DAILY FIELD REPORT
Date Performed:
January 29, 2007
Chambers Development
Ms. Silva Sullivan
2295 Coburg Rd. Ste. 200
Eugene, OR 97401
Report Number:
722-70018-3
Client:
Project Name:
Sports Way Business Park
Phase 11
Springfield, Oregon
Project Location:
B.P. No.:
Type of Inspection:
02-00818-01/C6-1357
Soils Observation
Weather:
Clear
Field Observations and Comments
As requested a representative of PSI was on site to observe proofrolling of the proposed north parking lot. A loaded
~ 48,000 pound tandem axle dump truck was used for the proofrolL Little to no deflection was noted indicating a relatively
stable subgrade at this time. The parking area was within a range of 1 foot overexcavation to plus 3/10 from grade.
The material consists of a previously placed and reworked bar run fill described in our report entitled "Review of
Foundation Recommendations from PSI" report number 722-85016 dated September 25, 1998. PSI recommended an
area of 5 feet by 12 feet, south of the proposed planter at the western site entrance, be cut 2 to 4 inches to remove
deleterious material and organics.
Inspector: Anthony Deluca
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
Li:;==
Department Manager
c: City of Springfield
Eric Hall Architects-- Eric Hall
Endex Engineering-- Dave Morris
Chambers Construction-- Brian Erickson
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONt Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TOA THIRD
PARTY, BY ANY MEANS. EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES. IS PROHIBITED.
RECEIVED
FEB 0 ~ 2001
Professional Service Industries, Inc.. 1040A Shelley St.. Springfield, OR 97477. Phone 541/746-9649. Fax 5411746.7163
. "'~.lInformation
I"'~. ToBuild On
.,..' , I .. . Cenn .&'11 . 'RtetInsr
FIELD DENSITY REPORT
SOIL AND SOIL-AGGREGATE
Project No.:@2:70018-2
Project: Sports Way-Busin-ess Park Phase II
~ -- -
PLrojet~t Springfield,Oregon .
oca ton:
Equipment: Troxler: 3430 SN: 31527
Client: Chambers Development
Address: Ms. Silva Sullivan
2295 Coburg Rd. Ste. 200
Eugene, OR 97401
.1"---=-' -- --.,--' - ------:,
Laboratory~S.oiUAggregate Data J
-~.~ -
Moisture Density Relationship of 134Ibs./cu.ft, at 10% moisture, was furnished by supplier Egge Sand and Gravel (3/4" - 0).
Date Performed:
P.O. No.:
B.P. No.:
Technician:
Field Density Tests: Nuclear Method (ASTM D2922)(ASTM D3017)(Standard Count: MS 620 DS 2350)
Approximate Test Probe Wet Density Dry Density Percent Percent Required
Elev. Depth LBS/CU.FT. LBS/CU.FT. Moisture Compaction Compaction
FRG 10" 138.1 130.9 5.7 /~f;71 ~%)
FRG 10" 137.9 133.4 3.4 \ 9~,:6, (@~
FRG 10" 138.8 132.3 4.9 Y9:e.ii\ (~/
FRG 10" 138.5 131.7 5.2 ' iit'i. \.9.5O/~)
/9M
FRG 10" 138.4 133.2 3.9 r~.M, ) 950/0
"1t99.~ of #0...:,
FRG 10" 139.2 132.2 5.3 >~' (95%..........
...........-.--
Test No.
Approximate Test location
Building Pad
Northwest corner
2 Southwest corner
3 North of center
4 South of center
5 Northeast corner
6 Southeast corner
Tests performed at finished grade of base rock at listed locations above.
Results were reported to contractor.
c:
City of Springfield
Eric Hall Architects-- Eric Hall
Endex Engineering-- Dave Morris
Chambers Construction-- Brian Erickson
/
1040 - A Shelley Street
Springfield, Oregon 97477
(541)746-9649 - (541)746-7163 fax
January 26, 2007
02-00818-01
Anthony Deluca
.
Comments
Respectfully Submitted,
~..t~'M~ "dd'om"
Jennifer Tran
Department Manager
THIS REPORT IS PROVIDED FOR THE INFORMA TION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT BY ANY METHOD, AND ITS TRANSMiTTAL TO A THIRD PARTY BY ANY MEANS EXCEPT IN FULL IS PROHIBITED WITHOUT THE WRITTEN PERMISSION OF
PROFESSIONAL SERVICE INDUSTRIES,
l"'~;lInfoAon
",~. .To Build On
Engineering . Consulting. 7l!sUng
.
/
DAILY FIELD REPORT
Date Performed:
January 24, 2007
Chambers Development
Ms. Silva Sullivan
2295 Coburg Rd. Ste. 200
Eugene, OR 97401
Report Number:
722-70018-8
Client:
Project Name:
Sports Way Business Park
Phase II
Springfield, Oregon
Project Location:
B.P. No.:
Type of Inspection:
02-00818-01/C6-1357
Soils Observation
Weather:
Clear
Field Observations and Comments
As requested, a representative of PSI was on site to observe proofrolling of the northeast portion of the proposed
building pad and the eastern parking area. All proofrolls were conducted using a 48,000 pound tandem axle dump truck
fully loaded. During the morning visit the aforementioned portion of the building pad was proofrolled. Little to no
deflection was noted indicating a stable subgrade at this time. During the afternoon visit the parking lot was assessed
for deflection. The contractor had overexcavated 6" of clay material in the southeast portion of the proposed lot.
Proofrolling of the eastern parking area showed little to no deflection. The contractor plans to place 12 inches of rock on
the roadway and parking lot during lanes and 9 inches in the parking stall area.
Inspector: Anthony Deluca
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
prOfeSjiOnat se:~ce Industries, Inc.
~: Ii
Jennifer Tran
Department Manager
c: City of Springfield
Eric Hall Architects-- Eric Hall
Endex Engineering-- Dave Morris
Chambers Construction-- Brian Erickson
THIS REPORT 15 PROVIDED FOR THE INFORMA TION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE: WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, 1$ PROHIBITED.
Professional Service Industries, Inc. -1Q40A Shelley St.. Springfield, OR 97477. Phone 541/746-9649. Fax 541/746-7163
l"'~;rrifoAn . ,/
",~. .To Build On
EngIneering . Consulting . lIJstlng
DAILY FIELD REPORT
Date Performed: January 23, 2007 Report Number: 722-70018-7
Client: Chambers Development Project Name: Sports Way Business Park
Ms. Silva Sullivan Phase II
2295 Co burg Rd. Ste. 200 Project Location: Springfield, Oregon
Eugene, OR 97401
B.P. No.: 02-00818-01/C6-1357
Type of Inspection: Soils Observation Weather: Clear
Field Observations and Comments.
As requested a representative of PSI was on site to observe deflection testing on the proposed building pad. Thi~
morning a proof roll was conducted on the south 1/2 of the pad using a loaded 48,000 pound tandem axle dump truck.
A 40' x 40' and 13' x 20' area displayed deflection. The contractor removed the material and replaced it with drier soil.
Egge 3/4"-0 rock was placed to a depth of 9". This afternoon the western 1/2 of the site was proof rolled. The material
disolaved little to no defler.tinn at this time indicatino a relativelv stable suborade.
Inspector: Anthony Oeiuca
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted.
Professional Service Industries, Inc.'
~.f.-r
Jennifer Tran
Department Manager
c: City of Springfield
Eric Hall Architects- Eric Hall
Endex Engineering- Dave Morris
Chambers Construction- Brian Erickson
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, rnc,. 1040A Shelley 51.. Springfield, OR 97477. Phone 541"46-9649. Fax 541"46-7163
l r,ur:~';lInfoAon
,.,..,. .To Build On
Engineering . Consulting. 'Il!stIng
..
/
DAILY FIELD REPORT
Date Performed:
Client:
January 25, 2007
Chambers Development
Ms. Silva Sullivan
2295 Coburg Rd. Ste. 200
EUgene, OR 97401
Report Number:
722-70018-1
Project Name:
Sports Way Business Park
Phase II
Springfield, Oregon
Project Location:
B.P. No.:
Type of Inspection:
02-00818-01
Soils Observation
Weather:
Fog
Field Observations and Comments
As requested, a PSI representative met on-site with Chambers Construction and Egge Sand and Gravel representatives
to observe a proofroll at finished subgrade elevation for the proposed parking and driveway pavement areas at the
following locations: north and west of existing trees along Sports Way (see attached site plan). To assist us in
determining the stability of the in-piace soils, a proofroll was conducted using a fully loaded tanden axled dump truck
weighing approximately 48,000 pounds. With exception to the parking stall area and a small area west of the trees,
defiections (pumping) were observed under the wheel loads of the dump truck and rutting up to 6 inches in depth
occurred indicating a soft, unstable subgrade. It appears that the subgrade is soft due to above optimum moisture soils.
Due to site grades, this area only received a very shallow cut due to saturated soils. PSI recommended overexcavating
an additional 6 inches to remove the soft soils or a minimum of 18 inch rock structure. Also, based on grades some
areas are already to receive at least 18 inches and therefore will not need to be overexcavated . To the best of our
knowledge, the work Inspected above was in accordance with the building department approved design drawings,
specifications and applicable workmanship provisions of the International Buildinq Code.
Inspector: Ray Aliperti
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
OJ f .r _
Je~ifL Tran
. Department Manager
c: City of Springfield
Eric Hall Architects - Eric Hall
Endex Engineering - Dave Morris
Chambers Construction - Brian Erickson
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED,
Professional Service Industries, Inc.. 1040A Shelley 81.. Springfield, OR 97477. Phone 541046-9649. Fax 541f146-7163
lror-;rnfoAn . /
,.,~. .To Build On
Engineering . Consulting. 7bstlng
DAILY FIELD REPORT
Date Performed: January 22, 2007 Report Number: 722-70018-6
Client: Chambers Development Project Name: Sports Way Business Park
Ms. Silva Sullivan Phase II
2295 Coburg Rd. Ste. 200 Project Location: Springfield, Oregon
Eugene, OR 97401
B.P. No.: 02-00818-01/C6-1357
Type of Inspection: Soils Observation Weather: Clear
Field Observations and Comments
PSI representative met on site at 8:00 AM to observe earthwork operations. The contractor had started building
excavation in the center one third working from south to north. Excavations are being performed using an excavator
with a smooth bladed bucket exposing fill soils as described in our soil report from 1998. Scheduled to return at 11 :00
AM to observe a proofroll on exposed subgrade soils. Proofrolling was conducted on the south-central 1/3 of the
proposed building plan using a 48,000 pound tandem axle dump truck. Defiection was noted in a 10x20' area in the
western portion and a 7x15' area in the eastern portion of the pad. The contractor plans to overexcavate these unstable
areas for reinspection tomorrow. The on site soil consists of a previously placed bar run fill which is dark brown in color.
The soil appeared near or slightly above optimum moisture. To the best of our knowledge, the work inspected above
was in accordance with the building department approved design drawings, specifications. geotechnical report and
workmanship provisions of the International Building Code.
Inspector: Anthony Deluca/Ray Allperti
If you have any questions regarding this report, please feel free to co~tact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
J,"1~:"~
Department Manager
c: City of Springfield
Eric Hall Architects- Eric Hall
Endex Engineering- Dave Morris
Chambers Construction- Brian Erickson
THiS REPORT IS PROVIDED FOR THE INFORMA TIO.N OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMfITAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WfTHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries. Inc.. 1040A Shelley St.. Springfield, OR 974n. Phone 5411746-9649. Fax 5411746-7163
l....,...rnfim.an . /
1""'. .To Build On
EngIneering . Consulting . Tbstlng
DAILY FIELD REPORT
Date Performed: January 18, 2007 Report Number: 722-70018-5
Client: Chambers Development Project Name: Sports Way Business Park
Ms. Silva Sullivan Phase II
2295 Coburg Rd. Ste. 200 Project Location: Springfield, Oregon
Eugene, OR 97401
B.P. No.: 02-00818-01tC6-1357
Type of Inspection: Soils Observation Weather: Overcast
Field Observations and Comments
PSI met on-site with Chambers Construction and Egge Sand and Gravel representatives to observe exposed subgrade
soils for the proposed building and parking lot areas. At the time of our site visit, the area south of Pioneer Pacific
College and News Source 16 building had been stripped of vegetation, stockpiled on the west side of the site and was
being loaded onto dump trucks and hauled off site. Stripping of the vegetation was performed using the 750J track
mounted dozer and Hitachi 200LC excavator with a smooth blade bucket. Scheduled to return Monday, January 22,
2007 at 8:00 AM. To the best of our knowledge, the work inspected above was in accordance with the building
department approved design drawings, specifications, geotechnical report dated September 25, 1998 and supplemental
report dated June 14, 2002, and applicable workmanship provisions of the International Building Code.
Inspector: Ray Aliperti
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
pWJionat Service Industries, Inc.
1(- , :r .~
Jennifer Tran
Department Manager
c: City of Springfield
Eric Hall Architects- Eric Hall
Endex Engineering- Dave Morris
Chambers Construction- Brian Erickson
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, excEPT IN FULL, WITHOur THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040A Shelley 81.. Springfield, OR 974n. Phone 541n46-9649. Fax 541"46-7163