HomeMy WebLinkAboutApplication APPLICANT 1/28/2008 (2)
"
City of Springfield
Development Services Department
225 Fifth Street
Springfield, OR 97477
SITE PLAN REVIEW
PRE-SUBMITTAL CHECKLIST
Project Name: Gourley / State Farm SPR
Project Proposal: Create additional off-street parklOg & associated site development
Case Number: PRE2008-00009
Project Address: 1310 Market Street
Assessors Map and Tax Lot Number(s): 17-03-25-33, TL 8300
Zoning: High DenSity Residential (HDR) & Low DenSity Residential (LOR)
Overlay District(s): Drinking Water Protection (DWP)
Applicable Refinement Plan: N/A
Refinement Plan Designation: N/A
Metro Plan Designation: Low DenSity Residential (LOR)
Pre-Submittal Meeting Date: February 5, 2008
Application Submittal Deadline: August 3, 2008
Associated Applications: SUB2007-00020 (PLA), ZON2006-00062 (DIM), DRc2002-
03074 (ExpanSion of Non-Conforming Structure)
NAME
Moll Markarian
Ga McKenne
Jesse Jones
Jesse Jones
Gilbert Gordon
Dave Puent
PHONE
726-4611
726-4585
736-1036
736-1036
726-2293
726-3668
Aeel!!IaNiI"lts D V:EI.!iOeMENiJi REVI1:W;cTEA)/J ~
Owner/ Applicant Applicant's Representative
Stuart Gourley Joseph E Egner
Corkey Gourley Insurance Agency, Inc, Slsul Engineering
1310 Market Street 4317 NE Thurston Way, SUite 230
S rln field OR 97477 Vancouver WA 98662
ReVised 10/25/07
I
TENTATIVE SITE PLAN REVIEW APPLICATION
I
PRE-SUBMITTAL CHECKLIST
PLANNING
o Application fee - discuss the applicable fees
o Copy of the Site Plan reduced to 8'!2"x 11"
Complete Incomplete See Planning
Note(s)
jgl
o
8 1/2" X 11" Copy of Site Plan
o Copy of the deed and a preliminary title report Issued Within the past 30 days
documenting ownership and listing all encumbrances If the applicant IS not the property
owner, written permiSSion from the property owner IS required
Complete Incomplete
See Planning
Note(s)
jgl 0
Deed and Preliminary Title Report
o Brief narrative explaining the purpose of the development, the eXisting use of the
property, and any additional information that may have a bearing In determining the
action to be taken The narrative should also Include the proposed number of employees
and future expansion plans, If known
Complete Incomplete See Planning
Note(s)
jgl 0 1 Brief Narrative
o Site Plan
Complete Incomplete
See Planning
Note(s)
2
jgl 0
jgl 0
o jgl
3
o jgl
4
jgl 0
Revised 10/25/07
Prepared by an Oregon Licensed Architect,
Landscape Architect, or Engineer
Proposed bUildings location, dimenSions,
size (gross floor area applicable to the
parking reqUirement for the proposed
use(s)), setbacks from property lines, and
distance between bUildings
LocatIOn and height of eXisting or proposed
fences, walls, outdoor equipment, storage,
trash receptacles, and signs
locatIOn, dimenSions, and number of tYPical,
compact, and disabled parking spaces,
including aisles, wheel bumpers, directional
signs, and striping
DimenSions of the development area, as well
as area and percentage of the site proposed
for bUildings, structures, parking and
121
121
D
121
r:::l
L;;;'j
D
121
D
5
121
D
vehicular areas, sidewalks, patios, and other
Impervious surfaces
Observance of solar access requirements as
specified In the applicable zoning district
On-site loading areas and vehicular and
pedestrian Circulation
Location, type, and number of bicycle
parking spaces
Area and dimensions of all property to be
conveyed, dedicated, or reserved for
common open spaces, recreational areas,
and other Similar public and semi-publiC uses
Location of eXisting and proposed transit
facilities
o Phased Development Plan Where applicable, the Site Plan application must Include a
phaSing plan indicating any proposed phases for development, including the boundaries
and sequencing of each phase PhaslOg must progress In a sequence promoting street
connectIvIty between the various phases of the development and accommodating other
reqUired public Improvements, Including but not limited to, sanitary sewer, storm water
management, water, and electriCity The applicant must indicate which phases apply to
the Site Plan application being submitted
Complete Incomplete See Planning N/A
Note(s)
D
D
o Landscape Plan
Complete Incomplete
See Planning
Note(s)
6
o ~
121 D
D 121 6
D 121 6
~ ,d
D 121 6
D 121 6
o Architectural Plan
Complete Incomplete
See Planning
Note(s)
7
o 1SI
ReVised 10/25/07
Phased Development Plan
Drawn by a Landscape Architect
Location and dimenSions of landscaping and
open space areas to Include calculation of
landscape coverage
Screening In accordance With SDc 4 4-110
Written deSCription, including speCifications, of
the permanent Irrigation system
Location and type of street trees
List In chart form the proposed types of
landscape materials (trees, shrubs, ground
cover) Include In the chart genus, speCies,
common name, quantity, Size, spacing and
method of planting
Exterior elevations of all bUildings and
o
r2J
7
structures proposed for the development site,
Including height
Conceptual floor plans
o On-Site Lighting Plan
Complete Incomplete See Planning
Note(s)
o ~ 8
o
r2J
8
Location, orientation, and maximum height of
exterior light fixtures, both free standing and
attached
Type and extent of shielding, Including cut-off
angles and type of Illumination, wattage, and
luminOUS area
Photometric test report for each light source
o
r2J
8
Planning Notes:
1 The Information prOVided In the narrative, application cover sheet, and Sheet 3 of the
plan set diSCUSS different quantities of new ImperviOUS surface Correct these
discrepancies,
2 The Engmeer's stamp has expired Note the new expiration date on the plan set
3 Indicate the location and type of trash receptacles Trash/recycling receptacles need
to be screened, covered, hydraulicaly Isolated, and connected to the sanitary sewer In
conformance With SDc 4.4-110 B 3 b&c and the EDSPM In addition, Indicate the
location of the outdoor air conditIOning equipment Mechanical deVices must be
screened In accordance With SDc 4 4-110 Also, show the location and Width of all
easements, utilities, signs, hydrants, etc Please note that all utilities must be placed
underground
4 Indicate the location and dimenSIOns of ALL eXisting parking spaces on the eXisting
conditions sheet, and Indicate which are proposed to remain and which are to be
removed on the site plan Are the new spaces proposed as compact or standard
(plans Indicate a compact Width but a standard length)? AdJust the parking lot deSign
to comply With the wheel bumper standards of SDc 46-120 C Indicate the locatIOn
of accessible parking and ensure compliance With the building code The parking lot
deSign must conform to SDc 46-110 - 125
5 Indicate the location, type, and number of bicycle parking spaces In conformance With
SDc 46-140 - 155
6 The landscape plan must be prepared by a landscape architect, and the entire site
must meet the commercial landscaping standards of SDc 3 2-315,44-100, and 4 7-
190 Show eXisting landscaping on the Site, Including street trees In the adJacent
rlght-of-ways, on the eXlstlOg conditions sheet Show eXisting landscaping to remain
on the site and proposed new landscaping, Including eXisting and/or proposed street
trees, on the site plan List In chart form the proposed types of landscape materials
(trees, shrubs, ground cover) Include In the chart genus, speCies, common name,
quantity, Size, spacing and method of planting Indicate If native plants are to be
used or proVide a written deSCription, Including speCifications, of the permanent
Irrigation system or provIsion of native plants In additIOn, indicate screening in
accordance With SDc 4 4-110
ReVised 1O{25{07
-
-
7 Provide exterior elevations of all bUildings and structures proposed for the
development Site, Including height and conceptual floor plans
8 ProVide an on-site lighting plan, Including location, orientation, and maximum height
of ALL exterior light fixtures, both free standing and attached, type and extent of
shIelding, including cut-off angles and type of Illumination, wattage, and luminous
area, and a photometric test report for each light source Please note that on-site
lighting must conform to the standards of SDc 4 5-100
Additional comments not related to the completeness of the application:
. The site must conform to the standards of SDc 4 7-190 for professional offices In
reSidential zOning districts
. The site IS within the 2-5 year Time of Travel Zone (TOTZ) for the 16th and Q Street
wellhead Submit a DWP Overlay District Development ApplicatIOn or a letter
requesting exemption from DWP requirements concurrently With the complete Site
Plan ReView submittal Contact Amy chlnltz at 744-3745 for more Information on
what to Include In the letter or application
. Please be aware of the new SDc and application forms
ReVised 10/25/07
- I _
ANY REQUIRED ADDITIONAL. MATERIALS, APPLICATIONS OR
PERMITS
,
,
I
IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS OR
APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT THE APPLICANT SHOULD
CONSIDER UTILIZING EITHER THE DEVELOPMENT ISSUES MEETING OR THE PRE-
APPLICATION REPORT FOR MORE DETAILED INFORMATION
Applicable Not
Applicable
o [gJ
o [gJ
o I2l
I2l 0
o [gJ
o I2l
o [gJ
[gJ 0
o [gJ
o [gJ
ReVised 10/25/07
Where a multi-family development IS proposed, any additional
materials to demonstrate compliance With SDc 3 2-240
Riparian Area Protection Report for properties located Within 150
feet of the top of bank of any Water Quality limited Watercourses
(WQLW) or Within 100 feet of the top of bank of any direct
tributaries of WQLW
A Geotechnical Report prepared by an engineer must be submitted
concurrently If there are unstable SOils and/or a high water table
present
Where the development area IS Within an overlay diStrict, address
the additional standards of the overlay district
If five or more trees are proposed to be removed, a Tree Felling
Permit as specified In SDc 5 19-100
A wetland delineatIOn approved by the Oregon DIVISion of State
Lands must be submitted concurrently where there IS a wetland on
the property
Any reqUired federal or state permit must be submitted
concurrently or eVidence the permit application has been submitted
for review
Where any grading, filling or excavating IS proposed With the
development, a Land and Drainage Alteration permit must be
submitted prior to development
Where applicable, any DiscretIOnary Use or Variance as speCified In
SDc 5 9-100 and 5 21-100
An Annexation application, as speCified In SDc 5 7-100, where a
development IS proposed outSide of the city limits but Within the
City's urban service area and can be serviced by sanitary sewer
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Transportation Engineer: Gary McKenney Case#: PRE2008-00009
Applicant: Stuart E Gourly
TRANSPORTATION
o Right-of-Way Approach Permit application must be provided where the property has
frontage on an Oregon Department of Transportation (ODOT) facility
Complete Incomplete See Transportation
Note(s)
[gj
o
Copy of ROW Approach Permit Application
o Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer In
accordance WIth SDc 42-105 A 4 Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic Impacts and mitigation of a development on the City's
transportation system In general, a TIS must explalO how the traffic from a given
development affects the transportation system In terms of safety, traffic operations,
access and mobility, and Immediate and adjOining street systems A TIS must also
address, If needed, City, Metro Plan, and state land use and transportation policies and
objectives
Complete Incomplete See Transportation
Note(s)
[gj
o
Traffic Impact Study
o Site Plan
Complete Incomplete See Transportation
Note(s)
o
[gj
Access to streets, alleys, and properties to
be served, including the location and
dimenSions of eXisting and proposed curb
cuts and curb cuts proposed to be closed
o Improvement and Public Utilities Plan
Complete Incomplete
See Transportation
Note(s)
1
Location and type of eXisting and
proposed street lighting
Location, width, and construction material
of all eXisting and proposed sidewalks,
sidewalk ramps, pedestrian access ways,
and trails
Location, widths (of paving and rlght-of-
way) and names of all eXisting and
proposed streets, alleys, dedications, or
o [gj
o [gJ
2
o
[gj
3
ReVised 10/25/07
~
!j]
other nght-of-ways within or adJacent to
the proposed development, Including
ownership and maintenance status, If
applicable
Location of eXisting and reqUired traffic
control devices
Transportation Notes:
1 Show eXisting street lighting
2 Show all eXisting above-ground Items Within the Market Street nght-of-way
3 Show the other half of Market Street opposite the site to the east (curb, cutter,
dnveways etc )
Additional comments not related to the completeness of the application:
.
Revised 10/25/07
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Engineer: Jesse Jones Case#: PRE2008-00009
PUBLIC WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete Incomplete See PW
Note(s)
ISJ 0 Prepared by an Oregon licensed Landscape Architect
or Engmeer
ISJ 0 VICInity Map
ISJ 0 The name, location, and dimenSIons of all eXlstmg site
features Including bUildings, curb cuts, trees and
Impervious surface areas, clearly indicating what IS
remaining and what IS being removed For eXisting
structures to remain, also Indicate present use, Size,
setbacks from property lines, and distance between
bUildings
0 ISJ 1 The name, location, dimenSions, direction of flow and
top of bank of all watercourses and required riparian
setback that are shown on the Water Quality limited
Watercourse Map on file In the Development Services
Department
D ISJ 2 The lOO-year floodplain and flood way boundaries on
the Site, as speCified In the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of Map
Amendment or Letter of Map ReVISion
ISJ 0 The Time of Travel Zones, as speCified In SDc 3 3-200
and delineated on the Wellhead Protection Areas Map
on file In the Development Services Department
ISJ 0 PhYSical features Including, but not limited to trees 5"
In diameter or greater when measured 4 1/2 feet above
the ground, Significant clusters of trees and shrubs,
riparian areas, wetlands, and rock outcropplngs
ISJ 0 SOIl types and water table Information as mapped and
speCified In the SOils Survey of Lane County A
Geotechnical Report prepared by an Engineer must be
submitted concurrently If the Soils Survey mdlcates
the proposed development area has unstable SOils
and/or a high water table
ReVised 1O{25{07
o Improvement and Public Utilitres Plan must be In compliance with the regulatlon~ of
SDc SectIOns 5 17-100,4 1-100,42-100, and 4 3-100 and must Include the follOWing
Information
Complete Incomplete See PW
r8l 0 Note(s)
0 r8l 3
r8l 0
o
r8l
4
Prepared by an Oregon licensed CIVil Engineer
Location and Width of all eXisting and proposed
easements
Location of eXisting and required power poles,
transformers, neighborhood mailbox Units, and Similar
public faCilities
Location and size of eXisting and proposed utilities on
and adJacent to the Site, Including sanitary sewer
mains, stormwater management systems, water
mainS, power, gas, telephone, and cable TV
Indicate the proposed connection pOints
0 Grading and Paving Plan
Complete Incomplete See PW
Note(s)
r8l 0 Prepared by an Oregon licensed CIVil Engmeer
0 r8l 5 PlantlOg plan prepared by an Oregon licensed
Landscape Architect where plants are proposed as
part of the stormwater management system
r8l 0 Roof drainage patterns and discharge locations
r8l 0 Pervious and Impervious area drainage patterns
r8l 0 The size and location of stormwater management
systems components, Including but not limited to
drain lines, catch baSinS, dry wells and/or detention
ponds, storm water quality measures, and natural
dralnageways to be retained
r8l 0 EXisting and proposed spot elevations and contours
lines drawn at 1 foot Intervals (for land With a slope
over 10 percent, the contour lines may be at 5 foot
Intervals)
0 r8l 6 Amount of proposed cut and fill
o Stormwater Management System Study - proVide four (4) copies of the study With
the completed Stormwater Scoping Sheet attached The plan, calculations, and
documentation must be consistent With the Engineering DeSign Standards and
Procedures Manual
Complete Incomplete See PW
Note(s)
~ 0 Scoplng Sheet and attached Stormwater Management
System Study
ReVised 10/25/07
PW Notes:
1 Provide the name, location, dimensions, direction of flow and top of bank of all
watercourses and required riparian setback that are shown on the Water Quality Limited
Watercourse Map on file rn the Development Services Department
2 Provide the 100-year floodplain and floodway boundaries on the site, as speCified rn
the latest adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map
Amendment or Letter of Map ReVISion
3, Provide a 7 0' P U E along the Centennial Blvd and Market St Frontage
4, Show sanitary sewer Irne and connection pOint for the eXlstrng buildrngs
5 The plantrng plan must be prepared by an Oregon licensed Landscape Architect
where plants are proposed as part of the stormwater management system
6 Provide proposed amount of cut and fill
Additional comments not related to the completeness of the application:
. The trash enclosure must be covered, hydraulically Isolated and drained to the
sanitary sewer
Rev,sed 10/25/07
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
Deputy Fire Marshal: Gilbert Gordon
Case #: PRE2008-00009
FIRE
o SIte Plan
Complete Incomplete See Fire
Note(s)
[gJ
E;J
On-site vehicular Circulation
o Improvement and Public Utilities Plan
Complete Incomplete
See Fire
Note(s)
1
Location of eXisting and required fire hydrants and
similar public facilities
~ r?,Q
Fire Notes:
1 Technically, the plans are Incomplete since the water supply IS not shown However,
the water supply (fire hydrant) IS not reqUired to be shown for Just a pavement
project and therefore IS not applicable to this proposed project
Additional comments not related to the completeness of the application:
Rev,sed 9/24/07
, '
"
THIS APPLICATION IS:
o COMPLETE FOR PROCESSING
[gJ INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
~CJ~
~
~lsl og
Date
This is not a decision on your application. Springfield Development Code Section 5 4-
105 and Oregon ReVised Statutes 227 178 require the City take final action on a limited land
use deCISion within 120 days after the application IS deemed complete The 120-day
processmg period for this application beginS when all the missing Information IS submitted or
when you request that the City proceed Without the Information You must Indicate by either
signing thiS form or by submitting a written response to the City Within seven days of the
date of thiS form asserting your IOtentlOns regarding the proVIsion of the missing information
If you IOdlcate herein or In your written response that the missing Information Will be
submitted, then you have 180 days from the date the application was submitted for Pre-
Submittal ReView to proVide the City With the missing Information If you refuse to submit
the missing information, then upon receipt of the full application packet and processing fee,
the City Will deem the application complete for purposes of starting the 120-day clock and
begin processing the application No new information may be submitted after the start of
the 120-day period unless accompanied by a request for an extension of the 120-day
processing time Upon receipt of a request for extenSion, the City may extend the 120-day
period for a reasonable period of time The City may also require additional fees If the new
Information IS submitted after the Notification to Surrounding Property Owners IS sent out
and a second notification IS reqUired or If the new Information substantially affects the
application proposal and additional review IS reqUired
I, the owner/applicant, intend to submit all missing items indicated herein to the
City within the 180-day timeline,
ReVised 10/25/07