CERTIFICATE OF TEMPORARY OCCUPANCY
CITY OF SPRINGFIELD
Community Services Division
o~
diU/:, Cw~ iIY:m.d ~ &,. lk, ~ of &clioo, j08 of lk, b~ rBuilkur ba{4 C~
I1dn~ CcJ.q, wJifrur IJuJ, aL lk, limv. of iMuamm /Jw, ~ W<Il> Un, ~ ~ wdiv lk,
Va/tiou.& GI.dinuvru:.Q/.y of lk, C4'~ ~ ~~ Glv UM, d<Yl, lk,~:
Occ. Group B-2
Type of Construction. V N
Use Group
Owner Shorewood Packaginq Address 500 International Way
Building Address 500 I nterna t i ona 1 Wa y
Assessors Map:17031500 Tax Lot :03101
* See Attached .
. \ ---
. .~......... ') -
~\\.~r,-\\
Building Official
Dave Puent
Permit # 950144
81=' ~,. - ..st-~~
Date: 8-17-95
~
:Jk C~ of ~ JuJ1 t., ~ Un, '" r~ pt= Mlo lk, rlMTliM.t. for 300days (7)
anu1 JuJ1 wi t., ~ =pi "'r lk, C4 rBuiIdimr ~ ~
Page 1 of 1
.
.
r
,
Punch list for temo occuoancv to be comoleted within 30 days
* items are to be comoleted within 5 days
August 17, 1995
1 Certification of approval for the electrical equipment installations,
2 Provide planning information for approval of vault at east entry,
3 Provide statement from Special Inspector indicating their final approval of all welds,
bolting, and concrete.
4 1 hr and 2 hr wall penetrations must be sealed in such a manner as to restore the
integrity of the wall.
5 A sprinkler head
· on the east side of the north door in the receiving bay, one row to the south
has paint on the fusible link.
· in the lower floor area of the north mezzanine has heads covered with tape,
6 The 8" sprinkler line off the riser in the receiving bay area has no longitudinal bracing,
7 Approved testing of: *
. fire alarm system
. coil doors
. emergency generator
. emergency exit lighting
8 Remove paint protective coverings from detectors and permanently mOllll!.
9 Accessible route from parking to building areas,
10 Provide a statement complying with UFC 2.302
. storage of hazardous materials methods
· hazardous materials list and quantities. MSDS sheets,
. Floor plan for pre-fire planning
. hazardous materials locations and routings
11 Seismic bracing of:
· main runs of electrical over head conduit and junction box
. fixtures in drop ceiling under north mezzanine
. unit heaters, and air handers
. hot water tanks and package boilers
12 F enetrations in one hour assemblies must be approved glazing, *
· Temporary installation of plywood until materials can be supplied
13 Complete installation of 1 -1/2 hr rated double door,
14 Complete railings on stairway to mezzanine over plate prep area,
15 Provide mechanical ventilation to locker, bath, and office areas not having natural.
16 Fire department inspection approval of sprinklers at clouded areas and new smoke
draft curtains,
17 State certification of boilers
18 Condinsate lines for AHU's
19 Connect unit heaters
20 Complete small bath in shipping area
21 Fire department list
.' ,
'.' ,FA';~;~:' 8-t1-<ts_ t?:o'i
.,....
. l ~, '
,
'.
,.-. ~. . .~~: .
~o
CERTIFICATE OF TEMPORARY OCCl!P;AN~Y, .,' ~
CITY OF SPRINGFIELD', ",' ' '\:J)
~=..1 '. ,- 0
Community Services Division.,.,.J. ' .
'.
Yflih Cl/~ iMm.d ~ & {fu, ~ , b.dwn, 308 , {fu, b~ 03uilduru;- baf4 C~,
AdnniJTlitbJw~ C~ ~ (JuJ, 01 /J~ fum.q, , iMuwrJa, I1tit. ~ UXJ.I> irn, ~ ~ wJA,{fu,
Val~ ~.v. , {fu, Cilt ~Rfl~ tw1dimtr ~ (lI. UM,. Y()Il, {fu, ~: .: .
Occ. Group B-2
Type of Construction V N
. Use Group,
Owner Shorewood Packaoino Address 500 International Way
Building Address 500 International Way
Assessors Map:17031500 Tax Lot :03101
* See Attached
, ~
~\"--)..,r\.\\
Building Official
Dave Puent
Permit # 950144
~~ .st-\~~
Date: 8-17-95
.
',.
~
:Jf~ CIIlJf'rn'" , ~ JuJ1 ~ ~ irn, a, ~ pi=, 1m {fu, ~
fVI11i, Jwil Mi, t~ ~ vm:~ ~ {fu, Cilt 03uilduru;- &fPaal
,,,30 d'Y~ (}J
...o~
J_ .... ..
"
\7.
~
Page 1 of 1
.
.
I."
,
Punch list for temn occunancv to be comnleted within 30 days
* items are to be comnleted within 5 days
August 17,1995
1 Certification of approval for the electrical equipment installations.
2 Provide planning information for approval of vault at east entry.
3 Provide statement from Special Inspector indicating their final approval of all welds,
bolting, and concrete.
4 I hr and 2 hr wall penetrations must be sealed in such a manner as to restore the
integrity of the wall.
5 A sprinkler head
· on the east side of the north door in the receiving bay, one row to the south
has paint on the fusible linle
· in the lower floor area of the north mezzanine has heads covered with tape,
6 The S" sprinkler line off the riser in the receiving bay area has no longitudinal bracing,
7 Approved testing of: *
. fire alarm system
· coil doors '
· emergency generator
. emergency exit lighting
,S Remove paint protective coverings from detectors and permanently mount.
9 Accessible route from parking to building areas.
10 Provide a statement complying with UFC 2,302
· storage of hazardous materials methods
· hazardous materials list and quantities. MSDS sheets.
· Floor plan for pre-fire planning
· hazardous materials locations and routings
II Seismic bracing of:
· main runs of electrical over head conduit and junction box
· fixtures in drop ceiling under north mezzanine
· unit heaters, and air handers
· hot water tanks and package boilers
12 Ftmetrations in one hour assemblies must be approved glazing. *
· Temporary installation of plywood until materials can be supplied
13 Complete installation of I -1/2 hr rated double door.
14 Complete railings on stairway to mezzanine over plate prep area.
IS Provide mechanical ventilation to locker, bath, and office areas not having natural.
16, Fire department inspection approval of sprinklers at clouded areas and new smoke
draft curtains. .
, . 17 State certification of boilers
IS Condinsate lines for AHU's
19 Connect unit heaters
20 Complete small bath in shipping area
21 Fire department list