HomeMy WebLinkAboutPermit Mechanical 1996-7-19 (2)
CO MM ERCIALlI N DUSTRIAL.
PEF.\MIT APPLICATION
.:
JOB NUMBER
9007f52.
ASSESSORS MAP:
~
LOCATION OF PROPOSED WORK' 30 J YY\."I. i r\ sf,
/7D3 :< S- ,7/
~t......-e.J
)OJ(ha:~i .
oS '(;"..qr;;~\J
INSPECTION LINE: 726.3769
OFFICE: 726.3759
J '3'"[wJ~ ~JM
'v
TAX LOT: ./2.7e-D
225 Fifth Street, Springfield, Oregon 97477
OWNER:
"3',,,,,
PHONF- S- '-( (-7 '2-b - '7 r?6
ADORE":""
CITY'
STAT'"
n (2. . ZIP' C{ 7\f 77
'NEW
REMODEL
e-.r(>/tir,vy. (')Id. klc....""=',.)~J,:,.:..- (C1""-td-<'\ AIr (2.o~ftor
~ t::IIl17f .^P{iI!. Da '<-..4-- N ., ... -r u,..J f4-c 'f:- .
ADDITION DEMOLISH , OTHER' VALUE:
~
DESCRIPTION OF WORK-
ARCHITECT'
CONTRACTOR'S NAME
ADDRESS
ADDRESS Lf 0 ~. ("et PHONE
G <<..J P j o-e-
CONST.
CONTRACTOR · EXPIRES PHONE
NAME
GENERA' .
PLUMBING:
MECHANICAL: ,,At, .(~\t..t II '.s
He.. '1 )"c
v
YJlfJ
OI'1t1ALJ,'L So~ 7 Lfl-lv V,r
--, (' r _i?4-"2.r7<9?) I '-lulu.
ELECTRICA' .
PIIlMBINCl MeCHANICAL
NO. FEE r.HARClE I ..n """
Single Fixture ~ Furnace/burner & vent
< 100.000 BTUs
Relocated Bldg. I Furnace/burner & vent
(new fix. addUl > 100.000 BTUs
Water Service I Floor furnace and vent
It.
I Sanitary Sewer I Suspended wall or floor
fl. mounted unit heater
I Storm Sewer I Appliance Vant
fl. separate
I I Statlonaryevap. ,
Backflow Device cooler
i I Vent Fan/Single
duct
, I I Vent System apart
from AC or htg.
I I MechanIcal exhaust
hood and duct
I I
I I Permit Issuance
I TOTAL PERMIT I TOTAL PERMIT
"''-10.0(21:
,M;~
I
I
$10.00
1';:;>."0
- OFFICE USE -
HANDICAP ACCESS:
FLOOD PLAIN:
ZONING'
LIGHTING POWER BUDGET:'.
WATER HEATER'
aUAD AREA'
. OF BLDGi'"
OCCY GROUP'
LAND USE'
. OF UNIT'"
.
. OF STORI"'"
CONSTR. TYP'"
HEAT SOURCE:
sa. FT.
$/SQ. FT.
VALUE
sa, FTG MAIN
sa. FTG ACCESS
sa. FTG OTHER
X
.
TOTAL VALUE OF ,PROJECT
*
X
.X
.
PLAN CHECK FF"
RC PT'
DATF
BY
1 BUILDING PERMIT
15% Slate
Surcha!!l.e
I MECHANICAL
( 1 ~ 1L'-'x:.f=.
15% State 7'- ,.;-
Surcharoe I J -f-I#'f I
I PAVING
. PLUMBING
. DEMOLITION
/5,0"00"
/tO~ 0 p
1,2/0
5% State
SurcharQe
FENCE
VALl'E ~
SIDEWALK
CURBCUT
FT.
SUBTOTAL
PERMITS
SYSTEMS
, DEVELOPMENT
FT.
"TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
2&,2D
/
I I
I.
UNDERSLAB PLUMBING,
. ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
ROUGH PLUMBING,
ELECTRICAL & .
MECHANICAL: No work Is to
be covered until these
Inspections have been made
and approved. . J,
ATTIC DRAFT STOPS &
CURTAIN WALLS'
FOOTINGS & FOl1NDATIONS:
To be made after trenches are
excsvated and forms sre
erected, ell steel In place, but'
prior to I1laclng concrete. . .
, '
FIREPLACE:' Prior to placing
facing materiels and before
, framlnglnspectlory.. .
I FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
,
. CONCRETE SLAB: To be
. made after ell Inslab building
service ,equipment, conduit,
piping, eccessorles and other
ancillary equipment Items are
In place but before any
concrete Is placed.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied,
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor Insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
POST & BEAM: To be made
prior to Installation of floor
Insulation. decking or floor
sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior. is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking cr floor sheathing.
SIDEWALK'& DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub.base material In
place.
MASONRY: Steel location,
bond ,beams grouting or
verticals In accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
PAVING: After gravel Is in
place but prior to placing
asphalt or conc~ete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
'" 'speclal inspactor shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
I STRUCTURAL CONCRETE: in
, excess. of 2500 P.S.I. (306 a.l)
STRUCTURAL WELDS;
Performed on the Job. (2722 f)
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.c.
Standards 43-8.
"
SPECIAL GRADING, "
EXCAVATION AND FILLING;
Ourlng earthwork. (306 a.ll &
Chapter 29)
GLU.LAM BEAMS: Inspection
Certificate by an approved
. agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.c.
STDS. 25-10,11).
STRUCTURAL MASONRY: (306
a ~\ r- ~ _ -.
Vd \l.{~' ; S"l[ '23.())
r.
c::1.e'k /hJ~
"In addition to the inspec.
tlons specified, the Building
Official may make or require
other Inspections of any
construction work to 'ensure
compliance with the Building,
City or Development Code.
FINAL PLUMBING
-------------------------------------------------------
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical.
mechanical and Fire Department Inspections are made and .
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
and posted on Ihe premises.
FINAL ELECTRICAL
x
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REViEWED BY
DATF
By signature, I slate and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certtfy that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield. and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In comptlance with ORS 701.055 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that proJect address Is readable from the
street, that the permit card Is located al the front of the property, and the approved set of .plans will remain on the site at all
times during construction.
Slgnatur. ~Nv.U, "') ~ bate ~:.. I q -1/.
u
VALIDATION:
~?O
'?-2-C6 J
AMOUNT RECEIVED:
RECEIPT N'
DATE PAID'
RECEIVED BY'
~1/76 .
g~
l