HomeMy WebLinkAboutPermit Building 1994-7-14
INSPECTION LINE: 726-3769
OFFICE: 726-3759
COMMERCIAL/INDUSTRIAL
PE~MIT APPLICATION
.
~
JOB NUMBER
.
225 Fifth Street, Springfield, Oregon 97477
LOCATION OF PROPOSED wof/9 IM,-€J?"uA T'IO.u AI. C~
.--
ASSESSORS MAP: / J -(0) ~ - ,5"
.~lL-r, / J.lAw
TAX LOT: --L' I :z
OWNER: ~LJ /:""1ff'FJ.l I-IOr,-r
ADDRESS:, q la=-- \..-91\ () f\('f'lH-, ~}"\
CITY: E.uh ..cAfE. STATf';'
PHONF'
oe....
ZIP'
DESCRIPTION OF WORI<' J::; f ,
hOjjr:>dA/r..-,
NEW
REMODEL
'\(
ADDITION
DEMOLISH
OTHER
NAME
ADDRESS
ARCHITECT'
1/11:1.
~i
CONST.
CONTRACTOR'
EXPIRES PHONE
.rr,~ "<-~
CONTRACTOR'S NAME
GENERA" J;,/I.A,c:~/,c:=
PLUMBING'
MECHANICA' .
ADD RESS
-SA~l r::>
ELECTRICA' .
I
I NO~
I
I
I
I
I
I
I
I I
I ------r
I I
I I
I TOTAL PERMIT
MECHANICAL
PLUMBING
I
CHARGE I
1
I
I
I -- -Suspended wall or floor
.............. ~ mounted unit heater
>r: Appliance Vent
separate
.--- .............. I Stationary evap.
_____ ~ cooler
I I --........... Vent Fan/Single
,duct
I I V~yslem apart
from ~ htg.
I I Mechanical ~ust
hood and duct ...............
I I
I , Permit Issuance
I TOTAL PERMfT
---
FEE
..n
----
SI~re'
Ralocated BI~
(new fix. addll) .............
Water Service ~
ft. ____
...........
Furnace/burner & vent
< 100.000 BTUs
Furnace/burner & vent _______
> 100.000 BTUs .---
Flo~nd vent
~anltary Sewer
ft.
Storm Sewer
fl.
Backflow Device
------
--------
~----
QUAD AREA'
- OFFICE USE.-
,.
"'-r:,~~
HANDICAP ACCESS:
FLOOD PLAIN'
LAND USE:
. OF BLDGS'
. OF UNITS:
- - '-::-:;,/'It
--
qa.- , C) b c:f
VALUE: JJ / A
PHONE
~f
I
I
I
I
l-$~O
OCCY GROUP:
CONSTR, TYPF'
HEAT SOURC.'
ZONING'
LIGHTING POWER BUDGET:
WATER HEATER-
. OF STORIE~'
Sa. FT.
$/SQ. FT.
VALUE
SQ, FTG MAl N
SQ. FTG ACCESS
SQ. FTG OTH ER
." -,
,
"
X
"
X
, '
x
TOTAL VALUE OF PROJECT
PLAN CHECK FE."
RCPTN
BY
DAT.
I BUILDING PERMIT
15% State
Surcha~e
MECHANICAL
PLUMBING
DEMOLITION
5% State
Surcharge
FENCE
VALUE $
SIDEWALK
CURBCUT
A A.YJr%..e~
8000 ,'+'.
&:'ILL
SUBTOTAL
FT. PERMITS
SYSTEMS
FT, DEVELOPMENT
5% State
Surchame'
I PAVI NG
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
.'
'\\) \\\)ot
f
4.0~
~I
'2.40
1
I
28:::> ~ I
r-
.
.
REQUIRED INSPECTIONS
1,\
It Is the responsibility of the permil holder to see that all Inspections are made at the proper time. To request an Inspection, call
726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same workIng day, requests made after 7:00 a~m. will be made
the following work day, ~..
SITE INSPECTION: To be ROUGH PLUMBING, PAVING: After gravel is In
made after excavation, but ELECTRICAL & place but prior to placing
prior to setup of forms, MECHANICAL: No work Is to asphalt or concrete,
be covered until these
inspections have been made
and approved.
UNDERSLAB PLUMBING,
, ELECTRICAL &
MECHANICAL: To be made
befqre any work Is covered.
ATTIC DRAFT STOPS &
CURTAIN WALLS
I
CONCRETE SLAB: To be
made after all inslab bulldln9
service equipment, conduit,
piping, accessories and other
ancillary equipment Items are
In place but before any
concrete Is placed.
FIREPLACE: P,ior to placing
facing materials and before
framing,lnspect!on.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, Chimneys
and vents are complete and
the rough elect,lcal, plumbln9
and mechanical are approved.
SPECIAL INSPECTIONS: In accordance
Section-30G of the State Specialty Code
a special Inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the speclallesting reports shall
be furnished to the Building Division.
FOOTINGS & FOUNDATIONS:
To be made after trenches arB
excavated and forms BrB
erected, all steel In place, but
prior to placing conc,ete,
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor Insulation, decking or
floor sheathing,
POST & BEAM: To be made
prior to Installation of floor
InsulatIon, decking or floor
sheathing.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are I n place but
before any lath or gypsum
board Interior wall covering Is
applied. -
~~,~
'1='1~t" & SEPARATION WALL:
Located and constructed
acc,ordlng to plans.
HIGH STRENGTH BOLTING:
Durlng'all bolt installation and
tightening operations. (306
a,6)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapte' 29)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
LATH ANDIOR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plaste'ing is applied or before
gypsum board jolnls and
fasteners are taped and,
finished.
GLU.LAM BEAMS: Inspection
Certificate by 'an approved
agency, furnished to the City's
Building Division befo'e
beams are placed. (2501 U.B.C.
STDS.25-10,11).
.'
STRUCTURAL MASONRY: (306
a.7)
.,'
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, 10 be made afte, all
excavating complete and form
work and sub-base materIal in
place.
'In addition to the Inspec,
tlons specified, the Building
Official may make or require
other InspectIons of any
construction work to ensure
compliance with the Building,
City or Development Code.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF ,SHEATHING AND
NAltING: P,ior 10 Installing
. any roof coverl ng.
CURB AND APPROACH
APRONS: Afte, forms are
erected but prlo, to placing
concrete.
-------------------------------------------------------
FINAL PLUMBING
FINAL ELECTRICAL
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish inspection, All project conditions such as
landscaping, parking lot stripln9, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
FINAL MECHANICAL mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
FINAL FIRE DEPARTMENT and posted on the premises.
ADDITIONAL COMMENTS: _~>>1pL q) A-IJ/"CJ-I ~-t..l4J7T~P X Ae TI CL€=:. f?
of=' err <P ,.., C' C:;r::>I7 IrlA PI FID Gnf"'_ ,
r'-'Al TI? A r -en!? ,--r;, r..... n->'p I It' ,u) 1..:L.l:! M {l TeD ,d'\.t"Lr:> 71}';:=
I")vFAr,t./ __;;/1 c?ol ~m~JlIS
PLANS REVIEWED BY r::; /.A.hl ~ F~
DATE 2=..LI - 9' c:;..
By signature, I 'state and agree, that I have carefully examined the completed application and do hereby certify that all Information
heretn Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of O,egon perlalnlng to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the
street, that the permit ca'd Is located at the front of tha property, and the approved set of plans will remain on the site at all
~:::t:~:ln~;u~on. );kn~J Date l' '; t/ )<1</
II /
=----
AMOUNT RECEIVED' 2m - DATE PAID: 7": / 4. .. 9> 4-
RECEIPT #: 0 I "3900 RECEIVED BY: ~---I~QA/ /';Cr
-
VALIDATION: