Requirements for Tours of Theater Construction Site on June 4th
. Draw up and submit Emergency Plan to Joe Wicks in Fire Department
. Provide illuminated exit signage at required exits,
. Protect all pits by installing orange construction "netting" around areas a
minimum of 4-5' around area and providing personnel at the area at all times the
tour is in progress.
. Install 2 x 4 rails down all aisles adjacent to pit. Rails should be between 30" and
36" in height with one intermediate rail.
. Protect all exp:Osed rebar by installing caps,
. Bend back all exposed rebar
. Provide an ADA ramp at the alley exit. This ramp can be a portable ramp, The
alley needs to be blocked off during the event to prevent any vehicle traffic,