Loading...
HomeMy WebLinkAboutPermit Building 1998-2-26 COMMERCIAL/INDUSTRIAL · PERMIT APPLICATION ~ .. JOB NUMBER .~~/8::<: INSPECTION LINE: 726,3769 OFFICE: 726-3759 225 Fifth Street, Springfield, Oregon 97477 ASSESSORS MAP: LOCATION OF PROPOSED WORK' -;:0, 7~:z. ~ 17 -0 ;?-/S"'-oO /~~h~;:7~A2L ~ y TAX LOT' /?/ /~=3 OWNER' ADDRESS' CITY' Mh"7rCZ 6 PHONF' ~ V / -//& ~ ?~'?/ /3//?,""~~7k-sf~''''< ~.~ ;'::::;~h'0 STATE:_/-'9-~-ZIP' ~4/?-::> , ( / - / DESCRIPTION OF WORt<. NEW REMODEL ,~~AV~ ~c.-.P ~7:>_#V ~hA/~L_~ (&;~ ~V- ADDITION DEMOLISH OTHER VAL5{ J"'1'~...,.'~ - ". NAME ADDRESS PHONE ARCHITECT' CONTRACTOR'S NAME AD~ ~ GENERAL' ~ / /9 ~-P";. %;~h'A!.~ .--:...~/ PLUMBIN'" CONST. CONTRACTOR' EXPIRES PHONE q-g 7-; :2 _ ?--- .:?'-9~ 1.S--"'7 }-<'5';.5' ..,g~.:' # ,. . - - MECHANICA' ' ELECTRICAl' PLUMBING MECHANICAL NO. FEE CHARGE Nn ~i=1= I """'A Rr. 1= It. Furnace/burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct Single Fixture Reiocated Bldg, (new Ilx. addtl) Water Service Sanitary Sewer It. Storm Sewer It. Backllow Device Permit Issuance S10.00 TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: QUAD AREA' , OF BLDG~' LAND U~.' FLOOD PLAIN: OCCY GROUP' , OF STORIES: , OF UNIT~' CONSTR. TYp.' HEAT SOURC.' ZONING: LIGHTING POWER BUDGET: WATER HEATER' So. FT. SISQ. FT, VALUE SO. FTG MAIN X SO. FTG ACCES" X X SQ. FTG OTHER TOTAL VALUE OF .PROJECT PLAN CHECK FEr RCPT' DATF BY I BUILDING PERMIT 15% State Surcharge I MECHANICAL 15% State Surcharoe I PAVI NG //ctJ, ~ ~:~~ PLUMBING DEMOLITION 5% State Surcharoe FENCE VALUE S SIDEWALK CURBCUT FT. I. I SUBTOTAL PE RM ITS I SYSTEMS DEVELOPMENT FT. TOTAL PERMIT FEES I EXCLUDINGELECTRICA' /~YS It Is the responsibility of the permit holder to see that aI/Inspections are made at the proper time. To request an inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be', made after excavation, but prior to setup of forms. . REQUIRED INSPECTIONS y ROUGH PLUMBING, ELECTRICAL & MECIIAr4ICM.: No work is to be covered until these inspections have been made and approved. / UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ATTIC DRAFT STOPS & CURTAIN WALLS FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are 'erected, all steel In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanIcal are approved. CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are In place but before any concrete Is placed. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. ~ LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished. POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base materIal In place. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. . PAVING: After gravel is in place but prior to placing' asphalt or concrete. SPECIAL INSPECTIONS, In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Owner/,Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) HIGH STRENGTH BOLTING: During all bolt Inslallatlon and tightening operations. (306 a.6) " SPRAYED ON FIREPROOFING: U.B.C. Standards 43,8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapler 29) GLU,LAM BEAMS: Inspection Certificate by an approved agency, furnished to the Clly's Building Division before beams are placed. (2501 U.BC. STDS. 25.10,11). STRUCTURAL MASONRY, (306 a.7) "In addition to Ihe Inspec, tlons specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. v FINAL PLUMBING ------------------------------------------------------- / SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot slrlping, etc. musl be completed before requesting this inspection. FINAL BUILDING: Requesled after Ihe final plumbing, electrical, mechanIcal and Fire Department InspectIons are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. FINAL ELECTRICAL FINAL MECHANICAL y /' FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' , PLANS REVIEWED BY OAT" By signature, I state and agree, that I have carefUlly examined the completed application and do hereby certify th:'lt all Information herein Is true a'1d correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with OAS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the pr.operty, and the approved set of plans will remain on the site at all times during construction. Slgnaturp 4~~ /' ~. /I~.....~~ VALIDATION: AMOUNT RECEIVED' ;/-9. ~.S- RECEIPT N' 2:f2~2 9 . , Datp .2 -2 b -Fe? <-2(;- ':39"- d~" /'P' DATE PAID: RECEIVED BY'