Loading...
HomeMy WebLinkAboutPermit Building 1998-1-5 . COMM ERCIAUIN DUSTRIAL PERMIT APPLICATION ;' ~. 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: CA SAD€: fA(I,/t I V>T'IcJ ASSESSORS MAP' /? ~ -/~~ . JOB NUMBER .-::~ '.~ INSPECTION LINE: 726.3769 OFFICE: 726.3759 9--s'~ /H/c.M-%,~~/ .~ TAX LOT: O///&; OWNER.b\~L e,eN~0J ADDRESS' ClqJ I N1\:.'ltNI'lllONAl CITY: sP<<.1 tV 1. t=' I E\..D lAJ-AY STAT'" c::ae- DESCRIPTION OF WORK' I NSTdlATIoN of f-AlN\' g.oo'Th' NEW REMODEL ADDITION DEMOLISH NAME ADDRESS ARCHITECT' CONTRACTOR'S NAME ADDRESS GENERAL: O~. ~BING'~~/~-""'~~ ''''~=- MECHANICAL: ~ ~~ /"Y~ <>:.- ELECTRICA" i9~~ .?Y ~-c;...,-'- DII.l.M..eiINGi NO. FEE CHARGE Single Fixture Relocated Bldg. (new fix. addtll Water Service ft. Sanitary Sewer ft. Storm Sewer ft. Backflow Device I I I I I I /~-I ~~~~ I ~Z'/)9'" ~7/~...J.- , I I I mE/'/' " I I I TOTAL PERMIT PHONF' l4,-zS 10 ZIP: <:1,44, OTHER ~~iij~~~c.~'.S PHONE CONST. CONTRACTOR' EXPIRES ...n MECHANICAL Furnace/burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duct z. / h?'AV Permit Issuance TOTAL PERMIT - OFFICE USE - OUAD AREA' LAND USF' , OF UNIT~' 'OF BLDG~' OCCY GROUP' CONSTR. TYP'" HEAT SOURCE: , OF STORIES: Sa. FT. $/SO. FT. so. FTG MAIN SO. FTG ACCESS SO. FTG OTH ER X X X PLAN CHECK F"" RCPT' DATF I BUILDING PERMIT 5% State SurcharQe MECJ;L4'NICAL/;?~ (/,E!JIL'''L /: 5%'State. ;"..J;' Surcharao ~ ors.r PAVING ' PLUMBING ".?? /.e'..v. HANDICAP ACCESS: FLOOD PLAIN' ZONIN'" PHONE """ f"U6E:1nE: I I I I I I /-s'.- $10.00 LIGHTING POWER BUDGET: WATER HEATER' VALUE TOTAL VALUE OF.PROJECT BY DEMOLITION r::>. r"i /..,,-:- ~~ . . ,- 5% State SurcharQe FENCE VALUE $ SIDEWALK CURBCUT /.P~ /~~ I :~ FT. FT. .~~ I. . I SUBTOTAL PE RM ITS I SYSTEMS DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICAl <;I~. ....". $.':;('. ~O 1 . . REQUIRED INSPECTIONS It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspectlon, call 726.3769 (recorder), state your City designated job number, Job address, type of InspecUon requested and when you will be ready for Inspection. Requests received before 7:00 a,m, will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE.INSPECTION:To be made after excavation, but prior to setup of forms. A' ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work Is to be covered until these inspections have been made and approved. PAVING: After gravel Is In place but prior to placing. asphalt or concrete. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ATTIC DRAFT STOPS & CURTAIN WALLS SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior /0 placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.l) CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. STRUCTURAL WELDS: Performed on the job. (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board interior wall covering Is applied. HIGH STRENGTH BOLTING: During all bolt InstallaUon and Ughtenlng operations. (306 a.6) SPRAYED ON FIREPROOFING: U.B.C. Standards 43.8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installatlon of floor Insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.ll & Chapter 29) POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the Clty's Building Division before beams are placed. (2501 U.B.C. STDS. 25.10,11). FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installatlon of decking or floor sheathing. STRUCTURAL MASONRY: (306 a.7) MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavatlng complete and form work and sub-base material In place. .- ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. "In addition to the Inspec. tlons specified, the Building Official may make or require other Inspections of any constructlon work to ensure compliance with the Building, City or Development Code. --------------------------------,---------------------- V FINAL PLUMBING x FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditlons such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. f f FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a CerUflcate of Occupancy has been Issued bY/he Building Division and posted on the premises. FINAL MECHANICAL -+- FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY //- " //.., ~ ~,./'7' . . DATE /....-c.>.~~ By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all times during constructl?2 Signature V3:-M V~/V\OJI1O~ Date ';51qg VALIDATION: AMOUNT RECEIVED:.$2-.Ybr S""<':./<~~E PAID' RECEIPT" ""2 :;53 ~ RECEIVED BY: /... S'~~ ~B~ ~~~ -/ - .