HomeMy WebLinkAboutPermit Building 1998-8-19
..SPRINGFIELD
,
~,
~-
~
Page 1
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number 980878
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Flfth Street
Sprlngfleld, OR 97477
Offlce 726-3759
Inspectlon Llne 726-3769
Locat~on of Proposed Work 5005 MAIN ST
Assessors Map # 17023332
Tax Lot # 04500
Owner CARLOs/LUCUS MCQUILL
Address 5005 MAIN STREET
Phone #
Clty/State/Zlp SPRINGFIELD, OREGON 97478
Descrlptlon Of Work DETACHED CLASSROOM STRUCT
ADDITION Value
o 00
Archltect
Name
LUKE
Address
Phone
Contractor
Const
Contractor #
Exp~res
Phone
Plumblng
ROBERT CURZON 0063893
PO BOX 5487 EUGENE OR 974050000
ROBINSON PLUMBI 0101624
1590 BOGART LANE EUGENE OR 97401000
GARIBAY HEATING 0070545
4207 W 5TH AVE EUGENE OR 974020000
DIXON ELECTRIC 0066894
33736 MARTIN RD CRESWELL OR 9742600
01/23/99
345-1213
General
08/15/98
343-0975
Mechanlcal
12/21/99
344-2481
Electrlcal
07/18/99
895-2440
--- PLUMBING ---
No
8
Fee
Charge
80 00
25 00
55 00
55 00
Slngle Flxture
Sanltary Sewer
Water Servlce
Storm Sewer
10
176
200
ft
ft
ft
TOTAL PERMIT
215 00
--- MECHANICAL ---
No
Fee
Charge
12 00
6 00
2 00
10 00
2
Furnace/burner & venl < 1000,000 BTUs
Vent Fan/Slngle Duct
GAS PIPING
Permlt Issuance
TOTAL PERMIT
30 00
HANDICAP ACCESS Y
ZONING CODE CC
-- OFFICE USE
QUAD AREA 3CSC
LAND USE 5300
Item
Square Feet
x
$/Square Feet
Value
>SPRINCFIELD
Job Number 980878
Page 2
Sq Ftg Ma In
1904
60,000 00
TOTAL VALUE OF PROJECT
60,000 00
Plan Check Fee
203 45 Rec # 30783 Date 07/15/98 Rec By LORNE PLEGER
BUILDING
Surcharge/Admln
MECHANICAL
Surcharge/Admln
PAVING VALUE
PLUMBING
Surcharge/Admln
CITY SDC FEES
2,214 00
313 00
25 04
30 00
1 60
38 50
215 00
17 20
5,989 44
6,629 78
6,629 78
SUBTOTAL PERMITS
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
--- REQUIRED INSPECTIONS
It lS the responslblllty of' the permlt holder to see that all lnspectlons are
made at the proper tlme To request an lnspectlon, call 726-3769
(recorder), state your Clty deslgnated Job number, Job address, type of
lnspectlon requested and when you wlll be ready for lnspectlon Requests
recelved before 7 00 a m wlll be made the same worklng day, requests made after
7 00 a m wlll be made the followlng work day
Speclal Inspectlons In accordance wlth
a speclal lnspector shall be employed by
constructlon of any followlng "*" work
shall be furnlshed to BUlldlng Safety
SectloD 306 of the State Speclalty Code
the Owner/Contractor durlng
A copy of the speclal testlng reports
In addltlon to the lllspectlons speclfled, the BUlldlng Offlclal may make or
requlre other lnspectlons of any constructlon work to ensure compllance wlth
the BUlldlng, Clty or Development Code
ROUGH GRADING - After gravel lS In place but prlor to placlng concrete
WATER LINE - Prlar ta fllllng trench
SANITARY SEWER LINE - Prlor to fllllng trench
STORM SEWER LINE - Prlor to fllllng trench
FOOTING - After trenches are excavated
FOUNDATION - After forms are erected but prlor to concrete placement
UUDERFLOOR PLUMBING - Prlor to lnsulatlon or decklng
UNDER FLOOR MECHANICAL - Prlor to lnsulatlon or decklng
POST AND BEAM - Prlor to floor lnsulatlon or decklng
ROUGH PLUMBING - Prlar to cover
ROUGH GAS - after Ilne lS lnstalled and capped lf not attached to an
appllance
ROUGH MECHANICAL - Prlor to cover
ROUGH ELECTRICAL - Prlor to cover
FRAMING - Prlor to cover
INSULATION - Floor, prlor to decklng Wall/Celllng, Prlor to cover
DRYWALL - Prlor to taplng
Job Number 980878
Page 3
FINAL PAVING - After pav1ng lS complete
FINAL PLUMBING - When all plumb1ng work 18 complete
FINAL GAS - When all gas work lS complete
GAS SERVICE - After 11ne lS lnstalled and llne has been connected to a
ffilnlmum of one appl1ance Pressure test done at th1S pOlnt
FINAL MECHANICAL - When all mechanlcal work lS complete
FINAL ELECTRICAL - When all electrlcal work lS complete
FINAL FIRE - When all Flre Department requ1rements have been met
been met
FINAL SITE PLAN - After all requlrements have been met for M1n1mum
Development Standards or from the Development Agreement
FINAL BUILDING - When all requ1red 1nspect1ons have been approved and
the bU1ldlng 1S complete
--- ADDITIONAL COMMENTS ---
ORe 98-06-127, PLANNER IS SARAH SUMMERS
SITE PLAN REVIEW JOURNAL #98-06-127, SARAH SUMMERS, PLANNER
BUlld1ng Slte
Plans
Revlewed By
Revlewed By
LISA HOPPER
LORNE PLEGER
Date
08/19/98
By slgnature, I state and agree, that I have carefully examlned the completed
appl1catlon and do hereby cert1fy that all 1nformatlon hereon lS true and
correct, and I further cert1fy that any and all work performed shall be done
ln accordance w1th the Ordlnances of the Clty of Spr1ngfleld, and the Laws
of the State of Oregon perta1n1ng to the work descrlbed here1n, and that
NO OCCUPANCY wlll be made of any structure wlthout perm1sslon of the
Communlty Servlces Dlvlslon, BUlld1ng Safety I further certlfy that only
contractors and employees who are In compl1ance wlth QRS 701 055 wlll be
used on th1S proJect
I further agree to ensure that all requ1red lnspectlons are requested at the
proper tlme, that proJect address lS readable from the street, that the
permlt card 1S located at the front of the property, and the approved set
of plans w1II rema1n on the slte at all t1mes dur1ng construct1on
~~7P~
Slgnature
(l/~/f'$
Date
--- VALIDATION
Rece1pt Number ---"?/J ~
Date Pa1d ~~:2~-~~
Amount Rece1 ved 1f:b.:2"'7. ?22:-
Recel ved By ./? 4 _~ "-
r/~- -
JOURNAl OR JOB NO ~LY~~
~- ATTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
WORKSHEET
NAME OR COMPANY
d:/&h/1 < i:1.J'.'Ld'- ~-Ior.lL';';Y,h' 5J:LY>/
LOCATION
Ci?,,::)."J /-tL'-/ P7 ":i:!:
Add Ap-tJ L-d."y' /M/77 ,64
il
DEVELOPMENT TYPE
BUILDING SIZE // 90)/ LOT SIZE SO Ft
J / /
_ h___I/.'H .--7"-e<- ~//W'5/Ch ~ f;02YY,2 ~ {7C,7'
1 STORM DRAINAGE _ #, CZr1 e h, /UW t"d!if- ~U- ~ ='rfi--"S 1-0 .l-/;>/..ve-f// I~/
r7 ~ "'-;rbU dVe/ /c
IMPERVIOUS SO FT I; 7h7 X $0 227 PER SO FT $ d/i?O
2
SANITARY SEWER.CITY
3
NO OF PFU'S ~C)
(See Reverse Slde)
SO U-I/J.z.-JJ /;Z;?,/' ~cJ ::N~<>
TRANSPORTATION (''1Ild-e- jU/" fffl1J /1.--n, {-fI: 'J~07&cJ """O./J'7
NO OF UNITS X TRIP RATE X COST PER TRIP
X $47 14 PER PFU
$ / y/</""tJ
/
_~o
X 0./J9 X $475 32
7-'7
$ .1 :30,1-
;
X
X $475 32
$
4 SANITARY SEWER-MWMC
A REIMBURSEMENT COST
'}/9'
NO OF FEU'S j.9o,/X..!7r-PER FEU
B IMPROVEMENT COST
g;
$ _"'0213
~
NO OF FEU'S /. 'lO'Y X ,.(~PER FEU
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
MWMC ADMINISTRATIVE FEE
,gg
$ 97~
TOTAL-MWMC SDC
< $ ~~
$ 10 00
P-
$_G.?
_ ~3
$~"j 70</~
.
.t/
$ .-la."f-
>
SUBTOTAL (ADD ITEMS 1 2 3 & 4)
5 ADMINISTRATIVE FEES
BASE CHARGE (SUBTOTAL ABOVE) X 05
h~1i~~
;/! - SDcV'Co6tdl nator
ATTACH A WPD
Date
~~g
TOTAL SDC
.,.-9'
15'989 -'-
/
.-
FIXTURE UNIT CALCULATION TABLE Number of New FI.s X Unit Equivalent ~ Fixture U.~I/~
(NOTE For remodels, calculate Of e NET additional flxturesl ..
NUMBER OF UNIT FIXTURE
FIXTURE TYPE NEW FIXTURES EQUIVALENT UNITS
Bathtu b
Dnnklng Fountain
Floor Drain
Interceptors For Grease/Oil/Sollds/Etc
Interceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clothes washer - 3 Or More
Mobile Home Park Trap (1 Per Trailer)
Receptor For Refngerator/Water Statlon/Etc
Receptor For Commercial Slnk/Dlshwasher/Etc
Shower, Single Stall
Shower, Gang
Sink Bar, Commercial, Residential Kitchen
Unnal, Stall/Wall
Wash Basin/Lavatory, Single
TOilet, Public Installation
TOilet, Pnvate
Miscellaneous
,.2
;).
2j
2
1
2
3
6
2
6
6
1
3
2
1/Head
2
2
1
6
4
TOTAL FIXTURE UNITS
CREDIT CALCULATION TABLE
calculate credits separates
II
Based on assessed value
1./
-l-
j#
.ft)
If Improvements occurred after annexation date In table,
Year
Annexed
Rate per $1,000
Assessed Value
1979 or before
1980
1981
1982
1983
1984
1985
1986
1987
1988
$427
418
412
399
383
368
348
318
282
242
Credit for Parcel or Land Only If Applicable
Year
Annexed
1989
1990
1991
1992
1993
1994
1995
1996
1997
X $
(Rate X Assessed Value)
X $
(Rate X Assessed Value)
CREDIT TOTAL
Improvement (If after annexation date)
;Vo q4&H-) ~I/ cr&,}/j! Ft1T ~I-t!:
(,/..-fJ fi,:V8-?\ /M /99& ';:fj?e !)1d,~/lrA-'r49t,,09S:J
V ~
RUNOFF COEFFICIENTS FOR STORM DRAINAGE
(For Estimating Purposes Only)
Residential
Commencal
Industnal
Governmental
04
09
05
05
FIXUNIT WPO
IMPERVIOUS AREA ~ TOTAL lOT SIZE X RUNOFF COEFFICIENT
Rate per $1,000
Assessed Value
$1 98
1 55
1 15
096
083
067
052
038
021
$
~