HomeMy WebLinkAboutPermit System Development Code Charge 1997-4-23
r
/~I'~
SPRINGFIELD
~-
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / INDUSTRIAL)
Name or Company: GIUSTINA RESOURCES
Location: 917 INTERNATIONAL WAY
Developement Type: C Building Size: 9930
1. STORM DRAINAGE
Impervious Sq Ft 1.0 X
X
0.216
2. SANITARY SEWER
Number Of PFUs
(see Page 2)
- CITY
1. 0 X 19
X
44.75
3. TRANSPORTATION
Number Of Units
1.0 X 9.930 X
X Trip Rate
1. 480 X
Job No.: 970583
Lot Size:
Per Sq Ft
Per PFU =
X
Cost Per Trip
451. 26
$6,631. 90
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
19
X
X
Per PFU +
20.690 +
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) x
0.50
TOTAL SDC
Reviewed By: TROY MCALLISTER
MWMC Admin Fee
10.00
Date: 04/23/97
Page 1
Sq Ft
$0.00
$850.25
$6,631. 90
$403. n
$0.00
$403. n
$7,885.26
$394.26
$8,279.52
SPRINGFIELD
/~I'.~
Job Number: 970583
Page 2
FIXTURE UNIT CALCULATION TABLE
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS =
.Number of
New Fixture
Unit
Equivalent
Fixture
Units
o
o
o
o
o
1
o
o
o
o
o
1
o
3
2
o
o
2
1
2
3
6
2
6
1
3
2
o
o
o
o
o
2
o
o
o
o
o
2
o
3
12
o
o
2
2
1
6
4
19
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed:
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
o
0.00
X
0.00
o
X
0.00 =
0.00
CREDIT TOTAL =
$0.00
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)