickness for polyurethane system shall be no less than one inch.
4. Roof surface shall be free of ponding water. A roof surface which has 36 or more square feet of water in any
area, one-fourth inch deep or more, 48 hours after a rain, shall be considered unacceptable. All water shall
drain off the roof. Small "bird baths" cannot account for more than 5% of the entire roof surface.
5. Polyurethane foam surface shall be free of voids, crevices, pinholes and ultraviolet degradation,
6. Texture of foam surface shall be no rougher than coarse orange peel.
7. Polyurethane foam shall receive coating no earlier than two hours nor later than 72 hours following
application.
8. If foam becomes wet during or after application, remove the foam or allow it to dry completely before
coating is applied.
3,04 Field Quality Control
A. Quality control requirements for foam application: the applied foam system shall be periodically checked at
various locations for:
1. Thickness
2. Adhesion to the substrate
3. Cellular structure
4. Interlaminar adhesion
5. Surface texture
6. Blisters
7. Cracks
8. Mechanical damage
9. Degradation of surface
END OF SECTION
r
.
.
-~-.(li!!l.!~
~i~ N
Distributed by:
Conklin Company Inc,
Building Products Division
Roofing Systems
Specially Coatings
'-0000148 @1995ConklinCompanylnc.076059829S
. .
.
.
.
.