Loading...
HomeMy WebLinkAboutPermit Building 1993-12-8 - .~..- ....-" ~. A,WN/NC, s . . ~ LOCATION OF PROPOSED WORK' ~3o MA,j.J S-r12-6€::, ASSESSORS MAP V\{)?)~S~ JOB NUMBER Cr~V1&~ COM M ERCIAL/ INDUSTRIAL PERMIT APPLlCATlo.N 225 Fifth Street, Springfield, Oregon 97477 INSPECTION LINE: 726.3769 OFFICE: 726.3759 TAX LOT: \ (J1i\ IJlXJ ADDRESS: CITY: MAlLIA .~3o S-fl. (2 P A, M'1'o1""'- /71,Pnl--l Sr, 'PHON~' 74-b-5oo3 OWNER: STATE: 0(2.., ZIP: ..,+702- DESCRi'PTION OF WORK: NEW)( REMODEL Ptp6- ~Ii... Jtt-vJo/lIv"'i 01./ S~:-VI ADDITION DEMOLISH OTHER VALUE" Z,. ';:> <-A.J. GO' '------, '.' .NAME ADDRESS PHONE ARCHITECT: PLUMBING' CONST, CONTRACTOR # 12-/ <:> olti::.PIl Tc.ft ~ 2."101 ?,fo ?-t1'f' Uc.lfNSf:. -# EXPIRES PHONE 12.-).0 -'13 'H3S -5S"/{, '!2-0<r.~ CONTRACTOR'S NAME ADDRESS GENERAl' bA~fi+J~ Slq/J k Aw;.l/fJ"i MECHANICAl' ELECTRICAl' I PLUMBING MECHANICAL I NO, I FEE CHARGE ",n ~~~ "!:lARGE- I Single Fixture. Furnacefburner & vent <100,000 BTUs 1 Relocated Bldg. Furnace/burner & vent (new lix, addll! > 100.000 BTUs I Water Service Floor furnace and vent It, 1 Sanitary Sewer Suspended wall or floor It, mounted unit heater 1 Storm Sew~r I Appliance Vent It. separate 1 I Slation.ary evap. Backflow Device cooler 1 I Vent Fan/Single duct 1 I Vent System apart from AC or htg. 1 1 Mechanical exhaust hood and duel I I 1 I Permit Issuance $10,00 1 TOTAL PERMIT TOTAL PERMIT. QUAD AREA: \0 i\ lh) - OFFICE USE - LAND USE ~::\tf'), HANDICAP ACCESS: # OF BLDGF' # OF UNITS' ZONING' FLOOD PLAIN' rt) OCCY GROUP: CONSTR. TYP~' LIGHTING POWER BUDGET: # OF STORIE~' HEAT SOURCF' WATER HEATER' SQ, FT. $ISQ, FT, VALUE SQ. FTG MAIN SQ, FTG ACCESf. x X X SQ, FTG OTHER TOTAL VALUE OF PROJECT PLAN CHECK FEF 05 , RCPT# DAT~ BY I BUILDING PERMIT 15% Stale SurcharQe 1 MECHANICAL 15% Slat,e SurcharQe , 1 PAVING, ~ 8, .5(') l ,<.\~ PLUMBING DEMOLITION 5% State Surcharge FENCE VALUE $ SIDEWALK FT.. SUBTOTAL PERMITS SYSTEMS ' DEVELOPMENT CURBCUT FT, TOTAL PERMIT FEES I EXCLUDING ELECTRICAl +CJ~ . REQUIRED INSPECTIONS . "". ..... It is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an inspection, caJl 726.3769 (recorder), state your City designated job number. job address, type of inspection requested and when you will be ready for Inspection. Requests received. before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the' following work day. SITE INSPECTION: To be made after excavation, but prior to setup of for~s.. UNDERSLAB PLUMBING, ELECTRICAL'& . MECHANICAL: To be made befor~ any. w?rk Is covered. ROUGH PLUMBING. ELECTRICAL. & ~ MECHANICAL: No work is to . be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & . 'CURTAIN 'WALLS FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel in' place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. CONCRETE SLAB: To be made after a/l" Inslab building service"equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete is placed. .INSULATION & VAPOR BARRIER: To'be made after all insulation and required vapor barriers are in place but before any lath or gypsum board interior wall covering is applied. UNDERGROUND: Plumbing. \\ electrical, gas,tsanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. .j.. UNDERFLOOR: Plumbing. electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. POST & BEAM: To be made prior to installation of floor Insulation, decklng.or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is in place but before any. plastering Is appiled, or before gypsum board Joints and . fasteners are taped ~nd finished, . FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor .sheathing. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of' way, to be made after all excavating complete and form work and sub.base materlal.in place. ' MASONRY: Sleel location. bond beams grouting or verticals In accordance with UBC 2415. . ROOF SHEATHING AND NAILING: Prior. to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to' placing concrete. PAVING: Afler gravel Is in place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specially Code a special inspeCtor.shall be employed by the Owner/.Contractor during construction of fhew'following work. A copy of the special testing reports shall be furnished t.o.the Building Qivlslon. STRUCTURAL CONCRETE: In excess of 2500 P,S,I. (306 a.1) STRUCTURAL WELDS: ': Performed on the job. (2722 f) HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) SPRAYED ON FIREPROOFING: U,S.G, Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) .x GLU,LAM BEAMS: Inspection Certifi,cate by an approved agency, furnished to the City's Buildln"g Division before beams are placed, (2501 U.S.G, STDS, 25.10.11), STRUCTURAL MASONRY: (306 . a,7) A\-\c-~,'h ~{>N-\ -In addition to the inspec- tions specified, the Building . Official may make or require . other inspections' of any . construction work to ensure compliance with the Building, . City qr Development Code. FINAL PLUMBING . . ------------------------------------------------------- . ' SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. 'must be completed be'fore requestlng this Inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections' are made and approved. No occupancy of the premises can be ,made until a Certificate of Occupancy has been issued by" the Building Division and posted on .th~ premises. FINAL 'ELECTRICAL A FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY f)-.,tI.,\ ('{\ro~ p I \.,)J I DATE --.l'J...: '0 \ ~ I By signature, I state and agree, that I have carefully ~xamined the completed appll.cation and do hereby c~rtlfy that aH"lnformation herein is true and correct, and I f~rther certify that any and all work pertor:med shall be done In accordance with the Ordinances . of the City of Springfield. and the Laws,of the Slate of.Oregon pertaining to the work described herein. and that NO OCCUPANCY will be made of any structure without permission of the Building Safety DivIsion. I further certify that only contractors and employees who' are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that thepermlt card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. VAll DATION: AMOUNT RECEIVED: on) ,0/\ III D \ RECEI PT #: Datl? II ~ Z. 2. -'7)