Loading...
HomeMy WebLinkAboutPermit Building 1996-1-10 (2) '!J COMMERCIALIINDUSTRIAL. PERMIT APPLICATION s~ . o. .:::8/"_ Y6: JOB NUMBER ~~_, INSPECTION LINE: 726.3769 OFFICE: 726,3759 :.. 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: --:;;;.2 / M~//V?r ASSESSORS MAP- /'7~3-~?~ ~/ OWNER: ~~ 4A;.?/~. ?7~h ~R ~ A?:> 5~;Z::--L /':) . STATE: ~ . ZIP ~2D:t!!... DESCRIPTION OF WORK: ~ K-r.?.,z::- ~ 2:;::? h> ". C:::;:~22..# .A9"~~,a. C'r:. NEW REMODEL /'; ~~cc- l- DEM~ISH OTHER VALUE: .::Z~<::E TAX LOT: J<t:;:c::>c>______.. PHONE: ~ '>' 7' ~/"Z~ ADDRESS: CITY: NAME ADDRESS , . PHONE ARCHITECT: CONTRACTOR'S NAME GENERAL: At... ~~ ~h/.'_ ~ I' , PLUMBING: MECHANICAL: ELECTRICA' . .' CONST. ~...e7~ CONTRACTOR. EXPIRES . j'/~ ,2Z':~~9-:Z~ ?~?__'Y/.?? PHONE I . PLUMBING I MECHANICAL I I NO. I FEE I CHARGE 1.0 I I F.EE_j_CHABG.i I I Furnace/burner & vent Single Fixture < '00.000 BTUs I Relocated Bldg. I I I I Furnace/burner & vent I I (new fix. addtll > 100,000 BTUs I Water Service I I I I Floor furnace and venl 1 , II. I Sanitary sewer I I I Suspended wall or lIoor I ft. mounted unit healer I Storm Sewer I I I Appliance Vent 1 I It. SCP,lr<l(C I I I I Stationaryevap. I j Back flow DevIce cooler I I I I Venl Fan/Single I I ducl 'I I I I Vent System apan I I from AC or hlg. I I I I Mechanical exhaust I I hood and duel I I I I I I I 1 I I Permit Issuance -"0,00 I I TOTAL PERMIT I I TOTAL PERMIT -I - OFFICE USE - HANOICAP ACCESS: OUAD AREA- . OF BLDGS: LANO USE: FLOOO PLAIN:______., ZONING: . OF UNITS' OCCY GROUP' . OF STOAIEf' CONSTR, TYPE'- HEAT SOURCE: LIGHTING POWER BUDGET: WATER HEATER: SO, FT. $/SO. FT. VALUE '* SO. FTG MAIN SO, FTG ACCESS SO, FTG OTHER X X X TOTAL VALUE OF PROJECT PLAN CHECK FFF RCPT' DATE _, . __ BY I BUILDING PERMIT 15% State I'?.' Surcharge 7<7 I MECHANICAL" I, 15% Stata I' . Surcharoe I PAVING I ~g': y-~ PLUMBING I . 7 ~ 15% State ' /_ /2;:; SurcharQe' . I FENCE VAt IJI= ~ SiOEWALK-., I FT. FT, I DEMOLITION ." I SUBTOTAL PERMITS I SYSTEMS __.. ..QEVELOPMENT I 1__.., ....._......... o_...._u_o._ Lfj..5? I: I I I I CURBCUT , " TOTAL PERMIT FEES I EXCLUDING ELECTRICAL ~\ REQUIRED INSPECTIONS It Is the responsibility of the permit holder 10 see t~at all Inspections are made at the proper time. To request an Insp~ctlon, call 726.3769 (recorderi. state your City designated jOb number. job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day. requests made after 7:00 a.m. will be made t,he following work day. SITE INSPECTION: To be made after excavation, but prior ~? setup of forms. . . .l UNDERSLAB PLUMBING, ,ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & . MECHANICAL: No work Is to. be covered until these, ' insp~ctlons have been made and approved. PAVING: After gravel Is In place but prior to placing asphalt or concrete. ATTIC DRAFT STOPS & CURTAIN WALLS ....,. SPECIAL INSPECTIONS: In accordance SeCtion 306 of the State Specialty Code, a special 'Inspector shall' be employed . by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms afe erected, all steel In place, but." prior to placing coner'ete. '., _.____ .'FIREPLACE: Prior to placing facing materials and before framing Inspactlo'!: CONCRETE SLAB: To be made after all Inslab building service equIpment, conduit, piping, accessories and other ancillary equi pment j lems are in place but before any concrete is placed. FRAMING: To be made after' the roof, all framing, fire blocking and bracing are In place and all pIpes. chimneys and .vents are complete and the rough electrical, plumbing and mechanical are approved. " cSTRUCTURAL CONCRETE: In excess of 2500 P,S,I. (306 a.l) , . STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERFLOOR: Plumbing. eleclrical, mechanical. To be made prior to Installation or floor Insulation, deckIng or Iloor sheathing. INsuLATION & VAPOR. BARRIER: To be made' after all insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) . . . UNOERG'ROUND:. Plumbing.:: electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prlor to covering or filling trenches, . .- " SPRAYED ON FIREPROOFING: U.B.C, Standards 43,6. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.ll & Chapter 29) POST & BEAM: To be made prior to Installation of floor insulation, decking or floor sheathing, LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, InterIor and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U,B,C, STDS. 25,10,11), MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub.base material In place. y STRUCTURAL MASONRY: (306 a.7) . ~/~4/~ ~d~5 ,/Y/'y~ '~~~, :f.(adCil~on to Ih;i~spec" ... tlons specified, the Building Official may make or require other Inspectlons of any' construction work to ensure compliance with the Building, City or Development Code. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Ins'tallation of decking or floor sheathing. A ROOF SHEATHING ANO NAILING: Prior to inslalllng any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. FINAL MECHANICAL SITE PLAN REVIEW BOARD: Must be reques,ted 2 days In advance of the date you wish Inspection. All proJect conditions such as landscaping, parking lot st,lplng, etc. must be completed before requesting this Inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the .premlses. FINAL PLUMBING FINAL ELECTRICAL .. FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' . PLANS REVIEWED BY DATF By signature. I st,te and agree, that I have carefully examined, the completed applicatIon and do hereby certify that all Information herein is true and correct, and I further cerli fy that any and all work performed shall be done In accordance with the OrdInances of the City of Springfield. and the Laws ollhe Slale of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety DivIsion. I further certify that only contractors and employees who are in compliance with GRS 701.055 will be used on this project. i furttH:n agree to ensure that all required inspections are requested at the proper time, thatproject address Is readable from the street, that the R ard Is located at the nt of the property, and the approved set of ,plans will remain on the site at all times during nstru Ion. ~ -ft( L.~ 1Iw. Date /-IO-t?6 VALIDATION: AMOUNT RECEIVED: 4/. 5"'7 RECEIPT ': 2"~"3""3 DATE PAID' RECEIVED BY: /-/p.~ /2'~ P'? ".;., j